02 ACWA Power Berlin-EWK Final
02 ACWA Power Berlin-EWK Final
02 ACWA Power Berlin-EWK Final
Balance 50% is BOP – TSK; cost competitive EPC + Dubai has an excellent
industrial platform + competitive construction capability – While no
minimum local content was stipulated; the maximization of local content
capex at over 60% was also a contributor to this competitive tariff.
Aprox 50% panels + inverter – Using First Solar Panel : well recognized
technology (efficiency) leadership + cost leadership
DEWA’s clear policy on renewable energy targets and their track record on mainlining
a stable policy environment is what contributed significantly to achieve this tariff.
1.5 The Ability for renewable energy to be now cost competitive
will require a rethink on what relevant policies we should focus on?
3100
Considering true cost of generation; at this
city 350MW (12%) must be delivered by
3000
Solar PV TODAY. Alternative:
provide oil at US$ 28 per barrel each
2900
and every day for the next 25 years; or
gas at US$ 7 /MMBTU each and every
2800
day for the next 25 years
2700
2600
2500
2400
2300
2:30
0:30
1:00
1:30
2:00
3:00
3:30
4:00
4:30
5:00
5:30
6:00
6:30
7:00
7:30
8:00
8:30
9:00
9:30
15:00
19:00
10:00
10:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:30
16:00
16:30
17:00
17:30
18:00
18:30
19:30
20:00
20:30
21:00
21:30
22:00
22:30
23:00
23:30
2.1 Which specific industrial needs do Renewable Energy
already meet in a cost-efficient way?
Paddy Padmanathan
Dubai | UAE
T: +971 4 5090555
F: +971 4 3859625
________________________________