Punctuality Performance (BPL) From:22-Oct-2019 To 22-Oct-2019

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

PAM / DV / BPL 2 Punctuality Performance [BPL] From:22-Oct-2019 to 22-Oct-2019 23-Oct-2019 01:39

% 2019 % 2018 % Financial year


Train Type Sch. Rpt. Not Rpt. BT RT MKUP NLT LT 2019-20 2018-19
22-Oct Upto 22-Oct 22-Oct Upto 22-Oct
Upto 22-Oct Upto 22-Oct
BG-Mail Express
DRNT 4 4 1 1 1 1 75.00 84.78 100 76.74 75.42 73.41
GBR 2 2 1 1 100 87.50 100 90.32 90.78 86.05
JSH 2 2 1 1 100 84.09 50.00 85.36 75.81 92.03
MEX 77 76 15 31 13 4 13 82.89 87.52 82.85 82.00 81.92 79.62
RAJ 4 4 2 1 1 75.00 86.00 100 85.52 85.44 81.85
SHT 2 2 1 1 100 93.18 100 84.09 86.31 74.63
SUF 98 97 1 22 27 15 12 21 78.35 85.77 86.31 77.28 78.16 70.11
SUVD 3 2 1 1 1 50.00 70.58 100 92.30 79.44 94.78
Total: 192 189 2 42 59 32 19 37 80.42 86.44 85.23 79.70 80.04 74.78
BG-Passenger
HSP 3 3 1 2 33.33 45.60 57.14 51.42 48.78 51.31
MEMU 4 4 1 1 2 50.00 79.54 100 70.23 69.24 69.82
PAS 44 44 5 5 3 12 19 56.81 64.14 66.66 69.65 65.06 71.16
Total: 51 51 5 6 4 13 23 54.90 63.31 66.67 68.48 63.34 68.36
All BG: 243 240 2 47 65 36 32 60 75.00 81.36 81.06 77.36 76.47 73.32
 
Grand Total: 243 240 2 47 65 36 32 60 75.00 81.36 81.06 77.36 76.47 73.32

Exceptional Trains Detail Rescheduled Trains


BG Detail
MEX PAS SUB BG
CANCELLED       MEX PAS SUB
SHORT TERMINATED      
3-12144
DIVERTED 15646     2-51187
12687  
ORIGIN CHANGED       51603
15547

PRIMARY MEX PASS SUVD RAJ DRNT MEMU HSP SUF Total Total
ACP 3 0 1 0 0 1 0 3 8 12141,12185,12192,11059,13202,15547,82356,61633
DCW 0 0 0 0 0 0 0 1 1 12512
DDSL 1 0 0 0 0 0 0 0 1 19608
DELC 0 0 0 0 0 0 0 1 1 12792
6 9 0 0 1 0 1 11 12191,12198,12293,12410,12541,12650,12652,12716,12780,12808
ENG 28 22187,22416,11016,11704,14814,15018,15063,19810,51607,51608
51609,51610,51611,51612,51684,59385,59386,01718
ORL 1 8 0 0 0 1 0 0 10 11072,51188,51683,51686,51688,51811,51830,51884,51885,61631
PATH 0 1 0 0 0 0 0 0 1 51829
RUNO 0 0 0 1 0 0 1 4 6 12150,12628,12687,12721,22221,01661
S&T 1 0 0 0 0 0 0 2 3 12183,12615,11015
TFC 0 1 0 0 0 0 0 0 1 51603
TOTAL 12 19 1 1 1 2 2 22 60

KNW 09:02-09:10 8
HD 10:20-10:46 26

11015  MEX ET 11:55-12:05 10


LTT 22:45 LT ET-BPL 22"HBJ DETAIN DUE TO STARTER & ADVANCE
1 HBJ 13:36-14:08 32 1.P.BPL ST/22
GKP 07:05 4 HBJ- SIGNAL FAILED FROM 14:02 TO 14:42.
21-Oct-2019 BPL 14:00-14:38 38
BAQ 15:12-15:57 45
BINA 16:30-16:42 12

2 11016  MEX LT BINA 09:55-11:24 89 1.S.BPL ET-BPL CNST/7 07"BPL REGULATE DUE TO BPL-HBJ UP ROAD P&T
BAQ 10:37-12:23 106
BPL 12:00-13:34 94
BLOCK GIVEN FROM 12:25 TO 13:35 CLEAR AT
GKP 19:00 HBJ 12:17-13:58 101 BPL-HBJ
13:45.
LTT 04:20 13
21-Oct-2019 ET 13:55-16:10 135 ET-BPL
2.P.BPL ENG/15 15"BKA PRE 12541 BOTH TRAIN LOR IN ENGG CD.
BKA-
HD 15:18-17:24 126
KNW 17:15-18:57 102

10"ACP KNW A/S FROM 22:01 TO 22:11 AT KM


11059  MEX KNW 20:10-22:01 111 KNW-ET 570/06 & 03"RGS + 10"KKN L/C 82356 AHD WHICH
1.P.BPL ACP/26
LTT 10:55 LT MTA-KKN DETN ACP KKN TO BRI AT KM 639/02 ECR 17228
3 HD 21:24-23:29 125 FROM 22:45 TO 23:00 & 03"RGS.
CPR 21:05 41
22-Oct-2019 ET 22:45-01:17 152 KNW-ET
2.N.BPL PATH/15 15"BRI TO ET L/C 82356 AHD.
BRI-ET

BINA 05:35-05:25 -10


BAQ 06:14-06:14 0

11072  MEX BPL 07:40-07:27 -13


KAMAYANI EXPRES 72"MTA REGULATE LINE CLEAR
BSB 15:50 LT KNW-ET
4 HBJ 07:57-07:50 -7 1.P.BPL ORL/72 EX KNW DUE TO ENGG BLOCK GIVEN BY BSL DIV
LTT 22:50 67 MTA-MTA
BAU-AGQ,SECTION.
21-Oct-2019 ET 09:30-09:43 13
HD 10:31-10:57 26
KNW 12:45-13:52 67

SHR
11704  MEX 01:25-01:12 -13
N 10"BET TO BINA L/C 12617,12625,12269 AHD DUE
DADN 20:20 LT BPL-BINA
5 1.P.BPL ENG/10 TO CD SR 30 KMPH KIKA YD FOR POINT 116-B
REWA 12:15 9 BAQ 02:57-03:45 48 BET-BINA
INSERTION WORK.
21-Oct-2019 BINA 04:45-04:54 9

LTT-PPTA EXPRESS 12" KNW-MTA ACP KM 568/32


12141  SUF KNW 08:45-08:48 3 KNW-ET
1.P.BPL ACP/20 CR-09266 CNY FROM 08:51 TO 09:01(+2" RGS)+8"
LTT 23:35 LT MTA-CAER
6 HD 09:53-10:15 22 TLV-CAER LCA 13202 ALL REP OF ACP,
PPTA 04:45 21
21-Oct-2019 KNW-ET
ET 11:05-11:29 24 2.S.BPL DELC/2 02" BP TEST BY DR ET TO GRO,
ET-ET

12150  SUF ET 15:10-14:35 -35 32"DRA-DKI DETAIN AT KM-720/21(DKI H/SIGNAL)


DNR 22:55 LT KNW-ET FROM 15:24 TO 15:55 IN CRO HENCE DUMMY PLUG
7 HD 16:12-16:39 27 1.P.BPL RUNO/32
PUNE 05:30 22 DRA-DKI BROKEN C/NO-CR 99063 A-2 SAME ATTEND &
21-Oct-2019 KNW 17:50-18:12 22 START.

BPL-BINA 02"BPL DR TO START + 02"BPL TO NSZ BP TEST +


1.N.BPL DELC/7
BPL-NSZ 03"LOR BPL TO NSZ.
12183  SUF BPL 19:15-19:17 2
BPL-BINA
BPL 19:15 LT 2.N.BPL PATH/5 05"SUW TO SMT L/C 81453 & ATLP AHD.
8 BAQ 20:21-20:46 25 SUW-SMT
PBH 09:00 14
22-Oct-2019 BINA 21:15-21:29 14 10"BHS ADMIT ON MID LINE & PASS VIA PF-02 DUE
BPL-BINA
3.P.BPL ST/10 TO PF-01PF-01 DN TRACK NO 208 FAIL FROM 19:42
BHS-BHS
TO 20:40.
ET-BPL
1.P.BPL ACP/3 03"ACP HBJ A/S FROM 22:00 TO 22:03 COACH N/T.
HBJ-HBJ
HBJ 22:00-22:03 3
12185  SUF ET-BPL
2.N.BPL PATH/2 02"BPL L/C 12723 AHD.
HBJ 22:00 LT BPL 22:15-22:17 2 BPL-BPL
9
REWA 08:00 7 BAQ 23:27-23:40 13 BPL-BINA
21-Oct-2019 3.N.BPL TFC/1 01"BHS HEAVY RUSH.
BHS-BHS
BINA 00:25-00:32 7
BPL-BINA
4.N.BPL DELC/2 02"BINA DR TO START.
BINA-BINA

BINA 23:05-23:01 -4

12191  SUF BAQ 23:46-23:51 5


10"MABA TO BAQ L/C 14624,19306 AHD ALL REP
NZM 14:15 LT BPL-BINA
10 BPL 01:15-01:30 15 1.P.BPL ENG/10 CD SR 30 KMPH CLHT-BET FOR DESTRESSING
JBP 07:15 6 MABA-BAQ
WORK.
21-Oct-2019 HBJ 01:32-01:49 17
ET 03:30-03:36 6

ET 21:35-21:24 -11

12192  SUF HBJ 23:17-23:44 27


JBP 17:30 LT BPL-BINA 07"ACP SUW TO BVB ACP 00:25 TO 00:32 AT KM
11 BPL 23:52-00:05 13 1.P.BPL ACP/7
NZM 11:35 4 SUW-BVB 849/24 F/SLR.
21-Oct-2019 BAQ 01:06-01:30 24
BINA 02:10-02:14 4

12 12198  SUF LT GWL 06:20-06:20 0 1.N.BPL BINA-GUNA DELC/2 02"BP TEST GUNA-MABN
SVPI 08:18-08:14 -4
GUNA-MABN
GUN
10:35-09:59 -36 22"PGA DETAIN DUE TO PGA-PIGT/YD ENGG
A
BLOCK FROM 09:15 TO 11:15 FOR TRR+WELDING,
GWL 06:20 ASK BINA-GUNA
11:30-11:48 18 2.P.BPL ENG/52 +30"KIKA-BET LCA DD SINCE MABA-KAH UP ROAD
BPL 15:00 59 N PGA-BINA
ENGG BLOCK FROM 13:30 TO 15:30 FOR DUO
22-Oct-2019 BINA 13:00-13:22 22 MACHINE WORK.
BAQ 13:41-14:38 57 BPL-BINA
3.N.BPL TFC/7 07"BINA-KIKA LCA AECS.
BINA-KIKA
BPL 15:00-15:59 59
12293 KNW-ET 08"MTA L/C 51157 AHD DETN FOR CD SR 75,40
KNW 00:50-00:51 1
DRNT 1.P.BPL ENG/8
LT MTA-TLV KMPH C/O BETN MTA-TLV FOR BCM WORK.
13 LTT 17:25 HD 01:57-02:05 8
12 KNW-ET
ALD 12:45 2.N.BPL DCW/4 04"ET C&W D/BOARD.
ET 02:55-03:08 13 ET-ET
21-Oct-2019
BINA 00:30-00:29 -1
BAQ 01:08-01:25 17 BPL-BINA 10"CLHT L/C 12688 AHD DETN FOR CD SR 30 KMPH
1.P.BPL ENG/10
12410  SUF CLHT-BET BETN CLHT-BET FOR DESTRESSING WORK.
NZM 15:20 LT BPL 02:25-02:39 14 BPL-BINA
14 2.N.BPL PATH/8 08"NSZ L/C 12688,12780 AHD.
RIG 19:00 18 HBJ 02:40-02:54 14 NSZ-NSZ
21-Oct-2019 ET-BPL
ET 04:10-04:25 15 3.N.BPL DELC/8 08"MIG OVER SPEED.
MIG-MIG
JUH 04:24-04:42 18

JUH 22:16-22:57 41

12512  SUF ET 22:25-23:10 45 40"DETN ET DUE TO FI NOT MAINTAIN AT ET


TVC 06:05 LT ET-BPL SIGNAL GIVEN 23:14 TO 23:26 DR NOT START DUE
15 BPL 00:10-01:47 97 1.P.BPL DCW/40
GKP 15:20 40 ET-ET TO AFI NOT MAINTAIN FURTHER START 12715 &
20-Oct-2019 BAQ 01:29-03:00 91 ADM 22126 & PRE 12626.
BINA 02:20-03:41 81

BINA 12:10-12:04 -6
BAQ 12:45-12:45 0

12541  SUF BPL 13:50-13:54 4 08"BRUD TO KNW LCA 12150 DUE TO 12150 ISSUE
GKP 21:50 LT KNW-ET E/C/O AT CKKD-YD AT KM-605/23-21 SR 30KMPH
16 HBJ 14:06-14:13 7 1.P.BPL ENG/8
LTT 04:00 8 BRUD-MTA FOR IMR RAIL ALSO BOTH OBSERVE C/O SR
21-Oct-2019 ET 15:25-15:49 24 30KMPH AT CKKD-YD.
HD 16:30-16:56 26
KNW 18:15-18:23 8

JUH 17:16-17:14 -2
ET 17:25-17:22 -3
12615  SUF
12"SMT TO SORI L/C 12183 AHD BOTH TRAIN PASS
MAS 19:15 LT HBJ 19:01-19:02 1 BPL-BINA
17 1.P.BPL ST/12 VIA MID LINE TO PF-02 AT BHS DUE TO TRACK NO
NDLS 06:30 12 BPL 19:20-19:21 1 SMT-SORI
208 FAIL AT BHS FROM 19:42 TO 20:40.
21-Oct-2019
BAQ 20:40-21:00 20
BINA 21:35-21:47 12

BINA 05:05-05:05 0
NDLS-SBC KARNATAKA EXP 08" HBJ LCA CTA/N +6"
BAQ 05:42-05:51 9 ET-BPL
1.S.BPL ENG/14 MDDP TO BKA LCA NEB SINCE SR 30KMPH C/O
HBJ-BKA
12628  SUF BPL 06:55-06:53 -2 ITKL-ODG FOR DESTRESSING WORK,
NDLS 21:15 LT 10" CRO PRKD-ET KM-743/05 FROM 08:40 TO
18 HBJ 07:11-07:19 8 ET-BPL
SBC 14:00 31 2.P.BPL RUNO/15 08:50+5" MTA KNW LCA 22948 AHD ALL REP OF
PRKD-ET
21-Oct-2019 ET 08:30-08:56 26 CRO,
HD 09:35-10:04 29 KNW-ET
3.N.BPL DELC/2 02" BP TEST BY DR ET TO ETB.
ET-ETB
KNW 11:00-11:31 31

BINA 14:30-15:26 56
BAQ 15:04-16:10 66
12650  SUF BPL-BINA 30"BINA TO BPL LCA 12144(127"),12646(08") ALL
16:15-17:41 1.P.BPL ENG/30
NZM 06:25 LT BPL 86 BINA-BPL TRAIN DUE TO LOST JHS DIV ON ENGG A/C.
19
YPR 19:35 28 HBJ 16:36-18:03 87 ET-BPL
22-Oct-2019 2.S.BPL ACP/8 08" ET UP M/L DETAIN IN ACP AFTER STARTER N/T.
ET-
ET 18:04-19:29 85
JUH 18:14-19:38 84
12652  SUF
LT BINA 16:10-16:02 -8 1.P.BPL BPL-BINA ENG/21 21"BET TO BPL LCA 12138, 22416, 12650, 12646,
20 NZM 07:10
27 BAQ 16:44-16:45 1 BET-BPL 12144, 12650, 12646, 12144 ALL TRAIN LOST ENGG
MDU 02:25
BPL 17:55-18:16 21
HBJ 18:16-18:40 24 A/C IN JHS DIV.
22-Oct-2019 ET-BPL
ET 19:45-19:59 14 2.N.BPL PATH/16 16"ET LCA 19317, START 12138.
ET-
JUH 19:55-20:22 27

JUH 08:06-16:00 474


ET 08:15-16:13 478 08"HBD-BNI DETAIN DUE TO CRO AT KM-765/24
12687  SUF ET-BPL FROM 16:35 TO 16:43,+06"SUW-BVB DETAIN DUE
1.P.BPL RUNO/14
21 MDU 23:35 LT HBJ 09:40-17:47 487 HBD-BNI TO CRO AT KM-844/8 FROM 18:30 TO 18:36 CATTLE
R DDN 04:45 16 BPL 09:50-18:11 501 ON TRACK ADVICED LP OF 11271.
20-Oct-2019 BPL-BINA
BAQ 11:06-19:37 511 2.N.BPL DELC/2 02"BP TEST BPL-NSZ
BPL-NSZ
BINA 12:00-20:10 490

BINA 22:32-23:12 40
BPL 00:20-01:16 56 10"HBJ L/C 14624 AHD DETN FOR CD SR 45 KMPH
12716  SUF C/O BPL TO HBJ FOR FOB WORK + 10"ET PRE 11094
ASR 05:30 LT HBJ 00:36-01:34 58 ET-BPL DUE TO ALREADY LOST ON ENGG A/C + 08"BINA TO
22 1.P.BPL ENG/10
NED 16:00 39 ET 01:55-02:59 64 BPL-ET PAI L/C 12191,14624,19306 AHD ALL REP DUE TO
21-Oct-2019 CD SR 30 KMPH BET YD + 10"DRHI L/C 11094 AHD
HD 03:00-04:23 83 DETN SR 30 KMPH C/O DRHI-BRU.
KNW 04:20-05:39 79

JUH 14:35-14:17 -18


ET 14:45-14:39 -6 BPL-BINA
12721  SUF 1.N.BPL TFC/4 04"SCH-BHS LCA PCMC.
SCI-BHS
HYB 22:30 LT HBJ 16:27-16:32 5
23 07"BAQ-BET DETAIN DUE TO CRO AT KM-933/08
NZM 04:05 10 BPL 16:50-16:50 0 BPL-BINA
21-Oct-2019 2.P.BPL RUNO/7 FROM 18:30 TO 18:37 LOCO CHEACKED BY LP &
BAQ-BET
BAQ 18:04-18:25 21 START.

BINA 19:15-19:25 10

BINA 23:45-23:46 1
BPL 01:30-01:59 29 GOA EXPRESS 30" NSZ TO BPL LCA
12780  SUF BPL-BINA
1.P.BPL ENG/30 15015.12191.12716.14624. ALL TRAIN DETAIN DUE
NZM 15:00 LT HBJ 01:51-02:20 29 NSZ-BPL
TO SR 75/40KMPH C/O AT KIKAYD FOR BCM WORK,
24
VSG 06:45 36 ET 03:05-03:40 35
21-Oct-2019 ET-BPL
2.S.BPL TFC/8 08" PRKD FOR SPARE STAFF.
HD 04:06-04:48 42 PRKD-PRKD

KNW 05:30-06:07 37
12792  SUF
DNR 12:15 LT ET 06:54-06:33 -21 KNW-ET DNR-SC EXP T/O ET BT & M/O JUH BT BUT GPS DSL
25 1.P.BPL DELC/219
SC 21:30 219 JUH 07:15-10:54 219 ET-ET LOCO PICK UP TIME 219" LATE,,
21-Oct-2019
BINA 17:10-17:05 -5
BAQ 17:47-17:50 3 25"KIKA TO BPL L/C 22416,12174,18238 AHD ALL
12808  SUF TRAIN PASS VIA THIRD LINE DUE TO EXTRA ENGG
NZM 08:35 LT BPL 19:10-19:35 25 BPL-BINA CD BINA TO BPL MID LINE KIKA YD 75,40 KMPH C/O
26 1.P.BPL ENG/25
VSKP 18:10 24 HBJ 19:25-19:50 25 BINA-BPL FOR BCM WORK & 30,75 KMPH C/O BHS-SCI FOR
22-Oct-2019 TSR WORK & SUW TO NSZ 30 KMPH C/O FOR
ET 21:00-21:22 22 DESTRESSING WORK.
JUH 21:20-21:44 24

13202  MEX KNW 08:15-08:38 23


LTT 22:15 LT KNW-ET LTT - PNBE EXP 10" MTA- TLV LC AHD 12141
27 HD 09:42-10:33 51 1.P.BPL ACP/10
PNBE 10:30 5 MTA-TLV DETAIN IN ACP KM-568/32 CR 09266 CNY
21-Oct-2019 ET 11:40-12:08 28

BPL 17:25-17:25 0
BAQ 19:13-19:33 20 02"BPL TO NSZ BP TEST + 01"LOR BPL TO NSZ +
13"DWG PRE 12919 + 12"SCI PRE 22161 + 10"BAQ
14814  MEX BINA 20:15-20:41 26 BPL-BINA
1.P.BPL ENG/40 PRE 12687 ALL PRE GIVEN DUE TO TRAIN RUN
BPL 17:25 LT BPL-BAQ
28 ASK WITH GOODS LOCO 32013 + 02"BINA TO MDVK BP
JU 19:50 25 21:46-22:39 53
N TEST.
22-Oct-2019
GUN BINA-GUNA
22:44-23:25 41 2.N.BPL TFC/10 10"MDVK FOR STAFF.
A MDVK-MDVK
RTA 23:40-00:05 25
15018  MEX
GKP 05:30 LT ET 04:20-04:38 18 KNW-ET GKP-LTT EXPRESS 30" CRK PRE 11060.12142 ALL
29 1.P.BPL ENG/30
LTT 18:05 17 HD 06:02-06:53 51 CRK-HD REP OF SR 30KMPH C/O CRK-HD FOR TRR WORK,
21-Oct-2019
KNW 08:15-08:50 35

BINA 00:45-00:46 1
GKP-LTT EXP 15" BINA TO KAH LCA 12410.12688.
BAQ 01:21-01:34 13
BPL-BINA ALL TRAIN OBSERVE SR 30KMPH C/O CHLT-BET FOR
1.P.BPL ENG/25
15063  MEX BPL 02:38-02:52 14 BINA-BPL DESTRESSING WORK,+10" BPL OS LCA 12410 ALL
GKP 05:30 LT REP OF ENGG CD,
30 HBJ 02:52-03:07 15
LTT 16:00 37 ET-BPL
2.S.BPL TFC/8 08" CHQ LCA LUR/N AHD,
21-Oct-2019 ET 04:25-04:52 27 CHQ-CHQ
HD 05:24-06:01 37 ET-BPL
3.N.BPL PATH/5 05" ET ADM 12803,
ET-ET
KNW 06:50-07:28 38

KNW-ET
1.N.BPL DELC/2 02"ET TO ET/B BP TEST.
ET-ETB
15547  MEX ET 17:55-19:05 70 KNW-ET
2.N.BPL PATH/11 11"ET P/C/H/UP ST 12646.
31 JYG 18:10 LT ET-ET
HD 19:10-20:54 104
R LTT 07:30 37 KNW-ET 10"DKI TO BPF L/C PSSS AHD DETN IN CRO AT KM
21-Oct-2019 3.N.BPL RUNO/10
KNW 20:40-22:27 107 DKI-BPF 715/10 FROM 19:55 TO 20:00.
KNW-ET 14"BRI TO KKN ACP AT KM 643/5 FROM 21:12 TO
4.P.BPL ACP/14
BRI-KKN 21:26 COACH N/T.

RTA 05:40-05:36 -4
10" DRIVER STOP ON TH SIGNAL AT SRKI AND
19608  MEX GUN BINA-GUNA PICK UP ASSITANT LP OF N/APLS WITHOUT ANY
06:08-05:58 -10 1.P.BPL DDSL/10
MDJN 18:55 LT A SHDR-SHDR INFORMATION,FROM 09:00 TO 09:10.LOCO NO-
32
KOAA 17:15 16 ASK 06:59-08:04 65 16759.
21-Oct-2019 N BINA-GUNA MDJN KOAA EXP 06" ACP ON PIA ON TH SIGNAL
MDV 2.S.BPL ACP/6
09:03-09:19 16 PIA-PIA FROM 08:37 TO 08:43 N/T,
K
MDV
01:05-01:59 54
K
19810  MEX ASK JBP-KOTA EXP 30" KXB XING 19809. LCA 12181
JBP 17:40 LT N 02:34-04:03 89 BINA-GUNA DUE TO SR 30KMPH C/O RTWS-ORR FOR PQRS
33 1.P.BPL ENG/38
KOTA 09:00 37 GUN KXB-RATI WORK,+8" RIKA XING N/HSPG SINCE SR 30KMPH
21-Oct-2019 03:30-05:02 92 PIGHT-SHDR FOR TRR WORK,
A
RTA 04:16-05:47 91
22187  SUF
HBJ-JBP INTERCITY S.F 10" HBJ TO BKA LCA
HBJ 05:10 LT HBJ 05:10-05:10 0 ET-BPL
34 1.P.BPL ENG/10 22692.NEB, ICBD ALL TRAIN OBSERVE SR 30KMPH
JBP 10:40 4 ET 07:05-07:09 4 HBJ-BKA
C/O ITKL-ODG FOR DESTRESSING WORK,
22-Oct-2019
KNW 23:00-22:57 -3
HD 00:06-00:05 -1

22221  RAJ ET 00:52-01:01 9


CSMT 16:10 LT BPL-BINA
35 HBJ 02:08-02:11 3 1.P.BPL RUNO/5 05"CRO BINA YD FROM 03:55 TO 04:00.
NZM 10:05 5 BINA-BINA
21-Oct-2019 BPL 02:22-02:22 0
BAQ 03:29-03:34 5
BINA 03:55-04:00 5

BIN
15:30-15:39 9
A
BAQ 16:04-16:20 16
22416  MEX
07"ITKL-BNI LCA 12174 BOTH TRAIN LOR IN ENGG
NDLS 06:25 LT BPL 17:35-18:57 82 ET-BPL
36 1.P.BPL ENG/7 CD SR 30KMPH BETWEEN ITKL-ODG FOR WELDING
VSKP 17:50 7 ITKL-BNI
HBJ 17:56-19:16 80 WORK.
22-Oct-2019
ET 20:25-20:36 11
JUH 20:35-20:51 16
82356 KNW-ET 15"ACP KKN TO BRI AT KM 639/02 ECR 17228
KNW 20:50-21:50 60
SUVD 1.P.BPL ACP/15
LT KKN-BRI FROM 22:45 TO 23:00.
37 CSMT 11:05 HD 21:58-23:14 76
20 ET-BPL [BSL(IGP-BSL)/ENG/19]:19 min excess CDO IGP-
PNBE 15:35 2.N.BPL ENG/9
ET 23:20-00:40 80 ET-ET BSL – KNW 40.18 min against 31.00 min.
22-Oct-2019
ET-BPL
1.N.BPL DELC/2 HBJ-PURI SPL 02" BP TEST BY DR HBJ TO MSO,
HBJ-MSO
01661  HSP
05" MDDP TO ODG LCA 12628.12976 ALL TRAIN
HBJ 07:20 LT HBJ 07:20-07:46 26 ET-BPL
1 2.S.BPL ENG/5 OBSERVE SR 30KMPH C/O ITKL-ODG FOR
PURI 10:00 14 ET 09:20-09:34 14 MDDP-ODG
DESTRESSING WORK,
22-Oct-2019
ET-BPL 07" PRKD TO ET LCA 12628. WHICH IS DETAIN IN
3.P.BPL RUNO/7
PRKD-ET CRO PRKD-ET KM-743/05 FROM 08:40 TO 08:50.
MDV
05:00-09:58 298 BINA-GUNA 24"MDVK-MNV LCA 19166,+22"GUNA-RTA LCA
K 1.S.BPL PATH/46
01718  HSP ASK MDVK-MNV 19166
DNR 12:30 LT N 05:46-12:35 409
2 32"PIA-RTWS LCA 19166 SINCE RTWS-YD SR
KOTA 10:00 121 GUN BINA-GUNA 30KMPH DUE TO PQRS WORK,+15"ORR XING
21-Oct-2019 06:27-13:21 414 2.P.BPL ENG/75
A PIA-ASKN 12198,+14"HPKA XING 51608,+14"ASKN XING
19167 ALL REPERCUSSION DUE TO ENGG CD.
RTA 06:55-13:54 419

51188  PAS ET 06:20-06:13 -7


46"MTA LCA 22130, 11072 REGULATE AT MTA
KTE 22:20 LT KNW-ET
3 HD 09:58-09:02 -56 1.P.BPL ORL/46 DUE TO LINE CLEAR EX KNW DUE TO ENGG BLOCK
BSL 17:00 46 MTA-
GIVEN BY BSL DIV BAU-AGQ,SECTION.
21-Oct-2019 KNW 13:21-14:07 46
51603  PAS
BINA 13:30 LT BPL-BINA 90"BINA LATE START DUE TO TRAIN RE/SCH 90"
4R BINA 13:30-15:00 90 1.P.BPL TFC/90
KTE 20:00 90 BINA- AS PER H/Q MESSAGE.
22-Oct-2019
51607  PAS BINA 06:20-06:21 1 BINA-GUNA PASSENGER 15" MDVK XING
BINA 06:20 LT BINA-GUNA 14813.+10" GVB XING 18214.+20" PIA XING
5 ASKN 08:00-08:38 38 1.P.BPL ENG/35
GUNA 09:15 26 MDVK-ORR 19608.+10" ORR XING MLO/N ALL REP OF ORR-
22-Oct-2019 GUNA 09:15-09:41 26 RTWS SR 30KMPH C/O FOR PQRS WORK,

51608  PAS GUNA 09:45-10:13 28


28"GUNA LATE START DUE TO I/C RAKE LATE
GUNA 09:45 LT BINA-GUNA
6 ASKN 10:39-12:12 93 1.P.BPL ENG/118 ARRIVED,+90"GUNA-BINA DETAIN DUE TO ENGG
BINA 12:40 118 GUNA-BINA
CD FOR PQRS WORK.
22-Oct-2019 BINA 12:40-14:38 118

51609  PAS BINA 15:00-15:15 15


118"BINA I/C RAKE 51608 LT ARRIVED & BINA
BINA 15:00 LT BINA-GUNA
7 ASKN 16:50-17:48 58 1.P.BPL ENG/46 DEP 15"LT & GUNA TERMINATE 46"LT DUE TO I/C
GUNA 18:05 46 BINA-GUNA
RAKE LOST ENGG A/C.
22-Oct-2019 GUNA 18:05-18:51 46

29"GUNA I/C RAKE 51609 LT ARRIVED +


51610  PAS GUNA 18:55-19:24 29 10"MABAN XING PCMC + 15"RTWS XING PCMC +
GUNA 18:55 LT BINA-GUNA 45"PIA XING 14814,PCMC + 10"KXB XING DSL/D
8 ASKN 19:51-20:43 52 1.P.BPL ENG/110
BINA 21:55 107 GUNA-BINA ALL TRAIN DETAIN IN ENGG CD PIGT-SHDR SR
22-Oct-2019 BINA 21:55-23:42 107 30KMPH FOR TRR+WELD & RTWS-YD SR 30KMPH
FOR PQRS WORK.

RTA 12:35-12:45 10 35"MABN XING 51612 & APLS,+05"SHDR XING


51611  PAS 51883,+10"RIKA ADM APLS,+15"ORR XING N-
KOTA 08:25 LT GUNA 13:10-13:17 7 BINA-GUNA DSLD,+10"PIA XING PCMC,+10"KXB XING PCMC
9 1.P.BPL ENG/85
BINA 17:05 61 ASKN 14:34-15:25 51 MABN-KXB ALL TRAIN DETAIN IN ENGG CD PIGT-SHDR SR
22-Oct-2019 30KMPH FOR TRR+WELD & RTWS-YD SR 30KMPH
BINA 17:05-18:16 71 FOR PQRS WORK.
51612  PAS LT 1.P.BPL BINA-GUNA ENG/25 25"RTWS LCA 19166, 01718, 12198 SINCE
10 BINA 10:00-10:00 0
BINA 10:00 18
ASKN 12:21-13:02 41
KOTA 18:50
GUNA 13:25-14:10 45 RATI- RTWS-YD SR 30KMPH CD DUE TO PQRS WORK.
22-Oct-2019
RTA 14:30-14:48 18
51683  PAS
KNW 08:30 LT KNW 08:30-09:22 52 KNW-ET KNW-BIR SHUTTLE 27" MTA PRE 11057.+10" TLV
11 1.P.BPL ORL/35
BIR 09:25 32 BIR 09:25-10:49 84 MTA-BRI PRE 12720.ALL REP OF LATE RECIVE EX KNW.
22-Oct-2019
51684  PAS
06:25-06:28 BIR-KNW SHUTTLE 50" MTA PRE
BIR 06:25 LT BIR 3 KNW-ET
12 1.P.BPL ENG/50 15063.11060.12142. ALL REP OF SR 75/40KMPH
KNW 07:15 48 KNW 07:15-08:03 48 BRI-MTA
C/O MTA-TLV FOR BCM WORK,
22-Oct-2019
51686  PAS BIR-KNW SHUTTLE 96" LATE START DUE TO I/C
BIR 09:45 LT BIR 09:45-11:21 96 KNW-ET RAKE ARRIVE LATE, 42" MTA PRE 11072 SINCE
13 1.P.BPL ORL/130
KNW 10:40 130 KNW 10:40-12:50 130 BRI-MTA 11072 KEPT KNW O/S DUE TO ENGG BLOCK, IN
22-Oct-2019 BSL DIV,
51688  PAS
BIR 15:15 LT BIR 15:15-15:16 1 KNW-ET
14 1.P.BPL ORL/11 11"BIR I/C RAKE 51685 DUE TO LT ARRIVED.
KNW 16:10 4 KNW 16:10-16:14 4 MTA-MTA
22-Oct-2019
51811  PAS
BINA 15:00 LT BPL-BINA 63"BINA LATE START DUE TO JAB(27061) DEP
15 BINA 15:00-16:03 63 1.P.BPL ORL/63
JHS 18:25 63 BINA- 14:50, L/C GIVEN AT 15:56.
22-Oct-2019
51829  PAS
NGP 08:00 LT JUH 17:05-18:18 73 ET-BPL 03"ET ADM 12061 TRAIN LOST NGP DIV IN PATH
16 1.P.BPL PATH/3
ET 17:45 3 ET 17:45-19:01 76 ET-ET A/C.
22-Oct-2019
51830  PAS
ET 12:00 LT ET 12:00-12:36 36 KNW-ET ET-NGP PASS 36" LATE START SINCE I/C RAKE EX
17 1.P.BPL ORL/36
NGP 20:35 33 JUH 12:11-12:44 33 ET-ET 78" LATE, PRE 12722, & LOCO CHANGE,
22-Oct-2019
GWL 08:30-08:30 0

51884  PAS SVPI 10:51-11:07 16


GWL 08:30 LT BINA-GUNA 84"GUNA DETAIN DUE TO I/C RAKE 51883 RUN
18 GUNA 13:55-13:45 -10 1.P.BPL ORL/84
BINA 17:45 84 GUNA- WITH SINGLE SLR.
22-Oct-2019 ASKN 15:36-15:53 17
BINA 17:45-19:09 84
51885  PAS
86"BINA LATE START DUE TO I/C RAKE 51884
BINA 18:00 LT BPL-BINA
19 BINA 18:00-19:26 86 1.P.BPL ORL/86 LATE ARRIVED WHICH DETAIN DUE TO TRAIN RUN
DMO 21:50 86 BINA-
WITH SINGLE SLR.
22-Oct-2019
19"O/S BPL START 22161 PF-05 TO BINA & START
SHRN 17:45-17:46 1 ET-BPL
1.N.BPL PATH/46 19714 EX PF-03 TO WR + 12"HBJ PRE 12174 +
BPL-BPL
59385  PAS BPL 18:12-18:31 19 15"BKA TO ET L/C DD/N AHD.
INDB 13:00 LT 80"MSO PRE 22416,18238,12808,22686,12618
20 HBJ 18:37-18:53 16
BDKD 06:10 114 ALL PRE GIVEN DUE TO EXTRA ENGG CD HBJ YD
22-Oct-2019 ET-BPL
ET 20:53-23:11 138 2.P.BPL ENG/80 30 KMPH FOR G/J REP & ITKL TO ODG 30 KMPH
BKA-BKA
C/O FOR WELDING WORK & ET YD 10 KMPH C/O
JUH 21:44-23:39 115
FOR BROKEN APRON.

JUH 05:15-06:10 55

59386  PAS ET 05:26-06:29 63 PANCHVALLEY PAS 20" MDDP PRE


CWA 21:05 LT ET-BPL 12707.12137.+15" MSO TO BPL LCA 12707.12137.
21 HBJ 08:20-10:01 101 1.P.BPL ENG/35
INDB 13:15 32 MDDP-BPL ALL REP OF HBJYD SR 30KMPH C/O FOR G/J, +SR
21-Oct-2019 BPL 08:45-10:19 94 45KMPH HBJ-BPL FOR NEW T/O REP,
SHRN 09:19-10:46 87

61631  MEMU BPL 08:45-08:48 3 BPL-BINA


1.N.BPL DELC/2 02"BPL-NSZ BP TEST
BPL 08:45 LT BPL-NSZ
22 BAQ 11:06-11:41 35
BINA 12:20 22 BPL-BINA 22"SCI PRE 11077, 15066 SINCE 15066 LOST
22-Oct-2019 2.P.BPL ORL/22
BINA 12:20-12:42 22 SCI- PUNCTUALITY ORL A/C.
15"BPL LATE START DUE TO I/C RAKE 61634
BPL-BINA
1.N.BPL ENG/15 ARRIVED LATE WHICH DETAIN IN ENGG CD IN
BPL-
MID LINE.
61633  MEMU BPL 15:05-15:35 30
10"BPL PRE 12001,+05"BPL ACP FROM 15:20 TO
BPL 15:05 LT
23 BAQ 16:34-17:37 63 BPL-BINA 15:25 AFTER START HENCE LCA & PRE
BINA 17:30 52 2.P.BPL ACP/28
BPL-DWG 12001,+13"DWG PRE 11057 ALL REPERCUSSION
22-Oct-2019 BINA 17:30-18:22 52
DUE TO ACP AT BPL.
BPL-BINA
3.N.BPL TFC/10 10"SORI LCA M/RAKE.
SORI-