Case Data:
S.No. Destination Wareho Cost of Local
use additio Transport
Capacity nal &
(tonne) Storage Handling
(Rs/ton Cost*
ne/mon (Rs/tonne)
th)
1 Karad 6000 - -
2 Kirloskarwadi 1400 6 12
3 Pune 1400 10 20
4 Kalyan 1400 12 20
For Rail-Rake
S.No Destination Range Mean Variance
1 Leat time for
procuring
wagon/rack 1-15 8 16.33
2 Transit time 10-15 12.5 2.08
3 Total Lead time - 20.5 18.42
For Rail-Wagon
S.No Destination Range Mean Variance
1 Leat time for
procuring
wagon/rack 15-35 25 33.33
2 Transit time 35-40 37.5 2.08
3 Total Lead time - 62.5 35.42
For Road
S.No Destination Range Mean Variance
1 Transit time 5-7 6 0.33
Option A : Road
CSL 0.95
Avg Lead Time = L 6 days
Variance of Lead Time= SL2 0.33
Rev. Period = T 6 days
No.of orders = 365/T 61
D d Q SS Iavg C
S.No Destination Demand Demand Expected Safety Stock Avg Pipeline SS
per day demand using Normal Inventory Inv. Cost
during lead distribution d*T/2
time
CSL 0.95
Avg Lead Time = L 62.5 days
Variance of Lead Time= SL2
35.42
Transit Time 37.5 days
Rev. Period = T 63 days
No.of orders = 365/T 6
D d Q SS Iavg C
S.No Destination Demand Demand Expected Safety Stock Avg Pipeline SS
per day demand using Normal Inventory Inv. Cost
during distribution d*T/2
lead time
CSL 0.95
Avg Lead Time = L 20.5 days
Variance of Lead Time= SL2 18.42
Transit Time 12.5
D d Q T 365/T SS
S.No Destination Demand Demand Order Qty. Rev. No.of Expected Safety Stock
per day Period orders demand using Normal
during distribution
lead time