Vendor Equipment Review Checklist
Vendor Equipment Review Checklist
Vendor Equipment Review Checklist
Model/Catalog number
Nameplate Detail
Painting requirements
Flow Direction
Access?
Pinch points/operability
Foundation Check
Base Plate size, separation between multiple base plates, bolt hole locations, dead loads, live
loads, dynamic loads, wind loads
Pressure Class
Design Requirements
Design Code
Design Pressure
Design Temperature
Hydrotest Pressure
Hydrotest Duration
NDE Requirements
Radiography
Mag Particle
Visual
Motor Size
AutoCAD Model:
Overall dimensions
Inlet/outlet properly connected to process piping (Raised face, flat face, weld neck, socket flange,
female thread, male thread, etc.)
Materials of Construction:
1.
________________________
2. ________________________
3.
________________________
4.
________________________
5.
________________________
6.
________________________
7.
8.
________________________
9.
________________________
10.
________________________
11.
________________________
12.
________________________
13.
________________________
14.
________________________
15.
________________________
16.
________________________
17. ________________________
18.
________________________
19. ________________________
20.
________________________
21. ________________________
22.
________________________
23.
________________________
24. ________________________
________________________
________________________
25. ________________________
26. ________________________
27. ________________________
28. ________________________
29. ________________________
________________________
________________________
30. ________________________
31. ________________________
32. ________________________
33. ________________________
34. ________________________
35. ________________________
36. ________________________
37. ________________________
38. ________________________
39. ________________________
40. ________________________
41. ________________________
42. ________________________
43. ________________________