Bunker Plan
Bunker Plan
Bunker Plan
Jan-05
UNLESS OTHERWISE, CORRECT SPECIFIC GRAVITY OF BUNKER IS KNOWN, HAVE TO ESTIMATE S.G., AND CONVERTION OF S.G SHALL BE MADE BY OBSERVED TEMP. IF NECESSARY.
QUANTITIES ESTD. S.G. KL by S.G. Estimated Volume K. L. by S.G. @ DUTY RANK NAME WATCHKEEPER DATE/TIME
GENERIC NAME OF OILS Temp at Corr'n at ldg.
REQUIRED @ 15 degC @ 15 degC loading. Temp. LDG TEMP LDG TEMP P.I.C. C/ENG. KIM WAN SIK
1. MARINE DIESEL OIL 37.91 0.8574 44.22 28 0.9893 44.75 0.847138 Watch Engr. 2/E M ISMAIL MARZUQI
2. IFO-350 154.00 0.9855 156.27 35 0.9862 158.63 0.970815 Watch rating 3/E TENDRIK IRMANSYAH
Point transfer C/ENG. KIM WAN SIK
LOADING LOADING VOL. 100% BEFORE LOAD'G LDG TEMP % Capacity LOADING PLAN LDG TEMP AFTER LOADING TANK new SG at ldg temp RECEIVED
SEQ'NCE TANK # ULL./SOUDING ULL./SOUDING SG at temp M.T. ULL./SOUDING SG at temp
M.T. ULL./SOUDING CAP. % new SG at 15C
M.T. REMARKS
M.T.
: Quantity (M/T) dibagi V.C.F (volume correction factor/ ASTM Table 54 B) dibagi W.C.F ( weight conversion vfactor/ASTM table 56)
SINGAPORE