Dismantling of Cement Silo
Dismantling of Cement Silo
Dismantling of Cement Silo
Ref:
Section / Dept: civil Activity: Risk Assessment For Location:-
Contractor :- Dismantling of cement silo
Probability
Probability
Risk rating Initial Additional Ri
Residual risk
Sl Basic Job Potential Conseque
No. Steps Hazard nce Risk control sk
measure ra
ti
n
g
P E A R P E A R
Deployment only experienced workmen
To fill up the Wah permit & daily attachment sheet before
starting the activity
Fall of man due to slip
Get Use double rope full body harness while ascending or
Injury/Fatality descending
Climbing up on Daily checked all the tools before starting the activity
the top of the
All the portable tools must be tied with rope while
1 Cement Silo for Slip of tools/Materials 1 0 0 1 2 2
working for preventing the accidental fall
anchoring the
sling Only authorised persons are allowed for working at
height
Get Use double rope full body harness and it must be
Working at height
Injury/Fatality anchored above the head height.