Nothing Special   »   [go: up one dir, main page]

My CV Senior Oerator

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 8

RESUME

MOB. + 20 0122 509 3658


SANDESH M. RAMDHARNE RESI. +91 9673820382
Email- sandeshramdharne@gmail.com

POSITION APPLIED - SENIOR OPERATOR - OIL & GAS


Top of Form

Current Location: - Egypt


Current Company: - GS.Eng.Co.for ERC Project Egypt.
Current Designation: - Senior Console Operator
Total Experience: - 25 Years.

CAREER OBJECTIVE:-

To contribute relevant refinery operating experience and expertise to a


challenging position that allows for growth and to seek career opportunity
In an Organization that will utilize my education, experience in process
Console operations.

Educational Qualification

S.S.C. Passed by Maharashtra State Board Pune-India in 1980-81


H.S.C. Appeared by Maharashtra State Board Pune- India in 1981-82
N.C.T.V.T. PROCESS ENG. Diploma by National Council for Vocational Trade
In 1990 with 1 st class.

PROFESSIONAL WORK EXPERIENCE DETAILS- Licenser: - UOP

HERDILLIA POLYMERS LTD. MUMBAI – INDIA 08 May 1992 to 22 Nov. 1993

Designation: - Worked as Technical Team Member. MTBE PROCESS PLANT.

Worked on YOKOGAWA DCS SYSTEM


Responsibilities: •
Controlling the MTBE obtaining process including the gas separation columns, adjusting
the reactors parameters to obtain good conversions and better efficiency.
Modifying the process parameters in accordance with products quality and existing
stocks. Operating the plant in safe conditions, performing the material balances and
dealing with lowering utilities and material consumptions.

Process Description: --
Methanol and the mixed butylene’s feed is pumped and heated to reaction conditions.
Both the methanol and the mixed butylenes are made in on-site units, and are sent to
this unit at the desired conditions.
Reliance Industries Ltd. PG. INDIA
Reliance AROMATIC Plant – Paraxylene Duration 25 Nov. 1993 to 31Oct.2008
Position: - Senior Operator / Panel Operator Licenser: - UOP
Worked on ABB Advent DCS SYSTEM

I have 15 years of experience in Aromatic plant PX Technology by UOP.


Worked with Safe and Efficient Field Operations in below Process sections -

I have good experience of handling console of Platforming reactor, Isomer, Tatoary.unit.


Commissioning activities refractory dry out of clay tower or reactor.steps are as follows
Check blinding diagram confirm the blinding is done.
1. Start hydrogen gas through reactor of purity 90%
2. Take heater in line Take burners inline,
3. Increase the temperature 10 deg per hour accordingly increase the burner.
4. Achieve the temp. For example in case of Isomer it may be around 350 deg. or
suggested by vendor. Take hourly sample on gas and give it to lab.
5. Observe the Co2 contain Initial stages co2 will increased then it will decreased.
6. We can do dry out of clay tower by passing hydrocarbon through clay tower, and
quantify the water contained in boot compressor trial of double stage
compressor.

Confirm de blinding is done add nitrogen take leak test confirm no leak is there then
add hydrogen pressurized and depressurized the loop. confirm the loop is has nitrogen
less than 0.5 % start oil pump, and cooling water pump, open suction and discharge
valve in reciprocating compressor start the compressor. Load compressor up to 75% by
pressing loader button observe the loop pressure and flow.observe the motor winding
temp.

Platforming Reactor/ CCR (continuous catalyst regeneration)


Reactor conditions are Temp-525, 520, 530deg
Pressure 9.2 barg.
Catalyst used platinum impigrated with molebdium and fused fused silica.

Isomer catalyst
Reactor condition
I/L temp. 370 deg. and O/L temp. 380 deg. Delta T 10 deg.
Pressure 9.8 barg.

COMMISSIONING OPERATIONS LNG SECTION:-


1. Gas Compression Plant Steam driven centrifugal compressor having inter
stage coolers and separators working.
2. Gas processing & Sweetening Plant Where a Sour gas containing H2S & CO2
and water is removed by di-ethyl amine and potassium Carbonate absorption.
3. Distillation & Fractionation. Separation of propane (L.P.G), Butane and
Pentane and Sub-Cooling and sending to storage tank for shipment.
4. Liquefaction plant. Cryogenic process of cooling and liquefying the methane
and Ethane (L.N.G) to 165 degrees centigrade. Using mixed composition
refrigerant
5. Sulphur Plant. Elemental Sulphur Produced by clause effect Unit Having
reactors Condenser, waste heat boiler,
Qatar Gas: - By - GS.ENG.CO. Duration - 7th June 2009 to 18 Dec. 2009

Organization : Qatar Gas Operating Company, QATAR

Designation: - Commissioning DCS Operator Licenser: - UOP

Worked on YOKOGAWA CS-3000 DCS SYSTEM SRU / ARU/ SWS/ RFCC UNIT –

I had been worked as a commissioning operator in Amine regeneration unit (capacity of


1320TPD) at Qatar Gas, for the client of Laffan Refinery. Laffan Refinery is a condensate
refinery which process unsweetened condensate (146,000 BPSD) from the Qatar north
gas field to LPG (35.3 T/H),
Responsibilities Monitors and coordinates the designated operation from Control
Panel, ensuring safe and efficient operations. Includes maintaining continuous
contact with various areas of the entire Plant

WORK RESPONSEBILITY: - Pre-Commissioning, Commissioning and Start-Up of


an upstream oil & gas EPCC project. Managerial skills on commissioning of oil &
gas project, Leading Project Management activities as like planning , quick
decision on non imaginary port from bottom management Analysis of the delays
associated with plant handover, mechanical completion, and startup and
commissioning of oil & gas exploration plant.DCS/Panel operator for NGL
extraction & fractionation unit for Pre-comm.& commissioning Project Engineer
responsible for the Scheduling and planning, engineering, procurement and
construction phases of the Turn key project of Oil &Gas.

Bharat Petroleum Corporation Ltd. India Duration Jan. 2010 to July 2010

Position: - Process Field Operator Unit - SRU / Hydrocracker

Location: Mahul – Mumbai (India) Licenser: - UOP

It is one of the grass root refinery of India since 1955 started by Shell. The
Refinery had primary & secondary facility for crude oil processing. There were
various units like Crude Distillation, Cracker, Vacuum Distillation, Bitumen unit,
Boiler House, etc.

Tasks:
Associated since the start-up & worked in FCCU unit for (3200 T/D of feed) both
in Field & control room (YOKOGAWA CENTUM). It was the latest technology for
cracking the middle distillate to get gasoline & diesel. The unit contained
Reactor, Riser, and Regenerator & Fractionator. The cracking was achieved with
the help of silica-alumina catalyst at @ 620 C. The other units independently
handled were Compressor & Blower, Gas concentration unit, High vacuum unit,
Sulphur Recovery unit (SRU), Gasoline & LPG treatment unit and Utilities.

VDU (Vacuum Distillation Unit) : This unit was further refining the long residue
(LR) from final stage of separation in CDU
The LR was heat again at 395-400 C and introduced to vacuum column at
-760mm Hg pressure. The light distillate called
Waxy was produced with Short residue at the bottom. The Waxy was the feed of
FCCU for productioing Gas/LPG/Gasoline
and LCO/HCO for making diesel. The capacity of unit was 2000 T/D.
Licenser: - UOP
GDP Project Abu Dhabi UAE Duration Sep. 2010 to May. 2011
Worked on Honeywell R-4OO DCS SYSTEM DCS Commissioning Operator

Organization: - Abu Dhabi National oil company - RFCC /SRU /NHT UNITS.

Operation of natural gas treating equipment to maintain designated operating


conditions. Surveillance of plant processes on PLC or DCS. Trouble shooting of
Process equipment and plant operations. Shutdown and startup of plant/ field
compression/process equipment (pumps, cooling equipment, generators, etc.).
Daily plant rounds and monitoring of equipment to identify operational problems
Not indicated through PLC or DCS alarm systems. Daily maintenance activities such as
adding oil, water, lubrication, etc. . Manually operate valves as operations dictate.

Lockout /Tag out and safe work permitting duties for maintenance work.
Monitoring the facilities in the gas plant control room on a 12 hour shift basis according
to approved procedures and operating manuals during commissioning the gas plant
test run (the gas plant is formed by two trains with 135 mmscfd net sales gas and over
35 000 BPD condensate each)reliability run for the gas plant; routine operation of the
gas plant at the required load, preparing work requests for minor and emergency repair
of plant equipment’s, preparing work permits for supervisory approvals.

WORKING IN THE FOLLOWING PLANTS -

Gas Compression Plant Steam driven centrifugal compressor having inter stage
coolers and separators.
Working in Gas processing & Sweetening Plant Where a Sour gas containing H2S
& CO2 and water is removed by di-ethyl amine and potassium Carbonate
absorption.
Distillation & Fractionation. Separation of propane (L.P.G), Butane and
Pentane and Sub-Cooling and sending to storage tank for shipment.
Liquefaction plant Cryogenic process of cooling and liquefying the methane and
Ethane (L.N.G) to -165 degrees centigrade. Using mixed composition refrigerant.

Petrofac International – Turkmenistan since 02 July. 2011 to 30Jan. 2012

Worked on YOKOGAWA CS-3000 DCS SYSTEM - SRU/ RFCC/ UTILITIES


Licenser: - UOP
Worked with Petrofac Turkmenistan as Senior Operator for
TURKMEN GAZ COMPANY With advance Dcs system HONEYWELL CS 300
Here we have 25 wells from these wells we are taking the raw gas.
The raw gas will send to the GTU (Gas Treatment Unit) from the GTU raw gas
Will send to the inlet facilities. From the inlet facilities gas send to the Train 1a,
1b and Train 2a, 2b for Acid gas absorption, Dehydration, Hydro carbon Dew
Pointing, Sulfur Recovery Unit, Condensate Stabilization, Amine storage….etc.

Gas Compressor Unit:-


Handled different types of Gas Compressor (Reciprocation, Centrifugal
& Screw Type) Gas Compressor Start up & Shut down, Cylindrical lube oil
Maintenance, Compressor unit pre lube oil level MTCE, engine crankcase oil
Level maintenance, Coolant water level RPM setting, inter collar
Operation, Temperature maintenance, Scrubber pump operation Fuel gas Filter
Separator operation & Isolation, Recycle, PVC operation. Temperature
Logging Suction, Discharge valve leaking. Engine cylinder function,
Cylinder fire order, Fuel gas splurging, cooled water supply SDV & BDV
Operation, Trouble shooting.

HYUNDAI ENG. & CONS. CO. ABUDHABI UAE. Since Feb. 2012 to July 2013
Worked on YOKOGAWA CS-3000 DCS SYSTEM Licenser: - UOP
Worked as Utility & Offsite Operator - Prepared a punch list of construction
completion, ready for startup unit Instrument loop checking, function test of
heaters, compressors. Start up & Shutdown activities, normal operation control,
operation trouble shooting maintenance activities. Taking regular rounds of unit
to ensure safe operation of the unit Recording and reporting of field parameter
to Shift Supervisor and if required panel officer
All activities in area, including, but not limited to, operation of the equipment,
preparation for maintenance, preventative maintenance activities, monitoring
equipments.
Worked as a DCS Comm. Operator by Cegelec with
HYUNDAI
At- Musandam Gas Project OMAN. Since Sept. 2013 to 27 April 2014
Licenser: - UOP
Worked on YOKOGAWA CS-3000 DCS SYSTEM LNG/ FCC/ SRU /SWS.
Here in Musandam Gas Project construction work is going on now having pre-comm.
Activities like lines and loops of every headers are checking as per p&id drawing and
also any missing valves , Gauges , instruments , line welding , fire water lines ,
extinguishers marked with highlighters. Supporting all aspects of the day–to-day
mechanical maintenance coordination of plant systems.
GAS DEHYDRATION UNIT:-
Familiar with Gas Gathering Startup & shutdown, Glycol Pump Operation Closer
separator handling and temperature maintenance conductor handling reboiler
operation pilot ignition system operation - TIC operation Reboiler operation, Fuel gas
filter separate operation, Flash drum, Sock filters, charcoal filter operation and isolation
Reflux drum and still column temperature maintenance - PH value maintenance.

SNC- LAVALIN- (Spie Oil & Gas) For Yosef Project - Saudi Arabia
Licenser: - UOP 12 May 2014 to Dec.2014
Worked on YOKOGAWA CS-3000 DCS SYSTEM SRU / HYDROGEN / RFCC
Worked as a Sr. DCS Console Operator with SNC-LAVALIN for Yasref Project
Saudi Arabia.Yanbu Aramco Sinopec Refining Company (YASREF) is a full-conversion
world class refinery that is built to process 400, 000 barrels per day (bpd), and
scheduled to be operational in 2014- 15 , Total SRU 3 Trains 420 MT/day each both on
85% load. SWS total 3 Trains. 1 non phenolic 115m3/hr and 2 phenolic trains 227m3/hr
each ARU 820m3/hr each two trains.
Working as a Console Operator in Gasoline /Carbon Black Section with Yokogava
Control System and participates in all Pre-commissioning, Commissioning and startup
activities. Instrument loop checking, function test of heaters, compressors. Normal
operation control, operation trouble shooting maintenance activities etc.

Commissioning of Hydrogen generation plant


Adsorbents and activated carbon loading for pressure swing adsorber.
Catalyst deduction for shift reactors and reformers.
Deft in handling various process equipments i.e. Pumps, Compressors, Exchangers,
columns, reactors, heaters, boilers, incinerators and vessels etc.
Achievement oriented, hardworking & dedicated with strong leadership/well-honed
skills in supervising and getting work from field process operators.
Meticulous and structured approach with super planning & implementation skills.
Excellent man-management, time management, and leadership skills.

Worked with Petrofac Qatar as a COMM. FIELD OPERATOR


For NGL-3 Project with Qatar Petroleum in SRU /FCC / UTILITIES Units.
Licenser: - UOP Since 28 March 2015 to 25
Nov.2016
Worked on YOKOGAWA CS-3000 DCS SYSTEM

WORK RESPONSEBILITY: -- Pre-Commissioning, Commissioning and Start-Up of an


upstream oil & gas EPCC project. Managerial skills on commissioning of oil & gas
project, Leading Project Management activities as like planning , quick decision on non
imaginary port from bottom management Analysis of the delays associated with plant
handover, mechanical completion, and startup and commissioning of oil & gas
exploration plant.DCS/Panel operator for SRU Unit & ARU/ UTILITY unit for Pre-
comm.& commissioning. Project Engineer responsible for the Scheduling and planning,
engineering, procurement and construction phases of the Turn key project of Oil &Gas.

Duties/Job Description:-
Check, operate monitor, and observe all activities/situations on plant equipment and
process parameters and find any abnormal conditions.
Logs and records all plant running parameters, exchange information
carry out operational of equipment prior to handover for maintenance , and ensure
proper implementation of work permit instructions.
Authorizes or co-signs maintenance work requests. Checks and follows-up
maintenance work of equipments in the unit.
Startup and Shutdown activities and emergency handling at assigned area
Ensure good housekeeping, report all unsafe conditions to supervisor keeps safety
equipments in workable condition and safe operation of plant and process equipment
Diagnose and correct problems affecting process conditions as per operating
principles and theory.

MACHINES OPERATED:--
Steam driven & Motor Driven Compressors, Multi Stage centrifugal pumps,
Positive displacement pumps Air blowers, various types of industrial valves, etc.
Safe Startups and Shut down operations of the Process Plants .Preparing the
various machines for the maintenance handing over. Safe changing over of the
running machines .Permit to work system proficient.

EXP. IN RFCC UNIT: -- SENIOR OPERATOR RELIANCE India .Jamnagar


Refinery Licenser: - UOP
Since Dec. 2016 to June 2017
I have an experience in R.F.C.C Plant. (Residue Fluid Catalic Cracker) in Reliance.
Experience in Pre commissioning and commissioning activities like loop clearance,
loop flushing hydro & pneumatic test and final box-up leak test, utility establishment,
column, heater operation startup and changeover of pumps & compressors and
routine checks. Involved in critical start up and shut down operations. I am well
conversed with the handling operations & troubles shooting of the following.
Responsible for monitoring field conditions, pumps, turbines, Compressors,
exchangers and local temperature & pressure points. Taking instructions from panel
man to carry out routine job and during trouble shooting.

RFCC-Reside is the heaviest fraction in the barrel of crude oil boiling at the highest
temperatures. Relative to VGO, resid contains larger quantities of polycyclic aromatics
and smaller quantities of paraffins. Relative to VGO, resid has a lower API gravity and
lower hydrogen content. Conradson carbon and heterocyclics of sulphur, nitrogen and
oxygen, as well as organometallics of nickel and vanadium tend to concentrate in the
heaviest fraction.

Worked with Spie Oil & Gas as a DCS Commissioning Specialist for KNPC
Project Kuwait. Licenser: - UOP

PROCESS OPERATIONS…

Since June 2017. DHT, NHT, CCR, SRU, Hydrocracker UNITS.

Reviews the PFD, P&ID and datasheets of the equipment’s and instruments.
Participates in Walk Through in order to ensure system readiness against Project
Scope and Standards.

Carries out Pre-Commissioning Activities: Piping loop identifications, making


punch lists Construction Package Such as Index, P & I Drawings, Loop drawing,
Location drawing, PFD drawing.
Witnesses to Pre-Commissioning activities carried by the EPC Contractors in
accordance to the responsibilities defined like witnessing pneumatic and hydro
tests.
Hands On involvement to review all instruments installed in the field and to
ensure it conformed to data sheets, identification of missing instruments and
verification of installation as per P & ID specs, writing pre-commissioning
procedures, commissioning procedures, Standard operating procedures of all
products tanks and pumps etc.

Presently working as Senior Operator with GS.Eng.Co. For ERC Project


Cairo- Egypt.

EXTRA CURRICULUM ACTIVITIES:--


Complete basic & Software like Microsoft Word, Excel, PowerPoint,
Forklift Driving, Maintenance Work Knowledge, Team Lead.

PERSONAL DETAILS:-
Gender : Male
Date of Birth : 16th June, 1965
Marital Status: Married
Nationality : Indian

Permanent Address
Shree Hari Park, H –102, 1st Floor Opp. Hotel Apoorva.
At- Rees, Post- Mohopada, (Rasayani) Tal –Khalapur, Dist.-Raigad
Pin- 410222 State- Maharashtra (India)

PASSPORT No. -- : Z 4107522


Date of issue: 25/05/ 2017 : Expiry: 24/05/2027
Skype ID – sandesh.ramdharne
DECLARATION: --

I hereby declare that the information mentioned in this Resume is correct to my knowledge.

SMRamdharne
(SANDESH M. RAMDHARNE)

You might also like