NCC-CV 2019
NCC-CV 2019
NCC-CV 2019
Burauen Comprehensive NHS, Burauen, Leyte Philippines Makati Development Corporation (General Contractor)
Circuit Mixed Used Project, a mixed-used development in Circuit Makati by Ayala Land Corporation
Elementary Education 1998 – 2004 Brgy. Carmona, Sta. Ana Makati City Philippines
Burabod Elementary School, Burauen, Leyte Philippines
http://www.mdc.com.ph/
Designation:
BIM Revit Modeler – Technical Services Department (TSD), (Site-based) from October 2014 – July 2015
˃ Responsible for the preparation & sheet generation of shop drawings, RFI (Request for Information), RFA (Request
for Approval), & transmittals.
˃ Modeling & Sheet generation of Basement Plumbing Layout, Sump Pit Details, & Elevator Pit details for approval from
Consultants & IFC issuance for Construction Operations Group.
˃ Updates the base plan coordinates for every changes in plans & according to answered RFI’s, latest FCD,
Licensure Examination for Architects Passed 82.0% - January 2015 & issued Construction Bulletin.
Professional Regulation Commission | Board of Architecture Manila, Philippines ˃ Sheet generation of Bored Pile Coordinates, Pile Cap Coordinates, Column Coordinates of Basement Level for approval
from Consultants & IFC issuance for Construction Operations Group.
Licensure Examination for Master Plumber Passed 72.2% - February 2015
˃ Sheet generation of Basement Column Setting out Plan for approval from Consultants & IFC issuance for Construction
Professional Regulation Commission | Board of Master Plumber Manila, Philippines Operations Group.
˃ Sheet generation of Basement Beam Setting out Plan & Slab depression plan for approval from Consultants & IFC
Issuance for Construction Operations Group.
˃ Sheet generation of Ramp details for approval from Consultants & IFC issuance for Construction Operations Group.
Jim Mcdonald ˃ Sheet generation of Basement Wall Staking plan for approval from Consultants & IFC issuance for Construction
Projects Director Operations Group.
Barr + Wray, FZE Dubai Branch ˃ Sheet generation of Basement Toilet Tile Setting out plan & Toilet CSD (Combined Services Design) for approval from
Dubai Silicon Oasis, United Arab Emirates Consultants & IFC issuance for Construction Operations Group.
JMcdonald@barrandwray.com ˃ 3D modeling, detailing & layouting of construction methodologies proposed by Project-In-Charge (PIC)
˃ Assist on updating of weekly BIM LOD 300(Design Intent Model) & BIM LOD 400 (Issued for Construction) Monitoring
Yasser Suleiman Accomplishment Report.
Senior Director, Mechanical Design ˃ Documentation of RFI (Request for Information) & RFA (Request for Approval) monitoring for reference.
Ian Banham and Associates
Dubai, United Arab Emirates Cadd Operator – Technical Services Department (TSD), (Site-based) from June 2014 – October 2014
+971 4 370 5777 ibadxb@ianbanham.com ˃ Review & monitoring of conflicts in plans based on Schematic Design Plans, Design Development Plans, & Issued
For Construction Drawings
Architect Catherine G. Cepeda, uap. ˃ Responsible for the preparation & sheet generation of shop drawings, RFI (Request for Information), RFA (Request for
Circuit Mixed Use TSD Supervisor Approval), & transmittals.
Makati Development Corporation ˃ Assist on the preparation & editing of 3D sequencing of PEP (Project Execution Plan) & construction methodology.
Circuit Makati Operation Center ˃ Assist on drafting of the proposed Temporary Road Layout, Temfacil Plans, Tower Crane Layout, Logistics, & details
Brgy. Carmona, Sta. Ana Makati City Philippines for PEP(Project Execution Plan) presentation using SketchUp & Photoshop.
+63916-434-2649 ˃ Responsible for the drafting of Bored Piling Works construction methodology.
˃ Performs weekly site documentation & coordination.
Architect Rodel T. Mallari, uap. ˃ Attends design coordination meeting for clarification of conflicts on plans & other technical issues and preparing minutes
Project Manager / Development Control Manager of the meeting.
Aseana Business Park Estate Association ˃ Prepared Base Plan Coordinates of Bored Piles, Columns, Pile Caps, & Temfacil, Temporary Road way, & logistics
Aseana City Paranaque, Philippines ˃ 3D modeling, detailing & layouting of construction methodologies proposed by Project-In-Charge (PIC)
+63921-763-8064 ˃ Documentation of Issued Drawings of consultants & other monitoring activities for reference.
˃ Documentation of RFI (Request for Information), RFA (Request for Approval) monitoring for reference.
˃ Assisted on preparing the presentation for DCM & PTG meeting
˃ Assist on reviewing & editing of Submittal Log Registry for forwarding to QS & other queries
˃ Attends Toolbox Meeting
˃ Participated in BIM Revit Workshop
˃ Attend Product Demo conducted by the suppliers.
Designation:
Date of Birth : July 25, 1992
Current Address : 1111 San Joaquin St. Burauen, Leyte
CADD Operator / Architectural Staff - Planning Department / Development Control Office
˃ Responsible for the preparation of Cad drawings / layout schemes / presentations for the assigned tasks.
6516 Philippines
˃ Assigned to prepare design concepts & schemes for the proposed Central Bus Station complex with office & residential
Mobile No. : +63-946-746-3830
towers.
Nationality : Filipino
˃ Updating of Master Plan to monitor saleable lots for marketing purposes.
Faith : Christian
˃ Preparation of Lot Restrictions for saleable lots based on their Design Standard Guidelines for Planned Unit
Civil Status : Married with 1 dependant
Development (PUD)
Language Spoken : English, Tagalog (Filipino)
˃ Preparation of area tabulations & GFA computations for design review to make sure lot owners follow restrictions
Visa Status : Eligible for Employment Visa
on their Design Standard Guidelines.
Driving License : Philippine License
˃ Assigned to supervise office renovations / interior fit-out of Aseana offices and prepared accomplishment reports
Availability : Can join immediately
˃ Collaborated with the Development Control Officers for the Daily Site Inspections and Monitoring of site constructions in
All the above-mentioned details are true to the best of Aseana City.
my knowledge and I assure to provide the necessary ˃ Prepare punch list at Aseana Two and S & R facade owner side projects at Aseana City.
testimonials and/or proofs to validate and substantiate ˃ Attend and participate in coordination meetings.
the same. ˃ Attend construction related presentation, seminars and product presentations.
Sample of works is available upon request. June 2009 – October 2013
Ar. Ariel T. Camasin, uap.
Architect | Designer | Design & Build
Burauen Leyte, Philippines
Designation:
Architectural Apprentice
(Project includes residential, commercial, educational buildings, mausoleum, resort, repair, & renovation)
˃Prepared AutoCad working drawings, material estimates, BOQ, 3D presentations, and preparation of necessary contract
documents for building permit application.
˃ Prepared proposed architectural plans, as-built plans and details through manual drafting, and conducted site verification
and measurement.
˃ Prepares Payroll, Weekly Accomplishment Report, & Weather Report.
˃ Performs Weekly Site supervision, inspection, updates at construction sites
˃ Assist in the preparation of specifications, material canvassing, & meeting with client.
˃ Checked and inspected materials and quality of work delivery.
How to Deal and Win Client Speaker: Architect George S. Salvan, fuap. September 2008
Kanhuraw Convention Center, Tacloban City Leyte Philippines
Construction Management Speaker: Architect George S. Salvan, fuap. August 2008
Kanhuraw Convention Center, Tacloban City Leyte Philippines
Creativeness in Design and Construction Speaker: Architect Edilberto F. Florentino, fuap. August 2009
Tacloban Convention Center, Tacloban City Leyte Philippines
The Business of Architecture Speaker: Architect Miguel Guerrero, fuap. September 2010
Tacloban Convention Center, Tacloban City Leyte Philippines
Urbanisasyon Han Tacloban, Metamorposis of City Planning October 2010
Speaker: Architect Primier Siegfried Solajes,uap., Engr. Manuel Serdan, Engr. Roberto V. Muñoz - Tacloban City Leyte Philippines
Design Conceptualization Speaker: Architect Leartes G. Tabotabo Jr., uap. January 2011
Tacloban Convention Center, Tacloban City Leyte Philippines
United Architects of the Philippines Students Auxiliary AREA C Assembly October 2011
San Remigio, Cebu, Philippines
MDC Site Safety Orientation July 2014
Circuit Makati Operation Center, Brgy. Carmona, Sta. Ana Makati City Philippines
BIM Revit Workshop September 2014
Circuit Makati Operation Center, Brgy. Carmona, Sta. Ana Makati City Philippines
Raw Plug and Husqvarna product seminar conducted by Tech. Engineer of Cut & Break Diamond Products, Inc. November 2014
Circuit Makati Operation Center, Brgy. Carmona, Sta. Ana Makati City Philippines
20th World Building & Construction Exposition March 11-15 2015
World Trade Center, Manila Philippines
41st UAP National Convention & Business Meeting for Architects April 16-19 2015
SMX Convention Center, Pasay City Manila Philippines