Nothing Special   »   [go: up one dir, main page]

03 Paref - e - Mech - Ece PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

REPUBLIC OF THE PHILIPPINES

DPWH
OFFICE OF THE BUILDING OFFICIAL
MANDAUE CITY

RECOMMENDING APPROVAL :

HEAD ELECTRICAL SECTION DATE

APPROVED :

BUILDING OFFICIAL DATE

MEDALLION
TRANSPORT
INC.
ALEJO'S THE SITE
LECHON

M
3 -22.0 mm² THHN
1 - 8.0 mm² THHN
in 32 mm Ø RSC pipe

SAL
VAD
PB

OR
STR
EET
1 2
CASA MIRA
TOWERS
3 4
TOMLYNS COMPOUND
CEBU CITY NATIONAL L.P. BALAGA
DRIVE 5 6
SCIENCE HIGH SCHOOL

LABANGON
7 8
BRGY. HALL

CAMOMOT FRANCIA
LABANGON 9 10
PUBLIC MARKET

SALV
KATIP 11 12

ADO
UNAN
STRE
B. ZU
ET

R
BIRI
STRE 13 14

STR
ET

EET
15 16
CEBU INSTITUTE OF

LEGEND:

SA
SAB
SABC

PB

PB
01

FROM THE OFFICE OF: APPROVED BY: SEAL PROJECT TITLE: APPROVED BY: REVISIONS SHEET CONTENTS: SHEET NO.
D.B. LOPEZ ELECTRICAL WORKS DENNIS B. LOPEZ DESIGNED:

· Electrical System Design


(Residential,Commercial and Industrial)
Contact nos.
416 0296 / 462 5145
PROFESSIONAL ELECTRICAL ENGINEER
A PROPOSED INTERIOR CADD: DATE: 1
KASILINGANAN EDUCATORS INC.
· Estimate REG. NO. : 0003699 PTR NO. : 1659915 E
·
·
Supervision
Contract
09277525763
09156532643
RENOVATION OF PAREF PRE-SCHOOL PROJECT OWNER CHECKED: DATE: 2
· Consultancy 09325752292 DATE : 5-13-2015 DATE ISSUED : 1-3-2019
REVISED:
ADDRESS: 2nd Flr. Unit-5 R.D. Realty Bldg. No.189 Colon St. Kalubihan, Cebu City TIN NO. : 246-379-902-000 ISSUED AT : CEBU CITY LOCATION: CASA MIRA TOWERS, SALVADOR EXT. LABANGON, CEBU CITY NOTE : THIS IS A CAD DRAWING. MANUAL ALTERATIONS SHALL NOT BE ALLOWED.
REPUBLIC OF THE PHILIPPINES
DPWH
VERIFY ACTUAL LOCATION. OFFICE OF THE BUILDING OFFICIAL
PB SEE RATINGS ON MANDAUE CITY
LOAD SCHEDULES.
13
RECOMMENDING APPROVAL :
8075 8075
1839 6236 1839 6236 HEAD ELECTRICAL SECTION DATE

APPROVED :

BUILDING OFFICIAL DATE


PB PB
12 07
PB PB
11 08
4421

4421
4448

4448
PB PB
10 09
6765

6765
PB
13

12200

12200
5194

5194
7752

7752
PB
03
2699

2699
CO

PB
PB
06
02

4379

4379
16335

16335
PB
PB 05
PB
4753

4753
10900

10900
PB
04
6521

6521
4345

4345

PB
01

PAREF SOUTHDALE PAREF SOUTHDALE


ELECTRICAL LIGHTING LAYOUT PLAN ELECTRICAL POWER LAYOUT PLAN
SCALE: 1:75 MM SCALE: 1:75 MM

FROM THE OFFICE OF: APPROVED BY: SEAL PROJECT TITLE: APPROVED BY: REVISIONS SHEET CONTENTS: SHEET NO.
D.B. LOPEZ ELECTRICAL WORKS DENNIS B. LOPEZ DESIGNED:

· Electrical System Design


(Residential,Commercial and Industrial)
Contact nos.
416 0296 / 462 5145
PROFESSIONAL ELECTRICAL ENGINEER
A PROPOSED INTERIOR CADD: DATE: 2
KASILINGANAN EDUCATORS INC.
· Estimate REG. NO. : 0003699 PTR NO. : 1659915 E
·
·
Supervision
Contract
09277525763
09156532643
RENOVATION OF PAREF PRE-SCHOOL PROJECT OWNER CHECKED: DATE: 2
· Consultancy 09325752292 DATE : 5-13-2015 DATE ISSUED : 1-3-2019
REVISED:
ADDRESS: 2nd Flr. Unit-5 R.D. Realty Bldg. No.189 Colon St. Kalubihan, Cebu City TIN NO. : 246-379-902-000 ISSUED AT : CEBU CITY LOCATION: CASA MIRA TOWERS, SALVADOR EXT. LABANGON, CEBU CITY NOTE : THIS IS A CAD DRAWING. MANUAL ALTERATIONS SHALL NOT BE ALLOWED.
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
VENTILATING AND AIRCONDITIONING
A. GENERAL NOTES:
RECOMMENDING APPROVAL
1. ALL EQUIPMENT SHALL BE INSTALLED IN APPROXIMATE LOCATION AS SHOWN ON THE
DRAWINGS.
CONTRACTORS MUST SUBMIT SHOP DRAWINGS INDICATING ACTUAL EQUIPMENT DIMENSIONS AND
OPERATING WEIGHTS. SUFFICIENT CLEARANCES TO FACILITATE NORMAL SERVICES AND MAINTENANCE HEAD ARCHITECTURAL SECTION DATE
WORKS ARE PROVIDED IN THESE DESIGN PLANS. HOWEVER, SHOULD ACTUAL EQUIPMENT PHYSICAL
SIZES DIFFER CONSIDERABLY FROM THOSE SHOWN IN THE PLANS, THE CONTRACTOR SHOULD
NOTIFY THE ARCHITECT OR DESIGN ENGINEER IMMEDIATELY IN WRITING. APPROVED:
CONTRACTORS ARE ADVISED TO VISIT & SURVEY THE PLACE OF INSTALLATION.
4. ALL EQUIPMENTS SHALL BE SET ON 150 MM.THICK, LEVEL REINFORCED CONCRETE BASE,
UNLESS OTHERWISE SPECIFIED.
BUILDING OFFICIAL DATE
5. ALL EQUIPMENT SHALL BE MOUNTED ON OR SUPPORTED BY VIBRATION ISOLATOR
OR ASSEMBLIES.
THIS CONTRACTOR SHOULD COORDINATE HIS WORKS CLOSELY WITH THE WORKS OF OTHER TRADES.
PROVISIONS FOR THE PIPE AND DUCT PASSAGES THRU WALLS, FLOORS, AND ROOFS SHALL BE
COORDINATED IN ADVANCE WITH THE BUILDING CONTRACTOR. FAILURE ON THE PART OF THIS
CONTRACTOR TO MAKE SUCH PROVISIONS IN ADVANCE SHALL MEAN PROVIDING THEM LATER AT HIS
OWN EXPENSE.
PIPES SHALL BE ANCHORED, PLUMB & PARALLEL TO BUILDING LINES. PIPE HANGERS & SUPPORTS
SUPPORTS SHALL BE INSTALLED AT 1.2 METERS ON CENTER. ALL PENETRATIONS THRU WALLS,
FLOORS & ROOF SHALL BE PROVIDED WITH PIPE SLEEVES. INSTALL 3mm. THICK RUBBER BETWEEN
PIPE & SUPPORT TO ELIMINATE METAL TO METAL CONTACT.
8. ALL PIPING SHALL BE LEAK TESTED WITH A PRESSURE OF AT LEAST 1 1/2 TIMES THE
DESIGN WORKING PRESSURE.
9. AIR-CONDITIONING DUCTWORKS SHALL BE FABRICATED (AS PER SMACNA STANDARDS AND INSULATED
WITH 25MM. THICK, (3PCF) DENSITY FIBERGLASS WITH REINFORCED ALUMINUM FOIL VAPOR
BARRIER UNLESS OTHERWISE SPECIFIED.
10. ALL MATERIALS SHALL BE NEW AND CLEAN.
DEVIATIONS AND REVISIONS FROM THE PLANS SHALL BE REFERRED TO THE ARCHITECT FOR REVIEW
AND APPROVAL..
12. ALL NECESSARY GOVERNMENT PERMITS SHALL BE SECURED AND BORNE BY THIS CONTRACTOR.
13. ALL WORKS SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF ACCEPTANCE.
14. ALL AIR TERMINALS ARE SUBJECT FOR AIR TESTING, ADJUSTMENT AND BALANCING USING ACCU FOOTING DETAIL FAN COIL DRAIN CONNECTION DETAIL
INDUSTRIAL GRADE INSTRUMENT.
15. AS-BUILT PLANS SHALL BE SUBMITTED AFTER COMPLETION OF INSTALLATION TO THE BUILDING OWNER.
16. ALL AIR-CONDITIONING DIFFUSERS SHALL BE ALUMINUM LINEAR DIFFUSERS , POWDER COATED FINISH.
SAMPLE SHOULD BE SUBMITTED TO THE ARCHITECT FOR APPROVAL.
17. ALL AIR-CONDITIONING DRAINS SHOULD BE INSULATED WITH 50mm THICK PVC PIPES SERIES 1000 WITH 1"
PIPE INSULATION USING ARMAFLEX.
18. ALL ELECTRICAL CONDUITS FROM ACCU TO CIRCUIT BREAKER SHOULD BE LIQUID TIGHT METALLIC.
ALL ELECTRICAL WIRES SHALL BE THW PHELPS DODGE, CONSUIT AND WIRE SIZE AS PER MANUFACTURER
RECOMMENDATION.
19. ALL DUCT SIZES AND DIMENSIONS TO CONFORM WITH THE MANUFACTURERS SPECIFICATIONS AND STANDARDS.

REFRIGERANT PIPE INSULATION DETAIL PIPE HANGER & SCHEDULE DETAIL ELECTRICAL RISER AND CONTROL DIAGRAM EXHAUST FAN INSTALLATION DETAIL

RECOMMENDED REFRIGERANT PIPE SIZE'S

PIPE PASSING THRU WALL AND FLOOR REFRIGERANT PIPE SCHEDULE DETAIL FCU/ACCU ISOMETRIC LAYOUT REF.PIPE SUPPORT ALONG THE WALL

SEAL REG. NO. : 0003430 PTR. NO: 7390475 PROFESSIONAL MECHANICAL ENGINEER PROJECT OWNER : DESIGNED: EDAS SHEET NUMBER
ISSUED AT: CEBU CITY TIN NO: 119-265-987
PROJECT TITLE : DRAFTED : -
EDWIN Q. TEVES
ISSUED ON: 01/03/2019 KASILINGANAN EDUCATORS INC. CHECKED: EDAS

EZPELETA-DEMIAR ARCHITECTURAL SOLUTIONS A PROPOSED INTERIOR RENOVATION OF PAREF PRE-SCHOOL DATE : M-01
OCTOBER 2019
Unit 312, Doña Luisa Building, Fuente Osmeña, Cebu City TEL. NOS. (032) 266-1497
EZPELETA-DEMIAR
ARCHITECTURAL
SOLUTIONS
LOCATION: CASA MIRA TOWERS, SALVADOR EXT. LABANGON, CEBU CITY ADDRESS: CASA MIRA TOWES SALVADOR EXT. LABANGON, CEBU CITY
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

RECOMMENDING APPROVAL

HEAD ARCHITECTURAL SECTION DATE

APPROVED:

MEDALLION BUILDING OFFICIAL DATE


TRANSPORT ALEJO'S FCU-3 FCU-3 FCU-2 FCU-2 FCU-2 FCU-3 FCU-1
INC. LECHON 60HP 6.0HP 3.0HP 3.0HP 3.0HP 6.0HP 2.0HP
8075
THE SITE
6432
1839 6236

SAL
VAD
OR
STO.
CASA MIRA TOWERS

STR
THIS SITE VICINITY MAP

EET
SCALE NTS. WASH

4421

4448
AREA
6.12 SQM.
GIRLS' CR
10.13 SQM.

6765
BOYS' CR
10.48 SQM.
TOMLYNS COMPOUND

LEGEND: CEBU CITY NATIONAL


SCIENCE HIGH SCHOOL
L.P. BALAGA DRIVE

LABANGON
BRGY. HALL

12200
CAMOMOT FRANCIA
LABANGON
PUBLIC MARKET
PREP

SALV
FCU-2

5194
KATIP CLASSROOM 3.0HP
29.30 SQM.

ADO
UNAN
STRE
B. ZU
ET

R ST
BIRI
STRE

7752
ET

REE
T
VICINITY MAP CEBU INSTITUTE OF
TECHNOLOGY UNIVERSITY
SCALE NTS.

PRE- NURSERY FCU-2


CLASSROOM 3.0HP
29.30 SQM.

2699
FCU-2
3.0HP

PLAY AREA

4379
67.48 SQM. STORAGE

16335
12.24 SQM.

NURSERY

4753
FCU-2
CLASSROOM 3.0HP
29.30 SQM.

10900
6521
FCU-1
2.0HP
FCU-2
WAITING AREA ADMIN
3.0HP

4345
27.11 SQM.
20.33 SQM.

FCU-2
3.0HP

4267 6384 3198


13850

MECHANICAL LAYOUT
SCALE 1:200 MTS.
SEAL REG. NO. : 0003430 PTR. NO: 7390475 PROFESSIONAL MECHANICAL ENGINEER PROJECT OWNER : DESIGNED: EDAS SHEET NUMBER
ISSUED AT: CEBU CITY TIN NO: 119-265-987
PROJECT TITLE : DRAFTED : -
EDWIN Q. TEVES
ISSUED ON: 01/03/2019 KASILINGANAN EDUCATORS INC. CHECKED: EDAS

A PROPOSED INTERIOR RENOVATION OF PAREF PRE-SCHOOL DATE : M-02


EZPELETA-DEMIAR ARCHITECTURAL SOLUTIONS OCTOBER 2019
Unit 312, Doña Luisa Building, Fuente Osmeña, Cebu City TEL. NOS. (032) 266-1497
EZPELETA-DEMIAR
ARCHITECTURAL
SOLUTIONS
LOCATION: CASA MIRA TOWERS, SALVADOR EXT. LABANGON, CEBU CITY ADDRESS: CASA MIRA TOWES SALVADOR EXT. LABANGON, CEBU CITY
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE BUILDING OFFICIAL
8075 CEBU CITY

6432
1839 6236
RECOMMENDING APPROVAL

HEAD ARCHITECTURAL SECTION DATE

APPROVED:

4421

4448
BUILDING OFFICIAL DATE

6765

12200
4828
SPEAKER

7752
SPEAKER
4753

SPEAKER

4379
SPEAKER
16335
4753

SPEAKER

10900
modem

AMPLIFIER

SPEAKER

6521
SPEAKER
4345

SPEAKER

PAREF PRE-SCHOOL
ECE-01 ELECTRONICS LAYOUT
4267 6384 3198 1 SCALE 1:120 M.

13850

SEAL REG. NO. : 0000432 PTR. NO: 1640868 PROF. ELECTRONICS ENGINEER PROJECT OWNER : DESIGNED: EDAS SHEET NUMBER
ISSUED AT: CEBU CITY TIN NO: 148-728-912
PROJECT TITLE : DRAFTED : -
VICTOR C. NAVARRO
ISSUED ON: 01/04/2019 KASILINGANAN EDUCATORS INC. CHECKED: EDAS

EZPELETA-DEMIAR ARCHITECTURAL SOLUTIONS


A PROPOSED INTERIOR RENOVATION OF PAREF PRE-SCHOOL DATE : ECE-01
OCTOBER 2019
Unit 312, Doña Luisa Building, Fuente Osmeña, Cebu City TEL. NOS. (032) 266-1497
EZPELETA-DEMIAR
ARCHITECTURAL
SOLUTIONS
LOCATION: CASA MIRA TOWERS, SALVADOR EXT. LABANGON, CEBU CITY ADDRESS: CASA MIRA TOWERS, SALVADOR EXT. LABANGON, CEBU CITY

You might also like