J910-DH02-P0ZEN-049002 - B - ITP For Fence and Gate
J910-DH02-P0ZEN-049002 - B - ITP For Fence and Gate
J910-DH02-P0ZEN-049002 - B - ITP For Fence and Gate
Owner’s Engineer
Contractor
Sub-Supplier
Project
Document No.
J910-DH02-P0ZEN-049002
ITP FOR FENCE AND GATE WORK
J910-DH02-P0ZEN-049002
RECORD OF REVISION
Rev. Date Page Affected Description of Revision
Rev.B 2 of 11
Jawa 9&10 Coal Fired Steam Power Plant_ITP Comment Sheet
From : O/E Mr. - -
To : HK Mr. I Made Japasunu j_japasunu@yahoo.com Comment Sheet Document No : J910-DH02-P0ZEN-049002_CS
cc : IRT Mr. Steve Adrianto Steve.adrianto@irt.co.id
Doc Title : ITP FOR FENCE AND GATE
Doc No : J910-DH02-P0ZEN-049002
Purpose : FA
Review Category
A = Approved
B = Approved with comments, forward final document C
C = Not Approved
I = Accepted for reference (For information only)
No. Rev. Sheet/ Page/ Sect. O/E Comments Consortium Response Status
1. Update the legend
2. Additional Point for Fence Material
1 A 7-8/11/- These are applied on Rev. B. Closed
3. Correction on CONTROL DOCUMENT, ACCEPTANCE CRITERIA and VERIFYING
DOCUMENT.
We added new ITP form for Fence Material Inspection and updated the ITP
1. Add new Appendix: Fence Material Inspection
Form number to ITP-C-0001-27.
2 A 9/11/- Closed
It is applied on the ITP Form for Inspection for Boundary of Fencing
2. Add: Coordinate Check. And revise the mistyped words.
Foundation and updated ITP Form number to ITP-C-0001-28.
1. Please add Coordinate check We don't use Precast Post and Panels, those points are added to Inspection for
3 A 10/11/- Boundary Fencing Foundation form. We updated some points related to Closed
2. Please add Strightness/Plumbness Check Precast Post and Panels on the Detals of ITP table.
Add: 5. General Connection Check
4 A 11/11- a. Bolt Tightening Check (if any) These are applied on Rev. B. Closed
b. Welding Connection Check (if any)
ITP FOR FENCE AND GATE WORK
J910-DH02-P0ZEN-049002
TABLE OF CONTENTS
I. INTRODUCTION…………………………………………………………………. 4
1.1.Inspection and Test Plan (ITP)
1.2.Acceptance Conditions
1.3.Request for Inspection and Test (RFI)
1.4.Documentation
Rev.B 3 of 11
ITP FOR FENCE AND GATE WORK
J910-DH02-P0ZEN-049002
I. INTRODUCTION
Rev.B 4 of 11
ITP FOR FENCE AND GATE WORK
J910-DH02-P0ZEN-049002
H : Hold Point
Consortium shall also send a notification to the Owner prior to perform the related
test or inspection. If the Owner fails to be present, any construction activities shall
not be proceeded by Consortium without attendence or any written approval of the
Owner.
1.4. Documentation
a. The results of inspections and tests shall be documented in writing and signed by the related
parties as a token of approval
b. Signed documents shall be controlled as a QA records in accordance with the related procedure.
Rev.B 5 of 11
ITP FOR FENCE AND GATE WORK
J910-DH02-P0ZEN-049002
II. FLOW CHART OF SITE MATERIAL INSPECTION
SITE
Rev.B 6 of 11
ITP FOR FENCE AND GATE WORK
J910-DH02-P0ZEN-049002
1 Fence Material
1.1 Material of Fence (Post, Chainlink, and Comply with
Contract Book 4.8.4.15.2 Vendor's Brochure I/R V -
Barbed Wire, ect.) Specification
Comply with
B 1.2 Warehouse/Receiving Point at Site Contract Book 4.4.2
Specification
ITP-C-0001-27 I/R V -
2 Foundation
2.1 Concrete Mix Design include Mixing Approved Concrete Mix Comply with
proportion Design/Approved Specification and Lab.Report I/R SW R
Specification and Drawing Drawing
Comply with
2.2 Main Reinforcing Bar ASTM A615M Grade 60 I/R V R
Specification Lab.Report
Comply with Method
2.3 Excavation for Foundation Method Statement I/R V -
Statement ITP-C-0001-28
Slump/Compressive Comply with
2.4 Field Test for Concrete I/R V -
Strength Test Specification Lab.Report
Comply with Method
2.5 Formwork Method Statement I/R V -
Statement ITP-C-0001-28
3 Prefabricated Fence Post
Comply with
3.1 Size and dimension Contract Book 4.8.4.15.2 I/R SW -
Specification ITP-C-0001-28
Comply with
3.2 Fixing of post Contract Book 4.8.4.15.2 I/R V -
Specification ITP-C-0001-28
3.3 Corners and juction shall be provided per Comply with
Contract Book 4.8.4.15.2 I/R V -
drawing Specification ITP-C-0001-28
Rev.B 7 of 11
ITP FOR FENCE AND GATE WORK
J910-DH02-P0ZEN-049002
Rev.B 8 of 11
ITP FOR FENCE AND GATE WORK
J910-DH02-P0ZEN-049002
IV. APPENDICES
APPENDIX 1
Form No. ITP-C-0001-27
Inspection Result
No. Description Remarks
Accept Reject
1 Vertical Post
- Diameter
- Length
- Coating Thickness
2 Chainlink
- Diameter
- Size of Mesh
- Coating Thickness
3 Barbed Wire
- Dimensions
- Coating Thickness
Note :
Rev.B 9 of 11
ITP FOR FENCE AND GATE WORK
J910-DH02-P0ZEN-049002
APPENDIX 2
Form No. ITP-C-0001-28
INSPECTION FOR BOUNDARY
FENCING FOUNDATION
Inspection Result
No. Description Remarks
Accept Reject
1 Excavation
Dimension :
- Width and Length
- Depth
2 Field Test
3 Formwork
- Dimension
- Elevation
B
4 Rebar Work
- Bending
5 Coordinate Check
Note :
Rev.B 10 of 11
ITP FOR FENCE AND GATE WORK
J910-DH02-P0ZEN-049002
APPENDIX 3
Form No. ITP-C-0001-29
INSPECTION FOR STEEL, BRACES AND
ACCESSORIES
Inspection Result
No. Description Remarks
Accept Reject
Bolt, Nut, U Clip shall be hot dip galvanized with minimum
1
thickness of 75 microns
All wire shall be galvanized with the weight of zinc coating not
2 less than 0.24 kg/m2 for 2.5mm wire and 0.20 kg/m2 for 2.11
wire
Note :
Rev.B 11 of 11