Bom Ilagan Demolition
Bom Ilagan Demolition
Bom Ilagan Demolition
HOLDINGS
CORPORATION
ENGINEERING
San Fermin, Cauayan City,
Isabela
DEPARTMENT
BILL OF MATERIA
ITEM
ITEM DESCRIPTION
NO.
1.0 Demolition Works
Ground Floor
Wall
CR slab
Beam
Columns
Roll up Doors
2nd Floor
Wall
Slab
Beams
Columns
Corridor Grills
Concrete Bleacher
Roofing
Perimeter Fence
Site Clearing
Sub-Total
Total for Structural Works
GRAND TOTAL
PREPARED BY:
PREPARED BY:
Engr. Jake Christopher L. Montero
Site Engineer - Dangan Project
OF MATERIALS
Revised
Qty Unit Unit Cost Total Cost
834,616.62
Ap
Ap
pr
pr
ov
ov
ed
ed
BY
BY
::
En
En
Ngr.
gr.
oRo
Ro
t ss
ss
ean
an
doo
Ca
Ca
Bnlnl
Yasas
:Co
Co
ns
ns
Gtrtr
auc
uc
utio
tio
dnn
iMM
oan
an
sagag
To Date
Percentage
qty unit cost total
###
###
-
###
###
Demolition
1st Floor
Wall
designation Length width depth/height number Area
W-1 3.6 2.8 6 60.48
W-2 2.6 2.8 3 21.84
w-3 1.4 2.8 5 19.6
w-4 3.1 2.8 14 121.52
w-5 3.4 2.8 1 9.52
w-6 5.3 2.8 2 29.68
w-7 2.639 2.8 1 7.3892
270.0292
Column
c-1 0.4 0.4 6.8 38
beam
b-1 3.1 0.4 0.35 31
b-2 5.3 0.4 0.35 31
cr 3.8
Wall
w-1 17.1 2.1 1 35.91
w=2 17.485 6 1 104.91
w-3 11 2.1 4 92.4
w-4 10.638 2.1 3 67.0194
w-5 21.367 2.1 1 44.8707
w-6 28.635 6 1 171.81
w-7 3.6 2.1 8 60.48
w-8 27.985 2.1 1 58.7685
636.1686
Bleacher
28.5 0.8 0.5 4
Column
c-1 0.4 0.4 2.7 12 5.184
3.6 2.8 8
Beam
28.635 0.4 0.35 2 8.0178
11 0.4 0.35 2 3.08
450000
46.6 0.4 0.35 3 19.572
5.3 0.4 0.35 8 5.936
3.1 0.4 0.35 6 2.604
39.2098
Roof bea,
180.397 0.3 0.25 1 13.529775
3rd Floor slab
116.9449271775
volume remarks
chb
chb
chb
roll up door
41.344
13.454
23.002
36.456
45.6 694.7986
m3
b-1
b-2
b-3
b-4
b-5
52.73958