Daily Report Welding: Cycle Power Plant Project Epc Gas Pipeline of 275 MM For Riau Gas Fired Combined

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

DAILY REPORT WELDING

Document Title :

Client :PT.CITRA PANJI MANUNGAL


Job No. :
EPC GAS PIPELINE OF 275 MM FOR RIAU GAS FIRED
DATA PIPE Project :
COMBINED
NO REPORT : 1 CYCLE POWER PLANT PROJECT
NDT INSPECTION
AFTER
REPAIR
VISUAL
NO DATE NO. JOINT INSPECTION REPAIR
1 7/31/2019 KP.01 M-64 ACC
KP.01 M-65 ACC
KP.01 M-66 ACC
KP.01 M-67 ACC
KP.01 M-68 ACC
KP.01 M-69 ACC
KP.01 M-70 ACC
KP.01 M-71 ACC
KP.01 M-72 ACC
KP.01 M-74 ACC

8/1/2019 KP.01 M-75 ACC


KP.01 M-76 ACC
KP.01 M-77 ACC
KP.01 M-78 ACC
KP.01 M-79 ACC
KP.01 M-80 ACC
KP.01 M-81 ACC
KP.01 M-82 ACC
KP.01 M-83 ACC
KP.01 M-84 ACC
KP.01 M-85 ACC
KP.01 M-86 ACC
KP.01 M-87 ACC
KP.01 M-88 ACC
KP.01 M-89 ACC
KP.02 M-01 ACC
KP.02 M-03 ACC
KP.02 M-04 ACC
KP.02 M-05 ACC
KP.02 M-06 ACC
KP.02 M-07 ACC

8/2/2019 KP.02 M-08 ACC


KP.02 M-09 ACC
KP.02 M-10 ACC
KP.02 M-11 ACC
KP.02 M-12 ACC
KP.02 M-13 ACC
KP.02 M-14 ACC
KP.02 M-15 ACC
KP.02 M-16 ACC
KP.02 M-17 ACC
KP.02 M-18 ACC
KP.02 M-19 ACC
KP.02 M-20 ACC
KP.02 M-21 ACC
KP.02 M-22 ACC
KP.02 M-23 ACC
KP.02 M-24 ACC
KP.02 M-26 ACC
KP.02 M-27 ACC
KP.02 M-29 ACC
KP.02 M-30 ACC

8/3/2019 KP.02 M-31 ACC


KP.02 M-32 ACC
KP.02 M-33 ACC
KP.02 M-34 ACC
KP.02 M-35 ACC
KP.02 M-36 ACC
KP.02 M-37 ACC
KP.02 M-38 ACC
KP.02 M-39 ACC
KP.02 M-40 ACC
KP.02 M-41 ACC
KP.02 M-42 ACC
KP.02 M-43 ACC
KP.02 M-44 ACC
KP.02 M-45 ACC
KP.02 M-46 ACC
KP.02 M-48 ACC
KP.02 M-49 ACC
KP.02 M-50 ACC
KP.02 M-51 ACC
KP.02 M-52 ACC

8/4/2019 KP.02 M-53 ACC


KP.02 M-54 ACC
KP.02 M-55 ACC
KP.02 M-56 ACC
KP.02 M-57 ACC
KP.02 M-58 ACC
KP.02 M-59 ACC
KP.02 M-60 ACC
KP.02 M-61 ACC
KP.02 M-62 ACC
KP.02 M-63 ACC
KP.02 M-64 ACC
KP.02 M-65 ACC
KP.02 M-66 ACC
KP.02 M-68 ACC
KP.02 M-69 ACC
KP.02 M-71 ACC
KP.02 M-72 ACC
KP.02 M-73 ACC
KP.02 M-74 ACC
KP.02 M-75 ACC
KP.02 M-76 ACC
KP.02 M-77 ACC
KP.02 M-78 ACC

8/5/2019 KP.02 M-79 ACC


KP.02 M-80 ACC
KP.02 M-81 ACC
KP.02 M-82 ACC
KP.02 M-83 ACC
KP.03 M-01 ACC
KP.03 M-02 ACC
KP.03 M-03 ACC
KP.03 M-04 ACC
KP.03 M-05 ACC
KP.03 M-06 ACC
KP.03 M-07 ACC
KP.03 M-08 ACC
KP.03 M-09 ACC
KP.03 M-10 ACC
KP.03 M-11 ACC
KP.03 M-12 ACC
KP.03 M-13 ACC
KP.03 M-14 ACC
KP.03 M-15 ACC
KP.03 M-16 ACC
R RIAU GAS FIRED

OWER PLANT PROJECT

TOTAL JOINT/DAY

10

21
21

21
24

21

118