Udaipur Cement Works Limited
Udaipur Cement Works Limited
Udaipur Cement Works Limited
01
VRM POWER
OPTIMIZATION
VRM Performance
Production Production
Capacity: 270 Capacity: 330
TPH TPH
EARLIER PRESENT
VRM Performance
S.N
Description Unit Designed / Upgraded Operating Data* % Change
o.
2 Residue % R @ 90 µ 12 12 0
*As per Energy Benchmarking Study conducted by CII for UCWL, we are the
country best in VRM power.
Background
Reducing N2 Pressure
from 50 bar to 45 bar
1
Upgradation: Mill Feed from 270 TPH to
300 TPH
New louver Ring & Armor Ring with Hard Faced Material,
Dam Ring, Scatter Ring, Wear/lining Ring
Reject Re-circulation
02
WHRS POWER
PERFORMANCE
WASTE HEAT POWER
WHRS of UCWL is one of the best performing WHRS in the country as per CII Energy
Benchmarking Study.
WASTE HEAT POWER
WHRS MODIFICATION FOR IMPROVED POWER PERFORMANCE
Logic Modification
Reduction of Auxiliary
Power
WHRS –Modification Performance
Sr. Before After
Modification Unit Gain/ Improvement
No Modification Modification
1 WHRS Power Generation KW 5800 6200 400
2 AQC- Boiler By - Pass Duct Modification
3 AQC-Boiler Outlet Draft mmwc 100 150 50
4 AQC- H.P Steam Pressure kg/cm² 14.6 16.8 2.2
6 AQC- H.P Steam TPH 13.3 15.0 1.7
5 AQC- L.P. Steam Flow TPH 2.7 3.01 0.31
7 E.S.P. Fan Power KW 250 150 100
Bird Water Pot Decoration Event to Create Awareness regarding Biodiversity among Children
Other Activities
Joy of Giving: A step towards Giving Back to those communities who don't have !!
A Case Study on Optimization of Energy & Productivity @
Udaipur Cement Works Limited