A Case Study Presentation

at 15th Green Cementech


2019 on Optimization of
Energy & Productivity
@

Udaipur Cement Works Limited


(a subsidiary of JK Lakshmi Cement Limited)
UCWL: Snapshot

UCWL is a subsidiary of JK Lakshmi Cement Ltd.

Located in Dabok near Udaipur

Installed Production Capacity of 3750 TPD

Brand Name: Platinum Heavy Duty Cement


Case Study

01
VRM POWER
OPTIMIZATION
VRM Performance

Production Production
Capacity: 270 Capacity: 330
TPH TPH

Specific Power Specific Power


Consumption: 25.0 Consumption: 14
kWh/MT kWh/MT

EARLIER PRESENT
VRM Performance
S.N
Description Unit Designed / Upgraded Operating Data* % Change
o.

1 Capacity TPH 330 302 8.48

2 Residue % R @ 90 µ 12 12 0

Specific Power Consumption

3 Mill Main Drive U/T 6.6 6.0 10

4 Classifier U/T 0.5 .09 82

5 Mill Fan U/T 7.1 4.7 33.80

Others (Bag House fan +


6 U/T 4 3.2 20
Reclaimer +Aux)

7 Overall U/T 18.2 13.9 23.62

8 Emission Level Mg/Nm3 20 14 30

*As per Energy Benchmarking Study conducted by CII for UCWL, we are the
country best in VRM power.
Background

The designed clinker production


capacity of kiln is 3750 MT / Day. To
cater designed clinker production
requirement Raw Mill is 6975 mt/day
330tph for 21 running hour

The then old mill capacity was 270


TPH, Hence it was decided to
increase the VRM capacity to
330TPH by innovative technique

It was decided to retrofit the VRM


with new classifier & Gearbox
VRM Performance by Modification

12 nos. (03 nos. after each Roller)


12 nos. (03 nos. before each Roller) 5 partial inserts “Plate" removed.
partial inserts “Plate" removed.
4
6 Reduced Nozzle Ring Velocity from
61.2 m/s to 58.3 m/s
Water Lance slot opening
increased from 2 mm to 5 mm. 3

7 Further Reduced N2 Pressure


from 45 bar to 40 bar

Roller Position Calibration 2

Reducing N2 Pressure
from 50 bar to 45 bar
1
Upgradation: Mill Feed from 270 TPH to
300 TPH

Gear Box from 1850 Kw / 27 RPM to 2500Kw / 30 RPM

Mill Motor from 2200 Kw to 2700 Kw

New louver Ring & Armor Ring with Hard Faced Material,
Dam Ring, Scatter Ring, Wear/lining Ring

Classifier LKS 67 to LSKS 71

Mill fan with VFD

RABH from ESP

Hydraulic line open loop to close loop


Installation of

Reject Re-circulation

Additive Circuit Belt Bucket


elevator for silo
filling
Case Study

02
WHRS POWER
PERFORMANCE
WASTE HEAT POWER

Contribution of WHR in total


Power Consumption is around Power Generation is 36-40
35% Unit/ton Clinker

Average generation is 6.2 MW


Auxiliary Consumption is
below 5%

WHRS of UCWL is one of the best performing WHRS in the country as per CII Energy
Benchmarking Study.
WASTE HEAT POWER
WHRS MODIFICATION FOR IMPROVED POWER PERFORMANCE

AQC- Boiler By pass of


Booster fan and
Erection of New
AQC- Boiler Repairing
Bypass Duct.
of Dust Separator with
Hard Facing
Installation of New
Damper in ESP Bypass
Duct
SP Boiler BY Pass
Damper Flap Sealing
Work

Logic Modification

Reduction of Auxiliary
Power
WHRS –Modification Performance
Sr. Before After
Modification Unit Gain/ Improvement
No Modification Modification
1 WHRS Power Generation KW 5800 6200 400
2 AQC- Boiler By - Pass Duct Modification
3 AQC-Boiler Outlet Draft mmwc 100 150 50
4 AQC- H.P Steam Pressure kg/cm² 14.6 16.8 2.2
6 AQC- H.P Steam TPH 13.3 15.0 1.7
5 AQC- L.P. Steam Flow TPH 2.7 3.01 0.31
7 E.S.P. Fan Power KW 250 150 100

8 S.P. Boiler By- Pass Damper Sealing Work


9 SP-Boiler H.P. Steam Pressure kg/cm² 16.0 18.0 2.0
10 S.P. Boiler H.P.Steam Flow TPH 14.7 15.2 0.5
11 S.P. Boiler L.P.Steam Flow TPH 4.9 6.0 1.1
12 S.P Boiler Flue Gas Inlet Temp. °C 374 347 27
13 Pre Heater Fan Inlet Temp. °C 205 180 25
14 Pre Heater Fan Power KW 1050 880 170
15 Total H.P Steam Generation TPH 28.0 30.2 2.2
16 Total L.P Steam Generation TPH 7.6 9.0 1.4
17 Total Power Saving KWH 670*

*GHG Emission reduction to the tune of 538.8 Kg CO2e


Other Activities

Bird Water Pot Decoration Event to Create Awareness regarding Biodiversity among Children
Other Activities

Joy of Giving: A step towards Giving Back to those communities who don't have !!
A Case Study on Optimization of Energy & Productivity @