DAFTAR KEBUTUHAN BAHAN

DRIVING RANGE SHELTER

No Nama Bahan Volume Satuan Harga Satuan Jumlah Harga

A Rangka Kayu 9,160,000


1 Tiang Kayu Ulin 10/10 @4m 14.00 Btng 375,000 5,250,000
2 Balok Kayu Ulin 10/10 @4m 10.00 Btng 375,000 3,750,000
3 Paku Ulin 2.00 Dus 80,000 160,000

B Rangka Atap Baja Ringan 108.57 m2 - 21,094,000


1 Atap Spandek 400*80 44.00 bh 257,000 11,308,000
2 Canal C75x65 55.00 Btng 79,000 4,345,000
3 Reng 35x50 44.00 Btng 43,000 1,892,000
4 Sekrup Rangka 3.00 dus 200,000 600,000
5 Sekrup Atap 2.00 dus 200,000 400,000
6 Nok Metal 22.00 bh 42,000 924,000
7 Lisplank 15.00 bh 63,000 945,000
8 Pisau Gerinda 15.00 bh 12,000 180,000
9 Lain-lain 1.00 Ls 500,000 500,000

C Beton Pondasi & Lantai 13.16 m3 20,453,863


1 PC (50 kg) 100.00 zak 60,000 6,000,000
2 Pasir beton 7.22 m3 275,000 1,985,140
3 Split Pecah mesin 2/3 8.42 m3 400,000 3,368,723
4 Wire Mesh m10 9.00 lbr 900,000 8,100,000
5 Papan dan kasau Bekisting 0.50 m3 2,000,000 1,000,000

D Kelistrikan 1,820,000
1 Kabel NYM 3x1.5 @50m 1 roll 350,000 350,000
2 Kabel NYM 3x2.5 @50m 1 roll 600,000 600,000
3 Fitting Lampu 4 bh 60,000 240,000
4 Lampu 4 bh 50,000 200,000
5 Saklar Ganda 1 bh 40,000 40,000
6 Stop Kontak 2 bh 40,000 80,000
7 Pipa konduit 20mm 5 btng 12,000 60,000
8 Klem, solatif, T-dos, dll 1 Ls 500,000 250,000

JUMLAH TOTAL 52,527,863