Exam : CSSGB

Title : CSSGB (Six Sigma Green Belt)

Vendor : ASQ

Version : DEMO

1
IT Certification Guaranteed, The Easy Way!

NO.1 Which element of waste best describes the cost of a resource being in the queue?
A. Waiting
B. Motion
C. Inventory
D. Correction
Answer: A

NO.2 The reason(s) for not marking the customer Specification Limits (SL) on a Control Chart is which
of these? (Note: There are 4 correct answers).
A. Process control teams should not control a process based on SLs
B. Displaying the SLs on a Control Chart sends a wrong signal toward process control
C. Marking the SLs on a Control Chart is against the principle of charting
D. By marking the SLs, one can confuse the operator as to what limits are critical
E. By using mere Control Limits the process only needs to be in Statistical Control
Answer: A,B,D,E

NO.3 According to a manager it takes an average weekday commute of 39 minutes with a Standard
Deviation of 7 minutes for the employees to get to work when they use their personal vehicles for
their office commute while management set a policy of not more than 40 minutes for their daily one-
way commute. A survey conducted one day on 70 employees showed an average of 34 minutes
commuting time using the metro public transportation system with a Standard Deviation of 21
minutes. For the employees choosing to increase their chances to come on time using personal
transportation their variation should be reduced to ___________?
A. 1 minute
B. 6 minutes
C. 3.5 minutes
D. Eliminate it to 0.0 minutes
Answer: C

NO.4 A Stable process is a process whose output is consistent over time. A primary tool used to
analyze Stability would be a ________________.
A. Data Forward Plot
B. Bag Plot
C. Min/Max Plot
D. Time Series Plot
Answer: D

NO.5 The Standard Deviation for the distribution of Means is called the ___________ and approaches
zero as the sample size reaches 30.
A. Standard Error
B. Mean Deviation
C. Mean Spread
D. Mean Error

2
IT Certification Guaranteed, The Easy Way!

Answer: A

NO.6 Which element of waste best describes "the unnecessary movement of materials and/or
goods"?
A. Overprocessing
B. Motion
C. Conveyance
D. Correction
Answer: C

NO.7 Which of the following is used to test the significance for the analysis of a Variance Table?
A. t Test
B. F Test
C. Chi Square Test
D. Acid Test
Answer: B

NO.8 Voice of the Customer is a Lean Six Sigma technique to determine __________________
attributes of a product or service.
A. At least 6
B. The profitable
C. Critical-to-Quality
D. The majority of the
Answer: C

NO.9 The very best way to begin an effort to map a process is to do which of these?
A. Interview the process owner
B. Interview the manager of the department
C. Walk the actual process from beginning to end
D. Take pictures of the factory floor at each shift
Answer: C

NO.10 When two Inputs have an impact on the Output together yet seem to have no or little impact
on their own this is called a/an ________________.
A. Interaction
B. Oddity
C. Coincidence
D. Impossibility
Answer: A

NO.11 When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make
certain the activity is _______________ .
A. Well documented
B. Removed from the line

3
IT Certification Guaranteed, The Easy Way!

C. Mistake proofed
D. Highly visible
Answer: C

NO.12 The term FMEA is an abbreviation for Failures Measure Effective Automation.
A. True
B. False
Answer: B