Friction Loss
Friction Loss
Friction Loss
6.05*100000 605000
(D4.87xC1.85) = 8129537068639834.0
(6.05x105/B13)= 0.00000000007
V=? 5 m/sec
18000 m/hr
Q=? 135 m3/hr
2249.991 lpm
d=? 0.0095504903
0.0977266098
MM= 97.726609777 mm
3) ISOSCELES RIGHT
1) TRIANGLE
PERIMETER = a+b+c
AREA = 1/2 bh
PERIMETER = 2a+d
AREA = 1/2 a2
Page 1
Sheet1
d= a x sq.root( 2 )
2) RIGHT
PERIMETER = 3a
AREA = sq.root(3)/4 x a
5) SQUARE h=sq.root(3)/2 x a
PERIMETER = 4a 7) RHOMBUS
AREA = a2
Diagonal=a x sq.root(2)
6) PARALLELOGRAM
PERIMETER = 2(a+b)
AREA = b x h
PERIMETER = 4a
AREA = d1d2 / 2
8) TRAPEZIUM Side a=1/2xsqrt(d
AREA = 1/2 x h ( a + b)
VOLUME OF SOLIDS:
1) CUBOID
SURFACE AREA = 2(lb + bh + lh)
VOLUME = lbh
Length of Diagonal =sq.root(l2+ b2+ h2)
2) CUBE
3) CYLINDER
AREA =2 rh.
Page 2
Sheet1
4) CONE
AREA = rl.
Total Surface Area = r(r+l).
VOLUME= 1/3 r2h.
5) Frustum of a Cone
6) Sphere
AREA =4 r2.
VOLUME= 4/3 r3.
7) Hemisphere(solid)
8) Spherical shell
Page 3
Sheet1
EXAMPLE:
Pf =0.045 Bar.
Pe = -0.147 Bar.
Pt = Pf - Pt
Pt = Pf - Pt
Pt = {0.045 - ( -0.147)}
) ISOSCELES RIGHT
ERIMETER = 2a+d
REA = 1/2 a2
Page 4
Sheet1
= a x sq.root( 2 )
4) EQUILATERAL
ERIMETER = 3a
REA = sq.root(3)/4 x a2
=sq.root(3)/2 x a
RHOMBUS
ERIMETER = 4a
REA = d1d2 / 2
de a=1/2xsqrt(d12 + d22)
Page 5