2 Storey School Building Katuparan Village
2 Storey School Building Katuparan Village
2 Storey School Building Katuparan Village
Structural Excavation
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit
Excavation 209.36 Cu. M 329 Cu. M
Backfilling and Compaction 128.61 Cu. M 180 Cu. M
Embankment / imported fill 240.52 Cu. M Cu. M
Gravel Fill 68.84 Cu. M 39 Cu. M
Concrete Works
Resting on Ground Concrete,
28 MPA @ 28 days
Masonry Works
Concrete Hollow Blocks, 150 mm thk.
Finishing Works
Finishes
Painting Works
Finishes
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit
Electrical Works
Cicruit Breakers and Panel
Boards
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit
Enclosed Air Circuit Breaker(50 A,
2P, 220V, 20 AT 1 set 1 set
Electrical Works
Electrical Works
Electrical Fixtures, Outlets, Switches &
Accessories
Plumbing Works
Drainage System
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit
PVC Downspout, 75mm dia. 84 lin.m 137 lin.m
Plumbing Works
Sewer system
A. Materials Katuparan Village Kakarong Resettlement
Description Quantity Unit Quantity Unit
Difference
-119.64
-51.39
29.84
Difference
425.38
Concrete Works
Resting on Ground Concrete,
28 MPA @ 28 days
Difference
Difference
Masonry Works
Concrete Hollow Blocks, 150 mm thk.
Difference
95.59
137.73
Difference
71.4
Difference
-1.98
1778.1
2389.68
Difference
0
0
2
5
1
-2
0
2
3
-8
Difference
36.51
7.49
Difference
1430.01
212.61
Electrical Works
Cicruit Breakers and Panel
Boards
Difference
Electrical Works
Difference
Electrical Works
Electrical Fixtures, Outlets, Switches &
Accessories
Difference
0
4
-6
8
13
-12
-6
Plumbing Works
Drainage System
Difference
-53
-37
-12
-12
-12
Plumbing Works
Sewer system
Difference
-14
12
5
-2
4