This document provides a quotation for transporting rail equipment materials from Manila/Subic to Clark in the Philippines. It lists the charges including ocean freight, surveys, customs clearing, port charges, and trucking. It outlines general terms such as payment terms, liability exclusions, permits, and documentation requirements. Freight charges are in USD per metric ton and trucking charges are in USD per truck.
This document provides a quotation for transporting rail equipment materials from Manila/Subic to Clark in the Philippines. It lists the charges including ocean freight, surveys, customs clearing, port charges, and trucking. It outlines general terms such as payment terms, liability exclusions, permits, and documentation requirements. Freight charges are in USD per metric ton and trucking charges are in USD per truck.
This document provides a quotation for transporting rail equipment materials from Manila/Subic to Clark in the Philippines. It lists the charges including ocean freight, surveys, customs clearing, port charges, and trucking. It outlines general terms such as payment terms, liability exclusions, permits, and documentation requirements. Freight charges are in USD per metric ton and trucking charges are in USD per truck.
This document provides a quotation for transporting rail equipment materials from Manila/Subic to Clark in the Philippines. It lists the charges including ocean freight, surveys, customs clearing, port charges, and trucking. It outlines general terms such as payment terms, liability exclusions, permits, and documentation requirements. Freight charges are in USD per metric ton and trucking charges are in USD per truck.
Unit 602, 6th floor, Altoha Bldg, 2100 Madre Ignacia Street, Malate, Manila 1004 Philippines
Quotation报价
To致:中铁一局
Cargo货物 铁路设备物资
POL装货港 - POD卸货港 Manila/subic
Doc No.文件号 - Invoice No.发票号 -
Destination目的地 Clark
Charge Basis Currency Unit price Quantity Sub-total Remark
费用 计价标准 币种 单价 数量 总价 备注
Ocean fright Per FT USD 32.00 - -
LPSR Per BL USD 500.00 - -
Brokerage Per BL As per CAO 1-2001
Customs clearing Per FT USD 2.50 - -
Port charge Per FT USD 18.00 - -
Trucking (Subic- Per Truck USD 550.00 - - Clark) Trucking (Subic- Per Truck USD 600.00 - - Clark) General terms and conditions: 1. Rates exclude 12% VAT. Value added tax to be applied wherever applicable. 2. All breakbulk shipments should have a Load port survey report (LPSR) conducted by 3rd party surveyor accredited by the Philippines Bureau of customs at load port and should be submitted to us prior to vessel arrival. 3. Import clearance is based on normal clearance procedures. Securing of government exemptions/permits, if any are excluded and will be quoted separately. 4. Consignee must have a valid import license accredited by the Bureau of Customs. 5. We will not be held liable for any delay, damage or losses of cargo due to force majeure, fortuitous event and other causes beyond our control, otherwise not attributable to our fault or negligence. 6. Port storage and detention charges, any penalty as well as 3rd party charges are excluded, amounts are based on tariff, actual outlays as per official receipts, shall be billed. 7. Removal of road obstacles, if any, are not included in our scope and for your account. 8. All permits need to enter/exit the working area to be provided by client at no cost to SINOTRANS (Phil) Inc. 9. All above charges are exclusive of government tax or import duty. Duty and tax is payable directly to customs & excise. We shall advise you of the duty amount incase levied. 10. Minimum 15 working days advance notice prior to cargo arrival required for documentation and arrangement for equipment. 11. For safety, SINOTRANS (Phil) Inc shall perform the transport & loading during good weather condition. 12. Terms of payment: 50% advance payment on the total invoice before the vessel arrival, the other final payment should be completed when the cargo reach destination, 10 days from receipts of our invoice. 13. Freetime and detention charges as following: a. chassis & flatbed trailer: 4 hours from arrival at site. Detention charge at USD 20.00 per hour/truck to be charged after the free time. Detention excess 12 hours will be charged additional one trip; b. lowbed trailer: one day each from arrival at port and at delivery site. Detention charges at USD 750.00 per day/trailer to be charged after the expiration of the free time. 14. Validation: