Manpower Prodcutivity Calculation
Manpower Prodcutivity Calculation
Manpower Prodcutivity Calculation
Plate compactor
concrete Pump
Mobile Crane
Carpentor
Steel fxer
Scafolder
Carpentor
Steel fxer
Scafolder
Excavator
Quantity.
Painter
Mason
Helper
Painter
Mason
Helper
Shovel
JCB
Origina 8
l
Duratio
Activity ID Activity Name n Start Finish Units .
Construction 87 28-Mar-19 29-Jul-19
Area 87 28-Mar-19 29-Jul-19
Foundation_Lo 84 28-Mar-19 24-Jul-19
Tank - 67 28-Mar-19 30-Jun-19
1 Intial Survey & Marking for Excavation 2 28-Mar-19 30-Mar-19
2 Excavation & Disposal 3 1-Apr-19 4-Apr-19 m3 21 200 176
3 Compaction & Bed Preparation 2 11-Apr-19 13-Apr-19 m2 32 144
4 Shutter fixing & Laying of Polythene Sheet for Blinding 2 18-Apr-19 20-Apr-19 m2 4 4.8 8 12 5 8 0
5 Inspection & Pour Blinding Concrete 2 21-Apr-19 22-Apr-19 m3 3 7 8 12 3657 5486
6 Rebar Fixing, Insertion of HDPE Strip & Anchor Bolts in the Ring Wa 5 23-Apr-19 28-Apr-19 kg 3200 300 8 8 3 3
7 Shutter fixing for Wall & Fixing for the Ring Wall 7 24-Apr-19 1-May-19 m2 130 3.5 8 12 4 69 103 34
8 Inspection & Pour Concrete Ring Wall 5 4-May-19 8-May-19 m3 30 5 8 12 194 290
9 Shutter strike and Curing for Ring Wall 3 9-May-19 13-May-19 m2 121 8 8 12 75 113
10 Protection for Ring Wall Concrete 3 14-May-19 16-May-19 m2 75 15 8 46
11 Back Filling at Ring Wall Upto above GL (1000 mm approx.) 8 16-May-19 29-May-19 m3 86 120
1
Tipper
360
360
Tele handler achinery (in
Excavator
JCB
0.16 0.18
Mobile Crane
Plate compactor
0.02778
#REF!
Shovel
Machinery Hours
concrete Pump
Tipper
#REF!
0.089
Tele handler