3. Project Description
(1) Project Objective(s)
The objective of this project is to provide safe and stable water supply service to
meet the growing demand for water by installing water supply facilities in the state of
Kerala in southern India; thereby contributing to improving living conditions of the local
residents.
(2) Project Site / Target Area
Thiruvananthapuram, Kozhikode, Cherthala, Meenad, Pattuvam, and the surrounding
areas.
(3) Project Component(s)
1) Water supply facilities: Construction of water intake facilities / conducting tubes /
treatment plants / water mains / distribution reservoirs / distribution pipes and
rehabilitation of existing facilities
2) Consulting services: Detailed design, tendering assistance supervision, project
oversight, etc.
3) Institutional strengthening of the executing agency: IT system development,
equipment procurement, training, etc.
(4) Estimated Project Costs (Loan Amount)
75,150 million yen (ODA loan amount: 12,727 million yen)
(5) Schedule
August 1997 – December 2010 (160 months). The project completion is defined as
completion of the construction and consulting service.
(6) Project Implementation Structure
1) Borrower: The President of India
2) Executing Agency: Kerala Water Authority (KWA)
3) Operation and Maintenance System: Same as 2) above.
(7) Environmental and Social Consideration/Poverty Reduction/Social Development
1) Environmental and Social Consideration
a) Category: Does not apply
b) Reasons for categorization: For this project, the “OECF Guidelines for
Environmental Considerations” (first edition) are applied. (Furthermore, this project is
classified as Category B under the “Japan Bank for International Cooperation Guidelines
for Confirmation of Environmental and Social Considerations” (established April 2002)
because it was determined that the project will not have any significant undesirable
impact on the environment given that the characteristics of the sector is not likely to exert
impact, and the characteristics of the region make it unsusceptible to impact.)
c) Environmental Permit:The EIA report is not required for the project in the country’s
legal system.
d) Anti-Pollution Measures: No ground subsidence is foreseen due to intake of
surface water from rivers in each area. The sludge generated at the water treatment
plant will be processed at sludge treatment facilities to be constructed inside the water
treatment plant sites.
e) Natural Environment: The project site is not located in and around any sensitive
areas such as national parks, and it is likely to have a minimal adverse impact on the
natural environment.
f) Social Environment: Land acquisition of 76.38 ha has been completed as of
November 2008, and the remaining 0.75 ha is proceeding in accordance with the
country’s domestic procedures. The resident relocation of 8 households in Kozhikode
and 5 households in Cherthala has been completed in accordance with the country’s
domestic procedures.
g) Other/Monitoring: KWA will monitor water quality, etc.
2) Promotion of Poverty Reduction: Improvement in living standards in poor regions.
3) Promotion of Social Development (e.g. Gender Perspective, Measure for Infectious
Diseases Including HIV/AIDS, Participatory Development, Consideration for Persons
with Disabilities, etc.): None.
(8) Collaboration with Other Donors: None.
(9) Other Important Issues: None.
4. Targeted Outcomes
(1) Performance Indicators (Operation and Effect Indicator)
Indicator Baseline Target (2012)
(Actual value in 2006)
[Expected value 2 years after completion]
Thiruvananthapuram Kozhikode and the Thiruvananthapuram and Kozhikode and the
and the surrounding surrounding area the surrounding area surrounding area
area
Total population 698 560 845 1,011
served (thousand
persons)
Amount of water 190,000 72,000 264,000 246,000
supply (m3/day)
Rate of facility - - 95 95
utilization (%)
Non-revenue 37 30 29 25
water rate (%)
Percentage of 77 52 90 90
population served
(%)
End