Back Fill With Selected Excavation Material Around All Foundation and Column
Back Fill With Selected Excavation Material Around All Foundation and Column
Back Fill With Selected Excavation Material Around All Foundation and Column
Preliminaries
Description Amount
total $305,000
1|Page
Block Work
Description Amount
total $504,650
2|Page
Decking
Description Amount
3|Page
Casting
Description Amount
total $322,450
4|Page
Electrical material
10 handy box
12 octagon box
14 receptacles
12 switches
6 wall case
4 15 amp breaker
1 30 amp breaker
1 G-O-5 breaker
3 3 ¾ pot head
1 metre box
6 10 mm male cupling
50 20 mm cupling
30 20 male cupling
5|Page
6 10 mm cupling
4 Bundle of 20 mm pipes
160 ft 10 mm red
80 ft 10 mm black
8 32 electrical bend
15 32 mm cupling
- Total
6|Page
Foundation material estimate
- Total - $390,100.00
- Total - $241,700
7|Page
Decking
- Total - $324,282.48
8|Page
Flashing, rendering and floor estimate
9|Page
Item Description Qty Unit Rate Amount
Engineering Service
Electrical installation
All electrical work should include all
necessary chasing of walls, installation
of conduits, wiring oxogonal boxes,
junction boxes, p.v.c wire connectors
and make good all work disturbed and
done by an approved electrician
plumbing installation
provide the following to complete
plumbing installation and accessories
complete with American standard band
Drainage
Manhole
Man hole 900mm × 900mm × 900mm
A deep complete with 150 mm thick
block, steel bars render and metal cover 2 No $28,000.00 $56,000.00
Septic tank
C $100,000.00
To supply and construct septic tank and
reed bed
Total