Cleaning and Rotor Replacement Instructions: Valco Instruments Co. Inc
Cleaning and Rotor Replacement Instructions: Valco Instruments Co. Inc
Cleaning and Rotor Replacement Instructions: Valco Instruments Co. Inc
Disassembly
Valves With External Spring Hardware
Perform all disassembly operations in a clean, well-lighted area. Flush all
hazardous or toxic materials from the valve before starting.
1. For a valve on a standoff: Use a 7/64" hex driver to loosen the 6-32 x 5/8" socket head screw in
the clamp on the end of the standoff (not the one which holds the standoff to the actuator) and
remove the valve from the actuator/standoff assembly.
For a closemount valve: Use a 7/64" hex driver to loosen the 6-32 x 5/8" socket head screw in the
clamp ring between the valve and the actuator, and remove the valve from the actuator.
2. Using a 7/16" open end wrench or nut-driver, loosen and remove the 10-32 hex nuts from the
threaded seal shaft. Slide the coil spring and washers from the shaft, taking care to note their order
for reassembly later.
3. Grasp the valve firmly and give a slight rotation to the 1/4" shaft of the rotor to break apart the
sealing surfaces. Alternatively, grip the valve with the 1/4" shaft pressed firmly into the palm of the
hand to restrict its travel and tap the end of the threaded shaft.
4. After the sealing surfaces are broken free in the above operation, carefully pull the rotor out of the
tapered interior of the valve body.
PRELOAD
ASSEMBLY
Valves With a Preload Assembly
Perform all disassembly operations in a clean, well-
lighted area. Flush all hazardous or toxic materials SOCKET
ADJUSTMENT
from the valve before starting. SCREW
1
2. Engage the end of the rotor (Figure 2) with a pencil-type magnet, available END OF ROTOR
NUTS
from Valco or any electronic components supplier.
3. Step the actuator through several positions to break apart the sealing surfaces
and carefully withdraw the rotor from the valve body with the magnet.
4. For a valve on a standoff: Use a 7/64" hex driver to loosen the 6-32 x 5/8"
socket head screw in the clamp on the end of the standoff (not the one that
holds the standoff to the actuator) and remove the valve from the actuator/
standoff assembly. Figure 2:
For a closemount valve: Use a 7/64" hex driver to loosen the 6-32 x 5/8" Valve viewed from
socket head screw in the clamp ring between the valve and the actuator, preload end
and remove the valve from the actuator.
Cleaning
1. Using clean dry air, blow any loose debris from the valve body and the rotor.
2. Using a strong solvent and an optical quality lint-free wiper such as a Kimwipe, wipe away any
loosely bound seal material which may have worn free and adhered to either surface. Avoid using
halocarbon solvents if the valve is to be used in a system with electron capture detection, since
some of the solvents may persist at the trace level. Consult the Manufacturer’s Data Safety sheet
for whatever solvent is utilized.
NOTE: If the valve has been used with aqueous buffer solutions and some leakage has occurred,
wipe the sealing surfaces of the valve with a water-moistened Kimwipe before using a nonpolar
solvent to clean any seal material still adhering to the valve’s interior.
3. Visually inspect the interior of the valve body. The conical surface should appear uniform as well as
highly polished. If scratches are visible between the ports or anywhere which suggests a potential
leakage path or wear source, the valve should be returned to the factory for regrinding. If the rotor’s
sealing surface shows any scratches and/or a narrowing of the surface flow passages, replacement
is necessary. If the valve body interior is in good condition, a field replacement of the rotor may be
effected using the following procedure.
STUW
The only configuration which does not fit this description is the STUW. STUWs have only
one row of ports around the circumference, with two common ports offset in the same
direction. The common ports are 180° apart, so the STUW and SDUW (with one offset
port) look identical in Figure 3. Special instructions for STUW, SDUW, and MW valves
are highlighted in this manner at several points in the following procedures.
The alignment procedure is a way of centering the perpendicular engraving on the selected port by
determining the point at which flow begins (when the engraving is just beginning to intersect the port)
and the point at which flow ends (when the engraving has ceased to intersect the port), and centering
the rotor between those two points.
2
ALIGNMENT INLET ALIGNMENT INLET ALIGNMENT INLET
SD SC SF
Configuration Configuration Configuration
ENGRAVED RING
ST STF STUW
Configuration Configuration Configuration
Figure 3:
Typical multiposition valve bodies and rotors (external spring hardware rotor shown above preload rotor)
3
5. Locate the flow passage(s) perpendicular to the ring(s) that go around the seal. Note the pin which
passes through the shaft. The end of the pin on the same side of the rotor as the flow passages(s)
perpendicular to the ring(s) will be used as a pointer. (Figure 3)
POINTER
STUW, SDUW, MW
The pointer will be that end of the tab which is stamped with a letter denoting
the rotor material. (Figure 4) Figure 4
6. Insert the rotor in the valve body with the pointer centered on the nut, being careful not to touch the
polished interior surface of the valve body with any of the metal parts of the rotor.
7. If the valve has external spring hardware, slide the three washers (in this sequence: 3/4" OD
washer, polymer or polyimide washer, standard 1/2" OD stainless steel washer) over the 3/16" diam-
eter threaded shaft while holding the rotor pressed firmly into the valve body. The flat side of the 3/4"
back washer should rest on the rear collar of the valve. Next put the spring and the stainless hex
nut in place. Tighten the nut 1/2 turn beyond the point where the spring touches the hardware at both
ends, and butt the elastic lock nut against it.
STUW, SDUW, MW
Screw the preload in fingertight.
8. For an electric actuator: Plug the actuator in. If the position indicator doesn’t read “1”, flip the
switch to the HOME position.
For an air actuator: Determine that the actuator is in Position 1, but then if necessary override or
disable the means of pulsing the air to the actuator so that pressure is continuously applied to the
actuator port nearest the valve.
9. Place the valve on the actuator/standoff. Factory alignment places the common port(s) at 12
o’clock. Re-orienting the drive shaft on the square drive of the actuator allows three other possibilities.
For a closemount valve: Make sure that the pin in the rotor or driver is engaged by the slots of
the coupling. Tighten the screw in the clamp ring enough to keep the valve from falling off, but make
sure it’s loose enough to allow the valve to be turned during the alignment procedure.
For a valve on a standoff: Make sure that the pin in the rotor or driver is engaged by the slots of
the standoff drive shaft, and tighten the standoff clamp screw. Loosen the screw in the clamp ring
which holds the standoff to the actuator enough to allow the valve/standoff assembly to be turned
during the alignment procedure.
10. Establish a flow of clean gas (50 psi is adequate) into the alignment inlet.
STUW
Establish gas flow into the common port at 6 o’clock (alignment inlet in Figure 3).
NOTE: When listening for flow in the following steps, it is helpful to isolate the sound by removing the
fitting from the port under consideration. If all the fittings have been removed, install a loop connecting
the two ports adjacent to the target port to better isolate the sound.
CAUTION:
Up to this point the instructions have applied to both air and electrically actuated valves. Because
the two types of actuators rotate in opposite directions, it is necessary for the instructions to
diverge at this point. For an electrically actuated valve, proceed with the steps immediately
following. For an air actuated valve, look for the heading on the next page.
4
For Electrically Actuated Valves
11. With the valve facing you and the actuator behind the valve, the port to the left of or counterclock-
wise from the alignment inlet corresponds to Position 1.
STUW
With the common port at 6 o’clock as the inlet, the port to the left of or counterclockwise
from the common port at 12 o’clock corresponds to Position 1.
If the assembly was done properly in Assembly Step 5, air will be coming out of the port to the right
of the alignment inlet (or common port at 12 o’clock for STUW’s). If so, proceed to Step 12. If the
initial alignment was off a little, grip the valve and rotate it slightly in either direction (the actuator
keeps the rotor fixed) until gas flows from this port. This sets up the “staging area” for the
approach to Position 1.
12. Slowly rotate the valve clockwise until the first trace of flow is heard from the port of Position 1.
13. While holding the valve steady, use a soft pencil or ink CLAMP RING
SCREW
marker to make a mark on the standoff corresponding FIRST MARK
to the slot in the actuator clamp ring. This slot makes a (Step 7)
16. Make a third pencil mark centered between the first two and rotate the valve clockwise until this
midway mark is reached. (Figure 6)
17. While holding the valve steady, firmly tighten the screw in the clamp ring. The rotor should be prop-
erly positioned at the point of maximum flow when the actuator is stepped to the next position.
It is a good idea to cycle the valve through all its positions to be certain everything is functioning
properly. In some cases it is possible to do an additional alignment check by simply looking down the
fitting detail and into the port as the valve is stepped from position to position. If it is a valve which has
a relatively short distance from the bottom of the detail to the internal taper, the engraved “dimples”
on the seal are visible as they come into alignment with the port.
Leak Detection
The instructions above put a minimum amount of tension on the spring to facilitate the manual
adjustments required in the alignment procedure. Before proceeding with this section, add an addi-
tional full turn to the hex nuts on the rotor shaft and cycle the valve through a complete revolution.
STUW, SDUW, MW
Use a wrench to tighten the preload assembly until the threads bottom out.
The valve should be tested with a gas leak detector. If a leak detector is unavailable, an alterna-
tive is to pressurize the valve with an appropriate gas and immerse it in a solvent with low surface
tension, e.g. 2-propanol. Be careful to test for gross leaks before immersing the valve. Wear eye
protection. 2.
If the valve leaks, tighten the nuts in 1/4 turn increments, cycling the valve through a complete revolution
between each 1/4 turn of tension, until the leaking stops. Test after each additional 1/4 turn. Never
tighten the spring to the point where its windings touch one another.
STUW, SDUW, MW
If the valve leaks, it must be returned to the factory for repair.
If additional help is needed, consult the factory or check out the support section of www.vici.com.
TN-703 Rev 4/17