CONTROL PLAN FOR ACID ZINC BARREL PLATING & HEXAVALENT PASSIVATION
PROTOTYPE PRELAUNCH PRODUCTION DATE(ORIG.)
KEY CONTACT:-
CUSTOMER 4/1/2007
CORE TEAM MR.PARVEEN KUMAR, MR.
CONTROL KAMLESH KUMAR
LATEST CHANGE LEVEL : CUSTOMER ENGG. APPROVAL DATE(I
PLAN NO
PART NAME SUPPLIER CODE: OTHER APPROVAL /DATE(IF REQD.) CUSTOMER QUALITY APPROVAL DAT
METHODS
SPECIAL
Machine, Device, CHARACTERSTICS CHAR. PRODUCT/PROCESS EVALUATION SAMPLE
Process Name /Operation
Process No. Description Jig, tools, make,
model, asset,etc CLASS SPECIFICATION/ MEASUREMENT
SIZE FREQ.
S.No. PRODUCT PROCESS TOLERANCE TECHNIQUE
0 INCOMING MATERIAL TO STORE photo displayed in incoming area
0 INSPECTION Appreance No rust & Dent Visual 05 nos. Each lot
2 WATER RINSE TANK II TIME 2-3 sec wall clock 1 Each lot
PART NAME SUPPLIER CODE: OTHER APPROVAL /DATE(IF REQD.) CUSTOMER QUALITY APPROVAL DAT
METHODS
SPECIAL
Machine, Device, CHARACTERSTICS CHAR. PRODUCT/PROCESS EVALUATION SAMPLE
Process Name /Operation
Process No. Description Jig, tools, make,
model, asset,etc CLASS SPECIFICATION/ MEASUREMENT
SIZE FREQ.
S.No. PRODUCT PROCESS TOLERANCE TECHNIQUE
III conductivity
max.1500 TDS METER 1 Every 4Hrs
microsiemens
6 WATER RINSE TANK I PH Value 3 -7 PH Paper 1 Every 4Hrs
III conductivity
max.1500 TDS METER 1 Every 4Hrs
microsiemens
VISHWAS ELECTROPLATERS
CONTROL PLAN FOR ACID ZINC BARREL PLATING & HEXAVALENT PASSIVATION
PROTOTYPE PRELAUNCH PRODUCTION DATE(ORIG.)
KEY CONTACT:-
CUSTOMER 4/1/2007
CORE TEAM MR.PARVEEN KUMAR, MR.
CONTROL KAMLESH KUMAR
LATEST CHANGE LEVEL : CUSTOMER ENGG. APPROVAL DATE(I
PLAN NO
PART NAME SUPPLIER CODE: OTHER APPROVAL /DATE(IF REQD.) CUSTOMER QUALITY APPROVAL DAT
METHODS
SPECIAL
Machine, Device, CHARACTERSTICS CHAR. PRODUCT/PROCESS EVALUATION SAMPLE
Process Name /Operation
Process No. Description Jig, tools, make,
model, asset,etc CLASS SPECIFICATION/ MEASUREMENT
SIZE FREQ.
S.No. PRODUCT PROCESS TOLERANCE TECHNIQUE
Sodium Hydroxide-
7 NEUTRALISER TANK I Concentration
3-5 % W/V
Lab Test 1 daily
Discard Frequency
chloride 130 ~
11 Lab Test 1 Daily
160 gm./ltr.
PART NAME SUPPLIER CODE: OTHER APPROVAL /DATE(IF REQD.) CUSTOMER QUALITY APPROVAL DAT
METHODS
SPECIAL
Machine, Device, CHARACTERSTICS CHAR. PRODUCT/PROCESS EVALUATION SAMPLE
Process Name /Operation
Process No. Description
Jig, tools, make,
model, asset,etc CLASS SPECIFICATION/ MEASUREMENT
SIZE FREQ.
S.No. PRODUCT PROCESS TOLERANCE TECHNIQUE
NITRIC ACID 1-2
10 ACTIVATION DIP TANK I Concentration Lab Test 1 Daily
%
III conductivity
max.500 TDS METER 1 Every 4Hrs
microsiemens
IV Discard Lab Test 1 daily
III conductivity
max.500 TDS METER 1 Every 4Hrs
microsiemens
VISHWAS ELECTROPLATERS
CONTROL PLAN FOR ACID ZINC BARREL PLATING & HEXAVALENT PASSIVATION
PROTOTYPE PRELAUNCH PRODUCTION DATE(ORIG.)
KEY CONTACT:-
CUSTOMER 4/1/2007
CORE TEAM MR.PARVEEN KUMAR, MR.
CONTROL KAMLESH KUMAR
LATEST CHANGE LEVEL : CUSTOMER ENGG. APPROVAL DATE(I
PLAN NO
PART NAME SUPPLIER CODE: OTHER APPROVAL /DATE(IF REQD.) CUSTOMER QUALITY APPROVAL DAT
METHODS
SPECIAL
Machine, Device, CHARACTERSTICS CHAR. PRODUCT/PROCESS EVALUATION SAMPLE
Process Name /Operation
Process No. Description Jig, tools, make,
model, asset,etc CLASS SPECIFICATION/ MEASUREMENT
SIZE FREQ.
S.No. PRODUCT PROCESS TOLERANCE TECHNIQUE
HEXVALENT GREEN PARKOVERT NR 80~100
12 TANK I Concentration Lab Test 1 Day
PASSIVATION ML/LTR
V Filtration 1 daily
III conductivity
max.500 TDS METER 1 Every 4Hrs
microsiemens
14 WATER RINSE TANK 1 PH Value 3-7 ph meter 1 Every 4Hrs
III conductivity
max.500 TDS METER 1 Every 4Hrs
microsiemens
Centrifugal/ Air
15 AIR DRYING 1 Dryness No water content Visual 1 Each lot
Drying M/c
PART NAME SUPPLIER CODE: OTHER APPROVAL /DATE(IF REQD.) CUSTOMER QUALITY APPROVAL DAT
METHODS
SPECIAL
Machine, Device, CHARACTERSTICS CHAR. PRODUCT/PROCESS EVALUATION SAMPLE
Process Name /Operation
Process No. Description
Jig, tools, make,
model, asset,etc CLASS SPECIFICATION/ MEASUREMENT
SIZE FREQ.
S.No. PRODUCT PROCESS TOLERANCE TECHNIQUE
17 INSPECTION Micro tester 1 Thickness 5~7 micron min. Thickness Tester 2% Each lot
Black
spot,blister,pitted,dull
11 APPEREANCE visual 100% Each lot
finish,water marks &
surface diffect
Salt Spray
18 N.S.S TEST 1 S.S.T 200 Hrs Lab Test 1 AS PER PLAN
Chamber
19 DISPATCH
SAFETY REQUIREMENTS
green passivation
VISHWAS ELECTROPLATERS
CONTROL PLAN FOR ACID ZINC BARREL PLATING & HEXAVALENT PASSIVATION
PROTOTYPE PRELAUNCH PRODUCTION DATE(ORIG.)
KEY CONTACT:-
CUSTOMER 4/1/2007
CORE TEAM MR.PARVEEN KUMAR, MR.
CONTROL KAMLESH KUMAR
LATEST CHANGE LEVEL : CUSTOMER ENGG. APPROVAL DATE(I
PLAN NO
PART NAME SUPPLIER CODE: OTHER APPROVAL /DATE(IF REQD.) CUSTOMER QUALITY APPROVAL DAT
METHODS
SPECIAL
Machine, Device, CHARACTERSTICS CHAR. PRODUCT/PROCESS EVALUATION SAMPLE
Process Name /Operation
Process No. Description Jig, tools, make,
model, asset,etc CLASS SPECIFICATION/ MEASUREMENT
SIZE FREQ.
S.No. PRODUCT PROCESS TOLERANCE TECHNIQUE
trivalent passivation
RESP. CONTROL
REACTION PLAN
METHOD
FRM/QA/04 REV
Engr./Grd
NO. 00
sup.
Not with in
FRM/QA/05 REV
Lab incharge specification add
NO. 00
chemical
FRM/QA/07 REV
NO. 00
supervisor
Lab incharge
FRM/QA/06 REV
supervisor
NO. 00
FRM/QA/07 REV
Change water
NO. 00
supervisor
FRM/QA/07 REV
Change water
NO. 00
supervisor
FRM NO.: VE/QA/01
LECTROPLATERS REV. NO.: 00
RESP. CONTROL
REACTION PLAN
supervisor METHOD
FRM/QA/05 REV
Lab incharge
NO. 00
supervisor
FRM/QA/06 REV
Lab incharge
NO. 00
FRM/QA/07 REV
Change water
NO. 00
supervisor
FRM/QA/07 REV
Change water
NO. 00
supervisor
FRM NO.: VE/QA/01
LECTROPLATERS REV. NO.: 00
RESP. CONTROL
REACTION PLAN
METHOD
FRM/QA/05 REV
Change every day
NO. 00
FRM/QA/05 REV
Lab incharge
NO. 00
FRM/QA/06 REV
Daily
NO. 00
Not with in
FRM/QA/05 REV
specification add
NO. 00
chemical
Not with in
FRM/QA/05 REV
Lab incharge specification add
NO. 00
chemical
Not with in
FRM/QA/05 REV
specification add
NO. 00
chemical
FRM/PR/05
supervisor
FRM/QA/07 REV
NO. 00
FRM/QA/08 REV
NO. 00
OUT SIDE
QA Engg
LABORATORY
FRM/QA/07 REV
Change water
NO. 00
supervisor
FRM NO.: VE/QA/01
LECTROPLATERS REV. NO.: 00
RESP. CONTROL
REACTION PLAN
METHOD
supervisor
FRM/QA/06 REV
NO. 00
FRM/QA/07 REV
Change water
NO. 00
supervisor
FRM NO.: VE/QA/01
LECTROPLATERS REV. NO.: 00
RESP. CONTROL
REACTION PLAN
METHOD
Not with in
FRM/QA/05 REV
Lab incharge specification add
NO. 00
chemical
FRM/QA/07 REV
NO. 00
supervisor
FRM/QA/07 REV
NO. 00
Operator
FRM/QA/07 REV
NO. 00
supervisor
FRM/QA/07 REV
NO. 00
supervisor
FRM/QA/07 REV
NO. 00
FRM NO.: VE/QA/01
LECTROPLATERS REV. NO.: 00
RESP. CONTROL
REACTION PLAN
METHOD