Shuttering
Shuttering
Shuttering
Severity rating
Hazard / Environment Aspect
Probability
Risk / Residual
rating
Sl.no Activity Existing control measures Imapct Additional Control measures Risk / Action by
Source / Situation /
Possible outcome People at risk level Impact
Act
1) Heavy material
Steel Wallers 1) Muscle strains / workmen
handling
3 handling & pains engaged & 2) Ensure safety shoe for the 3 4 Medium 1) Ensure lowering of waller Low Supervisor
2) Repetitive works /
dropping into pit 2) Foot injuries workmen in the workmen supports using rope arrangement
motions
pit 2) Establish good communication
1) Ensuer Removal & collection of
1) Eye Injury nails
1) Nail prick 2) Foot injury workmen 2) Lengthier nails inserting
1) Foot protection with safety
2) Fly of the wooden 3) Cuts, bruises engaged for (hammering) by giving packing
Shuttering works shoe
edges 4) Electrocution shuttering 3) NO joints in the cable shall be Site Engineer
4 into place(as per 2) Portable cutting m/c shall be 3 4 Medium Low
3) Usage of portable 5) Eye, nose placing allowed / Supervisor
dimensions) provided casing for the rotary part
cutting machine irritation (cartpenter, 4) Cable shall be layed away from
3) Using protection against dust
4) Dust expel 6) Respiratory helpers) the work posture
etc
problems etc 5) Machine - supply shall be put
OFF in idle condition.
workmen 1) Providing lifeline rope for the
engaged for 1) Material / men fall shall be height workmen to harness the
1) Failure of supports 1) Injury to workmen
Shuttering works shuttering protected using fall protection lanyards. Site Engineer
5 2) Fall of material 2) Damage of 3 5 High Low
for slab works placing nets. 2) NO ledger pipes etc shall be / Supervisor
3) fall of person material
(cartpenter, 2) Provision of edge barricades allowed at the top (chance of trip
helpers) & fall)
1) Cuts, brusies &
1) Handling of eye injury to workmen
1) Placing rigid platform for
Reinforcement lengthier rods & workmen engaged for 1) Sufficient workforce to handle
placing links/stirrups inbetween
6 placing & rod placing vertically 2) Fall of workmen reinforcement lengthier materials 3 4 Medium Low Supervisor
2) Usage of eye protection while
binding 2) Placing of links / 3) Penetration of placing (Fitter, 2) Usage of all PPE's
binding of the column(vertical)
stirrups reinforcement into helpers)
reinforcement
body due to fall
3)Good communication