The document provides cost details for capital equipment and production costs for a screw conveyor project. It lists the costs of land, buildings, machinery, tools, and other assets totaling Rs. 5,10,000 for capital equipment. It also outlines the material, labor, transportation, and other costs totaling Rs. 5,13,000 to produce 5,000 kg of screw conveyors. Overhead, negotiation fees, and profit margins account for an additional Rs. 85,500, bringing the total projected cost to produce the screw conveyors to Rs. 5,13,000.
The document provides cost details for capital equipment and production costs for a screw conveyor project. It lists the costs of land, buildings, machinery, tools, and other assets totaling Rs. 5,10,000 for capital equipment. It also outlines the material, labor, transportation, and other costs totaling Rs. 5,13,000 to produce 5,000 kg of screw conveyors. Overhead, negotiation fees, and profit margins account for an additional Rs. 85,500, bringing the total projected cost to produce the screw conveyors to Rs. 5,13,000.
The document provides cost details for capital equipment and production costs for a screw conveyor project. It lists the costs of land, buildings, machinery, tools, and other assets totaling Rs. 5,10,000 for capital equipment. It also outlines the material, labor, transportation, and other costs totaling Rs. 5,13,000 to produce 5,000 kg of screw conveyors. Overhead, negotiation fees, and profit margins account for an additional Rs. 85,500, bringing the total projected cost to produce the screw conveyors to Rs. 5,13,000.
The document provides cost details for capital equipment and production costs for a screw conveyor project. It lists the costs of land, buildings, machinery, tools, and other assets totaling Rs. 5,10,000 for capital equipment. It also outlines the material, labor, transportation, and other costs totaling Rs. 5,13,000 to produce 5,000 kg of screw conveyors. Overhead, negotiation fees, and profit margins account for an additional Rs. 85,500, bringing the total projected cost to produce the screw conveyors to Rs. 5,13,000.
Total Investment Cost for movable assets (A) : 5,10,000.00
Production Cost Details : For Production of Screw Conveyor(5000 Kg):
S.No Description of work Weight Unit Rs/Unit Total Price
1 Raw Material Purchase 5000 Kg 50 250000.00 2 Raw Material Wastage(10%) 500 Kg 50 25000.00 3 Transporting Charges(5%) 5000 Kg 2.5 12500.00 Labour Charges(Cutting, Welding, 4 5000 Kg 25 125000.00 Drilling, Machining, Assembly) 5 Painting Charges(3%) 5000 Kg 1.5 7500.00 6 Engineering Charges(3%) 5000 Kg 1.5 7500.00
Total Production Cost (A) 427500.00
(Rs: Four Lakhs Twenty Seven Thousand and Five Hundred only) Overhead, Negotiation and Adjustment Margin(10%) 42750.00 Profit Margin(10%) 42750.00 Total Cost of Equipment 513000.00 LIST OF MACHINERY
Pillar Drilling machine : 25 mm capacity : 1.5 HP
Welding Transformers : 450 Amps – 4 Nos.
: 400 Amps – 4 Nos.
Profile cutting machine : IOL Flamingo
Gas cutting machine : 1 Set
Plate rolling machine : 1 No : 3 HP
(12 Tk. X 1250 long)
Pug cutting machine : 1 No
Hydraulic Press : 200 t. capacity
Arc Welding Machine
ITM Make 400 Amps : 1 No : 20 KVA
Chain Pulley Block 5 Ton : 1 No
Chain Pulley Block 3 Ton : 1 No Hand Drilling Machine : 1 No : 0.5 HP AG-7 Grinding Machine : 1 No : 0.5 HP AG-4 Grinding Machine : 1 No : 0.5 HP Measuring Tools (micrometer, : 1 Lot vernier, height gauge etc.) Misc. equipment for Fabrication & : 1 Lot Fitting work