Daily Completion and Workover (Schematic) : Well Name: Sample 11 - Full Data Report # 18.0, Report Date: 2000-06-02
Daily Completion and Workover (Schematic) : Well Name: Sample 11 - Full Data Report # 18.0, Report Date: 2000-06-02
Daily Completion and Workover (Schematic) : Well Name: Sample 11 - Full Data Report # 18.0, Report Date: 2000-06-02
Well Name: Sample 11 - Full Data Report # 18.0, Report Date: 2000-06-02
API/UWI Surface Legal Location Field Name License # State/Province Well Configuration Type
0987656789 Akuinu 8818838 Texas Deviated
Original KB Elevation (ft) KB-Tubing Head Distance (ft) Spud Date Rig Release Date PBTD (All) (ftKB) Total Depth All (TVD) (ftKB)
210.00 210.00 2000-02-21 00:00 2000-03-18 00:00 Original Hole - 12,089.9 Original Hole - 9,546.3
Deviated - Original Hole, 2000-06-03 Primary Job Type Secondary Job Type
Vertical schematic (actual) Completion Initial Completion
Objective
Daily Contacts
Job Contact Title Mobile
Eddie Van Halen Consultant 555-029-9115
Time Log
Start End Dur
Time Time (hr) Code 1 Code 2 Com
00:00 02:15 2.25 38 COMPLETION PULL TREE CAP RETRIEVING TOOL
2-3; Tubing
02:15 06:15 4.00 38 COMPLETION WORK ON ROV
06:15 07:30 1.25 39 EQ FAIL ESTABLISH GUIDLINE
Report Fluids Summary
Fluid To well (bbl) From well (bbl) To lease (bbl) From lease (bbl)
Safety Checks
2-4; TRSSV Time Des Type Com
Logs
Time Type Top (ftKB) Btm (ftKB) Cased?
Perforations
Time Zone Top (ftKB) Btm (ftKB) Current Status
Stg # Stage Type Top (ftKB) Btm (ftKB) Vol Clean Pump (bbl)
2-5; Tubing
Cement
Start Time Des Type String Cement Comp