Nothing Special   »   [go: up one dir, main page]

Daily Completion and Workover (Schematic) : Well Name: Sample 11 - Full Data Report # 18.0, Report Date: 2000-06-02

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Daily Completion and Workover (schematic)

Well Name: Sample 11 - Full Data Report # 18.0, Report Date: 2000-06-02
API/UWI Surface Legal Location Field Name License # State/Province Well Configuration Type
0987656789 Akuinu 8818838 Texas Deviated
Original KB Elevation (ft) KB-Tubing Head Distance (ft) Spud Date Rig Release Date PBTD (All) (ftKB) Total Depth All (TVD) (ftKB)
210.00 210.00 2000-02-21 00:00 2000-03-18 00:00 Original Hole - 12,089.9 Original Hole - 9,546.3

Deviated - Original Hole, 2000-06-03 Primary Job Type Secondary Job Type
Vertical schematic (actual) Completion Initial Completion
Objective

Contractor Rig Number


2-1; Tubing NABORS 432
AFE Number AFE+Supp Amt (Cost) Daily Field Est Total (Cost) Cum Field Est To Date (Cost)
2-2; Communications nipple
1234567C 7,753,000.00 96,271.00 7,672,928.47
Daily Readings
Weather T (°F) Road Condition P Tub (psi) P Cas (psi) Rig Time (hr)

Daily Contacts
Job Contact Title Mobile
Eddie Van Halen Consultant 555-029-9115
Time Log
Start End Dur
Time Time (hr) Code 1 Code 2 Com
00:00 02:15 2.25 38 COMPLETION PULL TREE CAP RETRIEVING TOOL
2-3; Tubing
02:15 06:15 4.00 38 COMPLETION WORK ON ROV
06:15 07:30 1.25 39 EQ FAIL ESTABLISH GUIDLINE
Report Fluids Summary
Fluid To well (bbl) From well (bbl) To lease (bbl) From lease (bbl)

Safety Checks
2-4; TRSSV Time Des Type Com

Logs
Time Type Top (ftKB) Btm (ftKB) Cased?

Perforations
Time Zone Top (ftKB) Btm (ftKB) Current Status

Stimulations & Treatments


Time Zone Type Delivery Mode Stim/Treat Company

Stg # Stage Type Top (ftKB) Btm (ftKB) Vol Clean Pump (bbl)
2-5; Tubing

2-6; Gauge Mandrel


Tubing Run
2-7; Tubing Run Time Tubing Description Set Depth (ftKB) String Max Nomina… Weight/Length (lb/ft) String Grade
2-8; Tubing pup 00:00 Production Tubing 11,828.4 4 1/2 13.00 13CRS-80
2-9; Packer, production
2-10; Millout extension
Tubing Pulled
Pull Time Tubing Description Set Depth (ftKB) String Max Nomina… Weight/Length (lb/ft) String Grade
2-11; RN nipple (3.437")
2-12; Re-entry guide
Other in Hole Run (Bridge Plugs, etc)
Run Time Des OD (in) Top (ftKB) Btm (ftKB)

Other in Hole Pulled (Bridge Plugs, etc)


Pull Time Des Top (ftKB) Btm (ftKB) OD (in)

Cement
Start Time Des Type String Cement Comp

www.peloton.com Page 1/1 Report Printed: 2009-09-15

You might also like