Do 038 s2016 As-Built Plans
Do 038 s2016 As-Built Plans
Do 038 s2016 As-Built Plans
O~
Ar
-~7i-
25
JAN 2016
DEPARTMENT
NO.
ORDER
38
Series of 2016
)
)
,>.tJ.{C.
SUBJECT:
In line with the Department's objective to implement procedures to improve the efficiency and
performance in project implementation and documentation, specifically in the preparation,
approval and storage of "As-Built" plans, the following guidelines are hereby issued for the
implementation and compliance of all concerned.
1. "As-Built" plan shall be prepared for all DPWH infrastructure projects implemented by
Regional Offices, District Engineering Offices and Project Management Offices including
terminated contracts.
2. The "As-Built" plan shall be entirely a new set of drawings (AJ size) accurately depicting
each and every part of the structures and facilities as actually built to be prepared by
the contracl.Or and submitted to the implementing office. All notes, dimensions, material
specifications, construction methods and other pertinent construction details shall
correspond to the actual completed works.
3. The "As-Built" plan shall be reviewed and signed by the DPWH Project Engineer and the
Project Construction Supervision Consultant (if any), and approved by the authorized
DPWH official.
4. A certification shall be indicated in the cover sheet of the "As-Built" plan stating that all
material testing requirements were undertaken and that all materials used complied with
the required specifications, duly signed by the DPWH and Consultant's Materials
Engineer! if any, assigned to the project.
5. All completed works incorporated in the "As-Built" plan shall be covered in the original,
revised and/or supplemental design plans and "As-Staked" plans duly approved by the
proper authorities.
6. The original contract quantities, "As-Staked" quantities and "As-Built" quantities shall be
shown under different columns in the summary of quantities.
,.
7. The approved "As-Built" plan shall be stored as "Permanent DocumentS', for that
particular infrastructure project that the Department can retrieve for future use; hence,
the implementing
office concerned shall be responsible for filing and record
management of the original copy of the plan and all its appurtenant documents.
8. The Bureau of Design (BOD), Bureau of Maintenance (BOM) and Regional Office(s)
concerned shall be furnished with copies of approved "As-Built" plans, as follows:
1. A-3 size (in book form) duly certified by both contractor and implementing office:
1.a. All bridge and building projects
l.b. Road and flood control projects costing Php 100 million and above
2. Electronic file for all projects
9. "As-Built" plans shall be submitted by the contractor within 30 days upon reaching 95%
completion of the project.
10. No Certificate of Completion shall be issued to the contractor unless the "As-Built" plan
has been approved.
This Department Order supersedes Ministry Order No. 11, Series of 1985 and other previous
issuances inconsistent herewith, and shall take effect immediately.
1111111111111111111111111111111111111
WIN6R01225
5.1.4 SDD/ECM