Nothing Special   »   [go: up one dir, main page]

17

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Sec. 17. Construction where instrument is ambiguous.

- Where the
language of the instrument is ambiguous or there are omissions
therein, the following rules of construction apply:
(a) Where the sum payable is expressed in words and also in figures
and there is a discrepancy between the two, the sum denoted by the
words is the sum payable; but if the words are ambiguous or
uncertain, reference may be had to the figures to fix the amount;
chanroblesvirtuallawlibrary

You might also like