LIST OF COMPLETED PROJECTS UNDER GOV. ROBERTO Y.

UYs ADMINISTRATION
January 1 to August 31, 2015

NAME OF PROJECT

Length

Location

Appropriation

Source of Funds

Mode of
implementatio
n

Date
Started

Date
Completed

16-Sep14
15-Jan15

21-Jan15
30-Jan15

%
Accomp.

Remarks

100.00%

Completed

100.00%

Completed

MANUKAN

Slope Protection along Dipane - Meses


Provincial Road, Manukan
Installation of Pipeline @ Brgy Don Jose
2
Aguirre
1

Const of Fuel Tank Roofing of PEO Sub-Office,


3
Brgy Patunan, Manukan, ZN

Meses

120,000.00

8918(2B)851

Admin.

Don Jose
Aguirre

195,000.00

416-(DOF-MDFO)
-01(A)-PBGS-CG)

Takay
Labor

219,717.00

GF(01), FY 2015
9999(1) 215 AIP
Ref# 8000-1-3

Admin.

26-Jan15

31-Mar15

100.00%

Completed

Takay
Lumber &
Aggregates

2-Mar15

30-Mar15

100.00%

Completed

Admin.

28-Jul14
28-Jul14
28-Jul14
21-Apr14
16-Oct14
20May-15

30-Jan15
9-Mar15
9-Mar15

100.00%

Completed

100.00%

Completed

100.00%

Completed

5-Jun-15 100.00%

Completed

Patunan

Construction of Water Supply System @Sitio


4
Puho, Lingatongan, Manukan

Lingatongan

275,000.00

FY 2015, 20% DF
8918(4)
874 AIP Ref#8000-17

Electrification Projects at Brgy. Saluyong,


Manukan, Z.N.

Saluyong

102,720.00

8918(3)874

6 Electrification Projects at Brgy Lingatongan

Lingatongan

77,040.00

Admin.

Don Jose
Aguirre

51,360.00

Admin.

Patunan

250,000.00

7
8
9
10
11

Electrification Projects at Brgy Don Jose


Aguirre
Repainting & Repair of Provincial Engineering
Office at Patunan, Manukan, Z.N.
Const of 1-Unit Receiving Room Building
(Phase I) @ ZNCRC, Sipulan, Manukan, ZN
Single Phase Lateral Line Construction at
Purok Saging, Brgy. Disakan
Construction of One-Unit (10.6m x 18.50m)
Prison Cell (Phase I) @ Zamboanga del Norte
Correctional & Rehab Center, Brgy Sipulan

56-00-10-04/
8751-200-811
20%DF/
8918(1)215

Takay Labor
& Lumber

Admin.

6x10

Sipulan

620,000.00

1.176

km

Disakan

807,541.25

8918(3)874

Admin.

10.6
x
18.5

Sipulan

3,230,000.00

8918-250

Takay
Aggregates

1-Jul-15

31-Jul15
31-Jul15

100.00%

Completed

100.00%

Completed

22.00%

On-going

Construction of One Unit (4.80m x 18.50m)


12 TB Isolation Prison Cell (Phase - 1) @ ZN
Correctional & Rehabilitation Center,Sipulan
Prop Const of Main Entrance Gate, Perimeter
Fence(along highway only) & 2-Storey Guard
13
House w/ C.R. @ ZN Correctional & Rehab
Center, Don Jose Aguirre

1,700,000.00

9999(1)215

Takay Labor,
Lumber &
Aggregates

20-Jul15

14.00%

On-going

Don Jose
Aguire

3,850,000.00

FY 2015, GF(01)
AIP Ref# 80001-3

Takay
Labor,
Lumber &
Aggregates

15-Jul15

19.00%

On-going

Construction of Water Supply System @


Libuton

Libuton

2,660,000.00

FY 2015, 20%DF
8918(4) 874 AIP
Ref# 8000-1-7

Takay

29-Jun15

40.00%

On-going

Impv't of Water Supply System @ ZNC &


15 Rehab Center @ Brgy Don Jose Aguirre,
Manukan, ZN

Don Jose
Aguire

330,000.00

8918(1)815/20%
DF
AIP ref#8000-98

Admin.

NYS/Mat'ls on
process

Don Jose
Aguirre

1,712,113.42

FY 2015, 20% DF
8918(3) 815 AIP
Ref#8000-1-97

Admin.

NYS/Mat'ls on
process

Construction of Pipeline @ Sitio Golipos,


Upper Linay & Linay Proper, Manukan

Linay

1,330,000.00

Takay

NYS/Waiting for
Const Mat'ls

Prop Const of One(1) Unit (7m x 9m) One(1)


18 Classroom School Building @ Manukan East
Central School

Manukan
ECS

560,000.00

Takay Labor,
Lumber &
Aggregates

NYS/Materials on
Process

Patagan

1,782,141.00

Admin.

NYS/PR on process

Don Jose
Aguirre

1,450,000.00

Admin.

Newly Approved
POW

14

4.8 x
18.5

CY-2015
Installation of Generator Set & Const of Single
16 Phase Lateral Line@Prov'l Jail, Don Jose
Aguirre
17

Single Phase Lateral Line Construction at Sitio


Tiniguiban, Brgy Patagan, Manukan, ZN
Const of 1-Unit 3mx2.4mx5m Single Barrel &
1-Unit 2.4mx2.1mx5m Double Barrel
20
Reinforced Concrete Box Culvert @ Don Jose
Aguirre
19

3.746 kms

Sipulan

FY 2015, 20%DF
8918(4) 874 AIP
Ref# 8000-1-7
56-00-07-01
300(221) 212
SEF'15 AIP#1000-118

FY 2015, 20% DF
AIP Ref# 8000-1-5