Nothing Special   »   [go: up one dir, main page]

Wiring Measurement D

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 22

PHASE 1

S.NO FROM
1
2
3
4
5
6
7
9
10
11
12
13
14
15
16
17
18
19
20
21
22

DB

SB2

P2
P3
SB1

TOWER-B

TO

Flat no 609

WIRING MESURM

4 Sq mm 4 Sq mm 2.5 Sq mm 2.5 Sq mm 2.5 Sq mm 1.5 Sq mm 1.0 Sq mm


(PHASE) (NEUTRAL) (GROUND) (PHASE) (NEUTRAL) (GROUND) (PHASE)

SB1
L1
L2
L3
L4
FB
EP4
EP4
P 2, 1
P3
L1
L2

3.8

3.8

3.8
2.5
4.1
5.6
7.3
12.35

6.3
10.3
0.25
0.6

6.3
10.3
0.25
0.6

6.3
10.3
0.25
0.6
2.35
5.3

BUZZER

P1
SB3
BUZZER
DB
DB
SB4

SB3
FB
L1
L2
BELL
PP 1
SB4
FBK
L1

MAAC INFRASPACE PVT LTD


Name:
Signature:
Date:

22.65

22.65

22.65
4.2
6.3
7.2
15.9

8.9

8.9

8.9
10.35

10.35

10.35
3.6
6.1

PACIFICA:
Name:
Signature:
Date:

CBRE:
Name:
Signature:
Date:

PHASE 1
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

SB 4

P7

SB5
P11
DB
PP2
DB
DB
SB6

SB7

SB6

TOWER-B

Flat no 209

L2
L3
P6
P8
P7
SB5
EP 9
PP 4
L1
PP5
P10
P 11
L2
PP 2
PP3
PP5
SB7
SB6(2
WAY
SB7 (2
CONTROL
WAY
FOR LP)
CONTROL
SB7
FOR
FB3)
FB
L1
L2
P 15
L3
P12,13

MAAC INFRASPACE PVT LTD


Name:
Signature:
Date:

WIRING MESURM
8.8
10.2

7.1

7.1

7.1
9.5

1.4

PACIFICA:
Name:
Signature:
Date:

1.4

1.4

CBRE:
Name:
Signature:
Date:

MAAC INFRASPACE PVT LTD


Name:
Signature:
Date:
PHASE 1
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
67
68
69

PACIFICA:
Name:
Signature:
Date:
TOWER-B

CBRE:
Name:
Signature:
Date:
Flat no 209

WIRING MESURM

L1
SB8
P 17,P16
FB
L2
L3
SB 9
FB
P 19
SB9
DB
SB8(2
WAY
SB9 (2
CONTROL
WAY
FOR
LP)
CONTROL
SB 8
SB9
FOR FB3)
SB 10
P 21
L2
L1
SB 10
P 21
P 20
DB
PP6
DB
PP7
DB
PP8
TOTAL

MAAC INFRASPACE PVT LTD


Name:
Signature:
Date:

PACIFICA:
Name:
Signature:
Date:

CBRE:
Name:
Signature:
Date:

E:
Name:
ignature:
Date:

WIRING MESURMENTS
1.0 Sq mm 1.0 Sq mm
(NEUTRAL) (GROUND)
2.5
4.1
5.6
7.3
12.35

2.5
4.1
5.6
7.3
12.35

2.35
5.3

2.35
5.3

4.2
6.3
7.2
15.9

4.2
6.3
7.2
15.9

3.6
6.1

3.6
6.1

E:
Name:
ignature:
Date:

WIRING MESURMENTS
8.8
10.2

8.8
10.2

9.5

9.5

E:
Name:
ignature:
Date:

E:
Name:
ignature:
Date:

WIRING MESURMENTS

PHASE 1

S.NO FROM
1
2
3
4
5
6
7
8
9
10
11
12
15
16
17
18
19
20
21
22
23

DB

SB2

SB1

TOWER-D

TO

Flat no 108

4 Sq mm 4 Sq mm 2.5 Sq mm 2.5 Sq mm 2.5 Sq mm 1.5 Sq mm 1.0 Sq mm


(PHASE) (NEUTRAL) (GROUND) (PHASE) (NEUTRAL) (GROUND) (PHASE)

SB2
L1
L2
L3
FB
EP4
SB1
P3,P2, P1
L1
L2

12

SB5

SB3

PP1
SB5
L1
EXF
P11
L2
SB3
FB
L1
L2

MAAC INFRASPACE PVT LTD


Name: RAM KUMAR.V
Signature:
Date:

12

12
7.5
6.7
9.7
4.7

8.5
7.3
1.2

8.5
7.3
1.2

8.5
7.3
1.2
1.8
3

BUZZER

DB
DB

WIRING MESURM

14

14

1.1

1.1

1.1

19.5

19.5

19.5

14
3.6
9.5
0.6

0.6

0.6
3.3

7.3

7.3

7.3
4
5.2
6

PACIFICA:
Name: BASKARAN
Signature:
Date:

CBRE:
Name:
Signature:
Date:

MAAC INFRASPACE PVT LTD


Name: RAM KUMAR.V
Signature:
Date:

PHASE 1
24
DB
SB4
25
L1
26
L2
27
L3
28
FB
SB4
29
P7,P8
30
P6
31
EP9
32
PP4
33
DB
PP2
34
PP2
PP3
35
DB
PP5
36
DB
SB6
37
L1
38
SB7
39
SB7(2
SB6
40
SB7(2
41
P12
42
P14,P15
43
SB7
L1
44
SB7
FB
45
SB7
L2
46
DB
PP6
47
DB
PP7
48
DB
SB8
49
SB9
50
SB9(2
51
SB8
SB9(2
52
L1
53
L2
MAAC INFRASPACE PVT LTD
Name: RAM KUMAR.V
Signature:
Date:

PACIFICA:
Name: BASKARAN
Signature:
Date:
TOWER-D

CBRE:
Name:
Signature:
Date:
Flat no 108

24.8

24.8

WIRING MESURM
24.8
1.1
5.6
5.8
4.4

25
6
21.2

25
6
21.2

2
5.2
4.8
8.3

2
5.2
4.8
8.3

2
5.2
4.8
8.3

13.4

13.4

13.4

6.5

6.5

6.5

25
6
21.2
1.3
13
13
3
5.2

3
5.2

3
5.2
6.7
4.3
1.9

14.3
11

14.3
11

14.3
11
9.2
10.2

9.2
10.2

9.2
10.2
20.4
20.4
1.2
2.7

PACIFICA:
Name: BASKARAN
Signature:
Date:

CBRE:
Name:
Signature:
Date:

MAAC INFRASPACE PVT LTD


Name: RAM KUMAR.V
Signature:
Date:
PHASE 1
50
51
52
53
54
55
56
57
58
59

PACIFICA:
Name: BASKARAN
Signature:
Date:
TOWER-D

SB9
SB8
SB10
DB
BUZZER

L1
FB
P19
SB10
L1
EXF
P21
L2
PP8
BELL

TOTAL
MAAC INFRASPACE PVT LTD
Name: RAM KUMAR.V
Signature:
Date:

CBRE:
Name:
Signature:
Date:
Flat no 108

WIRING MESURM
7.7
5.3

7
12.3

7
12.3

7
12.3
3.2
3.5

0.5

0.5

0.5
2.2

13.2

13.2

13.2
7.7

104.7

104.7

104.7

169.9

PACIFICA:
Name: BASKARAN
Signature:
Date:

169.9

169.9

176
CBRE:
Name:
Signature:
Date:

E:
Name:
ignature:
Date:

WIRING MESURMENTS
1.0 Sq mm 1.0 Sq mm
(NEUTRAL) (GROUND)

3.8
3
6
4.7

3.8
3
6
4.7

1.8
3

1.8
3

3.6
6

3.6
6

3.3

3.3

4
2.5
4

4
2.5
4

E:
Name:
ignature:
Date:

E:
Name:
ignature:
Date:

WIRING MESURMENTS
1.1
3.5
3
4.4

1.1
3.5
3
4.4

1.3

1.3

4
4.3
1.9

4
4.3
1.9

1.2
2.7

1.2
2.7

E:
Name:
ignature:
Date:

E:
Name:
ignature:
Date:

WIRING MESURMENTS
3.5
5.3

3.5
5.3

3.2
3.5

3.2
3.5

2.2

2.2

7.7
98.5

90.8

PHASE 1
S.NO FROM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

DB
SB1

SB2

SB3
DB
DB

SB4

TOWER-D
TO

Flat no 506

4 Sq mm 4 Sq mm 2.5 Sq mm 2.5 Sq mm 2.5 Sq mm 1.5 Sq mm 1.0 Sq mm


(PHASE) (NEUTRAL) (GROUND) (PHASE) (NEUTRAL) (GROUND) (PHASE)

SB1
L1
L2

5.35

BUZZER

2.1
9.9

SB2
L1
L2
L3
L4
FB
EP1
SB3
P3,P2, P1
L1
L2
FB
PP1
SB4
L1
L2
L3
EF
FB
SB4
P7

MAAC INFRASPACE PVT LTD


Name: RAM KUMAR.V
Signature:
Date:

WIRING MESURM

5.35

5.35
1.9
2.9

2.1
9.9

2.1
9.9
4
2.4
7.2
3.3
5.7

4.4
10.8
0.8

4.4
10.8
0.8

4.4
10.8
0.8
6.7
2.05
3.9

6.85

6.85

6.85
11.45

11.45

11.45
6
6
13.8
13.2
3.7

21.5
7.1
PACIFICA:
Name: BASKARAN
Signature:
Date:

21.5
7.1

21.5
7.1
CBRE:
Name:
Signature:
Date:

MAAC INFRASPACE PVT LTD


Name: RAM KUMAR.V
Signature:
Date:
PHASE 1
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

P6

SB5

DB
PP3
DB
DB

SB6

SB7

SB8
DB
DB
DB

PACIFICA:
Name: BASKARAN
Signature:
Date:
TOWER-D

PP4
L1
EXF
P11
L2
SB3
PP3
PP2
PP5
SB6
SB7(2
SB7(2
SB7
P12
SB8
FB
L1
L2
P15
L3
L1
L2
EXF
P17
PP6
PP7
SB9

MAAC INFRASPACE PVT LTD


Name: RAM KUMAR.V
Signature:
Date:

CBRE:
Name:
Signature:
Date:
Flat no 506

0.6

0.6

WIRING MESURM
0.6
3.2
4.6

0.65

0.65

0.65
2.1

11.45
6
11.55

11.45
6
11.55

7.3

7.3

7.3

11.85

11.85

11.85

11.45
6
11.55
9.6
9.6
4.8
0.8
0.5

4.8
0.8
0.5

4.8
0.8
0.5
4.8
7
1.8

9.5

9.5

9.5
8.4
2.2
7.25
8.7

12.85
18.45

12.85
18.45

0.6

0.6

0.6

12.45

12.45

12.45

12.85
18.45

PACIFICA
Name: BASKARAN
Signature:
Date:

CBRE:
Name:
Signature:
Date:

MAAC INFRASPACE PVT LTD


Name: RAM KUMAR.V
Signature:
Date:
PHASE 1
53
54
55
56
57
58
59
60
61
62
63

PACIFICA
Name: BASKARAN
Signature:
Date:
TOWER-D

P18
SB10
SB9
SB10(2
SB10(2
FB
L1
SB10
L2
L3
P20
DB
PP8
BUZZER
BELL
TOTAL

MAAC INFRASPACE PVT LTD


Name: RAM KUMAR.V
Signature:
Date:

CBRE:
Name:
Signature:
Date:
Flat no 506

1.3
8.4

1.3
8.4

WIRING MESURM
1.3
8.4
16.8
16.8
4.7
7
2
10.1

9.5
13.65

13.65

9.5

9.5

13.65
13

80.8

80.8

80.8

141.65

PACIFICA
Name: BASKARAN
Signature:
Date:

141.65

141.65

222.4
CBRE:
Name:
Signature:
Date:

E:
Name:
ignature:
Date:

WIRING MESURMENTS
1.0 Sq mm 1.0 Sq mm
(NEUTRAL) (GROUND)
1.9
2.9

1.9
2.9

4
2.4
1.5
3.3
5.7

4
2.4
1.5
3.3
5.7

2.8
2.05
3.9

2.8
2.05
3.9

6
6
13.8
13.2
3.7

6
6
13.8
13.2
3.7

E:
Name:
ignature:
Date:

E:
Name:
ignature:
Date:

WIRING MESURMENTS
3.2
2.5

3.2
2.5

2.1

2.1

4.8
2.8
1.8

4.8
2.8
1.8

3.6
2.2
5.05
1.45

3.6
2.2
5.05
1.45

E:
Name:
ignature:
Date:

E:
Name:
ignature:
Date:

WIRING MESURMENTS

4.7
2.3
2
5.4

4.7
2.3
2
5.4

13
130.05

117.05

PHASE 1
S.NO FROM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

DB
SB1
1SB1
DB
ESB1
1ESB1
DB
SB2
1SB2
DB
ESB2
1ESB2
DB
SB3
1SB3
DB
ESB3
1ESB3
DB
SB4
1SB4

TO
SB1
L1
2SB1
ESB1
EL1
2ESB1
SB2
L1
L2
2SB2
ESB2
EL1
EL2
2ESB2
SB3
L1
2SB3
ESB3
EL1
2ESB3
SB4
L1
L2
L3
2SB4

MAAC INFRASPACE PVT LTD


Name: RAM KUMAR.V
Signature:
Date:

TOWER-D

LOBBY 1 ST FLOOR

2.5 Sq mm 2.5 Sq mm 1.5 Sq mm 1.5 Sq mm 1.5 Sq mm 1.0 Sq mm 2.5 Sq mm 2.5 Sq mm


(PHASE) (NEUTRAL) (GROUND)
(PHASE) (NEUTRAL) (GROUND)
(PHASE) (NEUTRAL)

37.19

37.19

37.19
6

3.6

20.59

3.6

37.59

3.6

20.59

3.6

37.59

10.19

3.6

3.6

10.19

3.6

3.6
36.19

36.19

3.6

3.6

19.59

19.59

3.6

3.6

27.56

27.56

3.6

3.6

20.59

3.6

10.9
7.3
7.2

10.9
7.3

10.9
7.3

37.59
4.6

3.6

4.6

4.6

3.6

10.19

3.6

7.9
3.6
7.4
7.2

PACIFICA:
Name: BASKARAN.D
Signature:
Date:

4.3
3.6
3.8

4.3
3.6
3.8

MAAC INFRASPACE PVT LTD


Name: RAM KUMAR.V
Signature:
Date:

PACIFICA:
Name: BASKARAN.D
Signature:
Date:

PHASE 1
26
27
28
29
30
31
32
33
34

DB
ESB4
1ESB4
DB
SB5
1SB5
DB
ESB5

ESB4
EL1
EL2
2ESB4
SB5
L1
2SB5
ESB5
L1

TOTAL
MAAC INFRASPACE PVT LTD
Name: RAM KUMAR.V
Signature:
Date:

TOWER-D

19.89

19.89

LOBBY 1ST FLOOR

143.45

3.6

143.45

10.59

10.59

3.6

3.6

25.09

25.09

133.42

133.42

19.89
8.3

3.6

8.3

8.3

3.6

143.45

70.4

PACIFICA
Name: BASKARAN
Signature:
Date:

48.8

48.8

LOBBY 1 ST FLOOR

WIRING MESURMENTS
1.5 Sq mm 1.5 Sq mm 1.5 Sq mm 1.0 Sq mm
(GROUND)
(PHASE) (NEUTRAL) (GROUND)

36.19
5.3

5.3

5.3

4.6
18.5
7.2

4.6
18.5

4.6
18.5

4.6

4.6

4.6

3.6

19.59

3.6

27.56
3.6

CBRE:
Name:
Signature:
Date:

CBRE:
Name:
Signature:
Date:

LOBBY 1ST FLOOR

WIRING MESURMENTS
10.59

3.6

6.3
4.4
7.2

6.3
4.4

6.3
4.4

5.6

5.6

5.6

63.7

49.3

49.3

25.09
133.42

CBRE:
Name:
Signature:
Date:

You might also like