Observation
Hazards and Consequences
Item
01
01
Immediate action:
03
02
Control Measures
Immediate/longer term action
Observation:
00218445
Health surveillance
3 Month
Long Term:
Exposure limit to chemical will decrease
by job rotation.
Immediate action:
1|Page
Immediate
Short term:
Observation
Time
Scale
Short term:
Long Term:
Monitor and check workplace regularly.
Make employees aware of the hazards
by providing information and training.
Regularly
Immediate
One week
Regular
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
03
Control Measures
Immediate/longer term action
Observation
Immediate action:
Collision hazard
Personal Injury, pedestrian injury, , property
damage,
Because of one way from main gate to plant
area, collision with pedestrian, vehicles, can
cause injury
04
00218445
Two weeks
One month
Long Term:
Provide separate entry & exit routes with
solid partition in between pedestrian and
vehicle.
Immediate action:
Short term:
Long Term:
Periodic maintenance and inspections of
artificial lighting and replacing them from
time to time.
2|Page
Immediate
Short term:
Observation
Time Scale
Immediate
Two Week
Ongoing
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
05
Immediate action:
Noise Hazard.
Noise at work can cause hearing loss that
can be temporary or permanent. Hearing loss
is not the only problem. People may develop
tinnitus (ringing, whistling, buzzing or
humming in the ears).
06
Short term:
Long Term:
Short term:
Replace the lines those are too much
damaged with new lines.
Six Month
Immediate
Two Week
Regularly
Immediate action:
3|Page
Two Week
Long Term:
Observation
Contact Hazards
Can cause injury to worker
Immediate
Immediate action:
Dust hazard.
Calcium Chloride Power
Irritant, Causes irritation to skin, eyes and
respiratory organs. Harmful if inhaled or
swallowed. Effects can be possible
coughing, sneezing, asthma and blocked
filters of machines.
Time Scale
Observation
07
Control Measures
Immediate/longer term action
Observation
00218445
Long Term:
Immediate
One Month
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
08
Immediate action:
Short term:
Provide trolley
Observation
Immediate action:
Observation
Chemical sewage drain system was made of
sanitary and at some points cover was not
installed and light was not good at those
Points.
4|Page
Time Scale
Immediate
One week
Two Month
Long Term:
Manual Handling,
Can cause back bone problem, slip disc
issue, Hernia, can cause musculoskeletal
disorders (MSDs).
10
Control Measures
Immediate/longer term action
Observation
09
00218445
Immediate
Short term:
Inform the maintenance staff to do the
pre use check before using electrical
equipments
Weekly
Long Term:
Conduct monthly inspection of all
electrical equipments & repair if needed.
Immediate action:
Immediately barricade the open points.
Short term:
Close the open points by sanitary work
or by keeping covers made of any
material
Long Term:
Erect proper and good sewage drain
system & properly out of passage area.
1 month
Immediate
Two week
Two month
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
11
Observation
Immediate action:
Short term:
Make the assessment of workplace to
provide standard DSE arrangements to
suit the worker.
Long Term:
Observation
Immediate:
13
Control Measures
Immediate/longer term action
Provide frequent breaks
12
00218445
Observation
One month
One month
Immediate
Short Term:
There must be one notice board
containing company policy, Rules &
Regulations and other information.
One week
Long Term:
Conduct inspection and provide training
to employee and keep them update
about company rules, laws and job
related information.
Immediate:
Following good hygiene practices.
5|Page
Immediate
Time Scale
Ongoing
Immediate
Short Term:
One week
Long Term:
Build up a washing area for workers
nearby workers changing room/ locker
area and provide proper ventilation
system.
One Month
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
14
Control Measures
Immediate/longer term action
Observation
Immediate:
15
00218445
Short Term:
Install line at top of tank and put the line
in the vessel filled with water so fumes
could absorb in water and water can be
drained. And install new valve.
6|Page
Three week
One Month
Immediate:
Immediate
Long Term:
Observation
Time Scale
Short Term:
Immediate
One week
Three
Month
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
16
00218445
Control Measures
Immediate/longer term action
Observation
Immediate:
Short Term:
Entanglement hazard
Worker can came in entanglement with the
moving parts of the combustion air fan and
can cause sever injury.
Long Term:
Time Scale
Immediate
Two Day
One Month
17
Observation
Immediate:
Short Term:
Two days
Long Term:
Monitor and check cables. make
employees aware of the hazards by
Providing instructions and supervision.
7|Page
Immediate
7 Days
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
18
Observation
Control Measures
Immediate/longer term action
Immediate:
Inspection of all fire extinguishers,
19
00218445
Short Term:
Replace empty fire extinguisher with new
fire extinguisher.
Long Term:
Discipline Hazards.
Can increase the severity of accident.
Observation
Immediate:
Short Term:
Immediate
Two days
One Month
Immediately
Two Week
Long Term:
Monitor lifting activities regularly.
8|Page
Time Scale
Regular
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
20
21
00218445
Control Measures
Immediate/longer term action
Observation
Immediate:
Long Term:
Observation:
Immediate:
Short Term:
Immediate
One Week
Regular
Short Term:
One week
Two week
Long Term:
Install local exhaust ventilation to
eliminate the possibility of breathing
welding fumes.
9|Page
Time Scale
Two month
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
22
Observation:
During process of drying of calcium chloride
solution to form calcium chloride prills,
problem came inside the prill or drying tower,
there was one way to go and come from inside
prill tower. Worker entered to prill tower to
check nozzle and also fluidized bed checking
was required due to parameters variation.
Inside bed environment was hot and
temperature was too high.
23
Observation:
Excavation work was carried out for the
installing new ID fan blower in the coal
furnace plant. And area was not barricade.
00218445
Control Measures
Immediate/longer term action
Immediate:
Immediate
Three week
Short Term:
Install strainer in the feed line, if any
blockage piece came in feed line can
remove outside the Prill or drying tower to
provide safe work system to worker.
Six Month
Long Term:
Install camera inside the Prill or drying
tower to watch the fluidized bed height
and condition of spoilage or non spoilage.
Immediate:
Immediate
Short Term:
Falling Hazard
Risk of people, material and equipments falling
into the excavations and the possible results
could be fatalities.
Long Term:
Excavations must be inspected at the
Beginning of the shift on daily basis.
All personnel need to be trained and
competent to carry out their tasks safely.
10 | P a g e
Time Scale
Two week
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
24
Observation:
The electrical system in the main electrical
panel room was open & unattended
25
26
00218445
Control Measures
Immediate/longer term action
Immediate:
Immediate:
Vibration Hazard
Hand arm vibration syndrome, numbness and
blanching of fingers, reduction in the dexterity
Long Term:
Observation:
Immediate:
Short Term:
Immediate
One Week
Regular
Short Term:
Immediate
One Week
Long Term:
Install smoke detector in the warehouse
11 | P a g e
Immediate
Observation:
Time Scale
Two week
INTERNATIONAL GENERAL
CERTIFICATE
(2014 specification)
Student Name:
Student Number:
00218445
Place Inspected:
Good Practices:
Good Practices
Maintain
Keep it up
Keep up
Keep up
Keep up
Keep up
Keep up
Keep up
12 | P a g e