HARGA SATUAN TOTAL HARGA

( Rp. ) ( Rp. )
A. Peralatan Utama Sistem
Pengadaan peralatan utama
1 Main Control Unit Unit 1
2 Computer Server include Software Akses dan Software Kamera Unit 1
3 Kartu Akses karyawan Pcs 700
4 Kartu Akses karyawan VIP Pcs 100
5 Gigabit Switch 16-ports Pcs 1
6 Uninterruptible Power Supply Pcs 1
B. Peralatan Sistem Pembangunan Barrier Gate
B.1 Gerbang Utama, Pintu Masuk & Pintu Keluar
1 kontroler Pintu Akses Pcs 1
2 Unit 2
3 Rising bollard ( di pintu masuk ) Unit 1
4 Pembaca Kartu Akses ( di pintu masuk dan pintu keluar ) Unit 2
5 Tombol Akses Kontrol Pembuka Pintu (di pos penjagaan gerbang utama) Unit 2
6 Network Camera ( di pintu masuk dan pintu keluar ) Unit 2
7 5-ports Gigabit Pcs 1
C. Material Instalasi Sistem
C.1 Pengadaan Material Instalasi Sistem
Material Instalasi Lot 1
1 Cable data UTP Cat 6 Roll 4
2 Cable data STP 22 AWG Roll 2
3 Cable power NYM 3 X 1,5mm Roll 5
4 Cable power NYY 4 X 4 mm Meter 150
5 Cable loop 18 AWG Meter 500
6 Pipa conduit 20 mm Btg 800
7 Sock pipa 20 mm Pack 21
8 Elbow pipa 20 mm Pack 32
9 Klem Pipa Conduit 20 mm Pack 32
10 T-dos/three way 20 mm Pcs 6
11 Flexible 20 mm Rol 3
12 fisher + screw S-6 Pack 5
13 Connector + Jacket RJ-45 Pack 2
14 Saklar Pcs 4
15 MCB 16 Amper Pcs 2
16 Box panel MCB + Rel 250mm x 300mm Pcs 3
17 Box panel kontroler 500mm x 600mm Pcs 1
18 Box panel kontroler 400mm x 500mm Pcs 3
19 Stop kontak 1 Lubang Pcs 10
20 Stop kontak 6 Lubang Pcs 2
21 Marker ties 15 cm Pack 2
22 Kabel Ties 30 cm Pack 8
23 Isolasi Pcs 20
24 Cakar ayam 30 x 30 x 20 cm Unit 9
25 Kawat bendrat Kg 2
BQ
Sub Total - A
Barrier Gate ( di pintu masuk dan pintu keluar )
Sub Total B
PEKERJAAN PEMBANGUNAN BARRIER GATE 2 SISTEM
NO URAIAN PEKERJAAN SAT. VOL.
26 Besi cor ulir 10 mm Batang 4
27 Besi cor ulir 13 mm Batang 4
28 Kaso 4m Batang 4
29 Triplek 1,5cm Lembar 3
30 Paku 10cm Kg 3
31 Paku 7cm Kg 3
32 Pipa 4" Batang 6
33 Sock pipa 4" Pcs 5
34 Elbow pipa 45 4" Pcs 6
35 Elbow pipa 90 4" Pcs 5
36 Tiang camera 3" x 2 m Tiang 3
37 Tiang reader 2" x 2 m Tiang 4
38 Basesplit 30 x 30 x 12mm Unit 8
39 Cakar ayam 30cm x 30cm x 15cm Unit 12
40 Semen 50 Kg Sak 13
41 Pasir cor Engkel 4
42 Batu split Engkel 3
D. Jasa Instalasi Sistem Lot 1
- Instalasi dan Pemasangan
- Integrasi
- Testing & Commissioning
- Training
- Dokumentasi
- Transportasi & Akomodasi
Jakarta, Desember 2012
PEJABAT PEMBUAT KOMITMEN
MENGETAHUI SEKRETARIAT UTAMA BMKG
KEPALA BIRO UMUM RUPIAH MURNI KONSTRUKSI
SOEPRIYO, Dipl. AIT, SSi R. LADY CLARA S, ST, MIM
NIP. 195410221977091001 NIP. 198405192008012009
TOTAL PEKERJAAN PEMBANGUNAN BARRIER GATE 2 SISTEM ( A + B + C + D )
Sub Total C
Sub Total D