Skip to main content
El libro constituye una importante revisión sobre la introducción a la Termodinámica. El texto es util para estudiantes avanzados de física e ingeniería que estén familiarizados con el calculo matematico.
This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth US$90 billion and... more
Megaproject Planning and Management: Essential Readings contains the seminal articles from the growing body of research on megaproject planning and management along with an original introduction by the editor, Bent Flyvbjerg. The leading... more
Back cover text: Megaprojects and Risk provides the first detailed examination of the phenomenon of megaprojects. It is a fascinating account of how the promoters of multi-billion dollar megaprojects systematically and self-servingly... more
The article first describes characteristics of major infrastructure projects. Second, it documents a much neglected topic in economics: that ex ante estimates of costs and benefits are often very different from actual ex post costs and... more
As megaprojects have become ubiquitous, their real benefits and costs have come under increased scrutiny. We interviewed Bent Flyvbjerg, who has extensively studied megaproject development. Flyvbjerg has found systematic problems in the... more
The Supplementary Green Book Guidance on Optimism Bias (HM Treasury 2003) with reference to the Review of Large Public Procurement in the UK (Mott MacDonald 2002) notes that there is a demonstrated, systematic, tendency for project... more
"Over budget, over time, over and over again" appears to be an appropriate slogan for large, complex infrastructure projects. This article explains why cost, benefits, and time forecasts for such projects are systematically... more
This article presents results from the first statistically significant study of traffic forecasts in transportation infrastructure projects. The sample used is the largest of its kind, covering 210 projects in 14 nations worth U.S.$59... more
Do different types of megaprojects have different cost overruns? This apparently simple question is at the heart of research at the University of Oxford aimed at understanding the characteristics of megaprojects, particularly in terms of... more
As megaprojects have become ubiquitous, their real benefits and costs have come under increased scrutiny. We interviewed Bent Flyvbjerg, who has extensively studied megaproject development. Flyvbjerg has found systematic problems in the... more
This research was funded by, and implemented within, a UK national research organisation, while the author was the KE and Impact Evaluation Manager responsible for assessing impact on a £15m UK government-funded research programme. This... more
Back cover text: This book aims to enlarge the understanding of decision-making on mega-projects and suggest recommendations for a more effective, efficient and democratic approach. Authors from different scientific disciplines address... more
This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs,... more
Risk, including economic risk, is increasingly a concern for public policy and management. The possibility of dealing effectively with risk is hampered, however, by lack of a sound empirical basis for risk assessment and management. This... more
Defining means to assess safety performance and delve into their causes is one of the current and future challenges of the ATM sector. Following the experiences of the Aerospace Performance Factor by FAA and EUROCONTROL, this research... more
Out-of-control information technology (IT) projects have ended the careers of top managers, such as EADS CEO Noël Forgeard and Levi Strauss’ CIO David Bergen. Moreover, IT projects have brought down whole companies, like Kmart in the US... more
This paper focuses on problems and their causes and cures in policy and planning for large-infrastructure projects. First, it identifies as the main problem in major infrastructure developments pervasive misinformation about the costs,... more
A major source of risk in project management is inaccurate forecasts of project costs, demand, and other impacts. The paper presents a promising new approach to mitigating such risk, based on theories of decision making under uncertainty... more
Dan Lovallo and Daniel Kahneman must be commended for their clear identification of causes and cures to the planning fallacy in “Delusions of Success: How Optimism Undermines Executives’ Decisions” (July 2003). Their look at overoptimism,... more
Results from the first statistically significant study of the causes of cost escalation in transport infrastructure projects are presented. The study is based on a sample of 258 rail, bridge, tunnel and road projects worth US$90 billion.... more
This paper explores how theories of the planning fallacy and the outside view may be used to conduct quality control and due diligence in project management. First, a much-neglected issue in project management is identified, namely that... more
The scope of activities of University Center for Space Research and Technologies (UCSRT) includes fundamental and applied research in the field of theoretical and experimental physics, space physics, geophysics, atmospheric physics,... more
University Centre for Space Research and Technologies, Sofia University performs scientific and applied research, and education in Space Research and Technologies, which have applications in Monitoring of Pollutions and... more
During World War I, the US Congress made it unlawful to speak against the war. The executive prosecuted many for doing so and when tried at the Supreme Court it upheld the sentences. During the Iraq War it was not a crime to speak against... more