Bartle, I. ; Vass, P. Independent economic regulation: a reassessment of its role in sustainable development. 2007 Utilities Policy. 15 261-269
- Bartle, I., Vass, P., 2006. Economic Regulators and Sustainable Development: Promoting Good Governance. Centre for the Study of Regulated Industries. University of Bath School of Management (Research Report 18).
Paper not yet in RePEc: Add citation now
- Buchanan, A., 2008. Ofgem's 'RPI at 20' project. In: Society of British Gas Industries Conference, Text of Speech by Chief Executive of Ofgem.
Paper not yet in RePEc: Add citation now
Burns, P. ; Jenkins, C. ; Riechmann, C. The role of benchmarking for yardstick competition. 2005 Utilities Policy. 13 302-309
- Committee on Climate Change, 2008. Building a low-carbon economy—the UK’s contribution to tackling climate change. December 2008.
Paper not yet in RePEc: Add citation now
Cowan, S. Network regulation. 2006 Oxford Review of Economic Policy. 22 248-259
Crouch, M. Investment under RPI-X: practical experience with an incentive compatible approach in the GB electricity distribution sector. 2006 Utilities Policy. 14 240-244
- DCLG, 2007. Planning Policy Statement: Planning and Climate Change—Supplement to Planning Policy Statement 1. Available from: 〈http://www.communities.gov.uk/publications/planningandbuilding/ppsclimatechange〉 (accessed 26.05.10).
Paper not yet in RePEc: Add citation now
- DECC and DCLG, 2009. Heat and Energy Saving Strategy: Consultation. Available from: 〈http://hes.decc.gov.uk/〉 (February 2009).
Paper not yet in RePEc: Add citation now
- DECC, 2009a. Consultation on Renewable Electricity Financial Incentives 2009. Available from: 〈http://www.decc.gov.uk/en/content/cms/consultations/elec_financial/elec_financial.aspx〉 (accessed 15.07.09).
Paper not yet in RePEc: Add citation now
- DECC, 2009b. Smarter Grids: The Opportunity (2050 Roadmap Discussion Paper). Available from: 〈http://www.decc.gov.uk/en/content/cms/what_we_do/uk_supply/network/smart_grid/smart_grid.aspx〉 (December 2009).
Paper not yet in RePEc: Add citation now
- DECC, 2010a. Renewable Heat Incentive — Consultation on the proposed RHI financial support scheme Available from: 〈http://www.decc.gov.uk/en/content/cms/consultations/rhi/rhi.aspx〉 (accessed 01.02.10).
Paper not yet in RePEc: Add citation now
- DECC, 2010c. Warm homes, greener homes: a strategy for household energy management—supporting paper VIII an enabling framework for district heating and cooling.
Paper not yet in RePEc: Add citation now
- DEFRA, 2007. Analysis of the UK potential for combined heat and power. October 2007.
Paper not yet in RePEc: Add citation now
- DTI, 2003. Our energy future—creating a low carbon economy (The Energy White Paper). Available from: 〈http://www.dti.gov.uk/energy/whitepaper/ourenergyfuture.pdf〉 (February 2003).
Paper not yet in RePEc: Add citation now
- DTI, 2006a. The Energy Challenge: Energy Review Report 2006. HMSO, July 2006.
Paper not yet in RePEc: Add citation now
- DTI, 2006b. Our energy challenge: power from the people. Microgeneration Strategy. URN no.: 06/993.
Paper not yet in RePEc: Add citation now
- DTI, 2007. Meeting the energy challenge: a white paper on energy. 23 May 2007, CM 7124—URN no.: 07/1006.
Paper not yet in RePEc: Add citation now
- EA Technology Limited, 2006. Network Losses and Distributed Generation. DTI, URN 06/1238.
Paper not yet in RePEc: Add citation now
- Econnect Consulting and NAREC, 2006. Registered Power Zones (RPZ): Assessing the Feasibility of Establishing Power Zones on Northern/Yorkshire Electricity Networks. DTI, URN no.: 06/1084.
Paper not yet in RePEc: Add citation now
- Econnect Consulting, 2006. Accommodating Distributed Generation. DTI.
Paper not yet in RePEc: Add citation now
- Electricity Networks Strategy Group, 2009a. Our electricity transmission network: a vision for 2020, 5 March 2009.
Paper not yet in RePEc: Add citation now
- Electricity Networks Strategy Group, 2009b. A Smart Grid Vision. November 2009.
Paper not yet in RePEc: Add citation now
- Electricity North West Ltd., 2009. Statement of Charges for the Use of Electricity North West Limited's Electricity Distribution Network. Available from: 〈http://www.enwltd.co.uk/ofgem.htm〉 (effective 1 April 2009).
Paper not yet in RePEc: Add citation now
- Energy and Climate Change Committee, 2008. The Future of Britain's Electricity Networks: Call for written evidence. UK Parliament. Available from: 〈http://www.parliament.uk/parliamentary_committees/ecc.cfm〉.
Paper not yet in RePEc: Add citation now
- Energy Networks Association, 2006. Engineering Recommendation P2/6—Security of Supply. July 2006.
Paper not yet in RePEc: Add citation now
- Energy Networks Association, 2009. Appendix B Draft Common Distribution Charging Methodology. Available from: 〈http://2009.energynetworks.org/structure-of-charges/〉 (August 2009).
Paper not yet in RePEc: Add citation now
- European Commission, 2007. Energising Europe: a real market with secure supply—press release. IP/07/1361. Available from: 〈http://europa.eu/rapid/pressReleasesAction.do?reference=IP/07/1361&format=HTML&aged=0&language=EN&guiLanguage=en〉 (19 September).
Paper not yet in RePEc: Add citation now
Filippini, M. Are municipal electricity distribution utilties natural monopolies?. 1998 Annals of Public and Cooperative Economics. 69 157-
- Frontier Economics, 2003. Developing Network Monopoly Price Controls: Workstream A—Regulatory Mechanisms for Dealing with Uncertainty, Ofgem, March 2003.
Paper not yet in RePEc: Add citation now
- Hampton, P., 2005. Reducing administrative burdens: effective inspection and enforcement. HM Treasury, March 2005.
Paper not yet in RePEc: Add citation now
- Helm, D. . 2004 Oxford University Press: Oxford
Paper not yet in RePEc: Add citation now
- Helm, D., 2008. Credible energy policy: meeting the challenges of security of supply and climate change. Policy Exchange, London.
Paper not yet in RePEc: Add citation now
- HM Government, 2005. Securing the future—The UK Government Sustainable Development Strategy. CM 6467. Available from: 〈http://www.defra.gov.uk/sustainable/government/〉.
Paper not yet in RePEc: Add citation now
- HM Government, 2009a. The UK Low Carbon Transition Plan—National strategy for climate and energy. Available from: 〈http://www.decc.gov.uk/en/content/cms/publications/lc_trans_plan/lc_trans_plan.aspx〉 (accessed 15.07.09).
Paper not yet in RePEc: Add citation now
- HM Treasury, 2009. Budget 2009. April 2009. Available from: 〈http://www.hm-treasury.gov.uk/d/Budget2009/bud09_completereport_2591.pdf〉.
Paper not yet in RePEc: Add citation now
- HMSO, 1989. Electricity Act (Chapter 32).
Paper not yet in RePEc: Add citation now
- HMSO, 2000. Utilities Act (Chapter 27).
Paper not yet in RePEc: Add citation now
- HMSO, 2003. Sustainable Energy Act (Chapter 30).
Paper not yet in RePEc: Add citation now
- HMSO, 2004. Energy Act (Chapter 20).
Paper not yet in RePEc: Add citation now
- HMSO, 2008. Energy Act (Chapter 32).
Paper not yet in RePEc: Add citation now
- HMSO, 2010. Energy Act (Chapter 27). Available from: 〈http://www.opsi.gov.uk/acts/acts2010/pdf/ukpga_20100027_en.pdf〉.
Paper not yet in RePEc: Add citation now
Jamasb, T. ; Pollitt, M. Incentive regulation of electricity distribution networks: lessons of experience from Britain. 2007 Energy Policy. 35 6163-6187
- Jenkins, N. ; Allan, R. ; Crossley, P. ; Kirschen, D. ; Strbac, G. Embedded Generation. 2000 The Institute of Electrical Engineers (IEE): London
Paper not yet in RePEc: Add citation now
Joskow, P.L., 2006. Incentive regulation in theory and practice: electricity distribution and transmission networks. Harvard Electricity Policy Group. Available from: 〈http://www.ksg.harvard.edu/hepg/〉.
- Miliband, E., 2009. Low Carbon Industrial strategy (press release of speech). Low Carbon Industrial Summit. Secretary of State for Energy and Climate Change.
Paper not yet in RePEc: Add citation now
- Miliband, E., 2010. Statement—Ofgem Project Discovery. Secretary of State for Energy and Climate Change.
Paper not yet in RePEc: Add citation now
- Ofgem, 2003a. Developing Network Monopoly Price Controls: Initial Conclusions. June 2003, 54/03.
Paper not yet in RePEc: Add citation now
- Ofgem, 2003b. Electricity Distribution Price Control Review: Initial consultation. 16 July 2003, 68/03.
Paper not yet in RePEc: Add citation now
- Ofgem, 2004. Electricity Distribution Price Control Review: Final Proposals. November 2004, 265/04.
Paper not yet in RePEc: Add citation now
- Ofgem, 2005. Modification of conditions in the distribution licence granted under section 6(1)(c) of the Electricity Act 1989: Special Licence Conditions. 23 March 2005.
Paper not yet in RePEc: Add citation now
- Ofgem, 2008a. Consumer first research for DPCR5—quantitative findings, 25 July 2008.
Paper not yet in RePEc: Add citation now
- Ofgem, 2008b. Electricity Distribution Price Control Review Policy Paper. 5 December 2008. Ref.: 159/08.
Paper not yet in RePEc: Add citation now
- Ofgem, 2008c. Electricity Distribution Price Control Review: Initial Consultation Document. 28 March 2008. Ref.: 32/08.
Paper not yet in RePEc: Add citation now
- Ofgem, 2008d. Transmission Access Review—Initial Consultation on Enhanced Transmission Investment Incentives. 19 December 2008. Ref.: 175/08.
Paper not yet in RePEc: Add citation now
- Ofgem, 2009a. Electricity Distribution Price Control Initial Proposals Consultation. 3 August 2009.
Paper not yet in RePEc: Add citation now
- Ofgem, 2009b. Electricity Distribution Price Control Review Final Proposals (DPCR5). 144/09. Available from: 〈http://www.ofgem.gov.uk/Networks/ElecDist/PriceCntrls/DPCR5/Pages/DPCR5.aspx〉 (7 December 2009).
Paper not yet in RePEc: Add citation now
- Ofgem, 2009c. Electricity Distribution Price Control Review Final Proposals (DPCR5)—Allowed revenue cost assessment. 146a/09. Available from: 〈http://www.ofgem.gov.uk/Networks/ElecDist/PriceCntrls/DPCR5/Pages/DPCR5.aspx〉 (accessed 7.12.09).
Paper not yet in RePEc: Add citation now
- Ofgem, 2009d. Electricity Distribution Price Control Review Initial Proposals—Allowed revenue cost assessment. 94/09. Available from: 〈http://www.ofgem.gov.uk/Pages/MoreInformation.aspx?docid=257&refer=Networks/ElecDist/PriceCntrls/DPCR5〉.
Paper not yet in RePEc: Add citation now
- Ofgem, 2009e. Electricity Distribution Price Control Review Methodology and Initial Results Paper: Consultation. 8 May 2009, 47/09.
Paper not yet in RePEc: Add citation now
- Ofgem, 2009f. Next steps in delivering the electricity distribution structure of charges project. 20 March 2009.
Paper not yet in RePEc: Add citation now
- Ofgem, 2009g. Regulating Energy Networks for the Future: RPI-X@20 Principles, Process and Issues. 27 February 2009, 13/09.
Paper not yet in RePEc: Add citation now
- Ofgem, 2010a. Consumer first—final report on the process and Group's views on DPCR5 final proposals. The Ofgem Consumer Challenge Group. March 2010.
Paper not yet in RePEc: Add citation now
- Ofgem, 2010b. Project discovery—options for delivering secure and sustainable energy supplies—consultation. 3 February 2010.
Paper not yet in RePEc: Add citation now
- Ofgem, 2010c. Regulating energy networks for the future: RPI-X@20 Emerging Thinking. 20 January 2010. Ref.: 5/10.
Paper not yet in RePEc: Add citation now
- Openshaw, D. Towards a framework for managing active networks. Round 4, Paper 22. 2003 CIRED, IEE: Barcelona
Paper not yet in RePEc: Add citation now
Pollitt, M. The role of efficiency estimates in regulatory price reviews: Ofgem's approach to benchmarking electricity networks. 2005 Utilities Policy. 13 279-288
Saplacan, R. Competition in electricity distribution. 2008 Utilities Policy. 16 231-237
- Shaw, R. ; Attree, M. ; Kay, M. ; Haniak, M. ; Jackson, T. A tool to analyse the regulatory incentives on a distribution network operator on a project level. 192. 2007 CIRED, IEE: Vienna
Paper not yet in RePEc: Add citation now
- Sinclair, J. and Thomas, P., 2003. Connection Requirements for small-scale Distributed Generation (up to 16A per phase) Operating in Parallel with Public Distribution Networks. CIRED, IEE, Barcelona.
Paper not yet in RePEc: Add citation now
- Sohn Associates, 2009. Electricity Distribution Systems Losses Non-Technical Overview, Ofgem.
Paper not yet in RePEc: Add citation now
- Strbac, G., Jenkins, N. and Green, T., 2006. Future Network Technologies. DTI, Energy Review 2006. April 2006.
Paper not yet in RePEc: Add citation now
- Sustainable Development Commission, 2007. Lost in Transmission? The role of Ofgem in a changing climate. Available from: 〈www.sd-commission.org.uk/〉.
Paper not yet in RePEc: Add citation now
- TCPA and CHPA, 2008. Community energy: urban planning for a low-carbon future. Town and Country Planning Association, Combined Heat and Power Association.
Paper not yet in RePEc: Add citation now
- UK Green Building Council, 2008. The Definition of Zero Carbon. Available from: 〈http://www.ukgbc.org/site/resources/showResourceDetails?id=180〉 (May 2008).
Paper not yet in RePEc: Add citation now
Woodman, B. ; Baker, P. Regulatory frameworks for decentralised energy. 2008 Energy Policy. 36 4527-4531