1.
|
Positron source for FCC-ee
/ Chaikovska, Iryna (Orsay, LAL) ; Apyan, Armen (Yerevan Phys. Inst.) ; Chehab, Robert (Orsay, LAL) ; Enomoto, Yoshinori (KEK, Tsukuba) ; Faus-Golfe, Angeles (Orsay, LAL) ; Furukawa, Kazuro (KEK, Tsukuba) ; Han, Yanliang (Orsay, LAL) ; Kamitani, Takuya (KEK, Tsukuba) ; Martyshkin, Pavel (Novosibirsk, IYF) ; Miyahara, Fusashi (KEK, Tsukuba) et al.
The FCC-ee is a high-luminosity, high-precision circular collider to be constructed in a new 100 km tunnel in the Geneva area. The physics case is well established and the FCC-ee operation is foreseen at 91 GeV (Z-pole), 160 GeV (W pair production threshold), 240 GeV (Higgs resonance) and 365 GeV ($t \bar{t}$ threshold). [...]
CERN-ACC-2019-145.-
2019 - 4 p.
- Published in : 10.18429/JACoW-IPAC2019-MOPMP003
Fulltext from publisher: PDF;
In : 10th International Particle Accelerator Conference, Melbourne, Australia, 19 - 24 May 2019, pp.MOPMP003
|
|
2.
|
Experimental Activities on High Intensity Positron Sources Using Channeling
/ Chaikovska, Iryna (Orsay, LAL) ; Artru, Xavier (Lyon, IPN) ; Chehab, Robert (Orsay, LAL) ; Furukawa, Kazuro (KEK, Tsukuba) ; Guler, Hayg (Orsay, LAL) ; Kamitani, Takuya (KEK, Tsukuba) ; Kubytskyi, Viacheslav (Orsay, LAL) ; Miyahara, Fusashi (KEK, Tsukuba) ; Rodin, Volodymyr (Taras Shevchenko U.) ; Satoh, Masanori (KEK, Tsukuba) et al.
The positron source under investigation is using channeling radiation of multi-GeV electrons in a tungsten crystal. The radiated photons are impinging on the amorphous targets creating e⁺e⁻ pairs. [...]
CERN-ACC-2017-270.-
2017 - 4 p.
- Published in : 10.18429/JACoW-IPAC2017-WEPIK002
Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.WEPIK002
|
|
3.
|
Achievements of KEKB
/ Abe, Tetsuo (KEK, Tsukuba) ; Akai, Kazunori (KEK, Tsukuba) ; Akasaka, Norimasa (KEK, Tsukuba) ; Akemoto, Mitsuo (KEK, Tsukuba) ; Akiyama, Atsuyoshi (KEK, Tsukuba) ; Arinaga, Mitsuhiro (KEK, Tsukuba) ; Cai, Yunhai (SLAC) ; Ebihara, Kiyokazu (KEK, Tsukuba) ; Egawa, Kazumi (KEK, Tsukuba) ; Enomoto, Atsushi (KEK, Tsukuba) et al.
The machine commissioning of KEKB started in December 1998 and its operation was terminated at the end of June 2010 to upgrade KEKB to SuperKEKB. In this paper, we summarize the history of KEKB and show the achievements made there..
2013
- Published in : Prog. Theor. Exp. Phys. 2013 (2013) 03A001
|
|
4.
|
Timing System Upgrade for Top-up Injection at KEK Linac
/ Furukawa, Kazuro (KEK, Ibaraki) ; Kadokura, Eiichi (KEK, Ibaraki) ; Kazakov, Artem (KEK, Ibaraki) ; Satoh, Masanori (KEK, Ibaraki) ; Suwada, Tsuyoshi (KEK, Ibaraki)
2006 - 3 p.
External link: Published version from JACoW
In : 10th European Particle Accelerator Conference, Edinburgh, UK, 26 - 30 Jun 2006, pp.3071
|
|
5.
|
Operation Status and Statistics of the KEK Electron/Positron Linac
/ Ogawa, Yujiro (KEK, Ibaraki) ; Enomoto, Atsushi (KEK, Ibaraki) ; Furukawa, Kazuro (KEK, Ibaraki) ; Imai, Yasuo (MELCO SC, Tsukuba) ; Kamitani, Takuya (KEK, Ibaraki) ; Kudou, Takuya (MELCO SC, Tsukuba) ; Kusano, Shiro (MELCO SC, Tsukuba) ; Satoh, Masanori (KEK, Ibaraki) ; Sugimura, Takashi (KEK, Ibaraki) ; Suwada, Tsuyoshi (KEK, Ibaraki) et al.
2006 - 3 p.
External link: Published version from JACoW
In : 10th European Particle Accelerator Conference, Edinburgh, UK, 26 - 30 Jun 2006, pp.2700
|
|
6.
|
New Beam Transport Line from LINAC to Photon Factory in KEK
/ Iida, Naoko (KEK, Ibaraki) ; Furukawa, Kazuro (KEK, Ibaraki) ; Ikeda, Mitsuo (KEK, Ibaraki) ; Kakihara, Kazuhisa (KEK, Ibaraki) ; Kamitani, Takuya (KEK, Ibaraki) ; Kikuchi, Mitsuo (KEK, Ibaraki) ; Kobayashi, Yukinori (KEK, Ibaraki) ; Mitsuhashi, Toshiyuki (KEK, Ibaraki) ; Ogawa, Yujiro (KEK, Ibaraki) ; Satoh, Masanori (KEK, Ibaraki) et al.
2006 - 3 p.
External link: Published version from JACoW
In : 10th European Particle Accelerator Conference, Edinburgh, UK, 26 - 30 Jun 2006, pp.1505
|
|
7.
|
|
8.
|
|