Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

CERN Document Server 34 εγγραφές βρέθηκαν  1 - 10επόμενοτέλος  μετάβαση στην εγγραφή: Η έρευνα πήρε 0.67 δευτερόλεπτα. 
1.
ALICE upgrades during the LHC Long Shutdown 2 / ALICE Collaboration
A Large Ion Collider Experiment (ALICE) has been conceived and constructed as a heavy-ion experiment at the LHC. During LHC Runs 1 and 2, it has produced a wide range of physics results using all collision systems available at the LHC. [...]
arXiv:2302.01238; CERN-EP-2023-009.- Geneva : CERN, 2024-05-23 - 159 p. - Published in : JINST 19 (2024) P05062 Draft (restricted): PDF; Fulltext: document - PDF; 2302.01238 - PDF;
In : The Large Hadron Collider and The Experiments for Run 3
2.
The upgrade of the ALICE TPC with GEMs and continuous readout / ALICE TPC Collaboration
The upgrade of the ALICE TPC will allow the experiment to cope with the high interaction rates foreseen for the forthcoming Run 3 and Run 4 at the CERN LHC. In this article, we describe the design of new readout chambers and front-end electronics, which are driven by the goals of the experiment. [...]
arXiv:2012.09518.- 2021-03-15 - 87 p. - Published in : JINST Fulltext: PDF;
3.
Particle identification studies with a full-size 4-GEM prototype for the ALICE TPC upgrade / ALICE TPC Collaboration
A large Time Projection Chamber is the main device for tracking and charged-particle identification in the ALICE experiment at the CERN LHC. After the second long shutdown in 2019/20, the LHC will deliver Pb beams colliding at an interaction rate of about 50 kHz, which is about a factor of 50 above the present readout rate of the TPC. [...]
arXiv:1805.03234.- 2018-09-21 - 9 p. - Published in : Nucl. Instrum. Methods Phys. Res., A 903 (2018) 215-223 Fulltext: S0168900218308222 - XML; arXiv:1805.03234 - PDF;
4.
A Fast Switching Mirror Chamber for FLASH / Pauliuk, S (DESY) ; Gensch, U (DESY) ; Hahn, U (DESY) ; Heller, R (DESY) ; Karstensen, S (DESY) ; Sachwitz, Martin (DESY) ; Schulte-Schrepping, H (DESY) ; Thom, H (DESY) ; Thurmann, D (DESY) ; Tiedtke, K I (DESY)
2008 - 3 p. External link: Published version from JACoW
In : 11th European Particle Accelerator Conference, Genoa, Italy, 23 - 27 Jun 2008, pp.MOPC027
5.
Hard X-ray Wiggler Front End Filter Design / Schulte-Schrepping, Horst ; Hahn, Ulrich
2007 - Published in : AIP Conf. Proc.: 879 (2007) , pp. 1042-1045 External link: Published version from AIP
In : 9th International Conference On Synchrotron Radiation Instrumentation, Daegu, Korea, 28 May - 2 Jun 2006, pp.1042-1045
6.
Compact Fixed-exit UHV DCM for XAFS / Rickers, K ; Brüggmann, U ; Drube, W ; Herrmann, M ; Heuer, J ; Welter, E ; Schulte-Schrepping, H ; Schulz-Ritter, H
2007 - Published in : AIP Conf. Proc.: 879 (2007) , pp. 907-910 External link: Published version from AIP
In : 9th International Conference On Synchrotron Radiation Instrumentation, Daegu, Korea, 28 May - 2 Jun 2006, pp.907-910
7.
Residual Gas X-ray Beam Position Monitor Development for PETRA III / Ilinski, P ; Hahn, U ; Schulte-Schrepping, H ; Degenhardt, M
2007 - Published in : AIP Conf. Proc.: 879 (2007) , pp. 782-785 External link: Published version from AIP
In : 9th International Conference On Synchrotron Radiation Instrumentation, Daegu, Korea, 28 May - 2 Jun 2006, pp.782-785
8.
The Generic Beamline Concept of the PETRA III Undulator Beamlines / Hahn, U ; Peters, H B ; Röhlsberger, R ; Schulte-Schrepping, H
2007 - Published in : AIP Conf. Proc.: 879 (2007) , pp. 539-542 External link: Published version from AIP
In : 9th International Conference On Synchrotron Radiation Instrumentation, Daegu, Korea, 28 May - 2 Jun 2006, pp.539-542
9.
New XAFS Facility for In-Situ Measurements at Beamline C at HASYLAB / Rickers, K ; Drube, W ; Schulte-Schrepping, H ; Welter, E ; Brüggmann, U ; Herrmann, M ; Heuer, J ; Schulz-Ritter, H
2007 - Published in : AIP Conf. Proc.: 882 (2007) , pp. 905-907 External link: Published version from AIP
In : 13th International Conference on X-ray Absorption Fine Structure, Stanford, CA, USA, 9 - 14 Jul 2006, pp.905-907
10.
The 320 keV ESR-Electron Cooler / Angert, N ; Bourgeois, W ; Emig, H ; Franzke, B ; Langenbeck, B ; Leible, K D ; Odenweller, T ; Poth, H ; Schulte, H ; Spädtke, P et al.
1990 External link: Published version from JACoW
In : 2nd European Particle Accelerator Conference, Nice, France, 12 - 16 Jun 1990, pp.1374

CERN Document Server : 34 εγγραφές βρέθηκαν   1 - 10επόμενοτέλος  μετάβαση στην εγγραφή:
Δείτε ακόμη: παρόμοια ονόματα συγγραφέων
2 Schulte, H.
1 Schulte, Hendrik
Ενδιαφέρεστε να ενημερώνεστε για νέα αποτελέσματα σχετικά με το ερώτημα αυτό;
Δημιουργήστε ένα προσωπικό email alert ή εγγραφείτε στο RSS feed.
Δεν βρήκατε αυτό που αναζητούσατε; Δοκιμάστε την έρευνά σας σε άλλους servers:
Schulte, H σε Amazon
Schulte, H σε CERN EDMS
Schulte, H σε CERN Intranet
Schulte, H σε CiteSeer
Schulte, H σε Google Books
Schulte, H σε Google Scholar
Schulte, H σε Google Web
Schulte, H σε IEC
Schulte, H σε IHS
Schulte, H σε INSPIRE
Schulte, H σε ISO
Schulte, H σε KISS Books/Journals
Schulte, H σε KISS Preprints
Schulte, H σε NEBIS
Schulte, H σε SLAC Library Catalog
Schulte, H σε Scirus