Home > CERN Experiments > LHC Experiments > ATLAS > ATLAS Preprints > Design and Evaluation of the LAr Trigger Digitizer Board in the ATLAS Phase-I Upgrade |
Article | |
Report number | arXiv:1806.08046 |
Title | Design and Evaluation of the LAr Trigger Digitizer Board in the ATLAS Phase-I Upgrade |
Related title | Design and Evaluation of LAr Trigger Digitizer Board in the ATLAS Phase-I Upgrade |
Author(s) | Besin, Dominique (Brookhaven Natl. Lab.) ; Chen, Hucheng (Brookhaven Natl. Lab.) ; Chen, Kai (Brookhaven Natl. Lab.) ; Citterio, Mauro (INFN, Milan) ; Deschamps, Herve (Saclay) ; Grabas, Aude (Saclay) ; Lanni, Francesco (Brookhaven Natl. Lab.) ; Latorre, Stefano (INFN, Milan) ; Lazzaroni, Massimo (INFN, Milan) ; Liu, Hongbin (Brookhaven Natl. Lab.) ; Pleier, Marc-André (Brookhaven Natl. Lab.) ; Schwemling, Phillippe (Saclay) ; Simion, Stefan (Orsay, LAL) ; Tang, Shaochun (Brookhaven Natl. Lab.) ; Xu, Hao (Brookhaven Natl. Lab.) ; Zhu, Heling (USTC, Hefei) |
Publication | 2019-06-24 |
Imprint | 2018-06-20 |
Number of pages | 6 |
In: | IEEE Trans. Nucl. Sci. 66 (2019) 2011-2016 |
In: | 21st IEEE Real Time Conference, Williamsburg, Va, United States Of America, 9 - 15 Jun 2018, pp.2011-2016 |
DOI | 10.1109/TNS.2019.2924795 |
Subject category | hep-ex ; Particle Physics - Experiment ; physics.ins-det ; Detectors and Experimental Techniques |
Accelerator/Facility, Experiment | CERN LHC ; ATLAS |
Abstract | The LHC upgrade is planned to enhance the instantaneous luminosity during Run 3 from 2021 through 2023. The Phase-I upgrade of the trigger readout electronics for the ATLAS Liquid Argon (LAr) Calorimeters will be installed during the second long shutdown of LHC in 2019-2020. In this upgrade, the so-called super cells are introduced to provide higher granularity, higher resolution and longitudinal shower shape information from the LAr calorimeters to the level-1 trigger processors. A new LAr Trigger Digitizer Board (LTDB) will manipulate and digitize 320 channels of super cell signals, and transmit it via 40 fiber optical links to the back end where data are further processed and transmitted to the trigger processors. Five pairs of bidirectional GBT links are used for slow control from the Front-end LInks eXchange (FELIX) in the ATLAS TDAQ system. LTDB also outputs 64 summed analog signals to the current Tower Builder Board via the new baseplane. A test system is developed to test all functions of the LTDB and carry out the performance measurement. A back end PCIe card is designed which has the circuit to interface to the ATLAS trigger, time and control system. It can control the generation of injection signals to the LTDB for performance test. It also configures and calibrate all ASICs on the LTDB. |
Copyright/License | preprint: (License: arXiv nonexclusive-distrib 1.0) |