WO2011119197A1 - Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining - Google Patents
Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining Download PDFInfo
- Publication number
- WO2011119197A1 WO2011119197A1 PCT/US2011/000372 US2011000372W WO2011119197A1 WO 2011119197 A1 WO2011119197 A1 WO 2011119197A1 US 2011000372 W US2011000372 W US 2011000372W WO 2011119197 A1 WO2011119197 A1 WO 2011119197A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- passageway
- fluid
- usable
- brine
- storage
- Prior art date
Links
- 238000003860 storage Methods 0.000 title claims abstract description 325
- 238000000034 method Methods 0.000 title claims abstract description 179
- 238000005065 mining Methods 0.000 title claims abstract description 121
- 229930195733 hydrocarbon Natural products 0.000 title claims abstract description 80
- 150000002430 hydrocarbons Chemical class 0.000 title claims abstract description 80
- 239000004215 Carbon black (E152) Substances 0.000 title claims abstract description 70
- 238000010276 construction Methods 0.000 title description 138
- 239000012530 fluid Substances 0.000 claims abstract description 341
- 238000004891 communication Methods 0.000 claims abstract description 89
- 230000004888 barrier function Effects 0.000 claims abstract description 85
- 239000000203 mixture Substances 0.000 claims abstract description 54
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 claims description 226
- 239000012267 brine Substances 0.000 claims description 211
- 239000007789 gas Substances 0.000 claims description 157
- 150000003839 salts Chemical class 0.000 claims description 156
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 151
- 239000000243 solution Substances 0.000 claims description 136
- 239000007788 liquid Substances 0.000 claims description 53
- 238000004090 dissolution Methods 0.000 claims description 32
- 230000005484 gravity Effects 0.000 claims description 25
- 230000002706 hydrostatic effect Effects 0.000 claims description 15
- 230000000903 blocking effect Effects 0.000 claims description 10
- 239000007787 solid Substances 0.000 claims description 9
- 238000010521 absorption reaction Methods 0.000 claims description 3
- XZPVPNZTYPUODG-UHFFFAOYSA-M sodium;chloride;dihydrate Chemical compound O.O.[Na+].[Cl-] XZPVPNZTYPUODG-UHFFFAOYSA-M 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 description 64
- 239000000047 product Substances 0.000 description 45
- 238000002347 injection Methods 0.000 description 38
- 239000007924 injection Substances 0.000 description 38
- 238000006073 displacement reaction Methods 0.000 description 30
- 238000000605 extraction Methods 0.000 description 21
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 20
- 239000013505 freshwater Substances 0.000 description 19
- 230000001932 seasonal effect Effects 0.000 description 18
- 238000007796 conventional method Methods 0.000 description 16
- 230000035699 permeability Effects 0.000 description 16
- 239000011148 porous material Substances 0.000 description 16
- 230000037380 skin damage Effects 0.000 description 16
- 238000013461 design Methods 0.000 description 15
- 238000012546 transfer Methods 0.000 description 15
- 238000005553 drilling Methods 0.000 description 14
- 239000002184 metal Substances 0.000 description 14
- 229910052751 metal Inorganic materials 0.000 description 14
- 238000005259 measurement Methods 0.000 description 13
- 230000009977 dual effect Effects 0.000 description 11
- 230000008569 process Effects 0.000 description 11
- 239000004568 cement Substances 0.000 description 10
- 238000002386 leaching Methods 0.000 description 10
- 229910052757 nitrogen Inorganic materials 0.000 description 10
- 229920006395 saturated elastomer Polymers 0.000 description 10
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 9
- 238000012544 monitoring process Methods 0.000 description 9
- 238000011049 filling Methods 0.000 description 8
- 239000002245 particle Substances 0.000 description 8
- 239000004020 conductor Substances 0.000 description 7
- 239000010779 crude oil Substances 0.000 description 7
- 230000001419 dependent effect Effects 0.000 description 7
- 230000000694 effects Effects 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 7
- 238000005086 pumping Methods 0.000 description 7
- -1 Salt saturated brine Chemical class 0.000 description 6
- 239000003570 air Substances 0.000 description 6
- 230000007306 turnover Effects 0.000 description 6
- 230000015572 biosynthetic process Effects 0.000 description 5
- 238000007906 compression Methods 0.000 description 5
- 230000006835 compression Effects 0.000 description 5
- 239000012263 liquid product Substances 0.000 description 4
- 230000009467 reduction Effects 0.000 description 4
- 230000002829 reductive effect Effects 0.000 description 4
- 238000007789 sealing Methods 0.000 description 4
- 230000000638 stimulation Effects 0.000 description 4
- 230000003442 weekly effect Effects 0.000 description 4
- 230000002411 adverse Effects 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 3
- 230000006837 decompression Effects 0.000 description 3
- 230000007717 exclusion Effects 0.000 description 3
- 231100001261 hazardous Toxicity 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 3
- 239000003345 natural gas Substances 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 239000002253 acid Substances 0.000 description 2
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 235000012206 bottled water Nutrition 0.000 description 2
- 230000015556 catabolic process Effects 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 238000006731 degradation reaction Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 239000003651 drinking water Substances 0.000 description 2
- 230000003628 erosive effect Effects 0.000 description 2
- 239000002360 explosive Substances 0.000 description 2
- 238000007667 floating Methods 0.000 description 2
- 230000000670 limiting effect Effects 0.000 description 2
- 238000011068 loading method Methods 0.000 description 2
- 150000002739 metals Chemical class 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 230000002441 reversible effect Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000013535 sea water Substances 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- LJRGBERXYNQPJI-UHFFFAOYSA-M sodium;3-nitrobenzenesulfonate Chemical compound [Na+].[O-][N+](=O)C1=CC=CC(S([O-])(=O)=O)=C1 LJRGBERXYNQPJI-UHFFFAOYSA-M 0.000 description 2
- 230000035899 viability Effects 0.000 description 2
- 241001331845 Equus asinus x caballus Species 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 239000006227 byproduct Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000001311 chemical methods and process Methods 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000001351 cycling effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 229910001873 dinitrogen Inorganic materials 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 239000010419 fine particle Substances 0.000 description 1
- 238000010304 firing Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 210000002445 nipple Anatomy 0.000 description 1
- QJGQUHMNIGDVPM-UHFFFAOYSA-N nitrogen(.) Chemical compound [N] QJGQUHMNIGDVPM-UHFFFAOYSA-N 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000003303 reheating Methods 0.000 description 1
- 238000009877 rendering Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000002910 solid waste Substances 0.000 description 1
- 230000004936 stimulating effect Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/18—Pipes provided with plural fluid passages
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/12—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using drilling pipes with plural fluid passages, e.g. closed circulation systems
Definitions
- the present invention relates, generally, to manifold crossover member apparatus and methods usable for providing pressure containment and control when constructing and/or operating a manifold string, and during hydrocarbon operations, storage and/or solution mining, with at least two conduits and fluid separated passageways through the subterranean strata, for one or more substantially hydrocarbon and/or substantially water wells, or storage caverns, that originate from a single main bore and can extend into one or more subterranean regions.
- An embodiment of the present invention can include providing a manifold string, with a plurality of conduits forming a plurality of pressure barriers with at least one intermediate passageway or annular space, that can be usable to control pressurized, subterranean, fluid-mixture, flow streams, which can be controUed by the manifold string within passageways through subterranean strata for one or more subterranean wells, that can extend from a single main bore.
- Important uses of this aspect include, for example, constructing and/or operation of one or more subterranean wells from a single surface location, providing the opportunity for simultaneous well activities and/or common batch activities to be performed on a plurality of wells, without the need to remove established barriers, reposition a rig, and/or to re-establish barriers necessary for well control.
- An additional embodiment of the present invention includes one or more manifold crossover apparatus, usable with a manifold string to selectively control an innermost and at least one intermediate concentric or annular passageway.
- the innermost passageway can be usable for communicating flow- controlling devices for engagement in one or more receptacles of a manifold string to provide, for example, the ability to selectively change controlling mechanisms and/or flow paths of subterranean pressurized fluids.
- Another embodiment of the present invention enables fluid separation within a plurality of radial passageways that can communicate through orifices within the innermost passageway, with the radial passageways' diverting walls located within annular or concentric passageways, to direct fluid flow to the innermost passageway.
- Placing fluid controlling devices through the innermost passageway, for engagement within the manifold string provides further control of fluid-mixture flow streams between passageways of the manifold crossover and the radially inward or radially outward disposed passageways, including the passageway surrounding the manifold string to, for example, enable the crossover of flow between the innermost and concentric passageways.
- This crossover of flow enables selective control of the flow in the concentric passageway by use of valves, which can be engaged to the innermost passageway for providing selective pressure control of one or more annular or concentric passageways, while retaining the ability to access wells through the innermost passageway.
- conventional flow controlling devices are conveyable through the innermost passageway, for engagement within a receptacle or conduits of a manifold string, to selectively control fluid communication by diverting at least a portion of the fluid-mixture flow streams.
- An example of this embodiment includes the placement of a fluid motor and fluid pump, usable with gas expansion from an underground storage cavern for driving an impellor to pump and inject water for solution mining, during combined operations.
- An additional example includes, placement of an orifice piston, which can be usable with coiled tubing for under-balanced drilling.
- flow control devices engagable within a manifold string, a manifold string receptacle, or a plurality of innermost passageway subterranean valves can be usable with one or more manifold crossovers to selectively control pressurized fluid, that can be communicated through the innermost passageway and/or one or more concentric passageways.
- the flow control devices can be used, for example, to replace traditionally unreliable annulus safety valves with more reliable tubing retrievable valves or, for example, to repair a failed tubing retrievable safety valve for controlling a concentric passageway of an underground storage, within depleted reservoirs or salt caverns, with an insert safety valve placed through the innermost passageway.
- Another embodiment of the present invention enables the ability to divert all or a portion of a fluid-mixture flow stream to a another passageway, that can be disposed radially inward or radially outward for the purposes of carrying out simultaneous well construction, well production and/or well injection operations.
- the simultaneous well construction and/or well operations enables, for example, one or more under-balanced coiled tubing fish-bone sidetracks of a well to be performed more readily, while producing the well to reduce skin damage in a low permeability reservoir, or can further enable underground storage and solution mining operations to be performed simultaneously, thus removing the conventional requirement for a plurality of rig operations and/or high risk snubbing operations to strip out a dewatering string from a gas storage cavern.
- Another embodiment of the present invention provides selective control for placing well construction fluid mixtures of gases, liquids and/or solids within a region of the passageway through subterranean strata, while removing pressurized subterranean fluids from the subterranean strata by over-balancing or under-balancing hydrostatic pressures, for example, during proppant frac stimulations, gravel packs and simultaneous underground storage and solution mining operations.
- the present invention provides an orifice piston apparatus that can be engagable to a manifold crossover and through which cables or conduits may pass during, for example, under-balanced perforating or drilling operations. Engagement, placement and/or removal of the piston can be assisted by differential pressure applied to the face of the piston during simultaneous well construction, injection operations and/or production operations, including for example, performing a mechamcal integrity test using a cable, passed through the orifice piston, to measure a gas liquid interface below the final cemented casing shoe of an underground storage cavern.
- Another embodiment of the present invention includes the ability to commingle fluid mixture flow streams and/or to separate selected fluid mixture flow streams with an adapted chamber junction.
- the fluid flow from exit bore conduits can be commingled through the chamber or directed to intermediate concentric passageways disposed radially inward or outward of the chamber.
- the bore selector can be usable to communicate fluid and/or fluid control devices through the innermost passageway and chamber junction for selectively controlling one or more wells below a single main bore.
- Another embodiment of the present invention provides adapted chamber junctions, usable within a single well passageway with a plurality of flow streams, wherein the innermost passageway of a chamber junction exit bore can be axially aligned with the innermost passageway of the chamber and the conduits axially above.
- At least one more exit bore conduit can contain a radial passageway that can be usable with a bore selector, fluid diverter, straddle, or other flow control device to fluidly communicate between the innermost passageway and the surrounding passageway, or another concentric intermediate passageway.
- Another embodiment of the present invention includes a reduced length manifold crossover with a plurality of radial passageways for communicating from the innermost passageway to the passageway surrounding the manifold string, or a radially outward concentric passageway using radially disposed small conduits, such that flow through the one or more intermediate concentric passageways effectively travels around and past the rounded shapes of the small conduits.
- reduced length conventional flow controlling apparatus can be usable to selectively control flow through orifice connections with the innermost passageway to, for example, provide gradual axial adjustments of solution mining fresh water placement during the salt dissolution and/or storage process.
- Embodiments of the present invention include methods for selectively controlling pressures, volumes and temperatures of fluids that can be stored and retrieved from a storage space. Examples of such methods include controlled pressurization of a storage cavern, using water or brine, during gas extraction to reduce or minimize the temperature reduction caused by retrieving compressed stored gas through expansion, thus providing a longer withdrawal period before reaching a minimum operating temperature for associated well equipment.
- Other embodiments of the present invention include methods for selectively controlling a substantially water interface during solution mining and/or during re-filling of a cavern, for stored fluid extraction. These selective control methods affect the shape of the cavern walls to, in use, control working storage volumes and solution mining rates for varying storage volume turnovers and natural salt creep rates, usable for simultaneous underground hydrocarbon storage and solution mining operations over a number of years, and/or seasonal storage volume turn-overs.
- Embodiments of the present invention can include methods for providing a subterranean brine reservoir with a stored product cushion for selectively controlling working volume and displacement of liquids or compressed gases to and from salt caverns, fluidly associated with brine reservoirs holding subterranean heated brine or generating displacement brine that can be fluidly communicated in u-tube like conduit, pumping and/or compression arrangements between caverns.
- the present invention can provide methods for removing salt gas storage cavern sunk construction cost by displacing conventionally irretrievable cushion gas cavern structural support inventories for preventing salt creep with brine from brine reservoirs during high demand, followed by gas refilling and brine displacement during periods of higher gas availability to, for example, improve the economic viability of constructing large scale salt cavern gas storage facilities, as compared to conventional depleted permeable sandstone reservoir storage.
- the present invention can provide methods usable to selectively access and fluidly communicate between a plurality of specific gravity separated fluids, that can be disposed in caverns and subterranean brine reservoirs connected with u-tube like conduit, pumping and/or compression arrangements engaged with manifold crossovers disposed with the caverns.
- Still other embodiments of the present invention can provide methods usable to space salt storage caverns and brine reservoirs for salt pillar support within ocean environments, with pipeline or shipping access and an abundance of water and brine absorption capacity usable, for example, to access stored specific gravity separated liquid products above brine with boats and/or pipelines, while performing u-tube fluid communication with gas storage caverns to, for example, perform storage operations during periods of contrary demand between liquids and gas.
- embodiments of the present invention provide methods for the use of a fluid buffer for transportation pipelines and/or the selective access to fluids of differing specific gravity for use or disposal, for example, pigging pipelines of water and other fluids into a storage cavern, wherein the fluids are selectively accessed by a manifold crossover with specific gravity cavern separation of stored hydrocarbons from water brine for environmentally safe ocean discharge.
- These cost-effective systems and methods must be operable during combined solution mining and storage, especially when encountering unexpected geologic salt deposit features because stored product may prevent large hoisting capacity rig interventions during solution mining conventionally necessary to remove a completion to take a sonar measurement and/or to adjust the depth of the outer leaching string, that controls the depth at which a substantially water interface is placed within a salt dissolution zone.
- valved concentric dual conduit apparatuses and methods usable from a single bore wellhead and valve tree for pressure containment while water flood stimulating of a hydrocarbon reservoir through a single main bore, while producing through the same single main bore for reduced construction cost economic extraction in, for example, instances of insufficient nature economic hydrocarbon flow rate pressures.
- valved dual conduits With the use of valved dual conduits, a further need exists for storing products in a cushion during simultaneous solution mining and storage operations of brine and storage reservoirs, usable to selectively control working volume and displacement of liquids or compressed gases to and from other salt cavern brine and storage reservoirs, where brine may be subterranean heated and stored or generated during displacement operations through u-tube conduit arrangements between two or more brine and storage reservoirs with fluid pumping and/or compression to, for example, remove the need for cavern stability cushion gas.
- annuli and passageways between pressure barriers are selectively controllable during well construction and/or well operations, including for example, production during underbalanced perforating and drilling within low permeability reservoirs, production during underbalanced gravel packs within unconsolidated reservoirs, and/or simultaneous gas storage and solution mining for day trading, transportation pipeline buffer storage, and/or pigging in an offshore environment.
- Embodiments of the present invention address these needs.
- the present invention relates, generally, to manifold crossover member apparatus, systems, and methods usable for providing pressure containment and control when constructing and/or operating a manifold string, and during hydrocarbon operations, storage and/or solution mining operations, with at least two conduits and fluid separated passageways through the subterranean strata, for one or more substantially hydrocarbon and/or substantially water wells, or cavern brine and storage reservoirs, that originate from a single main bore and can extend into one or more subterranean regions.
- Embodiments of the present invention can include apparatus (23C of Figures 6,
- the subterranean manifold string can comprise an upper end plurality of concentric conduits (2, 2A, 2B of Figures 17, 21, 31-32, 38, 42 and 71-73, 2C of Figures 32 and 71-73, 2D of Figures 71, 39), that can be engagable to a valve tree (10 and 10A of Figures 1, 3, 6-10, 13-14 and 80-81) and usable with selectively controllable surface valves (64 of Figures 1, 3, 6-10, 13-14 and 80-81), and a lower end plurality of conduits (2, 2A, 2B, 2C, 2D, 39), that can be arranged (CSl to CS7 of Figures 3, 5-6 and 9-12), configured (CS8 of Figures 59-62 and 66-71) and/or assembled (146 of Figures 59 and 62, IS, IT 157) for fluidly communicating with one or more subterranean regions through an innermost passageway (25), that can be usable for communicating fluid mixtures and flow control devices (61 of Figures
- a wall of a manifold crossover and/or a selectively placed fluid control device can be used to divert fluid-mixture flow streams of gases, liquids and/or solids. The flow streams can be diverted from one passageway to another radially disposed inward or outward passageway.
- the diversion of the flow streams serves to, in use, selectively control pressurized fluid communication through a plurality of concentric conduits and passageways through subterranean strata, which can extend axially downward from one or more wells from a single main bore (6), with a plurality of pressure barriers (7, 10, 10A, 61, 64, 74, 148, 149) to perform pressurized fluid well construction, injection, and/or production operations (COl to C07 of Figures 3, 6 and 9-14), either individually or simultaneously.
- Embodiments of the present invention can further inlcude methods that can be usable with a manifold string (70 of Figures 3, 9-11, 30-31 and 38) or a plurality of wells manifold string (76 of Figures 6, 11-12 and 54-58) and/or conventional well designs (for example Figures 1, 4, 7-8 and 13-14) for pressure-contained, simultaneous, underground, hydrocarbon storage and solution mining operations (IS of Figures 9-10, 12-14, 75-76 and 80-83).
- the method steps can inlcude providing two or more conduit strings (2, 2A, 2B of Figures 17, 21, 31-32, 38, 42 and 71-73; 2C of Figures 32 and 71-73; 2D of Figures 71, 39) that can be engagable to one or more wellheads (7) and valve trees (10 and 10A of Figures 1, 3, 6-10 and 13-14) for selectively communicating fluid mixtures of gases, liquids and/or solids into, and from, at least one region at the lower end of a passageway through subterranean strata, within a salt deposit (5), that can be usable for storing hydrocarbons and salt dissolution.
- the method steps can further include providing water, salt-inert fluids, and/or hydrocarbons within the region to form a cushion between the final cemented casing (3) shoe (16) and a substantially water interface, usable to form a storage cushion space and further usable with said two or more conduit strings to provide a plurality of barriers (7, 10, 10A, 61, 64, 74, 148, 149) for pressure contained underground hydrocarbon operations (C01-C02), storage (IS, IT) and/or to and from a storage cushion space, during further solution mining operations (IS, IT and COl to C07).
- barriers (7, 10, 10A, 61, 64, 74, 148, 149) for pressure contained underground hydrocarbon operations (C01-C02), storage (IS, IT) and/or to and from a storage cushion space, during further solution mining operations (IS, IT and COl to C07).
- Embodiments of the present invention can use a manifold string (70Q of Figure 3, 70R of Figure 9, 70T of Figure 10, 70U of Figure 30, 70W of Figure 31, 70G of Figure 38, 76M of Figure 6, 76N of Figures 11-12, 76H of Figures 54-58) with one or more manifold crossovers (23 of Figures 3, 6, 9-12, 17-26, 30-34, 38, 42-44, 54-58,71-73 and 80), that can be usable with one or more flow controlling devices (61 of Figures 9-12, 15, 22-31, 35-36, 39-41, 43-44, 51-53, 55-58 and 63-65) to selectively control pressurized subterranean fluid-mixture flow streams within a passageway through subterranean strata (52), for one or more subterranean wells extending from a single main bore (6).
- a manifold string 70Q of Figure 3, 70R of Figure 9, 70T of Figure 10, 70U of Figure 30, 70W of Figure 31, 70G of
- Various simultaneous underground storage and solution mining preferred method embodiments (C06 of Figures 14 and 81, and C07 of Figures 13 and 81) of the present invention can be usable with conventional wells of two or more string construction, which are capable of containing a pressurized storage cushion (IS) while injecting water to displace storage and/or solution mine a cavern wall (1A).
- IS pressurized storage cushion
- Preferred embodiments of the present invention can use a manifold crossover apparatus (23) with a first plurality of conduits at an upper end (2, 2A, 2B of Figures 17, 21, 31-32, 38, 42 and 71-73, 2C of Figures 32 and 71-73, 2D of Figures 71) and a second plurality of conduits at a lower end, wherein the first plurality of conduits can form at least one intermediate concentric passageway (24, 24A and 24B of Figures 71-73, 24X and 24Y of Figures 17-20, 22-23, 25- 26 and 32-34 and 24Z of Figures 32-34), that can be disposed about an inner passageway (25), which can be usable for communicating fluids and devices that can be engagable within the passageway or with at least one receptacle (45), wherein engaged fluid control devices (61, 128 of Figures 6, 27-28) can be usable to selectively control fluid communication.
- engaged fluid control devices 61, 128 of Figures 6, 27
- Fluid communication between passageways can occur through fluidly separated first and at least second radial passageways (75 of Figures 18-19, 22-26, 33-34, 38, 43-44, 54-57 and 71-73), that can be associated with first and at least second radial passageway orifices (59 of Figures 18-19, 22-26, 33-34, 43-44 and 55-58) that are connected to the innermost passageway (25).
- At least one passageway can be at least partially blocked from fluid communication by a wall across the passageway or by a fluid control device (61) between the manifold crossover upper end plurality of concentric conduits and the manifold crossover lower end plurality of concentric or non-concentric conduits (2, 2A, 2B, 2C, 2D, 39), comprising a lower end concentric string or lower end chamber junction (43 of Figures 38, 45-46, 48-50, 54-59, 61, 66-67 and 71-73), respectively.
- a fluid control device (61) between the manifold crossover upper end plurality of concentric conduits and the manifold crossover lower end plurality of concentric or non-concentric conduits (2, 2A, 2B, 2C, 2D, 39), comprising a lower end concentric string or lower end chamber junction (43 of Figures 38, 45-46, 48-50, 54-59, 61, 66-67 and 71-73), respectively.
- Fluid-mixture flow streams can be diverted from one passageway to another disposed radially inward or outward passageway from the diverted passageway of a manifold crossover, located between said upper end plurality of concentric conduits and said lower end plurality of conduits to, in use, control pressurized fluid communication within the innermost passageway (25), a surrounding passageway (55), and or an intermediate (24, 24A, 24B, 24C, 24X, 24Y, 24Z) passageway, that can be formed by a plurality of concentric conduits within the passageway through subterranean strata (52), that can extend axially downward from one or more wells from a single main bore (6), during well construction and/or well operations.
- 23F of Figures 3, 6, 9-12, 21-26 and 30-31 and 231 of Figures 31-34) of the present invention can fluidly segregate an intermediate concentric passageway, circumferentially, to form fluidly separate axial passageways (24X, 24Y, 24Z).
- the fluidly separate axial passageways can be associated with radial passageways (75), which are at least partially blocked from fluid communication between the upper and lower ends by one or more walls for diverting fluid through the radial passageway orifices (59), communicating with the innermost passageway (25), at axially opposite sides of a receptacle (45), usable for engagement of a flow controlling device (61), wherein blocking the innermost passageway causes flow streams to crossover between the innermost passageway and at least one concentric passageway (24, 24A, 24B, 24C, 24X, 24Y, 24Z, 55).
- Embodiments can further include various related manifold crossover embodiments (23F of Figures 3, 6, 9-12, 21-26 and 30-31; 231 of Figures 31-34; and 23S, 23T, 23V and 23Z of Figure 31) with subterranean valves (74 of Figures 1, 3, 6, 8-10, 13-14, 22-26 and 30-31,and 74A, 74B and 74C of Figures 30 and 31), that can be engaged to an innermost conduit string (2), at the ends of the string (2) and between manifold crossovers to selectively control pressurized fluid communicated through passageways for forming a valve-controlled manifold crossover assembly.
- various related manifold crossover embodiments 23F of Figures 3, 6, 9-12, 21-26 and 30-31; 231 of Figures 31-34; and 23S, 23T, 23V and 23Z of Figure 31
- subterranean valves 74 of Figures 1, 3, 6, 8-10, 13-14, 22-26 and 30-31,and 74A, 74B and 74C of Figure
- Figures 10, 31 and 42-44, and 23Z of Figures 31 and 38) can use at least one radial passageway (75) to fluidly communicate between the innermost passageway and at least one additional concentric passageway (24A, 24B, 24C, 55), that can be formed by a concentric string (2A, 2B, 2C, 2D) and/or passageway through subterranean strata (52) by passing through at least one intermediate concentric passageway (24) formed by the plurality of conduits.
- 54-58, 23V of Figures 31 and 71-73, 23Z of Figures 31 and 38) can use fluidly separated radial passageways (75), comprising associated passageways of exit bore conduits (39) of a chamber junction (43), that communicate through radial passageway orifices (44, 59) with the innermost passageway of the upper end plurality of concentric conduits (2, 2A, 2B, 2C, 2D).
- At least one additional radial passageway can fluidly communicate between the innermost passageway of at least one exit bore conduit and at least one axial passageway (24, 24A, 24B, 24C, 24X, 24Y, 24X, 55), that is formed by extending the upper end plurality of concentric conduits to surround and/or engage the exit bore conduit or a supporting fluid conduit (150 of Figures 68-73), with a bore selector (47 of Figures 3, 35-37, 47, 51-53, 59 and 63-65, 47A of Figures 35-36 and 39-41) usable to selectively communicate fluids and fluid control devices through the innermost passageway of the chamber junction exit bores for engagement with a receptacle to selectively control fluid communication through and/or between passageways.
- 59-62 and 66-71 are usable to provide a plurality of conventional metallic conduit pressure barriers with intermediate passageways for pressure monitoring with, for example, annulus gauges (13 of Figure 1) for measuring pressures between a secondary barrier (148 of Figures 60-70) and a potential failure of a primary barrier (149 of Figures 60-70).
- chamber junctions can be usable with a construction method (CS8 of 59-62 and 66-71) to provide a plurality of conventional sized conduits within a single main bore, which can be further usable for securing connectors of fluid communicating conduit or solid- construction, arranged concentrically or radially, within a secondary pressure bearing conduit, wherein engagement of primary and secondary full-pressure barrier conduit strings and/or provision of a pressure relief reservoir, such as exposed fracturable strata below a casing shoe, can be used to limit pressure exerted on the secondary pressure bearing conduit, should the primary conduit fail.
- Manifold crossover embodiments (23Z of Figures 31 and 38) of the present invention can use an exit bore conduit (39) innermost passageway (25), that can be axially aligned to the chamber (41) axis with an upper end plurality of concentric conduits extended, to surround the axially aligned exit bore conduit with at least one other exit bore conduit, that passes through at least one intermediate concentric passageway (24, 24A, 24B, 24C, 24X, 24Y, 24Z) to fluidly communicate with a different intermediate concentric passageway (24, 24A, 24B, 24C, 24X, 24Y, 24Z) or the surrounding passageway (55).
- a bore selector (47, 47 A) or flow control device (61) can be usable to selectively control fluid communication through radial passageways formed by the exit bores. Additional radial passageways and associated orifices can be usable with the flow diverter (21 of Figures 9 and 38) manifold crossover (23Z) to crossover between the innermost passageway (25) and an adjacent concentric passageway (24).
- FIG. 1 A first radial passageway comprising a straddle (22 of Figures 35-36, 39-41 and 43-44) bore axially aligned to the innermost passageway (25) for fluidly separating at least part of at least a second radial passageway, that can comprise a conduit passageway passing through the intermediate concentric passageway (24), between a plurality of concentric conduits (2, 2A, 2B, 2C, 2D) to fluidly communicate between the innermost passageway (25) and a different intermediate concentric passageway (24, 24A, 24B, 24C, 24X, 24Y, 24Z) or the surrounding passageway (55).
- the straddle (22) can be conveyable through the innermost passageway and engagable with a receptacle to selectively control fluid communication, by choking at least part of the at least second radial passageway.
- Figure 6, CS4 of Figure 9, CS5 of Figure 10, CS6 of Figure 11, CS7 of Figure 12 and CS8 of Figures 59-63 and 66-71) can be combinable with hydrocarbon operations method (COl of Figure 3, C02 of Figure 6, C03 of Figure 9, C04 of Figure 10, C05 of Figure 12) embodiments, for using at least one manifold crossover apparatus (23C, 231, 23S, 23T, 23V, 23Z) to form a manifold string, or with two or more conduit string pressure-controllable conventional wells (C06 of Figure 14, C07 of Figure 13) for selectively controlling pressurized subterranean fluid-mixture flow streams within the passageway through subterranean strata (52), for one or more subterranean wells extending from a single main bore (6).
- hydrocarbon operations method COl of Figure 3, C02 of Figure 6, C03 of Figure 9, C04 of Figure 10, C05 of Figure 12
- Embodiments of the construction and operation methods can include at least one manifold string (70, 76) with a plurality of concentric conduits (2, 2A, 2B, 2C, 2D) for engaging with an associated plurality of manifold crossover conduits, with at least one intermediate concentric passageway (24) disposed about an innermost passageway (25) that can be usable for communicating fluids and devices, with at least one receptacle (45) usable for engaging fluid control devices (61) to selectively control pressurized fluid communication,
- the method embodiments can be usable for communicating fluid-mixture flow streams through manifold crossover (23) fluidly separated radial passageways (75) and associated orifices (59) to the innermost passageways (25).
- Method embodiments can further include diverting at least a portion of the communicated fluids-mixture flow streams to a different passageway that can be disposed radially inward or outward from the diverted passageway of a manifold crossover (23), between the upper end of a manifold string or crossover plurality of concentric conduits and the lower end manifold string or crossover plurality of conduits to, in use, control pressurized fluid communication within the innermost passageway (25), intermediate concentric passageway (24, 24A, 24B, 24C, 24X, 24Y, 24Z), and/or the surrounding passageway (55), that can be formed between the plurality of conduits (2, 2A, 2B, 2C, 2D, 39) and the passageway through subterranean strata (52) extending axially downward from one or more wells from a single main bore (6).
- the method embodiments (CS1-CS8 and C01-C07) can also include providing subsea or surface valve trees (10, 10A) with subsea or surface valves (64) and/or subterranean valves (74), usable with control lines (79 of Figures 1 and 22-26) engaged to each of the ends of the innermost conduits (2, 39) of a manifold crossover (23) to selectively control at least a portion of the pressurized fluid that is communicated between the innermost passageways (25) and at least one concentric passageway (24, 24A, 24B, 24C, 24X, 24Y, 24Z, 55).
- CS1-CS8 and C01-C07 include providing flow controlling devices (61), that can be communicated through the innermost passageway (25) and engaged within a bore (25) and/or receptacle (45) of a conduit string to selectively control fluid communication, by diverting at least a portion of the communicated fluid mixture flow streams.
- CS1-CS8 and C01-C05 include providing an orifice piston (128) flow-controlling device (61), placeable and removable from a bore (25) or a receptacle (45) of a manifold string (70, 76) by greater differential pressure applied to an axially upward or axially downward piston surface, wherein cables (11 of Figure 15) or conduits can be placeable through the orifice piston, while diverting at least a portion of the communicated fluid- mixture flow streams to a passageway other than the innermost passageway.
- Various method embodiments can be usable for selectively controlling communication of fluid mixtures of gases, liquids and/or solids between the upper ends of a single main bore (6) and a proximal region of the passageway through subterranean strata (52) to over-balance, balance, or under-balance hydrostatic pressures exerted on the proximal region during fluid communication.
- Combined operations method embodiments include providing salt-inert fluids and/or hydrocarbons, within a subterranean region, for forming a cushion between the final cemented casing shoe and a substantially water interface, usable to form a storage cushion space and/or solution mine using a salt dissolution process.
- CS1-CS8 and C01-C07 can be usable with two or more strings (2, 2A, 2B, 2C, 2D, 39) for selectively controlling pressurized fluid communication between a valve tree (10, 10A) and region of the passageway through subterranean strata (52) to selectively control a substantially water interface, with a valve tree and salt-inert or hydrocarbon fluids, to form a storage cushion space to, in use, simultaneously provide pressure contained underground hydrocarbon storage operations (IS of Figures 9-10 and 12-14) to and from the storage cushion space during further solution mining operations (1 of Figures 7, 9-10 and 12-14).
- C01-C07 can replace conventional methods (CMl of Figure 1, CM2 of Figure 4, CM3 of Figure 7 and CM4 of Figure 8), or supplement conventional well designs (CM5 of Figures 13-14 and 81), with an apparatus and/or methods of the present invention to selectively control fluid mixture communication to one or more wells from a single main bore (6).
- IS, IT, CS1-CS8 and C01-C05 can be usable for controlling pressurized fluid communication of salt-inert or hydrocarbon fluids, that are stored and retrieved from a cushion with a valve controlled manifold crossover to selectively control the substantially water interface for causing salt dissolution, to affect associated working pressures, volumes, and temperatures of fluids stored and retrieved from a storage space and/or the rate of solution mining during combined solution mining and storage operations.
- I, CS1-CS8 and C01-C07 can be usable for controlling the shape of the cavern walls with a selectively controlled, substantially water interface, that can result from pressurized fluid communication to control working storage volumes and solution mining rates for varying storage volume turnovers and natural salt creep rates, during underground hydrocarbon storage and solution mining operations (IS).
- Sill other method embodiments provide water to a substantially water or fluid interface to generate and displace brine, at a lower end of a first brine and storage reservoir via a u-tube conduit arrangement, to at least a second brine and storage reservoir to minimize salt dissolution in at least the second brine and storage reservoir during such operations.
- I, 157 provide selective control of pressurized fluid communication of salt inert or stored fluids, stored and retrieved from a salt cavern cushion, to affect associated working pressures, volumes and temperatures of fluids stored and retrieved from a brine and storage reservoir and/or working storage volumes, solution mining rates, salt creep rates, or combinations thereof, until reaching the maximum effective diameter for salt cavern stability after which salt inert fluids are stored.
- Still other method emodiments comprising arranging and separating one or more reservoirs to provide salt pillar support according to pressures of fluids stored within and effective diameters of said brine and storage reservoirs.
- other various method embodiments can be usable for providing an underground fluid buffer for transportation pipelines, well production, and/or underground storage operations, wherein a storage cushion space can be further usable for separating fluids of differing specific gravity and for selectively accessing the separated fluids through a manifold crossover.
- Figures 1 and 2 depict a subterranean well and the concept of permeability skin damage, respectively.
- Figure 3 illustrates an embodiment of the present invention usable to reduce the impact of skin damage and/or solution mine a cavern.
- Figure 4 shows a prior art branching multi-well construction using conventional expandable metal technology.
- Figures 5 to 6 illustrate an intermediate construction and completed method step for plurality of well embodiments of the present invention from a single main bore, usable for substantially hydrocarbon and/or substantially water wells.
- Figures 7 and 8 show steps in the construction of a solution mining well and underground storage space.
- Figures 9 to 14 depict method embodiments for constructing wells and underground storage spaces from a single well and/or a plurality of wells extending from a single main bore.
- FIGS 15 to 16 show prior art apparatus usable with the present invention.
- Figures 17 to 20 illustrate an embodiment of a manifold crossover of the present invention.
- Figures 21 to 26 depict a manifold string using a manifold crossover of the present invention.
- Figures 27 to 28 show an orifice piston embodiment of the present invention for selectively controlling fluid flow streams.
- Figure 29 illustrates a fluid pump apparatus of the present inventor usable to selectively control fluid flow streams within embodiments of the present invention.
- Figures 30 and 31 are diagrammatic illustrations of the manifold crossover embodiments of the present invention.
- Figures 32 to 34 depict a manifold crossover embodiment of the present invention with additional intermediate concentric passageways.
- Figures 35 to 37 illustrate apparatus of the present inventor usable to selectively control fluid flow streams within embodiments of the present invention.
- Figure 38 illustrates an embodiment of a manifold crossover of the present invention adapted from flow diverting strings of the present inventor.
- Figures 39 to 41 show various views of an adapted prior art apparatus usable as a bore selector with the present invention.
- Figures 42 to 44 illustrate a manifold crossover embodiment of the present invention usable to reduce the length of a manifold crossover.
- Figures 45 to 53 show various apparatus of the present inventor usable with the present invention.
- Figures 54 to 58 depict a manifold crossover embodiment of the present invention formed from an adapted chamber junction of the present inventor.
- Figures 59 to 67 show various apparatus of the present inventor usable with a construction method of the present invention.
- Figures 68 to 70 illustrate examples of conventionally sized conduit and bore configurations usable within a single main bore, and which can be usable with a construction method of the present invention.
- Figures 71 to 73 depict an adapted chamber junction manifold crossover embodiment of the present invention with additional intermediate concentric passageways of a single main bore extended as supporting fluid passageways.
- Figure 74 diagrammatically depicts a subterranean liquid storage using brine displacement from a brine pond.
- Figure 75 diagrammatically illustrates an embodiment with u-tube like fluid communication between an underground storage cavern and associated subterranean brine reservoir.
- Figure 76 diagrammatically shows an embodiment with pumping, turbine or compressed fluid communication through surface conduit manifold between an underground storage cavern and associated subterranean brine reservoir.
- Figures 77 and 78 depict graphs for the conventional concepts of working volume relationships to subterranean reheating of a gas storage cavern, subsequent to solution mining and demand usage cycles.
- Figure 79 diagrammatically shows a gas storage cavern dewatering string through a completion, prior to its removal.
- Figure 80 diagrammatically depicts a method embodiment usable with a underground storage cavern engaged with apparatus and methods to operate underground storage caverns with brine reservoirs of the present invention.
- Figure 81 diagrammatically depicts a method embodiment using dual well underground storage arrangements.
- Figures 82 and 83 diagrammatically depict plan view method embodiments of cavern arrangements, usable for operating underground storage caverns and brine reservoirs.
- Figure 1 depicts an elevation diagrammatic cross-sectional view of a conventional subterranean well construction method (CM1), usable for various hydrocarbon or underground storage wells.
- CM1 subterranean well construction method
- the Figure depicts a lower perforated (129) cemented (20) liner (19) portion that can be replaced with a subterranean storage space of a geologic trap (1A), of a depleted reservoir, or a space that was solution mined from the strata bore (17) to salt cavern walls (1A), wherein a sliding door (123) is, generally, not present.
- the upper end of the subterranean wells of the present invention can be constructible by boring a strata passageway (17) and placing a conductor (14) casing, that can be secured and sealed to the bore with cement and referred to as a casing shoe (16), after which boring, placing and cementing one or more intermediate casings (15) and sealing casing shoes (16) can occur before placing the final cemented (20) casing (3) and casing shoe (16).
- Chamber junctions and manifold strings of the present inventor can be usable as, or placeable through, the intermediate casings.
- boring a final strata passageway (17) through the final cemented casing (3) to the targeted subterranean region can be followed by an open hole completion in, for example, solution mined wells or the depicted cemented (20) and perforated (129) liner (19) within, for example, hydrocarbon production wells or waste disposal wells.
- liners (19) are, generally, engaged to intermediate (15) and/or final cemented casing (3) with a hanger and packer (40)
- non-liner casings (3, 14, 15) are typically engaged to a wellhead (7), wherein intermediate concentric passageways or annuli are monitored with gauges (13) for pressure changes, indicating a breach of the primary barrier (2) or loss of integrity with secondary barriers (3, 15, 19), containing released subterranean pressurized fluid.
- Production conduits (2) or tubing generally form the primary barrier, located within the passageway through subterranean strata (52) and comprising passageways of casings (3, 14, 15), liners (19) and strata bores (17).
- the production tubing or production casing can be secured to the final cemented casing (3) or liner with a production packer (40) at its lower end and with the upper end secured to the wellhead (7) to form the primary barrier to subterranean pressurized fluids.
- a valve tree (10) with selectively operatable valves (64) can be engaged to the upper end of the wellhead.
- production and injection conduits (2, 2A) may be free hanging from the valve tree during the salt dissolution process, as described in Figure 7, after which a completion, similar to that shown in Figure 1, may be installed for underground storage operations.
- the innermost passageway (25) can be controllable by a subterranean valve
- the sliding side door can be usable for various construction methods, but generally closed for fluid mixture (38) production (34), with the annular passageway (55) used primarily for monitoring the primary pressure control barrier (2) and secondary barrier (3) conduit strings.
- various apparatus and methods of the present invention provide a usable additional intermediate concentric passageway between the innermost passageway (25) and surrounding passageway (55), and/or provide an outer string to replace the final cemented casing (3) for installing a completion with the final cemented casing string, unlike conventional methods (CM1).
- various methods of the present invention provide a manifold crossover that can be usable to selectively control fluid communication during construction, replacing, for example, the sliding side door (123) for use during production and/or injection operations, to provide a selectively controllable subterranean manifold for controlling one or more wells from a single main bore (6), unlike conventional methods (CM1).
- Other conventional methods for pressure control include, for example, placing a completion (2, 40, 74), without a sliding side door (123), within a completion fluid using a liner (19), that is cemented (20) across the strata bore (17), sealed with a liner top packer (40), and secured with a hanger to the final cemented casing (3) to control subterranean pressures, while the valve tree (10) is placed to control subterranean pressures.
- a rig (4A of Figure 16) can be usable to place perforating guns through the safety valve (74), temporarily disabling the valve, past a wireline re-entry guide (130) to perforate (129) the passageway through subterranean strata (52) in with an over-balance or limited underbalance to prevent pushing and tangling perforating guns and the cable they were placed with, after which the perforating guns and rig are removed in a controlled pressure operation.
- various apparatus and methods of the present invention provide a means of forming a significant under-balance by circulating through an additional passageway to, for example, perform underbalanced perforating or drilling through a completion, as later described.
- Maintaining control of subterranean pressures during construction and subsequent injection, or production to or from the subterranean strata through well passageways is a central axiom of well operations that affects virtually every activity from selection of casings, liners and associated equipment to the fluids placed within the passageway through subterranean strata (52) to hydrostatically hold back fluid mixtures (38) prior to pressure controlled production (34) through a valve tree (10).
- long term productivity may be damaged by conventional over-balance methods of controlling subterranean pressures.
- FIG. 2 the Figure depicts a plan view above an elevation cross-section with and along line A-A, with dashed lines showing hidden surfaces, showing the conventional concept of permeability skin damage (135), with larger reservoir particles (133), such as sand grains in a reservoir, packed together by subterranean pressures. Bridging across particles forms intermediate pore spaces (131) within which fluid mixtures of compressed gases, liquids and smaller solid particles may be contained. When pore spaces (131) are connected sufficiently to flow fluid mixtures, the connected pore spaces are permeable (132).
- Fluid mixtures contained within pore spaces (131) are subjected to the subterranean overburden pressure with permeability (132) providing a passageway through which fluid mixtures may migrate, wherein their fluid connection to deeper subterranean overburden forces pressurizes shallower permeable (132) pore spaces (131).
- insufficient pressure and/or surface area can force the particles or liquids out of the pore spaces (131) during production, thus causing skin damage (135).
- Reservoirs with low permeability or flow capacity through these skin-like pore spaces (131) can have insufficient pressure and/or flow area against the choking particles (134), or capillary forces of the liquid, to force intruding fluid mixtures back out of the pore throats, which can result in permanent skin damage (135) that affects productivity throughout the remaining well life.
- Figure 3 depicts an elevation diagrammatic view through a cross-sectional slice of the subterranean strata of an embodiment of construction (CSl) and hydrocarbon operations (COl) methods, which include a manifold string (70Q) of the present inventor.
- the manifold string (70Q) can be usable with embodiments of manifold crossovers (23F, 23Z), as shown in Figure 3.
- the Figure shows various conventional well construction elements, similar to that shown in Figure 1, with a dual spool tree (10A) capable of flow through the innermost bore (25), and a concentric passageway (24) engaged to the wellhead (7) and a completion string (2) that can comprise a manifold crossover (23F), with inner (2) and outer (2A) conduit strings engaged to the final cemented casing (3) and a production packer (40) sealed (66) to the liner (19) at its upper end.
- a dual spool tree (10A) capable of flow through the innermost bore (25), and a concentric passageway (24) engaged to the wellhead (7) and a completion string (2) that can comprise a manifold crossover (23F), with inner (2) and outer (2A) conduit strings engaged to the final cemented casing (3) and a production packer (40) sealed (66) to the liner (19) at its upper end.
- a dual spool tree (10A) capable of flow through the innermost bore (25), and a concentric passageway (24) engaged to the wellhead
- a production conduit (2), with another manifold crossover (23Z) within the surrounding (55) passageway through subterranean strata (52), can be usable to perform a series of fishbone sidetracks (136), wherein production packers (40), engaged to the liner (19), separate various producing zones with the lowermost zone perforated (129).
- the construction (CS1) and hydrocarbon operations (COl) methods depict a manifold crossover (23F) that can be usable to provide production and/or injection through either the innermost (25) or concentric (24) passageways.
- the lower conduit string (2) flow diverting manifold crossovers (23Z) can be engaged to the liner (17) with the upper packer (40);after which, the upper assembly (2, 2A, 23F, 40, 66, 137) can be engageable to the lower placed assembly (2, 2A, 23Z, 23Z, 40, 137), with a conventional connector (137), for example a ratch-latch, sealed (66) to the liner (19) with, for example a polished bore receptacle and mandrel, and secured to the final production casing (3) with a production packer (40).
- the dual spool valve tree (10A) may be placed.
- the construction (CS1) method can be usable for underground storage within a geologic trap (1A) of a depleted reservoir through, for example, lower skin damage side-tracks (136) or perforations (129), or in combination with an operations method (COl) that can be usable for underground storage and solution mining of cavern walls (1A) when well trajectories are oriented vertically, the lower end packer (40) and cementation (20) are omitted from the perforated (129) liner (19) to allow fluid flow for salt dissolution.
- COl operations method
- a salt inert cushion fluid For brine and storage reservoir cavern creation, a salt inert cushion fluid, with a specific gravity lighter than water, can be forced into the well and allowed to rise around the liner (19), where it can be trapped by the liner top packer (40) to form a water interface that, combined with conventional interface measuring technology, either placed through the innermost passageway (25) or permanently attached to various conduits of the manifold string (70Q), can be usable to selectively control combined storage and mining operations, with alternating injection of a salt inert stored cushion fluid, injection of fresh water, and extraction of brine through the valve controlled manifold crossover (23F) and flow diverting manifold crossovers (23Z).
- the operations method (COl) of displacing to a lighter specific gravity hydrostatic column by circulating a lower density fluid through the innermost (25) and concentric (24) passageways can be usable to under- balance the hydrostatic head of the fluid within the passageway through subterranean strata (52), below the pore pressure contained behind the liner (19). This will allow fluids to flow outward during perforation (129), thus reducing or avoiding skin damage (135 of Figure 2) in non-salt reservoirs, or placing a cushion under the final cemented casing (3) shoe (16) for brine and storage reservoirs.
- a wirline rig (4A of Figure 16) can be engagable to the valve tree (10A) for placement of guns to perforate (129) the liner in a pressure controlled and under-balanced state, without the risk of pushing the guns axially upward with released pore space fluid, by circulating down the innermost passageway (25) using a cable passable flow control device (61), for example an orifice piston (128 of Figures 27-28), that can be engaged in the upper manifold crossover (23F), and taking returns through the concentric passageway (24) and through the valve tree for pressure controlled processing.
- the lower production packer can be set to separate and pressure-contain the lower perforated fluid (38) production (34) zone.
- Hydrocarbon method embodiment can be usable to perform underbalanced drilling operations, while allowing production (38) to be extracted (34) from a non-salt reservoir, to reduce or avoid skin damage (135 of Figure 2) with, for example coiled tubing, wherein a series of side tracks (136), such as the fish-bone style sidetracks shown in Figure 3, are carried out through the exit bores of the manifold crossovers (23Z of Figure 38) using a bore selector (47 of Figure 37).
- side tracks such as the fish-bone style sidetracks shown in Figure 3
- a lighter specific gravity fluid such as gas or diesel, can be circulated down the concentric passageway (24), through orifices (59) in the inner conduit (2) of the upper manifold crossover (23Z), and through the bore selector (47) for mixing with coiled tubing drilling returns to further under-balance the drilling operations and associated skin damage (135 of Figure 2).
- Embodiments of construction (CS1) and hydrocarbon operations (COl) methods can be usable to under-balance various operations performable through a completion.
- CS1 and hydrocarbon operations (COl) methods can be usable to under-balance various operations performable through a completion.
- the innermost (25) and concentric (24) passageways can be designed for flow through the valve tree (10A) for underbalanced gravel pack placement or well construction.
- conventional completions (CM1 of Figure 1) are generally not usable for simultaneous construction and production operations, and the conventional method of over-balance placement may permanently damage a reservoir by choking pore throats, thus reducing its permeability.
- FIG. 4 an elevation cross-sectional view within the subterranean strata of a branching chamber (832) with expandable metal branches (836, 838) is shown.
- the Figure illustrates single barriers below the branch, which comprise expandable metals of lesser strength than traditional hardened metal materials, wherein a secondary barrier passageway and barrier, necessary for monitoring the integrity of primary subterranean well barriers below the junction, is not present.
- the branching chamber (832) is placed within a parent well bore and flexible metal branches (836, 838) are expanded to provide a pressure containing junction, that can be limited by lower expandable metal burst and collapse pressure ratings in comparison to conventional tempered and/or heat treated and hardened metal products.
- various apparatus and methods of the present invention can be, generally, constructed with conventional, non-expandable metals of higher strength, with a plurality of barriers and annular passageways below junctions to provide increase pressure bearing capacity and redundancy.
- Figure 4 shows branch wells (801, 808) extending from the branching chamber, and a branching sub (612) is shown at a node of a parent well, having parent casing (604) running through intermediate casing (602) and surface casing (600) from a wellhead (610).
- parent casing (604) running through intermediate casing (602) and surface casing (600) from a wellhead (610).
- the need to engage a branching sub (612) for the production tubing (820) and support of the low collapse strength expandable metal branching chamber (832) requires cementing the junction in place, thus preventing construction of a usable annular space to monitor the primary well barriers of branch wells (801, 808).
- Cementing conduits within well bores (801, 808) represents a single barrier that may, should it fail, bypass the connector (806), leaking through the strata and/or collapsing the expandable junctions (836, 838) and leaking between the branch sub (612) and branching chamber (832) into an annulus, with insufficient hydrostatic column, when placed within the shallow strata to prevent breaching the parent casing (604) barrier.
- This parent casing (604) barrier can be exposed to higher subterranean pressures transmitted through a poorly cemented annular space, without prior indications of increased pressure from, for example, an annulus gauge (13 of Figure 1).
- various apparatus and methods of the present invention can be usable to place shallow junctions of conventional hardened metal with concentric passageways or annular spaces, extending axially downward from wells of a junction of wells, to provide sufficient hydrostatic pressures and/or metal strength for a usable secondary barrier.
- a relief pressure reservoir for example, an exposed fracturable strata bore below a casing shoe in fluid communication with the annular space, can be usable to provide a secondary barrier, which can protect the above ground or mud-line environment in the event of a primary barrier failure.
- Methods of completing the branched well shown in Figure 4 include providing a down hole manifold (612) set in the branching chamber (832), above the junction of the branch well (801, 808) bore lining (805, 810) engagements (806).
- the downhole manifold can be oriented and latched via an apparatus (510, 862) in the branching chamber (832) by orienting the manifold (612) with a key (812) and a slot (860) arrangement.
- the Figure shows production tubing (820) that can extend from the surface to the downhole manifold (612) to isolate the parent well from the branch wells (801, 808), which can be closed by plugs placed in the branch well engagements (806) below the downhole manifold (612).
- the expandable metal branch can provide sufficient barriers when combined with a larger hydrostatic pressure head between the tubing (820) and the parent casing (604), similar to a multilateral application placed deep within the subterranean strata or if a production packer arrangement is used above or in place of the downhole manifold (612).
- the collapse resistance of an expandable metal junction may be insufficient to adequately resist very deep subterranean pore pressures.
- various apparatus and methods of the present invention can be usable with larger diameter conduits of sufficient wall thicknesses and associated pressure rating for shallow multi-well applications from a single main bore.
- the prefabrication with conventional technology, within a controlled environment, followed by onsite assembly, placement and/or construction within a subterranean environment, with the use of conventional off-the-shelf technologies, can reduce the risk in applications of the present invention.
- FIGS 5 and 6 show construction (CS2, CS3) and hydrocarbon operations (C02) method embodiments, illustrating a plurality of wells, one of which is bored (17) and one of which is yet to be bored (17A), branching from a junction of wells (51 A) within the shallow strata and depicting, for example, a plurality of perforated (129) hydrocarbon wells to non- salt reservoirs or a plurality of underground storage and solution mining wells to brine and storage reservoirs, usable to form and use space within the walls (1A) of one or more salt caverns.
- CS2, CS3 hydrocarbon operations
- Figure 5 depicts an elevation subterranean cross-sectional diagrammatic view of an intermediate construction step (CS2) embodiment using a chamber junction (43) and bore selector (47).
- the Figure illustrates a placed conductor casing (14), that is shown cemented (20) and sealed at the casing shoe (16) after boring the surface hole.
- the Figure further depicts a bore (17) that has been drilled through the conductor (14) and strata with a placed chamber junction (43), for example that of Figures 45-46, 48-50 or 61 and 66-57, and cemented (20) to form a casing shoe (16) of an intermediate (15) casing for a substantially hydrocarbon well or substantially water disposal well in non-salt reservoirs, or a final cemented casing (3) for substantially hydrocarbon and substantially water underground brine and storage reservoirs in salt reservoirs.
- a bore selector (47) for example as shown in Figures 47, 51-53 or 63-64, can be engaged within the chamber (41) at the chamber bottom (42) to selectively access the right hand chamber junction (43) exit bore conduit (39).
- the Figure shows a strata bore (17) that has been drilled to form a passageway through subterranean strata (52).
- a containing conduit, about the exit bores (39), is shown added to the chamber junctions to form a secondary barrier (2A, 148), similar to those shown in Figures 48-50, 66-67 and 68-70, disposed about primary barriers (2, 39, 149 of Figures 68-70), to allow concentric passageways or annular spaces below the chamber junction (43) to be monitored through various supporting fluid communication conduits (150 of Figures 66-70).
- the strata bores (17) may diverge to separate caverns before being oriented for vertical solution mining as shown in Figure 6, or progress axially downward in a parallel or intersecting arrangement as described in Figure 5 with a completion similar to that shown in Figure 11.
- FIG. 6 depicts an elevation diagrammatic view through a cross-sectional slice of the subterranean strata of a construction (CS3) and combined construction and operations (C02) method embodiment, illustrating a manifold string (76M) with a manifold crossover (23F) embodiment.
- the Figure shows selective control of the fluid communication between two separate wells, through a single main bore, using subterranean valves (74) engaged at both ends of a manifold crossover (23C) for forming a valve controlled manifold crossover (23F) engaged with a chamber junction manifold crossover (23T), which can be usable with a flow controlling plug (25A) to direct flow from left and right wells to the innermost (25) and intermediate concentric (24) passageway, respectively.
- a manifold crossover 23C
- 23F valve controlled manifold crossover
- 23T chamber junction manifold crossover
- liners (19) can be engaged to the primary barrier conduit (149) with hangers and liner top packers (40), extending axially downward for a plurality of wells from a single main bore (6).
- the hydrocarbon method (C02) can be usable to perforate (129) cemented (20) liners (19) in a substantially hydrocarbon well for production from a reservoir, or storage in a depleted sandstone reservoir well, or disposal and/or simulation in a substantially water well in non-salt reservoirs, or brine and storage reservoirs operations in salt deposits.
- the method (C02) can be usable to place a liner hanger, with a bypass flow capacity to suspend the tubing (2), with the unset lower end production packer (40) and upper end connector (137) (e.g. a ratch-latch), for each of the plurality of wells, usable to engage the chamber junction manifold (23T) and valve controlled manifold crossover (23F) placed as a single assembly prior to engagement of a valve tree (10A). Thereafter, a plug can be placeable within the lower production packer for setting and placing the lower end conduit strings of the manifold string (76M) in tension.
- a plug can be placeable within the lower production packer for setting and placing the lower end conduit strings of the manifold string (76M) in tension.
- a cable rig (4A of Figure 16) is engagable to the valve tree (10A) for placement of cable (11 of Figure 16) conveyed by perforating guns passing through an orifice piston (128), that is shown engaged between the valves of the upper manifold crossover (23F) with the perforating guns selectively communicated through the bore selector (47) and mule shoe (130) to perforate (129) the liner (19).
- An under-balance below the hydrostatic pore pressure can be achievable by injecting a low specific gravity fluid (31) through the lower innermost passageway (25) to prevent upward movement of the perforating guns, after firing with the fluid that is returned past an unset lower packer (40) and through an intermediate concentric passageway (24B), that can be diverted through a selectively controllable valve manifold crossover, similar to that of Figure 31, usable with three flow streams.
- a low specific gravity fluid (31) through the lower innermost passageway (25) to prevent upward movement of the perforating guns, after firing with the fluid that is returned past an unset lower packer (40) and through an intermediate concentric passageway (24B), that can be diverted through a selectively controllable valve manifold crossover, similar to that of Figure 31, usable with three flow streams.
- the hydrocarbon operations method (C02) can be usable for combined operations of substantially hydrocarbon and substantially water wells that are usable for injection (31) and production (34) through a single main bore (6) to, for example, water flood the lower portion of a reservoir while producing from the upper portion of the reservoir through a subsea valve tree.
- Water can be injected (31) into the concentric passageway (24) for crossing over at the manifold crossover (23F) and flowing through the innermost passageway (25) to the right side perforated (129) liner (19), while production from the left side perforated (129) liner (19) can be produced through the concentric passageway of the chamber junction manifold (23T).
- This production can cross over to the innermost passageway (25), at the upper manifold crossover (23F), wherein both the injection and production fluid mixture streams can be selectively controlled by a plurality of barriers (2, 2A, 2B, 3), subterranean valves (74) and a valve tree (10A).
- the construction method (CS3) can be usable with surface or subsea valves trees (10A), for example, an adapted horizontal subsea tree.
- An extra spool can be added to a conventional valve tree (10 of Figure 1) to allow continuous flow through a concentric passageway (24) with storage to and from, for example, a plurality of depleted reservoir storage wells from a single main bore (6), with a perforated (129) liner.
- the storage boundary (1A) can be a geologic trap such as a dip closure or solution mined cavern walls in a salt deposit usable for containing stored product.
- the construction (CS3) and hydrocarbon operations (C02) methods are adaptable for two laterally separated, substantially water, underground, solution- mined, storage cavern wells, wherein the cemented (20) liner (19) is replaced with a free-hanging liner (19) without the lower packer (40), flow diverting string (similar to 70T of Figure 10 below the cement packer 139), that can be engaged to each primary barrier (149) exit bore conduit (39) of the chamber junction (43).
- An outer string (2A of Figure 10) can be engaged with the depicted liner hanger and packer (40), with the connector (137) at the upper end of the inner string (2 of Figure 10).
- the arrangement can be engagable to the manifold crossover (23T) and usable to inject and trap a cushion of salt inert fluid between the bore (17) and the liner top packer (40) and final cemented (20) exit bore (39) casing shoe (16), during solution mining operations by using, for example, manifold crossovers (23S of Figure 10) to adjust the water interface level.
- Fresh water can be injected (31) through the innermost passageways extending from the chamber junction manifold crossover (23T), with the straddle (22) in place and the bore selector (47), to both the left and right side wells, respectively.
- Salt saturated brine can be returned (34) from the solution mined space within the cavern walls (1A) from both left and right side wells through a lower manifold crossover (23T) orifice (59), which is not present in previously described embodiments and requires blocking of the surrounding passageway by, for example, cement and/or a packer.
- the orifice (59) can be provided with a one-way valve, usable to inject and trap a salt inert fluid cushion for selectively controlling the water interface during solution mining.
- the method (CS3) can be usable with either substantially hydrocarbon and/or substantially water wells, using an inner chamber junction (43), similar to that of Figures 45-46, placed and engaged at its lower end with packers (40) to the outer chamber junction (43) primary barrier (149) exit bore conduits (39).
- This placement of the inner chamber junction (43) provides a surrounding passageway (55) for primary barrier monitoring within the hydrocarbon well with a lower packer (40), or for brine returns in a free-hanging manifold string solution mining water well, with an additional intermediate concentric passageway (24B) for monitoring the secondary barrier (148).
- Figures 7 and 8 depict elevation subterranean cross-sectional diagrammatic views of the generalized conventional construction steps (CM3, CM4) for forming an underground storage space within salt cavern walls (1A), using a solution mining salt dissolution process.
- the Figures illustrate conventional construction of a storage well, with a conductor (14), an intermediate casing (15), and a final cemented casing (3) sealed with a casing shoe (16), through which a strata passageway (17) is bored.
- the Figure shows passageway through subterranean strata (52) within which solution mining begins in Figure 7 by placing a free hanging inner string (2) within an outer free hanging string (2A), which may be adjusted with the use of a large hoisting capacity rig during the processes to reposition the point at which fresh water enters the solution mining region of a salt deposit (5) and/or to provide improved sonar measurements than are possible through casings (2, 2A), after which the free hanging strings are removed from the passageway through subterranean strata (52) of Figure 8 showing a completion (2, 40, 74) installed with a dewatering string (138) preventing valve (74) operation until after the cavern is emptied for gas operations and the string (138) is snubbed or stripped out of the well.
- CM3 (1) method (CM3) starting with injection of potable water, pond water, ditch water, sea water, or other forms of water, generally termed fresh water due its unsaturated salinity level as compared to extracted salt saturated brine.
- the Figure shows the water injected through the innermost passageway (25) and returned through the intermediate concentric passageway (24), between the inner (2) and outer (2A) free hanging conduit strings, using direct circulation with a cushion, generally comprising diesel or nitrogen.
- the injected water is shown forced into an additional intermediate concentric passageway (24A), between the outer conduit string (2A) and a final cemented casing (3), to control the water interface (117), wherein an initial solution mined space is created for insoluble strata to fall through a substantially water fluid stream to the cavern floor (IE).
- IE cavern floor
- a conventionally more efficient indirect circulation can be performed by injecting (31) down the intermediate concentric passageway (24) with returned (34) fluids passing through the innermost passageway (25), with a salt inert fluid fluidly communicated through a port in the wellhead (7) and trapped in the additional concentric passageway (24 A) to maintain a water interface (117) during circulation.
- caverns are solution mined from the bottom up by mining a space
- FIG 8 the Figure depicts the conventional completion method (CM4) following solution mining (CM3 and 1 of Figure 7), wherein the free hanging leaching strings (2, 2A) have been removed and a completion, similar to CM1 of Figure 1, comprising a production casing (2) and production packer (40), engaged to the final cemented casing (3), have been placed and engaged to the wellhead (7) with a valve tree (10A), that can be engaged to the upper end using valves (64) to selectively control injection and extraction of fluids.
- CM4 completion method following solution mining
- a dewatering string (138) generally, remains in place through the production casing (2), and product is injected (31) indirectly through the passageway, between the dewatering (138) and the production casing (2), taking brine returns (34) through the dewatering string (138) with stored liquid product displacing brine from the space within the cavern walls (1A).
- Retrieval of stored liquid is generally accomplished by direct injection of brine, from a pond or storage facility, through the dewatering string (138) to float the lower specific gravity stored product out of the cavern as described in Figure 74.
- a failsafe shut subterranean valve (74) is generally placed in the production casing (2), through which a dewatering string can be placed.
- Gas or volatile liquids can be stored using indirect circulation for injection (31) through the passageway, between the dewatering (138) and production casing (2), and taking brine returns (34) through the dewatering string (138), after which the dewatering string (138) must be stripped or snubbed out of the well in a relatively high risk operation, where personnel are in close proximity to pressurized barriers, to allow the fail safe safety valve (74) to function.
- CM3, CM4 Conventional methods (CM3, CM4) of constructing salt caverns and initializing gas or volatile liquid underground storage are labor intensive and potentially hazardous, taking a number of years to complete before realizing a return on investment.
- FIG. 9 an elevation cross-sectional diagrammatic view through a slice of subterranean strata along the axis depicting embodiments of construction (CS4) and hydrocarbon operations (C03) methods are shown.
- the depicted embodiments can be usable with a manifold string (70R) and flow diverter (21) and a manifold crossover (23F) of the present invention.
- the Figure illustrates well construction, similar to Figure 3, above the final cemented casing (3), which comprises the outer string (2A) of the manifold string (70R) cemented (2) to form a casing shoe (16).
- An initial cavern space, within salt deposit (5) cavern walls (1A), can be used for storage during solution mining (IS).
- C03-C07 The construction and combined operations methods (C03-C07) can be usable to reduce both the number of large hoisting capacity rig visits and the time frame before realizing a return on investment, when compared to conventional methods (CM3 and CM4 of Figures 7 and 8) with simultaneous storage and solution mining (IS).
- water can be injected into the solution mined (1) spaces (IB, 1C, ID), initially, using an indirect method.
- the indirect method injects the water through the intermediate concentric passageway (24), taking returns through the innermost passageway (25) and orifices (59) in the inner conduit string (2), at its lower end.
- a direct method can be used to inject water through the innermost passageway (25) to flow diverting crossovers (21), described in Figure 38, that can be selectively controlled with flow diverting bore selectors (47A of Figures 35-36), also usable to inject and trap a salt inert cushion fluid between the final cemented casing (3) shoe (16) and the water level (117).
- the water interface (117) can be lowered with the cushion between the lesser diameter roof and water interface usable as a storage space (147) during simultaneous storage and solution mining (IS), wherein below the water interface, the flow diverting bore selectors can be usable to selectively place water for solution mining (1) a larger diameter cavern, during which insoluble strata can fall and accumulate (IE, IF and 1G) at the bottom of the cavern.
- Saturated brine can enter orifices (59) in the inner conduit (2) and can cross over to the intermediate passageway (24), below the bore selector for extraction through the valve tree (10A).
- the method (C03) can be usable to form an initial space within cavern walls
- the initial space within the cavern walls can be formed indirectly from the circulation of water through the concentric passageway (24) to the innermost passageway, during which time a salt inert fluid cushion can be periodically injected through either passageway (24, 25) and trapped by the casing shoe (16).
- Various initial cavern volume shapes (147) usable for simultaneous storage and solution mining (IS) can be formed with direct or indirect circulation and adjustment of the salt inert fluid cushion that can control the water interface, selectively increased with injection or removed with a manifold crossover (23), after the initial insoluble volume. While no two caverns are ever the same shape after completing solution mining, any conventional design shape is formable with the present invention, for example those of Figures 10, 13 and 14, can be usable to more quickly form a cushion storage volume (147 of Figures 13 and 14) and can be further usable as a leaching cushion for subsequent solution mining operations (1).
- the conventional rule-of-thumb for salt dissolution is that the top of the cavern leaches twice as fast as the sides of the cavern, and the sides of a cavern leach twice as fast as the bottom of a cavern.
- Conventional methods (CM4 of Figure 8) of cavern formation involve developing a cavern width, first, at its deepest level and, then, working upward to complete the cavern shape, wherein the present method (C03) can be usable to form a smaller volume that can be usable for storage and cushion, after which solution mining of the cavern side walls (1A) can continue, either conventionally or with method embodiments (IT of Figures 75-76 and 80-83) for brine and storage reservoirs.
- Liquid storage is generally volume dependent, with a high unit value per unit of volume, and salt caverns are generally preferred with liquid storage methods (IT of Figures 75-76 and 80-83) of the present invention usable with gas storage.
- Gas storage within gas tight salt caverns is generally more profitable for shorter trading periods to increase the number of turns, referring to turn-around volumetric usage as described in Figure 78, wherein only a portion of the cavern is used with larger seasonal swings that are conventionally left to less efficient, depleted, sandstone reservoirs, presumably due to the higher investment cost of the more efficient salt cavern storage space dedicated solely to gas storage.
- Various methods (157, C01-C07, IS and IT of Figures 75-76 and 80-83) are usable to to combine both liquid and gas storage.
- the construction method (CS4) manifold crossover (23F) can be usable, for example, to perform both solution mining and gas storage operations (IS) without rig intervention.
- the water interface can be lowered by the volume of gas stored, during, for example, the weekend lower usage period for displacing brine, and released during daily peak demands as fresh water is injected to solution mine the cavern walls (1A) to a larger diameter from the bottom up.
- the stored cushion product extraction and associated pressures are aided by methods of (IT of Figures 75-76 and 80-83) fresh water injection, brine generation and displacement betwen a u-tube conduit arrangement between brine and storage reservoirs.
- Figures 13 and 14 depict elevation diagrammatic views of combined hydrocarbon operations method embodiments (C06 and C07, respectively) that can be usable with conventional well designs (CM5), including conventional designs incorporating one or more apparatus of the present invention to solution mine various cavern design shapes while simultaneously storing a valued produced, for example, hydrocarbon gas within the walls (1A) of a salt deposit cavern.
- the Figure shows a smaller cavern cushion storage space (147) that can be solution mined, first, for the purpose of simultaneous storage operations (IS) during solution mining operations (1) with a working pressure (WP), usable to selectively control the substantially water interface (117) during enlargement of the cavern walls (1A)
- FIG. 9-10, 12-14, 76 and 80 the Figures depict various example intermediate and final cavern design shapes that can be usable with the present invention.
- An initial volume (147) can be formed for a storage cushion during simultaneous storage and solution mining (IS), after which subsequent cavern shapes (IB, 1C, ID) can be formed by selectively controlling the substantially water interface (117) with placement of a salt inert cushion and selective placement of manifold crossovers (23) and flow control devices, until reaching the final cavern wall (1A of Figures 9-10, 12-14, 76 and 80) design volume.
- IS simultaneous storage and solution mining
- Construction methods can be usable with any underground storage facility requiring a subterranean well for fluid communication of stored products, for example depleted reservoirs similar to those depicted in Figures 3 and 6.
- the storage boundary (1A of Figures 3 and 6) represents a geologic feature, such as a four-way dip closure reservoir or the walls of a conventional mine or, as described, a solution mined salt cavern, wherein subterranean valves can be required for stored products, posing a significant risk of escaping through expansion or evaporation.
- Combined storage and solution mining methods can be usable with any underground salt cavern storage facility.
- the present invention can be usable for combining liquid and gas storage caverns, where higher unit value products, such as liquid hydrocarbon storage, conventionally displaced with saturated brine rather than water and having a storage value not necessarily driven by short term peak loading, are not generally combined with hydrocarbon gas salt cavern storage, wherein economics are dominated by short term peak leveling requiring only a small portion of the design volume from caverns generally not refilled after initial dewatering.
- Liquid products of greater per unit value generally, require lower economic volume turn-over or turns than, for example, a compressed product like hydrocarbon gas, with two distinct demand cycles comprising a daily or weekly usage of a small proportion of the stored volume to manage peak demand and a season demand occurring over a longer time horizon, comprising cycling the entire working storage volume between the maximum and minimum working pressures of the cavern.
- the capital cost of constructing large underground salt cavern gas storage facilities, comprising many interconnected caverns is less economic for seasonal demand than, for example, a depleted reservoir, because the capital investment is higher returns on the longer investment.
- salt cavern storage is conventionally used for peak leveling of daily and weekly demand, wherein the seasonal turn-over of a lower value per unit product cannot economically justify the construction investment, or the sunk cost investment, for a significant volume of cushion gas that must be left within caverns to maintain the minimum working pressure supporting the salt cavern roof.
- Embodiments of the methods of the present invention are usable to reduce the cost of constructing and operating liquid and gas storage facilities.
- embodiments of the present invention can reduce costs by constructing a well in a single rig visit, or by providing pressurized containment for seasonal re-filling of a gas storage cavern with liquid hydrocarbons, water and/or brine without further rig visits, that are conventionally required for placement and removal of a dewatering string through subsurface safety valve. Additional reduction of costs include economically supplying water and disposing of brine using, for example, the ocean to provide larger facilities with a plurality of more efficient gas-tight storage caverns that can be usable for economically supplying both peak leveling and seasonal gas demands.
- FIG. 13 and 14 show two or more conduit strings (2) and selectively controllable subterranean valves (74), engaged to associated wellheads (7) and subsea or surface valve (64) trees (10), that are usable to selectively control injection of salt inert fluids and water to form a cushion storage volume (147), after which a cushion storage space working pressure (WP) is usable to selectively control a substantially water or fluid interface (117) for underground storage operations (IS), while solution mining (1).
- WP cushion storage space working pressure
- hydrocarbon gas may be stored within the upper cushion volume (147) during a weekend forcing saturated brine from the cavern and, then, released from storage during weekday peak demands as water is injected into the cavern to solution mine the lower end of the cavern and to reduce working pressure (WP) reductions caused by product withdrawal.
- WP working pressure
- any salt inert fluid followed by any storage valued salt inert fluid for example, diesel or hydrocarbon gas, can be trappable through injection and lower specific gravity floatation between the final cemented casing shoe (3,16) and a substantially water interface (117), usable for selectively controlling salt dissolution (1).
- nitrogen gas can be used to form the initial storage cushion volume; after which, hydrocarbons valued for various consumer demands can be usable as a salt inert fluid for storage operations (IS) or compressed air, generated from wind energy and valued for release to a pneumatic motor driving an electrical generator, can be usable as a salt inert fluid for storage operations (IS) while solution mining (1).
- ISO salt inert fluid for storage operations
- IS salt inert fluid for storage operations
- Various methods for injection of water and extraction of saturated brine can be usable to selectively control the substantially water interface (117).
- a gas storage operation (IS) pump (69A of Figure 29), engaged within a manifold crossover (23F of Figures 6, 9, 10 and 12) between controlling valves (74 of Figures 6, 9, 10 and 12), can be operatable with release of compressed gas to pump water into the pressurized (WP) cavern for solution mining (1) operations, as expanding compressed gas is released from storage.
- WP pressurized
- the compressed gas can be injected into the cavern for urging saturated brine from the cavern, with the working pressure (WP) of the dewatering operation assisted by reverse operation of the in-line subterranean pump (69A of Figure 29) for aiding brine extraction.
- WP working pressure
- Various other solution mining (1) and storage operations can be usable including frequent, intermittent or seasonal extraction and emptying of stored fluids within the cavern by filling the volume (147, IB, 1C, ID) with fresh water left to fully saturate, with dissolution of a calculated salt, wall thickness within the tolerance of the maximum cavern design diameter using, for example, an ocean for water supply and brine disposal and/or a u-tube conduit arrangement method (IT) for fluid communication between brine and storage reservoirs.
- the working pressure and working volume, within underground gas storage wells and caverns, can be invariably linked in compressible fluid storage operations, where a large initial volume of cushion gas must remain within caverns for the life of a convention gas storage facility to maintain the minimum working pressure that is necessary to prevent salt creep from adversely affecting the storage space and/or stability of the salt cavern roof.
- Embodiments of the methods can be usable to positively affect the working volume, comprising for example the sum of a working gas volume and cushion gas volume necessary to maintain salt cavern stability and/or for extending the withdrawal period associated the limiting thermodynamics of expanding gas lowering well equipment, generally measured at the wellhead.
- Increased usable working volume can be achieved by filling the cavern volume with water or brine, from for example and ocean or brine and storage reservoir, while using a valve controlled manifold crossover (23F of Figures 6, 9, 10, 12 and 21-26) or a conventional well design with two conduit strings, usable to selectively control injection of water, salt inert and/or valued storage fluids while extracting brine or valued storage fluids.
- the embodiments of the methods can be usable to control at least a portion of the pressure, volume and temperature thermodynamic results of injection and/or extraction of stored fluids, while simultaneously emptying or filling the cavern with water or brine.
- FIG. 10 an elevation subterranean cross-sectional diagrammatic view of construction (CS5) and combined hydrocarbon operations (C04) method embodiments, using a manifold string (70T) with manifold crossovers (23F, 23S) within a bored strata passageway (17) through a salt deposit (5).
- Embodiments, shown in the Figure, include using a conventional cement retainer or expandable cement packer (139) and a manifold crossover (23S), adapted with a conventional cement stage collar (123) for performing a similar function to a sliding side door, wherein the cement port can be closed after cementation through radial passageway conduits extending from the innermost bore to the outer conduit string (2A), engaging the manifold string (70T) to the passageway through subterranean strata (52) with a casing shoe (16).
- the casing shoe (16) can comprise the expandable cement packer (139) that can be cemented (20) in place through an intermediate casing (15) placed and cemented (20) within a conductor casing (14), with a wellhead (7) at its upper end.
- the combined operations (IS, C04) method can comprise placing an initial water interface cushion with trapped injection and, then, forming a storage cushion volume (147) using the faster cavern roof leaching rate, once an initial cavern diameter is established by indirect circulation axially down the intermediate concentric passageway (24), and through the lower end orifices (59) in the inner conduit string (2).
- the method (C04) can continue by the combined operations of solution mining, injecting and storing a salt inert storage fluid (IS), within the upper end of the space (147) or cushion, to lower the water interface for enlargement of the initial cavern diameter, with further indirect and/or direct circulation through the innermost passageway (25) to various radial passageways (75) of manifold crossovers (23S), for enlarging the lower cavern shape (ID).
- a salt inert storage fluid IS
- Indirect circulation of water down the concentric passageway (24), with brine returned through the innermost passageway (25), can be changeable, after formation of the initial volume (147), to direct circulation of water down the innermost passageway to a selected blocked depth, using, for example, a flow controlling device such a plug, for diverting flow through the manifold crossover (23S) to fall downward through the storage cushion to the water interface, with stored products retrieved from the cushion through the manifold crossover (23S) by indirect circulation.
- a flow controlling device such a plug
- Subsequent combined operations (C04) can comprise, for example, alternating gas storage peak demand trading and solution mining operations (IS), wherein the sloped cavern roof is designed for emptying the cavern of water and refilling it, accounting for differing rates of salt dissolution between the walls and roof until reaching the final wall (1A) shape.
- the embodiments of the combined operations method (C04) can include, for example, peak leveling trading of gas for using a smaller portion of the cavern, refilling the cavern for season gas storage, and compensating for natural salt creep, resulting from strata overburden pressures, with subsequent seasonal salt dissolution.
- Various larger bore manifold crossovers can be included for sonar measuring devices to exit a manifold string entering the cavern, to take the sonar measurements.
- measurements can be taken through the manifold string conduits to adjust solution mining operations and to manage unexpected subterranean features encountered during solution mining.
- FIG. 11 and 12 elevation subterranean cross sectional diagrammatic views of construction (CS6) and combined hydrocarbon operations (C05) method embodiments are shown, which can be usable with a manifold string (76N) and manifold crossovers (23F, 23T).
- the Figures show a chamber junction (43) final casing (3) that can be cemented (20) within a conductor (14) casing for forming a single main bore (6) and wellhead (7) for engagement of a valve tree (10A).
- the Figures show a plurality of strata bores (17) that have been drilled through a salt deposit (5) to intersect at their lower end.
- the Figures include a plurality of conduit string (2) liners (19) with hangers and production packers (40), which are engaged with the chamber junction (43) exit bore conduits (39), after which the manifold crossovers (23F, 23T) assembly can be connected (137) with, for example, packer anchors secured to the production packers (40) with a valve tree (10A) that can be engaged to the upper end of the wellhead, securing the tops of the various conduit strings (2, 2A, 3 and 14).
- the combined underground storage and solution mining method (C05) can be usable to inject (31) fresh water into the left side well, taking returns (34) through the right side well, wherein a plug (25A) within a manifold crossover (23T) can direct flow from the right well into the concentric passageway (24) to enter the innermost passageway (25) above the flow control device (61) within the upper manifold crossover (23F).
- the upper manifold crossover (23F) can comprise, for example, a plug (25 A of Figure 15) or a fluid pump (69A of Figure 29), that can be usable to both divert and selectively control fluid flow through the subterranean valve (74) controlled upper manifold crossover (23F), wherein fluid communication is further selectively controlled by valves (64) of the valve tree (10A).
- Water and a salt inert fluid are injectable (31) and trappable under the production packers and casing shoe (16) or within, either or both, cavern chimneys formed by the wells exiting the chamber junction (43), if a manifold crossover (23S of Figure 10) is adapted with a cementing stage tool (123 of Figure 10) and a cement packer (139 of Figure 10) is used to seal either or both cavern chimneys.
- a manifold crossover 23S of Figure 10
- a cementing stage tool 123 of Figure 10
- a cement packer 139 of Figure 10
- One or both wells exiting the chamber junction (43) can be usable to leach a salt inert storage cushion fluid volume (147 of Figures 10, 13, 14, 76 and 80) and can be further usable to store fluid during combined operations (C05).
- the liquid interface (117) can be selectively movable with working pressure, and the interface (117) can be raised upward as the cavern volume (IB, 1C, ID) is formed through salt dissolution.
- Water insoluble strata can fall and accumulate (1G) at the cavern lower end with extraction (34) through orifices (59) in the right side well conduit (2), during the process of extracting fine particles and small solids, and leaving the larger particles (133) to form by permeability (132 of Figure 2), within the insolubles accumulated (1G) at the cavern floor.
- FIG. 3 Referring now to Figures 3, 5-6, 9-14, 76 and 80-83 depicting various preferred method embodiments (IS, CS1-CS7, C01-C07, IT, 157), wherein various methods and apparatus described herein can be usable and combinable with various other methods and apparatus of the present invention to form other embodiments, that can be usable to selectively control pressures during construction and/or hydrocarbon operations, storage or solution mining for one or more substantially hydrocarbon and/or substantially water wells from a single main bore (6).
- the present invention can be usable to accomplish various operations performable through a completion to one or more wells through a single main bore (6), and is further adaptable to perform, for example, any pressure controlled circulation of fluids through a completion string for acid cleanups, matrix acid frac stimulations or proppant frac stimulations, gravel packs, jet pump operations, gas lift operations, other fluid operations through a completion string normally requiring circulation, with for example, coiled tubing.
- FIG. 25A shows a flow control device (61) placeable through engagement with a cable (11) of a wireline or slickline (4 A) rig (4), with a hoisting (12) apparatus for conveyance through a lubricator (8) and blow out preventer (9) engaged to the top of a valve tree (10), that is secured to a wellhead (7) in communication with the innermost passageway of a manifold string, for placement within the passageway through subterranean strata to selectively control pressurized fluid flow.
- a flow control device placeable through engagement with a cable (11) of a wireline or slickline (4 A) rig (4), with a hoisting (12) apparatus for conveyance through a lubricator (8) and blow out preventer (9) engaged to the top of a valve tree (10), that is secured to a wellhead (7) in communication with the innermost passageway of a manifold string, for placement within the passageway through subterranean strata to selectively control pressurized fluid flow.
- FIG. 1 Various example flow control apparatuses (61) are depicted and comprise a: plug (25 A) with a cable engagable connector (68) and mandrels (89), a straddle (22 of Figures 39-44), an orifice piston (128 of Figures 27-28), a pump (69 A of Figure 29) and bore selectors (47 of Figure 37, 51-53 and 47A of Figures 35-36), that can be placeable, usable and retrievable from the innermost passageway (25) of the present invention to selectively control pressurized fluid flow, wherein other conventional devices and flow controlling devices of the present inventor are also usable.
- Figures 17, 21, 32, 38, 42 and 71 depict plan views with dashed lines representing additional conduits (2B, 2C, 2D), usable to form additional concentric passageways (24A, 24B, 24C) that can be engagable with other manifold crossovers, for example, 23C of Figures 17 to 20, 23F of Figures 21 to 26, 231 of Figures 31 to 34, 23Z of Figure 38, 23S of Figures 42- 44 and 23V of Figures 71 to 73, to form various other manifold crossover embodiments (23) and/or manifold strings.
- additional conduits 2B, 2C, 2D
- additional concentric passageways 24A, 24B, 24C
- other manifold crossovers for example, 23C of Figures 17 to 20, 23F of Figures 21 to 26, 231 of Figures 31 to 34, 23Z of Figure 38, 23S of Figures 42- 44 and 23V of Figures 71 to 73, to form various other manifold crossover embodiments (23) and/or manifold strings.
- any number of additional concentric conduits and/or conduit strings engagable with various manifold crossovers can be configurable in various arrangements to selectively control pressurized fluid mixture flow through a plurality of concentric passageways, using a valve disposed across the innermost passageway, whereby access through the innermost passageway remains usable for conveying flow controlling devices (61).
- FIG. 17 to 20 various views of a manifold crossover (23C) embodiment are shown, depicting concentric conduits (2, 2A) on upper and lower ends of an expanded diameter outer concentric conduit (2A), with walls angularly arranged for relatively high flow stream velocities and with an enlarged internal diameter to form equivalent or larger cross-sectional flow areas to, for example, reduce the risk of erosion or flow cutting of the manifold crossovers (23C) walls, usable to form embodiments of valve controlled crossovers (for example 23F of Figures 21 to 26).
- Figure 18 depicts an elevation cross-sectional view along line A-A of Figure 17, illustrating a manifold crossover (23C).
- the Figure shows the left side fluidly separated passageway (24Y) ending at a lower end wall for diverting fluid communication through lower radial passageways (75), with the right fluidly separated passageway (24X) ending at an upper end wall for diverting fluid communication through the upper radial passageways (75).
- a flow control device for example a plug (25 A of Figure 15
- a plug 25 A of Figure 15
- Figure 19 depicts a projected view of Figure 18 along section line A-A of Figure 17, with detail line B associated with Figure 20 of a manifold crossover (23C).
- the Figure shows the ends (90) of the manifold crossover engagable between conduits of conduit strings (2, 2A) of a manifold string, wherein the innermost passageway can be usable to convey flow control devices through the string.
- the intermediate concentric passageway (24) is shown fluidly separated into flow stream passageways (24X and 24Y) to cross over fluid communication from the innermost passageway (25) to the concentric passageway (24), and vice-versa, when a flow control device is engaged with the receptacle (45) between radial passageway (75) orifices (59)
- the manifold crossover (23C) can be usable with a valve controlled manifold crossover (23F of Figures 21-26), wherein a valve control line passageway (141) can be placeable within walls between fluidly separated passageways (24X, 24Y) for subsequent continuance within the concentric passageway (24) or for external engagement with the string, as shown in Figure 17.
- Figure 20 depicts a magnified view of the portion of the manifold crossover
- Figures 21 to 26 depict various views of a valve controlled manifold crossover
- the Figures include conventional valves (74) that can be suitable for subterranean use.
- the valves are shown, for example purposes, as fail-safe flapper (127) type subsurface safety valves, with control lines (79), that can be engaged to the upper and lower ends (90 of Figures 17-20) of a manifold crossover (23C of Figures 17-20) to form a valve controlled manifold crossover (23F), with upper and lower ends engagable between conduits (2, 2A) of a larger manifold string.
- Figures 21, 22 and 23 depict plan, elevation cross- sectional and isometric projection views, respectively, with break lines showing removed sections of the Figure 22 cross-section, along line C-C of Figure 21, and projected to form the isometric view of Figure 23, with detail lines D, E and F associated with Figures 24, 25 and 26, respectively, of a valve controlled manifold crossover (23F).
- the Figures illustrate flapper (127) type valves (74) through which flow control devices may be conveyed, and through which a plug (25A) flow controlling device can be installed within the receptacle (45) to divert fluid communication between the upper innermost passageway (25), through the upper radial passageway (75) and the fluid separated concentrically disposed passageway (24X), to the lower intermediate passageway (24).
- a plug (25A) flow controlling device can be installed within the receptacle (45) to divert fluid communication between the upper innermost passageway (25), through the upper radial passageway (75) and the fluid separated concentrically disposed passageway (24X), to the lower intermediate passageway (24).
- fluid communication can be diverted through the upper concentric passageway (24), through the fluidly separated concentric passageway (24Y) and lower radial passageway (75), to the lower innermost passageway (25).
- Fluid flow to both fluidly communicated flow streams can be selectively controllable by the upper and lower valves (74)
- Figure 24 depicts a magnified view of the portion of manifold crossover (23F) within detail line D of Figure 22.
- the Figure illustrates the upper conventional flapper (127) valve (74) with a flow tube (142) that can be engagable with the flapper (127) urged by a piston (143) pressured through the control line (79) axially downward to hold the valve open.
- a loss of hydraulic pressure in the control line (79) can release the piston (143) force, and a spring (144) can be used to shut the valve with pressure beneath the flapper assisting closure.
- the valve can be engaged to the inner concentric conduit string (2) and contained within the outer concentric conduit string (2A), with the lower valve control line passing through the concentric passageway (24) or, alternatively, on the exterior of the assembly as shown.
- the diameter of a conduit string (2, 2A) can be adjustable within any confining spaces to accommodate a loss of cross-sectional area.
- the diameter of the conduit 2A of Figures 21-26 is increasable to provide improved flow properties past the valve (74) bodies extending into, and partially blocking, the depicted concentric passageway (24).
- FIG 25 a magnified view of the portion of manifold crossovers (23C and 23F) within detail line F of Figure 23 is shown.
- the Figure depicts the cable engagable connector (68) of the plug (25A), that is deployed through, and engaged within, the upper innermost passageway (25) to divert fluid communication from the innermost passageway to the upper radial passageway (75) orifices (59).
- control and/or measurement lines (79) that can be usable to, for example, operate the lower valve (74) and to operate measurement devices for the substantially water interface in a solution mining and/or underground storage cushion operation, with hydraulic or electrical signal passage through the wall between the fluidly separated passageways (24X, 24Y) and the intermediate concentric passageway (24) or, alternatively, by engagement to the outside diameter of the outer string (2A).
- the control or measurement cable or line (79) can pass through the concentric passageway, between concentric conduits (2 and 2A), or enter the surrounding passageway about the manifold crossover (23).
- Similar arrangements can be usable for passing control and/or measuring conduit or cable lines (79) from the surrounding passageway (55 of Figures 3, 6 and 9-12) into a concentric passageway (24 of Figures 3, 6 and 9-12) to bypass, for example, a packer (40 of Figures 3, 6, and 9-12). Thereafter, the cables can re-enter the surrounding passageway and be strapped to the assembly as it is placed within the passageway through subterranean strata (52 of Figures 3, 6, and 9-12).
- Figure 26 depicts a magnified view of the portion of manifold crossovers (23C and 23F) within detail line E of Figure 22.
- the Figure illustrates the plug diverting fluid communication from the lower innermost passageway (25) to the radial passageway (75) orifices (59), with control lines (79) exiting the bottom of the wall between fluidly separated passageways (24X, 24Y), both internal and external to the outer conduit (2A).
- Figures 27 and 28 depict a plan view with line G- G and elevation cross-section along line G-G, respectively, of an orifice piston embodiment (128).
- the Figures show a housing (114) with outer diameter seals (66), upper and lower orifices (59) at the ends of the associated passageway that can be usable for passage of a conduit or cable (11 of Figure 15).
- the orifice (59) passageway may be sealing or provide partial fluid communication to aid placement, removal and use within a method.
- Methods of use include, for example, placement within manifold crossover (23C, 23F, 231, 23T, 23Z) receptacles between innermost passageway orifices, wherein the connectors, shown for example as mandrels (89), are engagable with receptacles to divert all or part of fluid communication from the innermost passageway from crossing radial passageways fluid flow streams above and below the orifice piston between intermediate and innermost passageways, similar to a choke or plug (25 A of Figures 21-23 and 25-26), when cable or conduits are passed through the flow control device (61) orifice piston (128) and innermost passageway.
- manifold crossover 23C, 23F, 231, 23T, 23Z
- Differential pressures against the upper and lower piston surfaces can be usable to place and/or hold the orifice piston (128) in place or to aid in its removal during, for example, the under-balanced cable perforating operations of Figures 3 and 6; the under-balanced coiled tubing drilling operations of Figure 3; or the coiled tubing cleanout of insolubles blocking a manifold string in the solution mining and combined operation methods of Figures 9-14.
- Figure 29 depicts an isometric view of a fluid motor and fluid pump (69 A) flow control device (61) with a cable connection (68) for placement and removal through the innermost passageway.
- the pump can be usable within receptacles in various manifold crossovers (for example 23C, 23F, 231, 23T, 23Z), with upper and lower fluid turbines (112) placeable between crossing fluid communicating passageways.
- the energy from one fluid mixture flow stream can be partially transferred to the other through a shaft (113) connecting the two turbine or impellor (112) arrangements, for example, gas expansion from an underground storage cavern driving one impellor also drives the other impellor, which can be usable to pump water into the storage cavern for solution mining operations and, conversely, with fluid pumped into the cavern during solution mining assists either storage fluid or brine extraction from the cavern.
- the temperature of gas expansion can be reduced by decreasing the decompression of stored gas, thereby increasing the withdrawal periods achievable during seasonal drawn down of a cavern, before shutting in on minimum equipment operating temperatures.
- gearing arrangements such as planetary gearing are usable within the housing (114).
- Figures 30 and 31 show diagrammatic views of the manifold crossover (23F) of Figures 21-26 forming a manifold string (70U) embodiment of Figure 30, and the manifold crossover (23F of Figures 21-26) combinable with manifold crossovers (231 of Figures 32-34; 23T of Figures 6, 11-12 and 54-58; 23Z of Figure 38; 23S of Figures 10 and 42-44; and 23V of Figures 71-73) and configurable in various arrangements to replicate the valve controlled manifold string (70 W) embodiment of Figure 31.
- the Figures include various usable flow paths and fluid mixture flow stream variations with a plurality of valve (74) configurations, wherein further embodiments are possible with addition conduits, passageways and valves .
- the Figure 30 manifold string (70U) depicts a flow stream Fl flowing axially upward within the lower end concentric passageway (24) and crossing over above the flow control device (61), below the upper valve (74 A), to the upper end innermost passageway (25).
- the Figure shows a flow stream F2 flowing axially downward within the upper end concentric passageway (24) and crossing over below the flow control device (61), above the lower valve (74B), to continue through the lower end innermost passageway (25).
- the Figure 31 manifold string (70W) depicts a flow stream Fl flowing axially downward within the upper end innermost passageway and crossing over above the upper flow control device (61), below the upper valve (74 A), to the lower end concentric passageway (24).
- the Figure shows a flow stream F2 flowing axially upward within the lower end additional concentric passageway (24A) and crossing over above the lower flow control device (61), above the lower valve (74C), to the innermost passageway (25) and crossing over again, below the upper flow control device (61) to the upper end concentric passageway (24).
- the Figure includes a flow stream F3 flowing axially upward through the lower end innermost passageway (25) and crossing over below the lower flow control device (61), to continue through the upper end additional concentric passageway (24A). All flow streams (Fl, F2, F3) can be controlled by selectively controllable valves (74A, 74B, 74C) of the innermost passageway (25).
- Figures 32, 33 and 34 show plan, elevation cross sectional and isometric projection views, respectively, with dashed lines showing hidden surfaces and break lines showing removed sections of Figure 33 cross-section, along line H-H of Figure 32, projected to form the isometric view of Figure 34, of a manifold crossover (231) embodiment, with additional intermediate concentric passageways (24A, 24B of Figure 32).
- the Figures illustrate an inner conduit (2), intermediate conduit (2A), and outer conduit (2B) forming an innermost passageway (25), intermediate concentric passageway (24), and additional intermediate concentric passageways that can be usable for fluid communication.
- one (24X) or more (24Y) fluidly separated passageways can pass through the manifold crossover (231) without being diverted to fluidly communication between one (24) or more upper and lower intermediate passageways.
- the third fluidly separated passageway (24Z) can fluidly communicate from a concentric passageway (24A), through radial passageway (75) orifices (59), with the innermost passageway (25) on opposite sides of a receptacle (45) for engagement of a flow control device.
- Engagement of a flow controlling device within the receptacle (45), between radial passageway orifices (59), can be usable to divert or crossover all or a part of fluid mixture flow streams being communicated through the innermost passageway (25) and the fluidly engaged (59, 75) concentric passageway (24 A).
- Figures 35 and 36 depict plan views with line I-I and elevation cross- section along line I-I, respectively, with break lines showing removed portions, of an embodiment of a flow controlling device (61) bore selector (47 A).
- the depicted embodiment can be usable to selectively divert fluid flow and/or further flow controlling devices through a plurality of orifices.
- the Figures show an upper straddle (22) wall branching to a plurality of orifices (59), with guiding surfaces (87), that can be usable with a chamber junction (43 of Figure 38) additional orifices to communicate devices and/or fluids.
- the bore selector (47) can be engagable at a receptacle (45B) for placement, with mandrels (60) engagable to an associated receptacle (45 of Figure 38).
- the upper and lower straddle (22) walls can be usable to control flow of a surrounding conduit orifices (23, 59 of Figure 38), with passage of fluids through, for example, an internal one-way valve (84) or other internal flow controlling device (61) to aid placement, removal and/or usage of the bore selector.
- FIG. 37 a plan view with line J-J above an elevation cross- section along line J-J, with a break line showing a portion removed, of a bore selector (47) and flow controlling device (61) is shown.
- the Figure shows a guiding surface (87) for fluids or devices through the bore selector orifice (59), that can be alignable with an associated chamber junction (for example 43 of Figure 38), wherein the guiding surface (87) wall can block access to an additional orifice and exit bore axially aligned with the innermost passageway, and/or other radially disposed additional orifices.
- An extension of the bore selector (47) outer wall can also form a straddle (22) that can be usable to block adjacent manifold crossover orifices (23, 59 of Figure 38).
- FIG. 32-34, 38 and 42-44 depict manifold crossovers (23) that can be usable for diverting flow between the innermost passageway (25), through an intermediate concentric passageway (24), to a passageway disposed radially outward, such as an additional concentric passageway (24A) or a passageway surrounding the outer conduit (2A).
- the radial passageway (75) comprises fluidly separated passageways (24X, 24Y) or the bore of a conduit (39).
- Figure 38 depicts a plan view with line K-K above an elevation cross-section along line K-K of a manifold crossover (23Z) embodiment, within a manifold string (70G), with break lines showing removed portions.
- the Figure illustrates a chamber junction (43) with three radially disposed exit bore conduits (39) truncated (46) at an enclosing concentric conduit (2A), forming radial passageways (75) engaged through radial passageway orifices (59) to the chamber (41) for forming an innermost bore (25) with a fourth exit bore conduit (39) axially aligned with the upper internal passageway (25), that is shown engaged to the lower end internal conduit (2) and concentrically disposed within the concentric conduit (2A).
- the Figure shows the manifold crossover (23Z) with a flow diverter (21), and the ends (90) of the manifold crossover (23Z) can be engagable between conduits of a manifold string (70G).
- the example manifold string (70) has a plurality of adjacent passageway orifice
- the devices can divert fluid from the innermost passageway (25) to the concentric passageway (24) through the adjacent passageway orifice (59) crossovers (23) by blocking a portion of the innermost passageway (25), or the devices can prevent communication between the passageways by straddling the orifices (59).
- Example fluid mixture flow stream arrangements include injecting (31) fluid through the upper end innermost bore (25) and diverting it, with a bore selector (47A of Figures 36-36), through the three radial passageways (75) to the passageway surrounding outer conduit (2A).
- the fluid flow (34) through the lower innermost passageway (25) can cross over (23) at the adjacent passageway orifices (59), below the bore selector and continue axially upward (34) in the concentric passageway (24).
- Figures 39, 40 and 41 depict plan, cross- sectional and magnified detail views, respectively, with the portion within detail line M of Figure 40 cross-section, along line L-L of Figure 39, magnified in Figure 41 for illustrating an adapted prior art flow control device (61), that can be usable as a bore selector (47 A).
- the Figure shows a straddle (22) with a flow control device connection (96) that is depicted, for example, as snap-in mandrel (60) with a spring (144) locking arrangement to prevent dislodgement during fluid communication.
- a placement receptacle (45B) can be usable for engaging and conveying the apparatus through the innermost passageway for engagement with an associated receptacle.
- the straddle (22) portion internal bore (25) can be usable as a radial passageway when blocking orifices of a manifold crossover (for example 23S of Figure 42- 44), or the internal bore may open, or be partially or fully blocked, to selectively divert fluid to orifices (59) within the straddle (22) wall, usable as fixed chokes and/or protection against flow cutting sealing surfaces within which the straddle or bore selector is engaged.
- Seals (66) for example, chevron type seals (97), can be usable for blocking flow past the straddle (22) wall or for diversion through the protective and/or fixed choke orifices (59).
- Any orientation means suitable for subterranean use can be usable to align the bore selector (47 A) fixed choke and/or protective orifices (59) with radial passageways of the exit bore conduits (39).
- Figures 42, 43 and 44 depict plan, elevation cross-sectional and isometric projection views, respectively, with Figure 43 cross-section, along line N-N of Figure 42, projected to form the isometric view of Figure 44 of manifold crossover (23S) embodiment.
- the Figures illustrate an additional concentric conduit (2B), shown as a dashed line, that can be usable to form an additional concentric passageway (24A of Figure 42) about a concentric conduit (2), that is shown engaged with an adapted chamber junction (43) for forming a concentric passageway (24) through which exit bore conduits (39), with internal radial passageways (75), can fluidly communicate between the innermost passageway (25) and the additional passageway (24A of Figure 42) or surrounding passageway, formed when the assembly is placed within the passageway through subterranean strata.
- the assembly can be engagable between conduits of manifold strings at upper and lower ends (90).
- An axially aligned exit bore conduit (39 of innermost bore (25) diameter can be disposed immediately below the radially extending exit bore conduits (39), wherein a bore selector (47A of Figures 39-41) can be engagable with the receptacle (45) to selectively control fluid flow through the radial passageways (75) and placeable, through the axially aligned exit bore conduit, for engagement with other manifold crossovers.
- Flow control devices (61) can be usable as a bore selector (47 A).
- the straddle (22) of Figures 39 to 41 can be placeable and engagable with an internal receptacle (45B) for engagement to the manifold crossover receptacle (45).
- the flow control device can be usable to form an axially aligned radial passageway (75A) that can be fluidly separated from radial-extending passageways (75) with various seals (66), including for example, interlocking type seals (97), which can be usable for pressure containment about orifices (59) for protection from flow cutting and/or fluid mixture abrasion.
- Figures 43 and 44 show a flow control device engagement (96), that can be usable for orienting the bore selector orifice (59) to bore passageways.
- conduits within a single strata bore from, for example, a conventional dual bore wellhead and valve tree or traditional concentric conduit wellhead and valve tree can be engagable with concentric and/or non-concentric conduits to form a single main bore that can be further engagable to a manifold crossover and/or chamber junction with a plurality of lower end conduits for forming a manifold string.
- FIG. 45 and 46 show isometric and magnified isometric views, respectively, with dashed lines showing hidden surfaces with and within detail line P, depicting an embodiment of a chamber junction (43).
- the depicted chamber junction (43) comprises a chamber (41) and engaged (44) exit bore conduits (39), with innermost passageways (25) extending downward from a chamber bottom (42), that can be usable for construction methods (for example CS2 of Figure 5).
- the engagement of a bore selector (for example 47 of Figure 47) is usable for boring and/or fluid communication.
- the upper end (90) of the chamber junction can be engagable to a conduit of the plurality of concentric conduits of a manifold string, with lower ends engagable to a plurality of conduit strings.
- Figure 47 depicts an isometric view of bore selector (47) flow control device
- the Figure illustrates a guiding surface (87) for devices and/or fluids, that is in communication with an orifice (88) engagable with the bore of an exit bore conduit through placement with, for example, a receptacle engagement (45B) that can be alignable with the slot receptacle (65) and associated key, which can be fixed to the chamber of a chamber junction, wherein the lower end engages the chamber junction bottom.
- a guiding surface (87) for devices and/or fluids that is in communication with an orifice (88) engagable with the bore of an exit bore conduit through placement with, for example, a receptacle engagement (45B) that can be alignable with the slot receptacle (65) and associated key, which can be fixed to the chamber of a chamber junction, wherein the lower end engages the chamber junction bottom.
- FIG. 48, 49 and 50 depict an isometric view with detail lines Q and R, a magnified view within line Q of Figure 48 and magnified view within line R of Figure 48, respectively, with dashed lines showing hidden surfaces of an embodiment of a chamber junction (43).
- the depicted chamber junction (43) includes an upper end (90) that can be engagable to conduits of a single main bore and placeable within or usable for boring a strata passageway, and a lower end casing drill bit or reamer shoe (125).
- the exit bore conduits (39) can be usable as primary barriers (149) for engagement of, for example, liner hangers or packers with a secondary barrier (148) extending downward from the chamber (41).
- Fluid communicating conduits (150, as shown in Fig. 67) orifices (59) can be usable for alignment of bore selectors or engagement of subsequent chamber junctions, and fluid communication through lower end orifices (59) associated with the drill bit or reamer shoe (125) during boring or placement.
- a bore selector guiding surface can be usable to place drilling assemblies, through the exit bore conduits (39), to whip-stocks (124) at the lower end, which can be further usable to laterally and fluidly separate the separated well bores under a single main bore.
- Figures 51, 52 and 53 depict an isometric view, an upwards side elevation view, and a front elevation view, respectively, with dashed lines showing hidden surfaces of a flow controlling device (61) bore selector (47).
- the depicted flow controlling device (61) bore selector (47) can be usable with chambers junctions, similar to Figures 54-58, with a guiding surface (87) for devices and/or fluids, wherein a flow control device engagement (96), shown as a helical alignable mandrel, can be usable to orient the bore selector orifice (59) to an exit bore passageway.
- the Figure includes an innermost bore aligned receptacle (45B) in the guiding surface that can be usable for placement and retrieval of the bore selector.
- FIG. 54 to 58 the Figures depict a manifold crossover embodiment (23T) usable as manifold string (76H) that can be usable to minimize frictional resistance to flow in high velocity or high erosion environments.
- 23T manifold crossover embodiment
- 76H manifold string
- Figure 54 depicts an isometric view of an adapted chamber junction manifold crossover (23T), associated with Figures 55 to 58.
- Figure 54 illustrates an inner concentric string (2), outer concentric string (2A) or second main bore conduit with ends (90) engagable to conduit strings of a single main bore.
- the chamber junction (43) can be adapted to form a manifold (43A) with the addition of receptacles and a radial passageway (75) blister, located between the exit bore conduits (39) and the chamber junction bottom (42) about which the upper outer concentric string (2A) extends and fluidly engages with the blister.
- Figures 55 and 57 depict plan views above elevation cross-sectional views with and along lines S-S and T-T, respectively, with break lines removing portions of the assembly associated with the cross-sections in Figures 56 and 58 isometric views, showing the manifold crossover (23T) of Figure 54.
- the Figures illustrate the placement of a flow controlling member, shown for example, as a cable (11 of Figure 16) placeable and retrievable blocking plug (25 A), that can be conveyable through the inner concentric string (2) innermost passageway (25) with a bore selector (47 of Figures 51-53) guiding surface that can be usable to complete the chamber junction innermost passageway guiding surface (87), excluding other exit bores.
- the diverting flow controlling member can be engaged with the nipple profile receptacle (45) to block fluid communication through the exit bore conduit (39) innermost passageway (25).
- the concentric passageway (24) flow stream fluidly communicates (Fl) through the radial passageway (75) blister to the lower end of one exit bore conduit (39) passageway, with the opposite exit bore conduit (39) fluidly communicating (F2) with the chamber (41) and chamber (41) innermost passageway (25).
- Commingled flow, within the chamber (41) junction manifold (43A), from both exit bores (39) can be operable by placing a straddle (22 of Figures 39-40 without choke orifices) across the orifice (59) of the radial passageway (75).
- Figures 56 and 58 depict projected isometric views with cross-sections associated with Figures 55 and 57 and break lines of the manifold crossover (23T) of Figure 54.
- the Figures show isometric views from different orientation perspectives of the radial passageway (75) blister about the flow controlling device (61), shown as a blocking plug (25 A).
- Other flow controlling members such as a pressure activated one-way valve, can be usable to feed a substantially lighter specific gravity fluid stream, from the concentric passageway (24), into a heavier specific gravity flow stream, from an exit bore conduit, to reduce hydrostatic pressure on the second well and, thus, increasing flowing velocity and/or creating an under-balance.
- the manifold crossover (23T) can be usable to fluidly separate water injection and brine extraction streams, maintaining access to the innermost passageway for the running of other devices, such as severance devices or measurement devices for measuring the shape of a salt cavern or performing a mechanical integrity test of the final cemented casing shoe.
- the manifold crossover (23T) of Figures 54 to 58 can be adaptable with further conduits comprising, for example, an adjacent passageway orifice crossover (23 of Figure 38) across the radial passageway (75) orifice (59) of the exit bore conduit (39), or to the concentric and supporting conduits of Figures 71-73, to form a manifold crossover (23V of Figures 71-73). Access to innermost passageways of supporting flow conduits (150, as shown in Fig. 67), located below the chamber (41), is not required.
- the additional exit bore conduits (39) can be increasable from two to four, by adapting the additional chamber junction with additional orifices aligned with supporting flow conduits (150, as shown in Fig. 67), to provide access to their innermost passageway.
- Embodiments of the method (CS8) can be usable with a plurality of exit bore (39) arrangements that can be selectively accessible through a chamber junction (43) with one or more bore selectors (47) engagable with an associated plurality of additional orifices.
- Additional conduits (150), supporting fluid communication to or from the single main bore, can be placeable about exit bore conduits of a chamber junction arrangement to, for example, fluidly communicate with concentric passageways, not requiring innermost bore access, or to align bore selectors or engage conduit arrangements with large cross-sectional areas and associated forces, in the event of a breach of a primary barrier (149), wherein a usable secondary barrier (148) is available.
- Prior art expandable metal junctions, as described in Figure 4, and conventional multilateral technologies are, generally, unable to provide well branches with both primary (2, 39, 149) and secondary (2A, 148) conduit barriers, with associated usable concentric or annular passageways for monitoring pressure between these barriers, through fluid communication.
- Concentric passageways, between conduit pressure barriers can be usable for various associated well operations, for example, fluidly circulating a higher specific gravity kill fluid to replace a failed primary barrier conduit barrier (2, 39, 149).
- Manifold strings (70, 76) and/or manifold crossovers (23) can be usable with the construction method (C8) to provide selective control of pressurized fluid communication within and about these barriers, for one or more wells below a single main bore, through a single wellhead and valve tree to, for example, provide a single subsea tree, which can be usable with gas lift and/or water injection for production from multiple wells.
- uses can include the selective control of a plurality of wells to one or more underground storage caverns, during solution mining and/or underground storage operations.
- Figure 59 depicts an isometric view of an arrangement (146) of a bore selector
- FIG. 47 an upper chamber junction assembly (145A), and lower chamber junction assembly (145B), illustrating a construction method (CS8).
- the conduit above the upper connection (137) is removed to show the bore selector (47) of Figures 63-64, that can be placeable through a single main bore and engagable to the upper chamber junction (43) of Figures 61 and Figures 66-67, engaged with a connector (137) to the lower chamber junction (43) shown in the plan view of Figure 60, wherein the entire assembly (146) is shown in the plan view of Figure 62.
- Figures 60, 61 and 62 show plan views of the lower chamber junction assembly (145B), upper chamber junction assembly (145 A) and fully assembled arrangement (146) of Figure 59, respectively.
- the Figures show a preferred construction method (CS8) with the Figure 60 chamber junction (43) of similar construction to the chamber junctions of Figures 45-46 and 48, and with no overlap of exit bore internal diameters for providing fluidly separated exit bores guiding surfaces (87) and innermost passageways (25) with fluid communicating conduits (150, as shown in Fig. 67).
- the fluid communicating conduits can be usable for fluid communication with, for example, fluidly separated passageways (24X, 24Y and 24Z) from a circumferentially segmented concentric passageway, or usable as receptacles (45A) for a bore selector, similar to that of Figure 47.
- the fluid communicating conduits can be usable to engage and/or to fluidly communicate with the upper chamber junction (43), as shown in Figure 61.
- the exit bores' inside diameters overlap in a cloverleaf shape which can be usable with the bore selector, of Figures 63-64, to select the right most exit bore passageway, as shown Figure 62 plan view.
- the guiding surfaces (87) of the bore selector extension (48) can be engaged within the cloverleaf shape to complete the right most bore circumference.
- Figures 63, 64 and 65 depict plan, elevation cross-sectional and isometric projection views of the cross-section, respectively, of the bore selector (47) flow controlling device (61) of Figures 59 and 62, with break lines showing removed portions in the Figure 64 cross-section, along line V-V of Figure 63, projected to form the isometric view of Figure 65.
- the Figures illustrate the guiding surface (87) extending to an extension (48), which can be usable to complete, for example, the circumference of exit bores of the chamber junction of Figure 61 for conveyance of devices and/or for fluid communication to a selected bore, while excluding other bores.
- the bore selector (47) can be rotatable to various bores and engagable with connectors (96) to the receptacles (45A of Figure 61).
- Figures 61, 66 and 67 depict plan, elevation cross- sectional and isometric projection views, respectively, of a chamber junction (43) and construction method (CS8), with break lines showing removed portions in Figure 66 cross-section, along line U-U of Figure 61, projected to form the isometric view of Figure 67, of the upper chamber junction assembly (43) of Figures 59 and 62.
- the Figures illustrate an upper end connector (137) that can be engagable with a single main bore conduit and a lower end connector (137) that can be engagable with, for example, the upper end of the lower chamber junction of Figures 59-60 or another assembly within the single main bore.
- the chamber (41) and exit bores (39) can form primary barrier conduits (149) with lower end seal stacks (66), engaged with the upper end bores of Figure 60, within a secondary conduit barrier (148).
- Fluid from, for example, lower end annular spaces associated with the well bore extending from the chamber junction (43 of Figure 60), can be communicable through supporting fluid communication conduits (150) for measurement (13 of Figure 1) at the single main bore upper end wellhead.
- Figures 68, 69 and 70 depict plan views of various example combinations of conventional sized conduit configurations, including four 13 3/8 inch diameter, three 13 3/8 inch diameter, and two 13 3/8 inch diameter primary barrier configurations, respectively, of construction method (CS8) that can be usable to adapt chamber junctions of Figures 45-46, 48-50, 54-58, 59-62 and 66-67.
- Figure 68 illustrates four 13 3/8 inch outside diameter primary barrier conduits
- Figure 69 depicts three 13 3/8 inch outside diameter primary barrier conduits (149) within a 32 inch outside diameter secondary barrier conduit (148), with three 6 inch outside diameter supporting fluid communication conduits (150).
- Figure 70 shows two 13 3/8 inch outside diameter primary barrier conduits (149) within a 30 inch outside diameter secondary barrier conduit (148), with four 5 inch outside diameter and two 8 5/8 inch outside diameter supporting pressurized fluid communication conduits
- the exemplary outside and inside diameters illustrated are reconfigurable to provide various pressurized fluid communication ratings, with annular spaces between outside diameters of the conduits (149, 150) and within the secondary barrier conduit (148) inside diameter, also usable for fluid communication.
- the construction method embodiment (CS8) of the present invention provides a secondary barrier (148), that can support conduits and space arrangements usable for selectively controlling pressurized subterranean fluid-mixture flow streams, should the primary barrier conduits (149) fail.
- a secondary barrier 148
- conduits and space arrangements usable for selectively controlling pressurized subterranean fluid-mixture flow streams, should the primary barrier conduits (149) fail.
- conduits (150) usable as solid or conduit type connectors to secure conduit assemblies, with large cross-sectional areas, to act as pressure equalization passageways for preventing application of pressure across large cross-sectional areas.
- these large cross-sectional areas can act as pressure relief passageways, in the event of a primary barrier (149) breach, to limit pressures placed on the secondary barrier by, for example, connecting the conduits to a subterranean formation with a fracture gradient, that is less than the secondary barrier, to form a subterranean strata pressure relief mechanism.
- the smaller diameters and associated higher pressure ratings of pressure relieving conduits (150) of the construction method (CS8) can be usable with plates, fluidly separating the passageway between conduits (149, 150) and the inside diameter of the secondary barrier (148). Integral plates can be usable to reinforce and improve the pressure integrity of the large diameter secondary barrier (148), with the pressure relief conduits (150) communicating fluid pressure to pressure relief flow controlling devices, in the event of a primary barrier breach to a pressure absorbing reservoir or pressure equalization mechanism to, in use, prevent breaching the secondary barrier prior to repairing the primary barrier.
- Figures 71, 72, 73 and 74 include a manifold crossover (23V) embodiment depicted in plan, elevation cross-sectional, isometric projection and magnified detail views, respectively, with break lines showing removed portions in Figure 72 cross-section, along line W-W of Figure 71, projected to form the isometric view of Figure 73, with the portion within detail line X magnified in Figure 74.
- the depicted manifold crossover (23V) embodiment is adapted from the chamber junction manifold (23T) of Figures 54-58.
- the Figures illustrate a construction method (CS8) with an additional concentric conduit (2D of Figure 71) shown as a dashed line, usable as a secondary barrier to form a concentric passageway (24C) about primary barriers.
- the primary barriers comprise the conduit (2C), forming a concentric passageway (24B) about the concentric conduit (2B), which forms an intermediate concentric passageway (24A) about the concentric conduit (2A), which surrounds the intermediate concentric passageway (24) disposed about the innermost conduit (2) and innermost passageway (25).
- the upper ends (90) of the conduits are shown engagable with concentric conduits of a single main bore while the lower ends (90) are shown engagable with, for example, conduits of a junction of wells or other conduits of a single main bore, such as that depicted in Figure 68.
- the innermost upper end concentric conduits (2, 2A) can engage with the chamber (41) junction (43) forming lower end exit bore conduits (39) that can fluidly communicate through a radial passageway (75) with the intermediate concentric passageway (24) disposed about the innermost conduit (2).
- the outermost concentric conduits (2B, 2C), fluidly separating concentric passageways (24A, 24B), can transition to lower end fluidly separated radially disposed pressurized fluid communication conduits (150).
- embodiments of the present invention thereby provide methods and manifold string (70, 76) arrangements of manifold crossovers (23), valves (74), flow control devices (61) and controlling and/or measurement lines (79) that can be usable in any configurable arrangement and placeable within a single main bore, and/or orientated to selectively control pressurized fluid mixture flow streams of one or more substantially hydrocarbon and/or substantially water wells from a single main bore, during well construction and/or operations..
- FIG. 74 the Figure depicts an elevation view cross-sectional slice through subterranean strata of a liquid underground cavern storage and surface brine pond arrangement.
- the Figure shows concentric conduits (2, 2A) passing through a passageway through subterranean strata (52), comprised of casings and a strata bore forming a chimney above the cavern with walls (1A), that are formed in a salt deposit (5).
- the conduit strings are usable to transfer brine to and from a pond for storage and displacement of the fluids to and from the cavern; wherein, after initial dewatering of a cavern, conventional practice is to only displace stored liquids with brine.
- Storage fluids can be injected (31) into the upper space within the cavern walls
- FIG. 153 Surface pumps and motor arrangements (116), with surface manifolds (155) comprising conduits and valves, can be usable for operating injection or extraction from the spaces within the cavern walls (1A), a brine pond (152), or other storage facility.
- the Figure illustrates the use of a transfer conduit (153), in communication with the pumps and motors (116), for extracting fluid from the brine pond (152).
- Figure 74 shows the surface pumps and motor arrangements (116) in communication with a storage operations conduit (154), usable for displacing stored fluids.
- Storage fluids can be displaced (34) from the upper end space, within the cavern walls (1A), by injecting (31) brine into the lower end space below the substantially water interface (117), from a brine pond (152) or other brine storage space, through the surface manifolds (155) pumps and motors (116).
- brine reservoirs (159) can be usable for brine generation during operation of a storage cavern (158) product displacement and brine storage operation, until the brine reservoir (159) and/or storage cavern (158), when under saturated brine is produced, reaches their maximum effective stable diameter; after which, the caverns (158, 159) can be usable for fully saturated brine and/or product storage at depths associated with the maximum effective diameter.
- Brine reservoirs (159) can be usable to improve net present value economics of large salt cavern storage developments by providing continuous brine displacement fluid during brine reservoir (159) solution mining operations (1, IS), for product displacement operation of an underground storage cavern (158), or product displacement of a storage cavern (158) under saturated brine to a brine reservoir (159). Thereafter, brine and storage reservoirs (158, 159) can be interchangably used as storage caverns (158) or brine generating caverns (159) usable with under saturated or fully saturated brine fluids, for separating storage of substatiantially water brine fluids with substantially hydrocarbon fluids of differing demand cycles, for example, crude oil, diesel and/or gasoline from an opposite demand cycle from, for example, natural gas.
- Embodiments of the present invention can be usable with other apparatus
- Figure 75 depicts a diagrammatic elevation cross-sectional view of a slice through subterranean strata depicting a method embodiment (IT) for operating a storage cavern (158) with brine from a subterranean brine reservoir (159).
- the Figure illustrates a u-tube like conduit arrangement between wells, with heavier brine at the lower end of both caverns and located below a substantially water interface (117) transferred from one cavern to the other with working pressure (WP1 to WP2).
- Dashed lines within the caverns represent the notional u-tube like arrangement, with brine or another heavier storage fluids gravity separated below lighter fluids, with substantially water (117) and/or fluid (117A) interfaces that can be stored in the upper cushion portion of each brine and storage reservoir salt cavern (158, 159).
- a brine reservoir (159) is solution mined (1), and/or usable for storage while being solution mining (IS), to produce brine, that can be expelled (34) through a disposal conduit (153 A) until, for example, the cavern reaches a desired size to operate an underground storage cavern (159).
- the brine is produced from the bring reservoir (159) through a transfer conduit (153) and u-tube arrangement, with the salt saturation level, of continuous brine provision, dependent on the temperature, pressure, volume and residence time of water injected (31) through the feed conduit (156) and into the brine reservoir (159), and in this instance, falling to the substantially water interface (117).
- the water can be provided through the feed conduit
- the water can be injected (31) through the feeding conduit (156) into the cushion above a substantially water interface (117) or fluid interface (117A) of the brine reservoir (159), during combined mining and storage operations (IS), to exert working pressure (WPl) on the interface (117 or 117A), which, through the u-tube arrangement, expels (34) the brine through a disposal conduit (153A) or injects (31) the brine through the transfer conduit (153), to the lower end of the underground storage cavern (159), which exerts working pressure (WP2) on the fluid interface (117 or 117A) to displace (34) stored fluid from the underground storage cavern (158) to a storage operations conduit (154) or pipeline.
- WPl working pressure
- Working pressures can depend upon the hydrostatic and dynamic pressure heads for stationary and moving fluid columns within the caverns, with various possible saturations of brine and liquids or gases that are storable within either cushion, above and below either substantially water or fluid interfaces (117, 117A).
- compressible fluids for example, air, nitrogen or natural gas
- working pressure WPl
- subsequent release of the compressed fluid can be usable to drive, for example, turbines or pneumatic motors, which can be further usable to aid storage operations.
- Heat transfer (160) from compression of the fluids can be further usable to heat the cavern and partially offset temperature reductions associated with solution mining and/or compressed fluid expansion.
- lighter specific gravity fluids and/or stored products are placed within a cavern, fluids will gravity separate, given sufficient residence time from the heavier brine, u-tubed between the lower ends of both caverns (158, 159), and form one or more lighter specific gravity fluid interfaces (117 or 117A) from, for example, separated fluids of a pipeline pigging operation.
- Conventional two string completions can be usable to operate single substantially water interface (117) arrangements within each cavern.
- the two string completions can be usable to operate manifold strings (70 of Figure 80) with concentric manifold strings (2, 2A of Figure 80), instead of the single strings (2), as shown, to selectively access a plurality of gravity separated fluids between a plurality of fluid interfaces (117 and 117A), with manifold crossovers (21 and 23 of Figure 80) forming part of a manifold string within either cavern (158, 159).
- Water can be injected (31) into the mining and/or storage operations conduit
- a salt inert fluid such as nitrogen, hydrocarbon gas or diesel
- the water can be used to produce brine through salt dissolution, with methods similar to those described in Figures 76, 80 and 81, for displacement of the upper end cushion of the storage cavern (158) during storage retrieval operations.
- Gas storage caverns may retrieve (34) stored gas from a cavern
- brine displacement can be usable during demand cycles, while solution mining a brine reservoir.
- Brine from the storage cavern (158) can be disposed to, for example, the ocean with subsequent re-filling of the cavern with stored product, while salt dissolution or solution mining continues within the brine reservoir (159), Alternatively, brine can be displaced back to the brine reservoir, displacing the storage cushion (IS) and/or under saturated brine in the brine reservoir.
- the compressed air or nitrogen in the brine reservoir (159) can be usable to drive a turbine or pneumatic motor to aid storage operations and can be released to the atmosphere.
- a brine reservoir can be usable to form brine continuously during displacement operations, if water is the displacement fluid, with the salt concentration levels being a function of residence time, pressures volumes and temperatures.
- Partially saturated brine can be usable to minimize salt dissolution in a storage cavern (158) during combined solution mining, and storage operations (IS), provided there is sufficient effective diameter available for such under saturated displacements prior to reaching a critical cavern stability diameter.
- Storing (31), for example, crude oil, gasoline or diesel in the right side brine cavern (159) upper end cushion to u-tube brine, that is partially and/or fully saturated, to the storage cavern (158) for displacing gas during high winter seasonal demand and lower seasonal crude oil, gasoline and/or diesel demand, may be followed by subsequent storage cavern (158) dewatering, with compressed natural gas, during spring or summer seasonally low gas demand, by u-tubing the saturated or partially saturated brine back to the brine reservoir (159) for displacing crude oil, gasoline and/or diesel during the spring or summer seasonally high demand cycle.
- Displacement of partially saturated brine between salt caverns can be usable until reaching a maximum effective diameter for salt cavern stability at relavent subterranean depths within the brine reservoir (159) usable to store brine and/or products and the storage cavern (158) usable to store brine and/or products.
- One or more fluid interfaces (117A) may be present between products of differing specific gravities, effectively floating on top of each other. Fluids, between differing fluid interfaces, can be accessible with manifold strings (70 of Figure 80).
- FIG. 76 the Figure depicts a diagrammatic elevation view cross-sectional slice through subterranean strata of a method embodiment (IT) for operating a storage cavern with a subterranean brine reservoir.
- the Figure shows a u-tube arrangement, similar to Figure 75, that can be usable to operate the storage cavern (158) with brine produced by solution mining (1) and combined operations (IS) within the brine reservoir (159) with one of two conduits (2) in each cavern (158, 159).
- Pumps (116), turbines, motors and valved manifolds (155) are shown and can be usable for injecting fluids into and urging fluids from a salt cavern.
- Various solution mining (1) methods comprising injecting water to control a substantially water interface (117), usable to extend the cavern roof from a fixed diameter upward (IB to 1C to 1A), increasing the cavern diameter after solution mining by a lesser diameter upward (IB to 1C to 1A), or combinations thereof, can be usable to form intermediate cavern shapes (147) usable for combined operations (IS) of combined solution mining (1) and storage, prior to reaching the final design cavern walls (1A) at the maximum effective diameter for salt cavern stability.
- Combined storage and solution mining operations can occur from increasing the cavern diameter after solution mining a lesser diameter upward (IB to 1C to 1A), for example, comprising injecting (31) water from a supply conduit (156) into the upper end of the cavern below the upper depicted substantially water interface (117) or, for example, from a fixed diameter upward (IB to 1C to 1A) with injected (31) water falling to the lower depicted substantially water interface (117).
- the combined operations (IS) can be usable to produce brine through salt dissolution, occurring between the intermediate cavern walls (147) and the final cavern walls (1A), to operate the storage cavern (158) with fluid displacement, by producing (34) brine through the brine reservoir (159) lower end inner conduit (2), transfer conduits (153) and surface manifold (155) with the use of surface pumps (116), usable to inject the brine into the lower end of the storage cavern (158), through its inner conduit (2), floating stored product from the cavern above the substantially water (117) or fluid interface (117A).
- the working pressures (WP2) and pumping (116) can be usable to move the storage cavern (158) substantially water (117) or fluid (117A) interface upward, selectively controlling the working pressure (WP1) with the valve tree, to produce (34) stored fluids from the upper end of the storage cavern (158).
- the described method can be reversible by arranging flow from the storage cavern (158) to the brine reservoir (159), wherein product may be moved with transfer (153) or production (154) conduits from the upper or lower end of either cavern to the other.
- Stored product from the storage cavern (158) upper end is generally usable as a salt inert solution mining cushion at the upper end of a brine reservoir (159), or brine in the storage cavern (158) lower end can be returned to the brine reservoir (159) lower end.
- compressed air from a wind turbine or other compressible fluids such as nitrogen from a nitrogen generator, are used to displace brine from a reservoir (159) in the displacement operation of a storage cavern (158), during storage cavern (158) product re-injection (31) the compressed upper end brine reservoir (159) fluids can be releasable to the atmosphere and or usable to drive, for example, a surface pneumatic motor (116) or to process turbines through a surface manifold (155) to aid storage operations.
- storage cavern (158) can use subterranean heat transfer (160) in storage operations to, for example, maintain temperatures in a gas storage cavern (158), that was displaced with brine thermally heated by the subterranean strata over a period of residence in a brine reservoir (159).
- Figure 77 depicts an example of a graphical representation of the conventional concept of increasing usable working gas volume from the lower end of the vertical axis upward, over an increasing period of years on the horizontal axis from left to right, resulting from subterranean heat transfer (160) to an underground gas storage cavern.
- the Figure shows that due to the lower temperatures of water used in solution mining over a period of years, and the chemical process of salt dissolution, the strata around a cavern is cooled below its natural state, and, for this particular example, requires a number of years to return to its original temperature.
- Figure 78 depicts an exemplary graphical representation of the conventional concept of working volume usage during short (161) and longer (162) demand cycles, with the vertical axis depicting increasing percentages of usage upwards, and the horizontal axis illustrating an increasing number of weeks over a yearly period, from the left to right.
- the Figure shows that in the conventional storage operations of this example, a shorter weekly demand leveling requires approximately 10% of the gas cavern working volume, while seasonal swings represent full working volume usage.
- Methods (IT of Figures 75, 76 and 80-81) of the present invention can be usable to extend gas withdrawal periods, thus increasing working gas volumes available for seasonal demand through brine displacement, which can remove the need for a sunk cost gas cushion gas to resist salt creep and to maintain salt cavern roof and wall integrity. Increased working gas levels thus provide a means for large gas tight salt cavern storage facilities to supply seasonal demands, conventionally restricted to less than gas tight depleted sandstone reservoir storage facilities, wherein the gas tight integrity of cap rock and spill points cannot be tested.
- Figure 79 depict the conventional completion method (CM4) of Figure 79 usable after, for example, the conventional solution mining (1) method (CM3) of the Figure 80.
- CM3 of Figure 80 is usable for both solution mining and conventional liquid storage operation, with brine displacement practices similar to that of Figure 74.
- Stored liquid products generally displace brine from the space within the cavern walls (1A) during storage or can be retrieved from storage by direct injection of brine from a pond or storage facility, through the dewatering string, to float the lower specific gravity product out of the cavern, as shown in Figure 74.
- Figure 79 depicts a diagrammatic cross-sectional slice elevation view through subterranean strata of the conventional completion method (CM4) for operating a gas storage salt cavern.
- the Figure shows a dewatering string (2) as a dashed line placed through a subsurface safety valve (74).
- CM4 gas storage salt
- the free hanging leaching strings (2, 2A of Figure 80 left side well) have been removed and a completion, comprising production casing (2), that can be engaged with a production packer (40), further engaged to the final cemented casing (3), is secured at upper end to a wellhead (7) and valve tree (10A) with surface valves (64), to control injection and extraction of fluids, that have been installed.
- a fail safe shut subterranean valve (74) can be generally placed in the production casing (2), through which a dewatering string (138 shown as a dashed line) is placed. Expandable or volatile fluids can then be used to displace brine from the cavern with indirect injection (31) through the passageway, between the dewatering (138) and production casing (2), taking brine, expelled (34) from the cavern, through the dewatering string (138); after which, the dewatering string (138) must be stripped or snubbed out of the well in a relatively high risk operation, where personnel are in close proximity to pressurized barriers, to allow the fail safe safety valve (74) to function.
- Figure 80 depicts a diagrammatic cross-sectional slice elevation view through subterranean strata of a method embodiment (IT) for operating a storage cavern with a subterranean brine reservoir.
- the Figure shows a conventionally constructed (CM3) left side well that can be usable for solution mining and/or liquid storage that is engagable to a right hand well (CS4) with apparatuses (21, 23, 23F, 70, 70R) and methods (C03) of the present inventor that can be usable for dewatering and selective access to liquid and/or gas storage, to replace the conventional gas storage arrangement of Figure 79 for example, during combined solution mining (1) and storage operations (IS).
- CM3 conventionally constructed
- CS4 right hand well
- apparatuses 21, 23, 23F, 70, 70R
- C03 apparatuses of the present inventor that can be usable for dewatering and selective access to liquid and/or gas storage, to replace the conventional gas storage arrangement of Figure 79 for example, during combined solution mining (1) and storage operations (IS).
- the wells can be formed with conductors (14), intermediate casings (15), and final cemented casings (3) sealed with a cavern chimney, with a casing shoe (16) below which a strata passageway (17) is bored and strings (2, 2A) are placed for solution mining operations.
- a free hanging inner string (2) is placed within an outer free hanging string (2A), which can be adjusted with the use of a large hoisting capacity rig during the process to reposition the point at which fresh water enters the solution mining region of a salt deposit (5), and/or to provide improved sonar measurements than are possible through casings (2, 2A).
- a salt inert cushion of nitrogen or diesel is generally displaced between the final cemented casing (3) and outer leaching string (2A) to control the substantially water interface (117) and to protect the final cemented casing (3) shoe (16).
- Example apparatuses (21, 23, 23F, 70, 70R) and methods (C03) of the present invention in the right side well (CS4) provide access through crossovers (21, 23) at the lower end of the inner (2) and outer (2A) strings to access various regions, within intermediate cavern volume (147) usable for combined solution mining (1) and storage (IS) and for final (1A) cavern walls.
- Either the right (CS4) or left side (CM3) wells can be usable as a brine reservoir
- Solution mining and brine generation (1) can be usable with injected potable water, pond water, ditch water, sea water, and/or other forms of water, generally termed fresh water due an unsaturated salinity level compared to the produced salt saturated brine.
- the water can be injected through the innermost passageway (25) or the intermediate concentric passageway (24), between the inner (2) and outer (2A) free hanging conduit strings, or vice versa, using direct or indirect circulation with a cushion.
- the cushion generally comprises diesel or nitrogen.
- the water can be forced into an additional intermediate concentric passageway (24A), between the outer conduit string (2A) and final cemented casing (3), for the left side well (CM3), or the water can be forced through a passageway (24, 25) of the right side well (CS4) and allowed to float up to the final cemented casing shoe, to control the water interface (117), wherein an initial solution mined space can be formed for insoluble strata to fall through a substantially water fluid to the cavern floor (IE).
- IE cavern floor
- caverns are solution mined (1) from the bottom up by mining a space
- the water interface (117) can be raised, repeatedly, to create increasing volumetric spaces (1C and ID) with water insoluble strata falling through fluids and raising (IE, IF, 1G) the cavern floor, while continuously injecting (31) fresh water and extracting (34) saturated or nearly saturated salt brine, dependent upon the residence time, pressure, volume and temperature conditions of the salt dissolution process.
- the method (C03) can be usable to simultaneously perform storage and solution mining operations (IS) by first forming an initial space within cavern walls (IB, 1C, 147) with direct circulation of fresh water through the innermost passageway (25), and with salt saturated brine returned through the concentric passageway (24), using the lowest water interface (117) above the lower end of the outer string (2A).
- IS storage and solution mining operations
- the brine can be returned from the concentric passageway (24) to the innermost passageway (25), using the manifold crossover (23) flow di verier (21), at selected depths, corresponding to various fluid interfaces (117), during which time a salt inert fluid cushion can be periodically injected through one of the passageways (24, 24A, 25) and trapped under the casing shoe (16).
- Various initial cavern volume shapes can be formed with direct or indirect circulation and adjustment of the salt inert fluid cushion controlling the water interface selectively changed using a manifold crossover (23) and flow diverter (21), for the right hand well (CS4), or the additional concentric passageway (24A) for the left hand well (CM3), to form a volume (147) with lesser effective diameter and volume than the final cavern wall (1 A), for simultaneous storage and solution mining operations (IS).
- a manifold crossover (23) and flow diverter (21), for the right hand well (CS4), or the additional concentric passageway (24A) for the left hand well (CM3) to form a volume (147) with lesser effective diameter and volume than the final cavern wall (1 A), for simultaneous storage and solution mining operations (IS).
- Various initial cavern shapes (147) can be formable by controlling water residence time against the roof, sides and bottom of a cavern at the various salt dissolution rates to simultaneously produce brine from a brine reservoir cavern (159), while fluidly displacing and operating an underground storage cavern (158) with less than fully saturated brine, if the maximum effective cavern diameter of the walls (1A) has not been solution mined or fully saturated the brine after reaching the final cavern wall (1A) effective diameter.
- the method (IT) can be usable, for example, with gas storage within gas tight salt caverns to increase the number of working volume turn-overs and for profitability of short term trading, using an intermediate cavern volume (147), until reaching a cavern volume sufficient for seasonal near-full capacity working volume swings.
- the left side well (CM3) is usable, for example, as a brine reservoir (159), that can be engaged, through a u-tube like arrangement, to the lower end right side well (CS4) storage cavern (158) for combined storage (IS) and solution mining (1) operations, with a short term trading volume of gas within an upper end cushion, that can be controlled by a valve manifold crossover (23F) above the fluid interface (117).
- CS4 lower end right side well
- solution mining (1) operations with a short term trading volume of gas within an upper end cushion, that can be controlled by a valve manifold crossover (23F) above the fluid interface (117).
- IS valve manifold crossover
- water can be usable to displace short-term gas trading volumes with subsequent gas product displacement, which can force brine from the cavern before resuming solution mining or during later phases.
- brine from the brine reservoir (159), can be divertible through the u-tube like arrangement to the lower end of the underground storage cavern (158) for pressure assisting the extraction of the short-term and longer term seasonal trading volumes of gas.
- the well construction method (CS4) can be usable, for example, to perform both solution mining and storage operations (IS) without rig intervention, which is generally necessary to adjust the outer leaching string (2A) of conventional wells (CM3) or to provide a dual well valve dewatering string arrangement (CM5 of Figure 81).
- Figure 81 depicts a diagrammatic cross-sectional slice elevation view through subterranean strata of a method embodiment (IT), with conventional dual well valve string arrangements (CM5) usable for operating a storage cavern (158) with brine from a subterranean brine reservoir (159).
- the Figure depicts smaller cavern cushion storage spaces (147), corresponding to increasing diameters which are less than the maximum effective diameter for cavern stability, solution mined (1) first for the purpose of simultaneous storage operations (IS), and with a working pressure (WP) usable to selectively control the substantially water interfaces (117), during enlargement of the cavern walls (IB, 1C, ID).
- Various methods for shaping a cavern can be usable including, for example, notionally vertical cavern walls methods (C07) or inward sloping cavern wall methods (C06), providing more roof support and allowing a lower minimum cavern pressure.
- Either cavern can be usable as a storage cavern (158).
- the remaining cavern can be usable as a brine reservoir (159) for solution mining with water supplied through a feeding conduit (156) and valves (64) of a valve tree (10).
- the brine can be expelled through a disposal conduit (153A) or a transfer conduit (153) forming a u-tube like brine transfer arrangement between cavern lower ends, with product supply through a supply conduit (154) or pipeline to form an upper end cushion that can protect the final cemented casing (3) shoe (16). Escape of the upper end cushion can be controlled by subsurface safety valves (74).
- FIG. 82 to 83 various diagrammatic plan view embodiments (157) of underground storage cavern (158) and subterranean brine reservoir (159) arrangements usable with brine and storage reservoir operations methods (IT) and combined solution mining and storage operations (IS), depicting cavern configurations usable to provide salt deposit pillar support, according to the product stored and working pressure variations with cavern exclusion zones (1Z).
- I brine and storage reservoir operations methods
- IS solution mining and storage operations
- Pressure integrity of a cavern generally depends upon the fluid being contained with liquid pressure integrity generally greater than, for example, gas tight integrity within the same cavern, with the capillary and cohesive properties of liquid greater than gas attempting to escape through micro annuli and porous or permeable spaces with the strata.
- Brine reservoirs (159), using an upper end liquid cushion with water and having brine below their substantially water interface, are placeable in closer proximity than, for example, underground storage caverns (158) with gas product, wherein a higher pressure is maintainable within a liquid storage cavern than a gaseous storage cavern, to maintain cavern stability.
- Methods (IS, IT) of the present invention can be usable for operating a storage cavern (158) with brine from close proximity liquid storage brine reservoirs (159), engaged with stored product (154), and brine transfer (153) conduits to storage caverns (158) arranged with larger cavern exclusion zones (1Z) and associated with more salt deposit overburden pillar support between cavern walls (1A).
- Water supply and brine disposal conduits are placeable centrally or individually for each cavern, for example, in an ocean environment where offshore platforms exist above caverns, with water taken and brine disposed to the ocean during solution mining.
- embodiments of the present invention provide systems and methods for combined or simultaneous storage and solution mining operation that can be usable in any configuration or arrangement, including with various apparatus and methods that can be placeable in the subterranean strata, onshore or offshore, and that can be engaged with conduits carrying products to be stored, water for salt dissolution, or brine for selectively displacing stored product within another cavern or the cushion between the final cemented casing shoe and a substantially water interface.
- These systems and methods can be further usable to form a subterranean brine and storage reservoir with salt dissolution, wherein two or more strings having a plurality of passageways and a valve tree can be usable to selectively operate or form one or more subterranean brine storage reservoirs, with salt inert cushion fluid and water for associated operation of one or more other underground storage salt caverns, by selectively communicating fluids between the caverns with pumping, compression and/or pressure equalization.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
Claims
Priority Applications (13)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP11759817.7A EP2550422B1 (en) | 2010-03-25 | 2011-03-01 | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining |
BR112012025142-2A BR112012025142B1 (en) | 2010-03-25 | 2011-03-01 | METHODS AND SYSTEMS OF OPERATION AND CONSTRUCTION OF CONTROLLED PRESSURE WELLS APPLICABLE TO SOLUTION MINING, STORAGE AND OPERATIONS WITH HYDROCARBONS |
CN201180026024.9A CN102906365B (en) | 2010-03-25 | 2011-03-01 | Pressure controlled wellbore structure and operating system and can be used for the method for hydrocarbon operation, storage and solution exploitation |
RU2012145291/03A RU2563865C2 (en) | 2010-03-25 | 2011-03-01 | Construction of well with pressure control, operations system, and methods applied to operations with hydrocarbons, storage and production by dissolution |
MX2012011096A MX2012011096A (en) | 2010-03-25 | 2011-03-01 | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining. |
AU2011229956A AU2011229956B2 (en) | 2010-03-25 | 2011-03-01 | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining |
CA2794346A CA2794346C (en) | 2010-06-22 | 2011-03-01 | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining |
US13/261,445 US9181776B2 (en) | 2009-06-23 | 2011-03-01 | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining |
DK11759817T DK2550422T3 (en) | 2010-03-25 | 2011-03-01 | Pressurized well construction and operation systems and methods that can be used to kulbrinteoperationer, storage and resolution |
GB1121742.9A GB2487274B (en) | 2010-12-16 | 2011-12-16 | A space provision system using compression devices for the reallocation of resources to new technology, brownfield and greenfield developments |
GB1121743.7A GB2486592A (en) | 2010-12-16 | 2011-12-16 | Steering system for a down-hole shaft comprising a hydrodynamic bearing system |
GB1121741.1A GB2486591B (en) | 2010-12-16 | 2011-12-16 | Rotary stick, slip and vibration reduction drilling stabilizes with hydrodynamic fluid bearings and homogenizers |
GB1203649.7A GB2514075B (en) | 2011-03-01 | 2012-03-01 | High pressure large bore well conduit system |
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1004961.7A GB2471354B (en) | 2009-06-23 | 2010-03-25 | Apparatus and methods for operating one or more solution mined storage wells through a single bore |
GBGB1004961.7 | 2010-03-25 | ||
GB1010480A GB2471385B (en) | 2009-06-23 | 2010-06-22 | Apparatus and methods for forming and using subterranean salt cavern |
GBGB1010480.0 | 2010-06-22 | ||
GBGB1011290.2 | 2010-07-05 | ||
GB1011290.2A GB2471760B (en) | 2009-07-06 | 2010-07-05 | Apparatus and methods for subterranean downhole cutting, displacement and sealing operations using cable conveyance. |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2011119197A1 true WO2011119197A1 (en) | 2011-09-29 |
Family
ID=44673935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2011/000372 WO2011119197A1 (en) | 2009-06-23 | 2011-03-01 | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2011119197A1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2597251A1 (en) * | 2011-11-22 | 2013-05-29 | Weatherford/Lamb Inc. | Entry tube system |
WO2016000068A1 (en) * | 2014-07-02 | 2016-01-07 | IOR Canada Ltd. | Multi-flow pipe and pipe couplings therefor for use in fracture flow hydrocarbon recovery processes |
WO2016094267A1 (en) * | 2014-12-09 | 2016-06-16 | L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Solution mining a stable roof under an inert gas |
US10215005B2 (en) | 2013-07-04 | 2019-02-26 | IOR Canada Ltd. | Multi-flow pipe and pipe couplings therefor for use in fracture flow hydrocarbon recovery processes |
CN114427390A (en) * | 2020-09-02 | 2022-05-03 | 中国石油化工股份有限公司 | Salt-removing and salt-preventing injection-production integrated pipe column |
CN115749690A (en) * | 2022-10-19 | 2023-03-07 | 重庆大学 | Halogen discharging pipe column and halogen discharging method for operation of coiled tubing of gas storage under no pressure |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030201104A1 (en) * | 2002-04-25 | 2003-10-30 | Conoco Inc., | Petroleum production utilizing a salt cavern |
US20050105971A1 (en) * | 2003-11-13 | 2005-05-19 | Maduell Roger J. | Simultaneous development of underground caverns and deposition of materials |
US20050126822A1 (en) * | 2003-12-11 | 2005-06-16 | Campbell Paul B. | Drilling systems |
-
2011
- 2011-03-01 WO PCT/US2011/000372 patent/WO2011119197A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030201104A1 (en) * | 2002-04-25 | 2003-10-30 | Conoco Inc., | Petroleum production utilizing a salt cavern |
US20050105971A1 (en) * | 2003-11-13 | 2005-05-19 | Maduell Roger J. | Simultaneous development of underground caverns and deposition of materials |
US20050126822A1 (en) * | 2003-12-11 | 2005-06-16 | Campbell Paul B. | Drilling systems |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2597251A1 (en) * | 2011-11-22 | 2013-05-29 | Weatherford/Lamb Inc. | Entry tube system |
AU2012244199B2 (en) * | 2011-11-22 | 2015-03-05 | Weatherford Technology Holdings, Llc | Entry tube system |
US9309751B2 (en) | 2011-11-22 | 2016-04-12 | Weatherford Technology Holdings Llc | Entry tube system |
US10215005B2 (en) | 2013-07-04 | 2019-02-26 | IOR Canada Ltd. | Multi-flow pipe and pipe couplings therefor for use in fracture flow hydrocarbon recovery processes |
WO2016000068A1 (en) * | 2014-07-02 | 2016-01-07 | IOR Canada Ltd. | Multi-flow pipe and pipe couplings therefor for use in fracture flow hydrocarbon recovery processes |
WO2016094267A1 (en) * | 2014-12-09 | 2016-06-16 | L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Solution mining a stable roof under an inert gas |
CN114427390A (en) * | 2020-09-02 | 2022-05-03 | 中国石油化工股份有限公司 | Salt-removing and salt-preventing injection-production integrated pipe column |
CN115749690A (en) * | 2022-10-19 | 2023-03-07 | 重庆大学 | Halogen discharging pipe column and halogen discharging method for operation of coiled tubing of gas storage under no pressure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2794346C (en) | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining | |
EP2550422B1 (en) | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining | |
US9366126B2 (en) | Apparatus and methods for forming and using subterranean salt cavern | |
AU2011229956B2 (en) | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining | |
US9181776B2 (en) | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining | |
US9574404B2 (en) | High pressure large bore well conduit system | |
WO2011119197A1 (en) | Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining | |
WO2013176705A1 (en) | High pressure large bore well conduit system | |
GB2479432A (en) | Selective control of simultaneously flowing fluid streams | |
RU2466271C1 (en) | Thermal production of bitumen oil from shallow beds by cavities of higher permeability | |
US4279307A (en) | Natural gas production from geopressured aquifers | |
GB2479043A (en) | Wellbore crossover tool | |
CA3026636C (en) | System and method for enhanced oil recovery | |
Johnson et al. | Single Trip, Multistage System Delivers Fast, Efficient Solutions in Deepwater | |
Machado | Case History of a Successful Selective Horizontal Openhole Gravel Pack With Zonal Isolation in Deep Water Field | |
Amantini et al. | DEVELOPMENT OF THE PERFORMANCE OF THE LOENHOUT UGS (ANTWERP-BELGIUM) DRILLING THROUGH A HIGHLY KARSTIFIED AND FISSURED LIMESTONE RESERVOIR UNDER GAS STORAGE OPERATION | |
Valeriyivna et al. | Galko Tetiana Mykolayivna | |
Bellarby | Specialist Completions | |
AU2011229957A1 (en) | Manifold string for selectively controlling flowing fluid streams of varying velocities in wells from a single main bore |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201180026024.9 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11759817 Country of ref document: EP Kind code of ref document: A1 |
|
WD | Withdrawal of designations after international publication |
Designated state(s): GB |
|
ENP | Entry into the national phase |
Ref document number: 2794346 Country of ref document: CA |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13261445 Country of ref document: US Ref document number: MX/A/2012/011096 Country of ref document: MX |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2011759817 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2012145291 Country of ref document: RU |
|
ENP | Entry into the national phase |
Ref document number: 2011229956 Country of ref document: AU Date of ref document: 20110301 Kind code of ref document: A |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112012025142 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112012025142 Country of ref document: BR Kind code of ref document: A2 Effective date: 20120925 |