USRE38642E1 - Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes - Google Patents
Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes Download PDFInfo
- Publication number
- USRE38642E1 USRE38642E1 US09/871,813 US87181301A USRE38642E US RE38642 E1 USRE38642 E1 US RE38642E1 US 87181301 A US87181301 A US 87181301A US RE38642 E USRE38642 E US RE38642E
- Authority
- US
- United States
- Prior art keywords
- borehole
- joint assembly
- tubular member
- liner
- casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000000034 method Methods 0.000 title claims abstract description 150
- 238000005553 drilling Methods 0.000 title claims abstract description 55
- 239000003129 oil well Substances 0.000 title description 4
- 238000004519 manufacturing process Methods 0.000 claims abstract description 74
- 238000010793 Steam injection (oil industry) Methods 0.000 claims abstract description 8
- 230000000712 assembly Effects 0.000 claims abstract description 4
- 238000000429 assembly Methods 0.000 claims abstract description 4
- 239000007789 gas Substances 0.000 claims description 44
- 239000000463 material Substances 0.000 claims description 35
- 239000012530 fluid Substances 0.000 claims description 32
- 210000002445 nipple Anatomy 0.000 claims description 29
- 239000004568 cement Substances 0.000 claims description 27
- 229910052751 metal Inorganic materials 0.000 claims description 18
- 239000002184 metal Substances 0.000 claims description 18
- 239000007788 liquid Substances 0.000 claims description 15
- 230000009977 dual effect Effects 0.000 claims description 14
- 239000002002 slurry Substances 0.000 claims description 12
- 238000012856 packing Methods 0.000 claims description 9
- 238000010926 purge Methods 0.000 claims description 9
- 238000007789 sealing Methods 0.000 claims description 9
- 238000005520 cutting process Methods 0.000 claims description 8
- 238000003780 insertion Methods 0.000 claims description 6
- 230000037431 insertion Effects 0.000 claims description 6
- 238000003801 milling Methods 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 5
- 239000012528 membrane Substances 0.000 claims description 5
- 238000011084 recovery Methods 0.000 claims description 5
- 238000006073 displacement reaction Methods 0.000 claims description 4
- 238000004873 anchoring Methods 0.000 claims description 3
- 230000000737 periodic effect Effects 0.000 claims description 3
- 239000000243 solution Substances 0.000 claims description 3
- 238000011065 in-situ storage Methods 0.000 claims description 2
- 230000008439 repair process Effects 0.000 claims description 2
- 229910000831 Steel Inorganic materials 0.000 claims 12
- 239000010959 steel Substances 0.000 claims 12
- 125000004122 cyclic group Chemical group 0.000 claims 4
- 239000003208 petroleum Substances 0.000 claims 4
- 238000009835 boiling Methods 0.000 claims 1
- 230000006835 compression Effects 0.000 claims 1
- 238000007906 compression Methods 0.000 claims 1
- 238000007689 inspection Methods 0.000 claims 1
- 239000003829 resin cement Substances 0.000 claims 1
- 239000003921 oil Substances 0.000 abstract description 29
- 238000002347 injection Methods 0.000 abstract description 11
- 239000007924 injection Substances 0.000 abstract description 11
- 238000004140 cleaning Methods 0.000 abstract description 7
- 239000000295 fuel oil Substances 0.000 abstract description 7
- 230000009286 beneficial effect Effects 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 abstract 1
- 238000005086 pumping Methods 0.000 description 8
- 239000004576 sand Substances 0.000 description 8
- 230000000750 progressive effect Effects 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000007596 consolidation process Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000004080 punching Methods 0.000 description 3
- 230000002441 reversible effect Effects 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- YLQBMQCUIZJEEH-UHFFFAOYSA-N Furan Chemical compound C=1C=COC=1 YLQBMQCUIZJEEH-UHFFFAOYSA-N 0.000 description 2
- 230000001627 detrimental effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005755 formation reaction Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 239000011347 resin Substances 0.000 description 2
- 229920005989 resin Polymers 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 241000282472 Canis lupus familiaris Species 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 239000003463 adsorbent Substances 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 239000010425 asbestos Substances 0.000 description 1
- 239000006229 carbon black Substances 0.000 description 1
- 239000003610 charcoal Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 239000003595 mist Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 229910052895 riebeckite Inorganic materials 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000002904 solvent Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
- E21B41/0042—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches characterised by sealing the junction between a lateral and a main bore
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/06—Deflecting the direction of boreholes
- E21B7/061—Deflecting the direction of boreholes the tool shaft advancing relative to a guide, e.g. a curved tube or a whipstock
Definitions
- Horizontal wells have been used extensively in heterogeneous reservoirs to intersect fractures and/or to reduce the detrimental effects of gas coning and water coning. It has been shown that such wells are capable of higher oil production rates than vertical wells drilled in the same reservoir. In most cases, the higher productivity more than offsets the higher cost of drilling and completion of the horizontal well. Theory predicts that the use of multiple horizontal drainholes correspondingly multiplies the total well productivity. Indeed many vertical cased wells connected to twin or multiple horizontal drainholes of medium (500 ⁇ 200 ft) and short (150 ⁇ 40 ft) radius of curvature have been successfully used in compact oil reservoirs, such as the Austin Chalk, in which open hole completion of the drainholes is applicable.
- the present invention addresses the problem of drilling, cementation and tie-in by pressure-tight connections to a casing of twin or multiple drainholes of medium to short radius of curvature (typically 500 ft to 40 ft) equipped with liners of sufficient diameter to allow the passage of available well logging, perforating, cementing and cleaning tools, for subsequent well maintenance and repairs.
- a casing of twin or multiple drainholes of medium to short radius of curvature typically 500 ft to 40 ft
- liners of sufficient diameter to allow the passage of available well logging, perforating, cementing and cleaning tools, for subsequent well maintenance and repairs.
- the next step is to provide the means to bring up the reservoir fluids and/or to inject fluids from the surface into the reservoir through the drainhole liners.
- tubing completion assemblies may be used for these purposes.
- the simplest which allows only commingled flow from or into all drainholes simultaneously, does not even requires any additional equipment if vertical flow is through the casing, but it provides minimum operational flexibility and no safety controls. For these reasons, additional equipment (at least a properly sized production tubing or a kill string for safety, for instance, and often a hanger or a packer) will be used in the field.
- the tubing completion assembly which provides the greatest operational flexibility and safety is that which provides a direct connection of each drainhole separately to a tubing, thus leaving the casing/tubing annulus available for other uses.
- This is the type of tubing completion assembly which is included in the present invention. It also provides the means of implementing in this type of heterogeneous reservoirs the heavy oil recovery process and the injected steam quality conservation process described respectively in U.S. Pat. No. 4,706,751 and U.S. Pat. No. 5,085,275 using some of the equipment described in U.S. Pat. No. 5,052,482.
- the present invention does not preclude the use of the already known simpler completion designs, whenever they are sufficient for the application considered.
- Known elements of downhole equipment (valve nipple joints, safety joints, retrievable plugs, etc. . . ) may also be added, as needed, to the novel tubing completion assembly to perform specific additional tasks.
- the present invention includes equipment providing the means of pumping produced fluids and of injecting steam and/or other gases in such wells equipped with multiple drainholes completed with liners. Sand production being frequent in such reservoirs, the drainholes may be gravel packed or equipped with screens or subjected to known sand consolidation techniques.
- the desired well and drainholes configuration may be obtained either with entirely new wells or by re-entry into an existing vertical cased well, in which case the required equipment and procedures are somewhat different.
- FIG. 1 is a vertical cross section of the special casing joint with twin whipstocks used in Case 1 .
- FIG. 1a is a perspective drawing showing the base of the retrievable top whipstock of Case 1 .
- FIG. 1b is a vertical cross section showing the drainhole tie-in to the casing.
- FIG. 1c is a vertical cross section showing the tubing completion.
- FIG. 1 ld 1 d is a vertical cross section of an overshot-type tool used in case 1 .
- FIG. 2 and 2a are vertical cross sections showing schematically the successive phases of the operations required in Case 2 .
- FIG. 2b is a vertical cross section of the spherical seal union joint used in Case 2 and in subsequent cases.
- FIG. 2c is a schematic vertical cross section of a hydraulically operated tool for punching multiple slots into thin gauge liners.
- FIG. 2d is a schematic vertical cross section of the tubing completion assembly used in Case 2 .
- FIG. 3 is a vertical cross section of a special casing joint equipped with a drillable packer and retrievable whipstock for drilling and completion of the side-tracked hole of Case 3 .
- FIG. 3a is a vertical cross section of an intermediate liner.
- FIG. 3b is a vertical cross section of the deviated cased well and side-tracked hole of Case 3 .
- FIG. 3c is a vertical cross-section of the overshot-type tool used in Case 3 .
- FIG. 4 is a vertical cross section showing the special casing joint with its stub extended and cemented in the reamed cavity of Case 4 .
- FIG. 4a is a vertical cross section showing connection to the stubs by means of articulated connector tubes.
- FIG. 4b is a schematic flow diagram showing the connection to the stubs by means of telescopic connector tubes.
- FIG. 4c and 4d are vertical cross sections showing telescopic connector tubes respectively in the retracted and in the extended positions.
- FIG. 4e is a schematic vertical cross section showing the tubing completion assembly for two pairs of stacked drainholes in Case 4 .
- FIG. 5a, 5 b and 5 c are schematic vertical cross sections of a well and twin drainholes, showing different possible pump locations.
- FIG. 6 is a schematic vertical cross section of a well and two drainholes, showing the various fluid levels in the reservoir.
- FIG. 6a is a schematic diagram showing the operation of the periodic gas purging system.
- FIG. 6b is a cross section of the permselective plug and venturi used for continuous gas purging.
- FIG. 7 is a vertical cross section of the tubing completion assembly used for dual pumps in Case 7 .
- FIG. 8 and 8a are vertical cross sections of the tubing completion assembly used for Case 8 , with the well tie-in configuration of Case 1 .
- FIG. 9 and 9a are vertical cross sections of the special casing insert of Case 1 a and 3 a respectively.
- FIG. 10 is a vertical cross section of the special casing patch with telescopic stubs used in Case 4 a.
- FIG. 11 is a schematic vertical cross section of the novel casing patch used for side-tracking and cementing intermediate liners in case 4 a (second embodiment).
- FIG. 12 is a schematic vertical cross section of the tubing completion assembly including two articulated connector tubes for Case 8 a when an oil sump is used.
- FIG. 13 is a schematic vertical cross section of the upper part of the tubing completion assembly for “huff and puff” steam injection of Cases 8 or 8 a when dual pumps and a 4 string hanger are used.
- Case 1 a vertical well is drilled to a depth slightly greater than that of the common kick-off depth of the drainholes.
- the casing string is made-up by including a special joint immediately above the conventional casing shoe and float collar.
- This casing joint shown on FIG. 1 includes two elliptical windows ( 1 ) machined at the desired kick-off angle, typically about 2 degrees oriented downward from the vertical.
- These windows are plugged up with a drillable material (an Aluminum plate ( 2 ), for instance) machined to conform with the cylindrical surfaces of the casing.
- a twin whipstock ( 3 ) of hardened metal, is securely fastened to the casing joint, for instance by welding. It provides a curved guiding path from a guide plate above to each of the two plugged windows. For added strength, a portion of that curved guide may be partly filled with cement ( 4 ) or other drillable material.
- One of the smaller holes ( 7 ) in the guide plate ( 5 ) is threaded and extends to the whipstock base, to provide a flow path to the float collar and shoe below it.
- the work string will be stabbed into the threaded connection to inject the cement slurry into the float collar and shoe and from there into the annular space behind the casing.
- the other small cylindrical hole has a smooth bore. Its function is to receive one of the alignment pins ( 8 ) used to positions and latch a retrievable whipstock top which provides a continuation of the guiding path from one of the two large holes to the casing side.
- the combination of the permanent twin whipstock with its retrievable top provides a guide to the drainhole drilling bit through the machined window.
- a perspective view of the retrievable top whipstock showing its two alignment pins ( 8 ) is presented on FIG. 1 a.
- the same whipstock (top and bottom parts) guides the liner into the drainhole.
- the liner in the horizontal part, may be a slotted liner equipped with screens for gravel packing or it may be cemented and later selectively perforated. In all cases, however, the curved part of the liner is cemented using known procedures.
- the tail end of the liner is centered and hung into the open large vertical hole in the bottom whipstock (FIG. 1 b), by means of a known hydraulically-set hanger ( 9 ) equipped with dual sets of slips and pressure-setting seals.
- a polished bore receptacle 10
- the work string is disconnected, a recess in the top whipstock is latched into hooks in an overshot tool, pulled up and rotated by 180 degrees for presentation and insertion of the two alignment pins (or prongs) respectively into each alternate small hole in the permanent whipstock.
- the overshot tool is then released and pulled out.
- Drilling of the cement and plug in the second window now begins the drilling and liner cementing operations for the second drainhole, using the same procedures.
- the work string With the liner hung and sealed in the second large vertical hole in the permanent whipstock, the work string is disconnected from the second polished bore receptacle.
- the top whipstock is latched with an overshot tool and pulled out of the well. This completes the drainholes drilling and tie-in operations.
- Completion of the well is achieved by making up and running-in a tubing string consisting of dual tubing prongs ( 11 ) equipped with chevron seals ( 12 ) and connected to the lower ends of an inverted Y nipple joint ( 13 ).
- the chevron seals constitute the male mating parts of the two polished bore receptacles ( 10 ) previously installed.
- the upper branch of the inverted Y nipple joint ( 13 ) is connected to a conventional tubing hanger ( 14 ) which may be set hydraulically or by wireline.
- the tubing string ( 15 ) is oriented so as to stab the tubing prongs into the female parts of the two polished bore receptacles. After leak-testing of the sealed connections, the tubing hanger is set and the wellhead is nippled up using conventional equipment and procedures.
- artificial lift equipment may also be included in the tubing string, such as gas lift valves, diverter valves, a pump seat nipple, etc. . . in the manner which is familiar to those skilled in the art of oil well completion.
- Case 2 from a vertical cased well drilled and cemented by conventional techniques, the casing shoe is drilled out and two short (ca. 50 ft long) smaller diameter twin deviated holes are drilled through the bottom of the vertical well.
- This uses, for instance, a bit ( 16 ) driven by a downhole motor ( 17 ) connected to a bent sub ( 18 ), in the type of downhole assembly commonly used for drilling horizontal wells (see FIG. 2 ).
- each tailpipe ( 23 ) is fitted with a cup-type packer ( 24 ), which closes the annular space between liner and tailpipe during cement injection and displacement behind the liner, but opens during the reverse circulation of mud, for cleaning after the liners have been released from their respective latching tool.
- the cementing string with its two tailpipes is then pulled out.
- FIG. 2b shows in detail the spring-loaded spherical seal articulated joint ( 21 ).
- the vertical casing is thus tied-in and sealed to each intermediate liner over an overlap interval of about 10 ft. Entry to one of the liners is closed by a temporary plug set by wireline and drilling of a drainhole proceeds through the other intermediate liner, using a bit driven by a conventional downhole motor and bent sub assembly.
- a smaller diameter liner is run-in, hung into the lower part of the intermediate liner and cemented at least from the intermediate liner to the start of the horizontal segment of the drainhole.
- An alternate method is to use a coiled tubing as drill string and to abandon the bit and motor in the hole, prior to cementing it as a liner. Gravel packing and/or sand consolidation techniques may be used.
- the lower part of the liner may be slotted and equipped with screens. Otherwise, this part of the liner may be cemented and selectively perforated using known perforating guns.
- liner In view of the relatively small diameter of the liner (typically less than 2.5 in.), a thin-gauged coiled tubing is preferred as liner.
- the annular space behind the liner may be gravel packed first by displacement of a sand slurry, in direct circulation, followed by a reverse circulation of the sand slurry.
- a hydraulically actuated punching tool in which multiple articulated edge-cutting wheels ( 25 ) or punches are periodically pressed against the inner surface of the liner to punch slots into the coiled tubing liner, thus opening flow paths to the gravel packed annulus.
- FIG. 2c shows a schematic view of the hydraulic punching tool.
- Sand consolidation by injection of a suitable thermo-setting resin as a mist in a hot gas or steam or as a suspension or foam in a liquid may then be applied to the gravel pack and cross-linked to stabilize it, with minimum permeability reduction.
- FIG. 2 d Well completion is achieved by make-up, run-in and set of the production tubing string assembly, shown on FIG. 2 d. It consists of a tubing connected to:
- a conventional hanger 14
- an inverted Y nipple joint 13
- each of its two lower branches equipped with a spherical seal union joint ( 21 ) and a connector tube ( 26 ) equipped, near its end, with a conventional packer ( 27 ) of the type which can be set hydraulically or by wireline.
- each connector tube penetrates into the upper part of one of the cemented intermediate liners while rotating slightly around the articulation formed by its union joint.
- a spreader spring, ( 28 ) linked to the upper part of each articulated tube facilitates its insertion into the corresponding drainhole liner.
- Each of the packers is then set, to tie-in each articulated connector tube to its corresponding intermediate liner.
- the tubing hanger is then set and the well head nippled up.
- suitable known artificial lift equipment components may have been included in the tubing string, if it is expected that the well will not be flowing at an economic rate without gas-lift or pumping.
- Case 3 includes a special casing joint equipped with a drillable packer and retrievable whipstock for drilling and completion of a side- tracked hole.
- a vertical well is drilled, with its lower 50 ft deviated at the angle required to kick-off a horizontal drainhole and oriented in the direction selected for the drainholes.
- a special casing string is made-up, run-in and cemented by known techniques into the vertical and deviated portions of the hole. It consits of a shoe, a float collar and a special casing joint(FIG. 3 ) , see FIGS. 3a-3c, located at a depth slightly above that of the start of the hole deviation.
- This casing joint presents an elliptical window machined into the casing with a downward orientation of a few degrees from the vertical.
- the window ( 1 ) is again plugged off with a drillable plate ( 2 ) made, for instance, of a soft metal and shaped to generally conform with the casing surfaces.
- the plug is firmly attached to the casing by means of drillable fasteners ( 29 ) .
- Its orientation is also indicated by a vertical drillable key or groove ( 30 ) in the casing joint inner surface at or near its lower end.
- the string is rotated to orient the plugged window in the direction opposite to that of the deviated portion of the hole. This is done by marking the window direction on all the uphole joints of the casing, up to the rig floor.
- a whipstock drillable packer ( 31 ) is run-in and set below the special casing joint at a predetermined depth.
- a retrievable whipstock ( 32 ) is then oriented towards the plugged window, using the casing joint's orientation key or groove, fitted in a matching groove or key in the whipstock's outer cylindrical surface.
- the oriented whipstock presents a curved guiding surface which matches the depth, width and orientation of the window, so that a side-tracked hole ( 33 ) of diameter smaller than the casing ID may be kicked-off by drilling the window plug.
- the hollowed curve of the whipstock also presents a central alignment groove ( 34 ) corresponding to the lowest point of the elliptical window ( 1 ).
- the base of the whipstock is preferably equipped with a rubber cup for catching excess cement during later operations.
- an intermediate liner is run-in through the window and cemented by known techniques.
- the upper end of the liner has been machined as shown on FIG. 3a so as to conform with the inner edge of the window ( 1 ) and its edge is equipped with an elliptical collar ( 35 ) made of drillable metal, which conforms with the inner surface of the casing at the window's edge.
- the outer surface of the collar is covered with a rubber gasket or plastic sealing material ( 36 ) and the lowest part of the collar presents a key ( 37 ) which matches the central alignment groove ( 34 ) in the retrievable whipstock, so that the intermediate liner end may be oriented and guided to provide a closely fitting contact between the drillable elliptical collar and the casing window's edge.
- the intermediate liner is equipped with a cementing shoe and latched to a liner releasing tool equipped with a tailpipe and a cup-type packer for cementing by the same technique as in Case 2 .
- the outer saw-tooth grooves ( 38 ) of the whipstock are latched into an overshot tool equipped with a milling edge to drill out the elliptical collar ( 35 ) and the whipstock is pulled out.
- the supporting whipstock packer ( 31 ) is also drilled out and pulled out with the overshot milling tool, which also is equipped at its lower end with a suitable packer-latching device.
- Liner gravel packing, cementation and liner hanging respectively in the deviated casing and in the side-tracked intermediate liner may be done either as in Case 1 or as in Case 2 , depending upon the drainhole diameter.
- the drillable plugs closing the windows during run-in are located at the ends of telescopic liner stubs ( 39 ) oriented downward at the kick-off angle (typically 2 degrees).
- Each plugged stub is later hydraulically extended into an under-reamed portion ( 40 ) of the vertical hole filled with cement slurry during the casing cementation, to serve as guide for a bit driven by a downhole motor connected to a bent sub in a conventional drilling assembly.
- Each of these two stubs is supported during run-in and guided during its outwards extension by two tubular guides or cages made of drillable metal.
- One of them ( 41 ) is fixed, it is attached to the casing by drillable metal fasteners.
- the other ( 42 ) is mobile and slides within the fixed cage ( 41 ) over only half of the stub extension, while providing a cantilevered sliding internal support to the extended stub.
- the upper end of the stub is terminated by a drillable collar ( 35 ) and gasket ( 37 ) as in Case 3 .
- the elliptical casing window would be 200.6 in. by 7 in.
- the total stub extension length is about 286.6 in. and the stub maximum length is about 487.2 in. This is because both ends of the stub are machined to conform with the elliptical window, leaving in the middle a length of about 86 in. of tubular segment. This length is sufficient to provide tie-in both with the cemented drainhole liner and also with a connector tube linked to the tubing. With the vertical casing and extended stubs cemented, drilling of the extension guides and other internals leaves two 7 in.
- OD stubs as pockets from which to start drilling the drainholes, using the usual bent sub and downhole motor assembly including the navigation system for angle build up and directional control.
- the first step is to drill out the stub's end plug. After reaching total measured depth, a liner assembly is made-up and run-in through the stub. Gravel packing and cementing of the uphole liner proceed as in Case 1 . The upper end of the liner is centered and hung into the lower part of the stub. It is also terminated by the female part of a polished bore receptacle. The work string is disconnected from the polished bore receptacle and pulled out. The same operations are repeated for the second drainhole, leaving the well ready for tubing completion.
- the tubing completion assembly again includes a tubing hanger ( 14 ), an inverted Y nipple joint ( 13 ), two spherical seal union joints ( 21 ), each terminated by a connector tube stinger equipped with chevron seals ( 12 ).
- a bow spring ( 28 ) between the two stingers facilitates their entry into the stubs where they are mated with their respective polished bore receptacle ( 10 ).
- the tubing hanger is set and the well head nippled up, as in Case 3 .
- the bow spring may be compressed during run-in and released by a suitable wireline tool when reaching the proper insertion depth for the connector tubes.
- connection of the tubing to the drainholes is by means of telescopic connector tubes ( 43 ). These are located in cylindrical cavities ( 44 ), connected to the two vertical lower branches of the inverted Y nipple joint ( 13 ) at the kick-off angle.
- the lower end of each connector tube ( 43 ) is equipped with chevron seals ( 12 ), supplemented in some cases by an end to end spherical metal/metal seal ( 45 ).
- the connector tube is locked into its extended position, but may be retracted inside the cylinder body by shearing off the latch pins ( 46 ) with a wireline tool as shown in FIG. 4d, when it is necessary to disconnect and pull out the tubing for a well work-over.
- the upper end of the body ( 44 ) is equipped with dogs which bite into the inner surface of the casing when the telescopic connector tube is fully extended and pressed against the bottom of the polished bore receptacle. It will be apparent to those skilled in the art that this is only one of many possible ways of achieving both a spring-loaded metal/metal seal and anchoring in the extended position of the telescopic tube while providing means for its eventual retraction and pull out.
- the invention is not limited to the example described herein.
- the casing includes two special joints of the type used in Case 3 , located one above the other, separated by an interval sufficient for setting a packer and the two plugged windows oriented in opposite directions.
- a drillable whipstock packer is set below one of the windows.
- the retrievable whipstock is latched into the packer and drilling of the window and side-tracked hole proceeds.
- a short intermediate liner as in Case 3 , is run-in through the window and cemented.
- the procedure repeated for both windows, leaves two side-tracked intermediate liners from which the drainholes are drilled, and their liners are hung and cemented. After drilling out the drillable elliptical collar of each cemented intermediate liner, the entire casing space is available for installing the tubing completion assembly.
- the commingled production from all drainholes may be discharged into an oil sump formed by the casing below a production packer and pumped to the surface through a single production tubing.
- the pump location in the tubing may be above the packer, or below it in a tailpipe tubing extension.
- the tubing completion assembly may also be the same as in Cases 2 and 3 , which provide a continuous path from the surface to each of two twin drainholes, and greater operational flexibility.
- tubing completion assemblies including telescopic connector tubes or articulated connector tubes, described above for two stacked drainholes, are also applicable to more than two stacked drainholes. If the drainholes are grouped by pairs, connected to a single production tubing, the number of parallel tubes in the casing at any depth is reduced to only three, as shown on FIG. 4 e. These are:
- This number may be increased to four if the hydraulic or jet pump is located below the top pair of drainholes and if the tubing carrying the power fluid to the pump is parallel with the production tubing, but the number of possible stacked drainholes, which is only limited by the casing length, may be much greater.
- a packer must be added to the tubing hanger, a diverter valve must be included in the tubing above the packer to convey the production stream to the annulus and a plug must be located in the tubing between the open diverter valve and the bottom gas-lift valve.
- the commingled production stream from both drainholes may be pumped to the surface through the tubing or through the annulus using known types of pumps. These can be mechanically actuated by sucking rods, by rotating rods (progressive cavity pumps) or they can be actuated hydraulically. Jet pumps may also be used as well as electrically driven submersible pumps. Pump selection criteria and the importance of an optimum depth of the pump in the well are well known from those skilled in the art.
- the pump may be anchored either in the tubing or in the annulus, depending upon reservoir and well conditions, including the need to handle gas or sand production.
- reservoir energy may be insufficient to convey the production stream up to a pump or gas lift valve located above the kick-off points of the drainholes.
- the difference in elevation between such a pump and the fluids entry points in the horizontal part of the drainholes is greater than the drainholes radius of curvature, which may be up to 500 ft.
- flow from each drainhole may be directed to an oil sump ( 50 ), with the pump taking suction at or near the bottom of the sump. See FIG. 6 b.
- the top of the sump is closed by a packer ( 51 ) a short distance above the highest kick-off point. It constitutes the apex of a kind of syphon (see FIG. 6 6 b) for each drainhole.
- the flowing pressure at that point may still be well above the bubble point of the production stream, so that the risk of cavitation and break-up of the de-celerating liquid stream at that point is much less than it would be in a pump at the same location.
- the flowing pressure at the apex, plus the liquid head in the sump provide a pump suction pressure exceeding the minimum NPSH required, thus eliminating the risk of cavitation in the bottom pump.
- an intermittent flow gas lift system may also be used for the same purpose.
- a gas piston lifts an oil slug up the tubing after the standing valve at the bottom has closed. This is equivalent to a beam pump, but more tolerant of sand production.
- the threaded small hole is also extended above with the female part of a polished bore receptacle to later receive a tubing stinger equipped with chevron seals, so as to extend the tailpipe upwards by a production tubing through a sealing connection.
- the smooth bore second small hole is drilled through the bottom whipstock, to provide a flow path for the produced fluids into the oil sump below it. It may be supplemented with other small holes to provide a sufficiently large cross section for the low velocity liquid flow in the downward leg of the syphon.
- the polished bore receptacles terminating the cemented drainhole liners may be omitted, the large vertical holes providing a natural guide for inserting logging or cleaning tools into the liners.
- tubing completion assembly is modified to consist of:
- a dual string production packer with a retrievable plug in its short string.
- the main purpose of that string is to provide eventual access to the sump for inserting logging or cleaning tools into the drainholes below the packer.
- a secondary purpose of the short string is to provide a pump by-pass flow path which may be periodically opened to let any gas accumulation below the packer escape upwards by buoyancy, while re-filling the sump with de-gassed liquid from above the packer to maintain continuity of the liquid stream through the syphon. Periodic gas purging operations may be automatically controlled from the surface.
- the retrievable plug in the short string is in fact a conventional wireline retrievable subsurface safety valve (FIG.
- Detection means may be direct, using known liquid level sensors or indirect, by continuous monitoring of the pump efficiency.
- Continuous gas purging may otherwise be obtained by using a wireline plug including a permselective membrane ( 52 ), which allows continuous diffusional gas migration upwards, under a gas pressure gradient across the membrane, created by a retrievable venturi ( 53 ), located at the exit of the production tubing into the larger cross section of the casing annular space. The membrane also prevents liquid flow downwards (see FIG. 6 b).
- the energy supplied to the pump serves three purposes:
- Suitable permselective plug materials include, but are not limited to: charcoal, agglomerated carbon black, compressed powdered mineral adsorbents, asbestos felt, etc. . .
- the long string in the dual string packer, extends below the packer with a stinger equipped with chevron seals which is stabbed into the polished bore receptacle threaded into the top of the small hole ( 7 ) of the modified novel casing joint, thus providing a connection from the production tubing to the tailpipe, in which a pump is set.
- a rod string or a power fluid tubing string is then inserted from the surface within the production tubing and connected to the pump.
- the flow from both drainholes is discharged into the sump below the packer and flows downwards through one or several holes in the whipstock, to reach the pump inlet at the bottom of the tailpipe, to be discharged, at a higher pressure, into the production tubing and from it to the casing annulus leading to the surface.
- the packer may be omitted if the production tubing extends to the surface, so that any gas coming out of solution at the apex of the syphon freely accumulates in the casing/tubing annulus, forming a low pressure gas cap extending up to the casing head. Gas purging of the casing to maintain the gas cap at the required low pressure is then accomplished through a conventional gas re-mixing valve at the surface, upstream of the low pressure separator inlet.
- the casing now extends below the special joint (or joints) to form the oil sump.
- the tubing completion assembly is the same as above: a production tubing, a dual string packer with its short string temporarily plugged off and the production tubing extending below the packer, with a bottom pump.
- each drainhole In low pressure reservoirs containing relatively high GOR oil, the risk of cavitation at the apex of the syphon may be too great, so that the use of a syphon is no longer possible. In some very heterogeneous reservoirs, it is also possible that the productivity indices of the two drainholes are widely different. In those cases, it is preferable to equip each drainhole with its own pump sized to maximize total oil production. The same is true if one of the drainholes is more prone to gas coning or water coning than the other.
- a pump anchor nipple joint is included in the liner string, at the selected depth in the curved portion of each drainhole.
- the production tubing diameter must be increased to provide space inside it for the power fluid tubing strings or for the rotating rod strings.
- Another alternative is to insert the power fluid tubing or the rotating rod string into the drainhole liner through a side entry in each of the lower branches of the inverted Y nipple joint. In that case (see FIG.
- a short conduit ( 54 ) leads from the top of the tubing hanger (or packer) to the side entry point to facilitate the insertion of the power fluid tubing or rod string from the annulus space into the drainhole liner. This requires corresponding modifications of the Y nipple joint ( 13 ) and of the tubing hanger ( 14 ), or packer ( 51 ).
- a downhole three-way retrievable valve of the type described and claimed in U.S. Pat. No. 5,052,482 is required in each lower tubing branch below the inverted Y nipple joint. This is done (FIG. 8 and 8a) by adding a valve nipple joint ( 55 ) in each branch with its control hydraulic line ( 56 ), strapped on the outer surface of the insulated steam tubing ( 57 ).
- the valve In its axial full opening position, the valve conveys steam from the tubing to the corresponding drainhole. In its side opening position, the valve discharges the production stream from the drainhole liner into the casing annulus space. From there, the produced fluid may be pumped to the surface or gas-lifted.
- the pump is hung in the annulus casing/steam tubing, above the kick-off points.
- the pump may be located at the bottom of an oil sump as in Case 6 or it may be located within each drainhole liner as in Case 7 .
- the tubing completion will be modified accordingly, as will be shown later.
- the type of pump used in that case must allow easy disconnection from its seat, when the drainhole is switched from the production mode to the injection mode. For this reason, jet pumps, hydraulic pumps and progressive cavity pumps are preferred in that case.
- the packer may be a three or four string packer, depending upon the location of the inverted Y nipple joint with respect to the packer. With the Y nipple joint below the packer, only three strings are connected to the bottom face of the packer:the upper branch of the Y, the production tubing extending into the oil sump and the short string with its retrievable plug.
- the inverted Y nipple joint is located above a four string packer, in which two of the strings are connected to the lower branches of the inverted Y, the third string is connected to the production tubing extending into the oil sump and the fourth string is the temporarily plugged-off pump by-pass.
- the production tubing may end just above the packer without reaching the surface, if the production stream flows through the casing/steam tubing annulus.
- the cost of drilling and cementing the vertical cased well is a large portion of the total cost of a well presenting the general configurations described above.
- Re-entry into an existing cased well for drilling, gravel-packing, cementation and liner tie-in of multiple drainholes is a cost-effective way of increasing productivity.
- the absence of a pre-established window in the casing string may be remedied by milling a side-track window using available tapered mills guided by the novel retrievable whipstock latched in a drillable whipstock packer set slightly above the deviation depth.
- the procedures and equipment, other than the special casing joint, are then the same as in Case 3 , provided that known downhole orientation surveying methods are used to remedy the absence of pre-determined alignment keys or grooves in the casing.
- Case 1 may be used if a twin whipstock insert of diameter less than the drift diameter of the existing casing is run-in, hung in the casing and cemented at the selected depth above a plug permanently set in the casing.
- the oriented insert (FIG. 9 ), is held by a known packer/hanger ( 58 ) set hydraulically or by wireline tools.
- the hanger's slips are preferably located in the lower part of the insert below the drainholes so as to avoid any interference with them.
- elliptical windows will be milled in the existing casing using tapered mills guided by the twin whipstock ( 3 ).
- the hanger slips are located above the twin whipstock, so that the casing may be entirely milled over the depth interval of the windows, covered by the twin whipstock ( 3 ).
- the existing casing is milled out and the hole is under-reamed to a diameter of about 30 in. over the depth intervals corresponding respectively to each drainhole start.
- a casing patch is then run-in and fastened to the casing by means of hanger slips ( 59 ) above and below the lower milled-out interval. This embodiment is shown on FIG. 10 .
- the casing patch presents close similarities with the special casing joint of Case 4 , except that its outside diameter must be less than the drift diameter of the existing casing and that its outer surface, opposite the plugged telescopic stub ( 39 ) is now covered by an external rubber packer ( 60 ), which, when inflated with cement slurry entirely fills the reamed cavity.
- a suitable device including shearing disks also allows to inject the cement slurry in the two overlap ( 61 ) annular spaces between casing and casing patch hangers ( 14 ) above and below the cement-filled bladder, during the hydraulically-controlled extension of the stub into the slurry filling the rubber bladder.
- the stub ( 39 ) is supported and guided during its extension by a fixed guiding cage ( 41 ) and a mobile inner guide ( 42 ) which penetrates only half way outside the casing.
- Added support and guidance is also provided by several cables ( 62 ) attached to the rubber wall and pulled under hydraulically-controlled tension from a drillable drum ( 63 ) through inclined holes ( 64 ) in the casing patch wall, at various locations around the machined edge of the elliptical window ( 1 ) through which the stub is extended.
- the taught cables provide additional guidance and support to the stub ( 39 ) in its fully extended position.
- the drillable guides and the tail-end drillable collar ( 35 ) of the stub are drilled-out after the cement has set. This restores the vertical cased well to a diameter equal to that of the casing patch drift diameter.
- a second casing patch is run-in, oriented, hung and cemented, with full extension of the second stub into the upper reamed interval, thus providing the start for the second drainhole.
- Drilling, gravel packing, liner hanging and cementing procedures for both drainholes are identical with those of Case 4 .
- the tubing completion assembly equipment and procedures are also the same.
- Case 4 in which tie-in of the drainholes is by means of intermediate liners inserted and cemented in side-tracked holes drilled through elliptical windows by guiding the bit with a retrievable whipstock set in a drillable whipstock packer may also be adapted.
- the absence of pre-established windows plugged with drillable metal may be remedied in several ways.
- the first method calls for milling each elliptical window into the existing casing with a tapered mill guided by a suitable retrievable whipstock.
- the whipstock required to mill the lowest window and to drill and complete the lowest drainhole is set and oriented in a packer, as in Case 2 a.
- the whipstocks used to mill the other windows may then be stacked, each into the adjacent lower whipstock and oriented with respect to it by inserting into it multiple prongs, in a way similar to that used for the top whipstock of Case 1 .
- the order in which stacked holes are drilled and completed may be either from the bottom up or from the top down.
- the supporting packer is released after completion of each hole or drainhole and successively reset and re-oriented at a different depth for each of the other holes or drainholes.
- the whipstocks are handled by appropriate overshot latching tools, preferably equipped with end milling cutters to remove any protruding obstruction.
- the second method again uses a special casing patch, shown on FIG. 11, with an open elliptical window ( 65 ).
- the casing patch is set in the casing by slips above and below an interval over which the casing was milled out.
- the casing patch includes a pre-oriented whipstock packer ( 31 ) in its lower part. It may also be run-in with the retrievable whipstock ( 32 ) already in place.
- the drilling bit and drill string, guided by the whipstock through the open elliptical window are used to drill the side-tracked hole and operations continue as in Case 4 .
- the existing casing with its perforations plugged off, constitutes the oil sump required as the downwards leg of the syphon (see FIG. 11 ).
- the production tubing must extend to the bottom of the sump, where the pump is located, as in Case 6 .
- Drilling, gravel packing, tie-in and cementing of the drainholes may be obtained by any of the methods described in Cases 1 a, 2 a, and 4 a.
- the twin whipstock used in Case la includes a flow-through hole connected to a tail pipe ( 66 ) equipped with a pump receiver nipple joint ( 67 ) at the bottom.
- the upper face of the hole also serves to receive one of the alignment pins ( 8 ) of the retrievable top whipstock.
- This hole is also terminated by a polished bore receptacle ( 10 ) in which the production tubing stinger, equipped with chevron seals, will be stabbed prior to setting the packer, as in Case 6 .
- the production tubing assembly is the same as in Case 7 . It can be used with any of the well configurations resulting from the drainhole drilling and tie-in methods of Cases 1 a, 2 a and 4 a.
- the tubing completion assembly is similar to that in Case 8 . (see FIG. 12 ).
- all the drilling and tie-in methods of Cases 1 a, 2 a and 4 a are applicable, provided that the inside diameter of the insert or casing patch is sufficient to accomodate two drainhole tubing strings below the packer, when the pump is located above the packer, and three tubing strings when pumping is through a syphon.
- valve nipple joints ( 55 ), connected to the lower branches of the Y are then below the hanger, so their hydraulic control lines ( 56 ) also pass through and extend below the hanger ( 14 ).
- the one located in the injection drainhole is pulled out of its seat (e. g. a progressive cavity pump) or pumped out (e. g. a casing-free type jet pump) prior to switching the drainhole to the injection mode.
- a progressive cavity pump e. g. a progressive cavity pump
- pumped out e. g. a casing-free type jet pump
- Each type of pump is actuated through its own side entry conduit The side entry of the rod string or that of the power fluid tubing is always located below the valve nipple, so as not to interfere with the valve operation while unseating the pump.
- the power fluid pumped from the surface through a single tubing stabbed into a receptacle above the hanger is also fed to the pumps in all drainhole liners by means of twin conduits leading respectively to each of the two side entry points. It is through those conduits that smaller power fluid tubings are inserted into the drainhole liners, with a pump linked to each of them.
- the production stream from each drainhole, mixed with the spent power fluid is then discharged into the annulus between liner and power fluid tubing to ultimately reach the casing annulus where it is commingled with that of the other drainholes and conveyed to the surface.
- valve nipples When the the Y nipple joint is above the hanger, the valve nipples may then also be above the hanger, together with their control lines.
- the two lower branches of the Y and the corresponding two side entry conduits require that a 4 string hanger be used.
- tubing completion assembly may be run-in and set in the casing in a single trip, even in the most complex configurations of Cases 8 or 8 a.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
Description
Claims (102)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/871,813 USRE38642E1 (en) | 1993-01-04 | 2001-06-04 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US07/814,585 US5462120A (en) | 1993-01-04 | 1993-01-04 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US08/861,457 USRE37867E1 (en) | 1993-01-04 | 1997-05-22 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US09/871,813 USRE38642E1 (en) | 1993-01-04 | 2001-06-04 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US07814585 Reissue | 1991-12-30 |
Publications (1)
Publication Number | Publication Date |
---|---|
USRE38642E1 true USRE38642E1 (en) | 2004-11-02 |
Family
ID=25215487
Family Applications (7)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US07/814,585 Ceased US5462120A (en) | 1993-01-04 | 1993-01-04 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US08/861,457 Expired - Lifetime USRE37867E1 (en) | 1993-01-04 | 1997-05-22 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US09/824,738 Expired - Lifetime USRE38636E1 (en) | 1993-01-04 | 2001-04-04 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical oil wells connected to liner-equipped multiple drainholes |
US09/871,813 Ceased USRE38642E1 (en) | 1993-01-04 | 2001-06-04 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US09/944,115 Expired - Lifetime USRE38616E1 (en) | 1993-01-04 | 2001-09-04 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US09/956,806 Expired - Lifetime USRE39141E1 (en) | 1993-01-04 | 2001-09-21 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US11/038,005 Expired - Lifetime USRE40067E1 (en) | 1993-01-04 | 2005-04-08 | Downhole equipment tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
Family Applications Before (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US07/814,585 Ceased US5462120A (en) | 1993-01-04 | 1993-01-04 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US08/861,457 Expired - Lifetime USRE37867E1 (en) | 1993-01-04 | 1997-05-22 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US09/824,738 Expired - Lifetime USRE38636E1 (en) | 1993-01-04 | 2001-04-04 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical oil wells connected to liner-equipped multiple drainholes |
Family Applications After (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/944,115 Expired - Lifetime USRE38616E1 (en) | 1993-01-04 | 2001-09-04 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US09/956,806 Expired - Lifetime USRE39141E1 (en) | 1993-01-04 | 2001-09-21 | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US11/038,005 Expired - Lifetime USRE40067E1 (en) | 1993-01-04 | 2005-04-08 | Downhole equipment tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
Country Status (1)
Country | Link |
---|---|
US (7) | US5462120A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040182579A1 (en) * | 2002-05-02 | 2004-09-23 | Halliburton Energy Services, Inc. | Expanding wellbore junction |
US20050173112A1 (en) * | 2004-02-05 | 2005-08-11 | Kadir Kavaklioglu | Annulus plugging detection using a pressure transmitter in gas-lift oil production |
US8291974B2 (en) | 1998-11-20 | 2012-10-23 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US8297350B2 (en) | 1998-11-20 | 2012-10-30 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface |
US8333245B2 (en) | 2002-09-17 | 2012-12-18 | Vitruvian Exploration, Llc | Accelerated production of gas from a subterranean zone |
US8376052B2 (en) | 1998-11-20 | 2013-02-19 | Vitruvian Exploration, Llc | Method and system for surface production of gas from a subterranean zone |
US8376039B2 (en) | 1998-11-20 | 2013-02-19 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US8434568B2 (en) | 1998-11-20 | 2013-05-07 | Vitruvian Exploration, Llc | Method and system for circulating fluid in a well system |
US9513241B2 (en) | 2010-12-23 | 2016-12-06 | Schlumberger Technology Corporation | Systems and methods for interpreting multi-phase fluid flow data |
US9587460B2 (en) * | 2013-05-16 | 2017-03-07 | Halliburton Energy Services, Inc. | System and method for deploying a casing patch |
US20200232289A1 (en) * | 2019-01-23 | 2020-07-23 | Cameron International Corporation | System and methodology utilizing conductor sharing offset shoe |
Families Citing this family (173)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5655602A (en) * | 1992-08-28 | 1997-08-12 | Marathon Oil Company | Apparatus and process for drilling and completing multiple wells |
US6202752B1 (en) | 1993-09-10 | 2001-03-20 | Weatherford/Lamb, Inc. | Wellbore milling methods |
US5887655A (en) * | 1993-09-10 | 1999-03-30 | Weatherford/Lamb, Inc | Wellbore milling and drilling |
US5887668A (en) * | 1993-09-10 | 1999-03-30 | Weatherford/Lamb, Inc. | Wellbore milling-- drilling |
US5836387A (en) | 1993-09-10 | 1998-11-17 | Weatherford/Lamb, Inc. | System for securing an item in a tubular channel in a wellbore |
US6070665A (en) * | 1996-05-02 | 2000-06-06 | Weatherford/Lamb, Inc. | Wellbore milling |
US5787978A (en) * | 1995-03-31 | 1998-08-04 | Weatherford/Lamb, Inc. | Multi-face whipstock with sacrificial face element |
US5826651A (en) | 1993-09-10 | 1998-10-27 | Weatherford/Lamb, Inc. | Wellbore single trip milling |
WO1996023953A1 (en) * | 1995-02-03 | 1996-08-08 | Integrated Drilling Services Limited | Multiple drain drilling and production apparatus |
US5803176A (en) | 1996-01-24 | 1998-09-08 | Weatherford/Lamb, Inc. | Sidetracking operations |
US6056056A (en) * | 1995-03-31 | 2000-05-02 | Durst; Douglas G. | Whipstock mill |
US5584350A (en) * | 1995-09-22 | 1996-12-17 | Weatherford U.S., Inc. | Wellbore sidetracking methods |
US5697445A (en) * | 1995-09-27 | 1997-12-16 | Natural Reserves Group, Inc. | Method and apparatus for selective horizontal well re-entry using retrievable diverter oriented by logging means |
US5715891A (en) * | 1995-09-27 | 1998-02-10 | Natural Reserves Group, Inc. | Method for isolating multi-lateral well completions while maintaining selective drainhole re-entry access |
US5941308A (en) * | 1996-01-26 | 1999-08-24 | Schlumberger Technology Corporation | Flow segregator for multi-drain well completion |
US6283216B1 (en) | 1996-03-11 | 2001-09-04 | Schlumberger Technology Corporation | Apparatus and method for establishing branch wells from a parent well |
US6732801B2 (en) | 1996-03-11 | 2004-05-11 | Schlumberger Technology Corporation | Apparatus and method for completing a junction of plural wellbores |
US6056059A (en) | 1996-03-11 | 2000-05-02 | Schlumberger Technology Corporation | Apparatus and method for establishing branch wells from a parent well |
US5944107A (en) * | 1996-03-11 | 1999-08-31 | Schlumberger Technology Corporation | Method and apparatus for establishing branch wells at a node of a parent well |
US6155349A (en) | 1996-05-02 | 2000-12-05 | Weatherford/Lamb, Inc. | Flexible wellbore mill |
US6547006B1 (en) | 1996-05-02 | 2003-04-15 | Weatherford/Lamb, Inc. | Wellbore liner system |
US5833003A (en) | 1996-07-15 | 1998-11-10 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
AU719919B2 (en) | 1996-07-15 | 2000-05-18 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
CA2210563C (en) | 1996-07-15 | 2004-03-02 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
AU714721B2 (en) | 1996-07-15 | 2000-01-06 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
CA2209958A1 (en) | 1996-07-15 | 1998-01-15 | James M. Barker | Apparatus for completing a subterranean well and associated methods of using same |
US5813465A (en) | 1996-07-15 | 1998-09-29 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
US5730221A (en) | 1996-07-15 | 1998-03-24 | Halliburton Energy Services, Inc | Methods of completing a subterranean well |
NO313763B1 (en) | 1996-07-15 | 2002-11-25 | Halliburton Energy Serv Inc | Method of re-establishing access to a wellbore and guide member for use in forming an opening in a wellbore |
US5862862A (en) | 1996-07-15 | 1999-01-26 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
WO1998009049A1 (en) * | 1996-08-30 | 1998-03-05 | Camco International, Inc. | Method and apparatus to seal a junction between a lateral and a main wellbore |
GB9619951D0 (en) * | 1996-09-25 | 1996-11-13 | Red Baron Oil Tools Rental | Improvements in and relating to formation of laterals |
US6012527A (en) * | 1996-10-01 | 2000-01-11 | Schlumberger Technology Corporation | Method and apparatus for drilling and re-entering multiple lateral branched in a well |
US5806614A (en) * | 1997-01-08 | 1998-09-15 | Nelson; Jack R. | Apparatus and method for drilling lateral wells |
US6079493A (en) * | 1997-02-13 | 2000-06-27 | Halliburton Energy Services, Inc. | Methods of completing a subterranean well and associated apparatus |
US6065209A (en) * | 1997-05-23 | 2000-05-23 | S-Cal Research Corp. | Method of fabrication, tooling and installation of downhole sealed casing connectors for drilling and completion of multi-lateral wells |
CA2293427C (en) * | 1997-06-09 | 2003-09-30 | Phillips Petroleum Company | System for drilling and completing multilateral wells |
MY122241A (en) * | 1997-08-01 | 2006-04-29 | Shell Int Research | Creating zonal isolation between the interior and exterior of a well system |
US6283208B1 (en) * | 1997-09-05 | 2001-09-04 | Schlumberger Technology Corp. | Orienting tool and method |
US6138756A (en) * | 1998-01-09 | 2000-10-31 | Halliburton Energy Services, Inc. | Milling guide having orientation and depth determination capabilities |
US6062306A (en) * | 1998-01-27 | 2000-05-16 | Halliburton Energy Services, Inc. | Sealed lateral wellbore junction assembled downhole |
US6035937A (en) * | 1998-01-27 | 2000-03-14 | Halliburton Energy Services, Inc. | Sealed lateral wellbore junction assembled downhole |
US6092602A (en) * | 1998-01-27 | 2000-07-25 | Halliburton Energy Services, Inc. | Sealed lateral wellbore junction assembled downhole |
US6009949A (en) * | 1998-01-27 | 2000-01-04 | Halliburton Energy Services, Inc. | Apparatus and methods for sealing a wellbore junction |
US6065543A (en) * | 1998-01-27 | 2000-05-23 | Halliburton Energy Services, Inc. | Sealed lateral wellbore junction assembled downhole |
US6119771A (en) * | 1998-01-27 | 2000-09-19 | Halliburton Energy Services, Inc. | Sealed lateral wellbore junction assembled downhole |
US6073697A (en) * | 1998-03-24 | 2000-06-13 | Halliburton Energy Services, Inc. | Lateral wellbore junction having displaceable casing blocking member |
CA2235865C (en) * | 1998-04-23 | 2004-05-25 | Dresser Industries, Inc. | High torque pressure sleeve for easily drillable casing exit ports |
NO981998D0 (en) * | 1998-05-04 | 1998-05-04 | Henning Hansen | Method of multi-phase sealing borehole plugging used for hydrocarbon production or injection of downhole liquids or exploratory boreholes |
US6135208A (en) * | 1998-05-28 | 2000-10-24 | Halliburton Energy Services, Inc. | Expandable wellbore junction |
US6182760B1 (en) * | 1998-07-20 | 2001-02-06 | Union Oil Company Of California | Supplementary borehole drilling |
US7357188B1 (en) | 1998-12-07 | 2008-04-15 | Shell Oil Company | Mono-diameter wellbore casing |
US6557640B1 (en) * | 1998-12-07 | 2003-05-06 | Shell Oil Company | Lubrication and self-cleaning system for expansion mandrel |
US6745845B2 (en) * | 1998-11-16 | 2004-06-08 | Shell Oil Company | Isolation of subterranean zones |
US6823937B1 (en) | 1998-12-07 | 2004-11-30 | Shell Oil Company | Wellhead |
US6209648B1 (en) | 1998-11-19 | 2001-04-03 | Schlumberger Technology Corporation | Method and apparatus for connecting a lateral branch liner to a main well bore |
US6708764B2 (en) | 2002-07-12 | 2004-03-23 | Cdx Gas, L.L.C. | Undulating well bore |
US6425448B1 (en) | 2001-01-30 | 2002-07-30 | Cdx Gas, L.L.P. | Method and system for accessing subterranean zones from a limited surface area |
US6679322B1 (en) | 1998-11-20 | 2004-01-20 | Cdx Gas, Llc | Method and system for accessing subterranean deposits from the surface |
US6598686B1 (en) | 1998-11-20 | 2003-07-29 | Cdx Gas, Llc | Method and system for enhanced access to a subterranean zone |
US6681855B2 (en) | 2001-10-19 | 2004-01-27 | Cdx Gas, L.L.C. | Method and system for management of by-products from subterranean zones |
US6662870B1 (en) | 2001-01-30 | 2003-12-16 | Cdx Gas, L.L.C. | Method and system for accessing subterranean deposits from a limited surface area |
US6186233B1 (en) * | 1998-11-30 | 2001-02-13 | Weatherford Lamb, Inc. | Down hole assembly and method for forming a down hole window and at least one keyway in communication with the down hole window for use in multilateral wells |
US7240728B2 (en) | 1998-12-07 | 2007-07-10 | Shell Oil Company | Expandable tubulars with a radial passage and wall portions with different wall thicknesses |
AU770359B2 (en) | 1999-02-26 | 2004-02-19 | Shell Internationale Research Maatschappij B.V. | Liner hanger |
US6070717A (en) * | 1999-04-09 | 2000-06-06 | Superior Merchandise Company Inc. | Point of sale display box and kit |
GB2365047B (en) * | 1999-04-19 | 2003-08-27 | Schlumberger Technology Corp | Dual diverter and orientation device for multilateral completions and method |
GC0000136A (en) | 1999-08-09 | 2005-06-29 | Shell Int Research | Multilateral wellbore system. |
US6374924B2 (en) * | 2000-02-18 | 2002-04-23 | Halliburton Energy Services, Inc. | Downhole drilling apparatus |
WO2001066901A1 (en) * | 2000-03-06 | 2001-09-13 | Schlumberger Technology Corporation | Deflecting tool including millable or drillable plug and method of use |
US6454006B1 (en) * | 2000-03-28 | 2002-09-24 | Halliburton Energy Services, Inc. | Methods and associated apparatus for drilling and completing a wellbore junction |
GB2395215B (en) * | 2000-03-28 | 2004-11-03 | Halliburton Energy Serv Inc | Methods and associated apparatus for drilling and completing a wellbore junction |
GB2363142B (en) * | 2000-05-22 | 2004-11-10 | Smith International | Downhole lateral completion system |
US6712144B2 (en) * | 2000-08-28 | 2004-03-30 | Frank's International, Inc. | Method for drilling multilateral wells with reduced under-reaming and related device |
US20020023754A1 (en) * | 2000-08-28 | 2002-02-28 | Buytaert Jean P. | Method for drilling multilateral wells and related device |
US6543553B2 (en) | 2001-01-29 | 2003-04-08 | Chevron Nigeria Limited | Apparatus for use in drilling oil and gas production wells or water injection wells |
GB2390386B (en) * | 2001-02-16 | 2004-10-20 | Charles M Helms | High tensile loading top entry sub and method |
US7039502B2 (en) * | 2001-03-12 | 2006-05-02 | Berwanger, Inc. | Risk assessment for relief pressure system |
US7775290B2 (en) | 2003-04-17 | 2010-08-17 | Enventure Global Technology, Llc | Apparatus for radially expanding and plastically deforming a tubular member |
WO2004081346A2 (en) | 2003-03-11 | 2004-09-23 | Enventure Global Technology | Apparatus for radially expanding and plastically deforming a tubular member |
US6904797B2 (en) * | 2001-12-19 | 2005-06-14 | Schlumberger Technology Corporation | Production profile determination and modification system |
US7506690B2 (en) * | 2002-01-09 | 2009-03-24 | Terry Earl Kelley | Enhanced liquid hydrocarbon recovery by miscible gas injection water drive |
US7478674B2 (en) * | 2002-02-25 | 2009-01-20 | Baker Hughes Incorporated | System and method for fracturing and gravel packing a wellbore |
US6883611B2 (en) * | 2002-04-12 | 2005-04-26 | Halliburton Energy Services, Inc. | Sealed multilateral junction system |
EP1985796B1 (en) | 2002-04-12 | 2012-05-16 | Enventure Global Technology | Protective sleeve for threated connections for expandable liner hanger |
CA2482278A1 (en) | 2002-04-15 | 2003-10-30 | Enventure Global Technology | Protective sleeve for threaded connections for expandable liner hanger |
US6725922B2 (en) | 2002-07-12 | 2004-04-27 | Cdx Gas, Llc | Ramping well bores |
US9366086B2 (en) | 2002-08-30 | 2016-06-14 | Technology Ventures International Limited | Method of forming a bore |
US9347272B2 (en) | 2002-08-30 | 2016-05-24 | Technology Ventures International Limited | Method and assembly for forming a supported bore using a first and second drill bit |
US7730965B2 (en) * | 2002-12-13 | 2010-06-08 | Weatherford/Lamb, Inc. | Retractable joint and cementing shoe for use in completing a wellbore |
EP1552271A1 (en) | 2002-09-20 | 2005-07-13 | Enventure Global Technology | Pipe formability evaluation for expandable tubulars |
US6840321B2 (en) | 2002-09-24 | 2005-01-11 | Halliburton Energy Services, Inc. | Multilateral injection/production/storage completion system |
US6951252B2 (en) * | 2002-09-24 | 2005-10-04 | Halliburton Energy Services, Inc. | Surface controlled subsurface lateral branch safety valve |
US6863126B2 (en) | 2002-09-24 | 2005-03-08 | Halliburton Energy Services, Inc. | Alternate path multilayer production/injection |
CA2504247C (en) * | 2002-11-11 | 2009-03-10 | Baker Hughes Incorporated | A method and apparatus for creating a cemented lateral junction system |
US7104332B2 (en) * | 2002-11-11 | 2006-09-12 | Baker Hughes Incorporated | Method and apparatus for creating a cemented lateral junction system |
US7886831B2 (en) | 2003-01-22 | 2011-02-15 | Enventure Global Technology, L.L.C. | Apparatus for radially expanding and plastically deforming a tubular member |
USRE42877E1 (en) | 2003-02-07 | 2011-11-01 | Weatherford/Lamb, Inc. | Methods and apparatus for wellbore construction and completion |
US6915847B2 (en) * | 2003-02-14 | 2005-07-12 | Schlumberger Technology Corporation | Testing a junction of plural bores in a well |
US6932168B2 (en) * | 2003-05-15 | 2005-08-23 | Cnx Gas Company, Llc | Method for making a well for removing fluid from a desired subterranean formation |
US7712522B2 (en) | 2003-09-05 | 2010-05-11 | Enventure Global Technology, Llc | Expansion cone and system |
US20050103497A1 (en) * | 2003-11-17 | 2005-05-19 | Michel Gondouin | Downhole flow control apparatus, super-insulated tubulars and surface tools for producing heavy oil by steam injection methods from multi-lateral wells located in cold environments |
US7159661B2 (en) * | 2003-12-01 | 2007-01-09 | Halliburton Energy Services, Inc. | Multilateral completion system utilizing an alternate passage |
US20050121190A1 (en) * | 2003-12-08 | 2005-06-09 | Oberkircher James P. | Segregated deployment of downhole valves for monitoring and control of multilateral wells |
US7131497B2 (en) * | 2004-03-23 | 2006-11-07 | Specialty Rental Tools & Supply, Lp | Articulated drillstring entry apparatus and method |
US7278497B2 (en) * | 2004-07-09 | 2007-10-09 | Weatherford/Lamb | Method for extracting coal bed methane with source fluid injection |
US7490668B2 (en) * | 2004-08-05 | 2009-02-17 | Halliburton Energy Services, Inc. | Method for designing and constructing a well with enhanced durability |
GB2432866A (en) | 2004-08-13 | 2007-06-06 | Enventure Global Technology | Expandable tubular |
US20050051326A1 (en) * | 2004-09-29 | 2005-03-10 | Toothman Richard L. | Method for making wells for removing fluid from a desired subterranean |
CA2538196C (en) | 2005-02-28 | 2011-10-11 | Weatherford/Lamb, Inc. | Deep water drilling with casing |
CA2610369A1 (en) * | 2005-04-21 | 2006-11-02 | Baker Hughes Incorporated | Lateral control system |
US8443890B2 (en) * | 2006-01-04 | 2013-05-21 | Halliburton Energy Services, Inc. | Methods of stimulating liquid-sensitive subterranean formations |
US8056619B2 (en) | 2006-03-30 | 2011-11-15 | Schlumberger Technology Corporation | Aligning inductive couplers in a well |
US7712524B2 (en) * | 2006-03-30 | 2010-05-11 | Schlumberger Technology Corporation | Measuring a characteristic of a well proximate a region to be gravel packed |
US7793718B2 (en) | 2006-03-30 | 2010-09-14 | Schlumberger Technology Corporation | Communicating electrical energy with an electrical device in a well |
US7735555B2 (en) * | 2006-03-30 | 2010-06-15 | Schlumberger Technology Corporation | Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly |
CA2651966C (en) | 2006-05-12 | 2011-08-23 | Weatherford/Lamb, Inc. | Stage cementing methods used in casing while drilling |
US8276689B2 (en) | 2006-05-22 | 2012-10-02 | Weatherford/Lamb, Inc. | Methods and apparatus for drilling with casing |
DE102007016823A1 (en) * | 2007-04-05 | 2008-11-06 | Tracto-Technik Gmbh & Co. Kg | Drilling System |
EP2065554B1 (en) * | 2007-11-30 | 2014-04-02 | Services Pétroliers Schlumberger | System and method for drilling and completing lateral boreholes |
EP2065553B1 (en) | 2007-11-30 | 2013-12-25 | Services Pétroliers Schlumberger | System and method for drilling lateral boreholes |
US7909118B2 (en) * | 2008-02-01 | 2011-03-22 | Rudy Sanfelice | Apparatus and method for positioning extended lateral channel well stimulation equipment |
US9260921B2 (en) | 2008-05-20 | 2016-02-16 | Halliburton Energy Services, Inc. | System and methods for constructing and fracture stimulating multiple ultra-short radius laterals from a parent well |
US7703524B2 (en) * | 2008-05-21 | 2010-04-27 | Halliburton Energy Services, Inc. | Cutting windows for lateral wellbore drilling |
US7726401B2 (en) * | 2008-05-21 | 2010-06-01 | Halliburton Energy Services, Inc. | Casing exit joint with easily milled, low density barrier |
US8397819B2 (en) * | 2008-11-21 | 2013-03-19 | Bruce Tunget | Systems and methods for operating a plurality of wells through a single bore |
US20100084140A1 (en) * | 2008-10-06 | 2010-04-08 | Baker Hughes Incorporated | Downhole seal and anchor releasing system and method |
US9777554B2 (en) * | 2008-11-21 | 2017-10-03 | Bruce Tunget | Systems and methods for operating a plurality of wells through a single bore |
GB0910779D0 (en) * | 2009-06-23 | 2009-08-05 | Tunget Bruce A | Large volume low temperature well structure |
US8430187B2 (en) * | 2009-02-27 | 2013-04-30 | Conocophillips Company | Directional sidetrack well drilling system |
US9371694B2 (en) * | 2009-06-08 | 2016-06-21 | Conocophillips Company | Permanent bypass whipstock assembly for drilling and completing a sidetrack well and preserving access to the original wellbore |
WO2010150010A2 (en) * | 2009-06-23 | 2010-12-29 | Bruce Arnold Tunget | Apparatus and methods for forming and using subterranean salt cavern |
US8839850B2 (en) * | 2009-10-07 | 2014-09-23 | Schlumberger Technology Corporation | Active integrated completion installation system and method |
CN101800000B (en) * | 2009-10-30 | 2011-08-03 | 中国石油天然气股份有限公司 | Multi-angle horizontal branch well natural gas exploitation simulator |
US8376054B2 (en) * | 2010-02-04 | 2013-02-19 | Halliburton Energy Services, Inc. | Methods and systems for orienting in a bore |
US20110192596A1 (en) * | 2010-02-07 | 2011-08-11 | Schlumberger Technology Corporation | Through tubing intelligent completion system and method with connection |
US8505621B2 (en) * | 2010-03-30 | 2013-08-13 | Halliburton Energy Services, Inc. | Well assembly with recesses facilitating branch wellbore creation |
US8371368B2 (en) * | 2010-03-31 | 2013-02-12 | Halliburton Energy Services, Inc. | Well assembly with a millable member in an opening |
US9234613B2 (en) | 2010-05-28 | 2016-01-12 | Halliburton Energy Services, Inc. | Well assembly coupling |
US8505622B1 (en) | 2010-09-09 | 2013-08-13 | Robert Harris | Conical deflection wedge system for oil and gas wells and the method of use thereof |
CN102242614A (en) * | 2011-07-19 | 2011-11-16 | 中国石油天然股份有限公司 | Coaxial double-layer gas injection well mouth device |
CN102278101B (en) * | 2011-08-31 | 2014-07-23 | 中国石油化工股份有限公司 | Subdivided layer watered oil extraction pipe column |
US9249559B2 (en) | 2011-10-04 | 2016-02-02 | Schlumberger Technology Corporation | Providing equipment in lateral branches of a well |
US9091159B2 (en) * | 2011-12-08 | 2015-07-28 | Fccl Partnership | Process and well arrangement for hydrocarbon recovery from bypassed pay or a region near the reservoir base |
US9644476B2 (en) | 2012-01-23 | 2017-05-09 | Schlumberger Technology Corporation | Structures having cavities containing coupler portions |
US9175560B2 (en) | 2012-01-26 | 2015-11-03 | Schlumberger Technology Corporation | Providing coupler portions along a structure |
US9938823B2 (en) | 2012-02-15 | 2018-04-10 | Schlumberger Technology Corporation | Communicating power and data to a component in a well |
CN102536187A (en) * | 2012-02-24 | 2012-07-04 | 中国石油大学(北京) | Switchable hydraulic jet fracturing underground device with combined slide sleeves |
US10036234B2 (en) | 2012-06-08 | 2018-07-31 | Schlumberger Technology Corporation | Lateral wellbore completion apparatus and method |
WO2014007809A1 (en) * | 2012-07-03 | 2014-01-09 | Halliburton Energy Services, Inc. | Method of intersecting a first well bore by a second well bore |
US20150218886A1 (en) | 2012-08-13 | 2015-08-06 | Matthew A. Dawson | Penetrating A Subterranean Formation |
CN102852504A (en) * | 2012-09-13 | 2013-01-02 | 中国石油天然气股份有限公司 | Multi-layer fracturing tool string for vertical well immovable pipe column |
CN102943650B (en) * | 2012-10-10 | 2015-07-29 | 中国石油集团长城钻探工程有限公司 | A kind of Multilateral Wells divides the instrument of adopting and construction technology thereof |
CN105443056B (en) * | 2014-08-27 | 2018-11-16 | 中国石油天然气股份有限公司 | Separate injection method for water injection well |
BR112017019578B1 (en) | 2015-04-30 | 2022-03-15 | Halliburton Energy Services, Inc | Downhole control method and downhole completion apparatus |
US10487629B2 (en) | 2015-04-30 | 2019-11-26 | Halliburton Energy Services, Inc. | Remotely-powered casing-based intelligent completion assembly |
CN104879098B (en) * | 2015-06-12 | 2017-10-13 | 中国海洋石油总公司 | A kind of concentric double pipe gas well liquid loading tubing string |
CN106761642B (en) * | 2016-12-21 | 2019-08-02 | 中国石油天然气股份有限公司 | Vertical well fixed-point multistage fracturing method and application |
CN108487879B (en) * | 2017-12-20 | 2024-09-24 | 东营市昌瑞石油机械配件有限责任公司 | Oil layer protection well-flushing packer |
CN110552628A (en) * | 2018-05-31 | 2019-12-10 | 思达斯易能源技术(集团)有限公司 | Drilling device, stimulation string with drilling device and using method |
US10724322B2 (en) * | 2018-08-01 | 2020-07-28 | Weatherford Technology Holdings, Llc | Apparatus and method for forming a lateral wellbore |
CN110439496B (en) * | 2019-08-16 | 2020-09-08 | 江苏卫东机械有限公司 | Double-base double-well casing head device |
NO20220575A1 (en) * | 2019-12-10 | 2022-05-12 | Halliburton Energy Services Inc | A method for high-pressure access through a multilateral junction |
CN111852455B (en) * | 2020-08-27 | 2023-08-01 | 中石化绿源地热能(陕西)开发有限公司 | High-temperature high-pressure self-injection geothermal well killing device and method |
CN112900912B (en) * | 2021-01-23 | 2022-08-19 | 北京新兴保信建设工程有限公司 | Glue injection filling device of assembly type building |
WO2022177802A1 (en) * | 2021-02-22 | 2022-08-25 | Conocophillips Company | Method and apparatus for making a lateral well |
CN115142822A (en) * | 2021-03-30 | 2022-10-04 | 中国石油化工股份有限公司 | Multi-branch horizontal well cementing and completion method and tool |
US12006775B2 (en) * | 2021-04-23 | 2024-06-11 | Halliburton Energy Services, Inc. | Extensible transition joint for control line protection |
US11591870B1 (en) | 2021-09-02 | 2023-02-28 | Saudi Arabian Oil Company | Methods and apparatuses for gaining reentry below abandoned packers |
WO2023164276A2 (en) * | 2022-02-28 | 2023-08-31 | Ur-Energy USA Inc. | System and method of using a thermoplastic casing in a wellbore |
US12012854B2 (en) * | 2022-11-16 | 2024-06-18 | Saudi Arabian Oil Company | Sidetrack casing assembly for drilling sidetrack wellbores |
US20240183231A1 (en) * | 2022-12-06 | 2024-06-06 | Forum Us, Inc. | Casing shoe assembly |
CN117107180B (en) * | 2023-10-24 | 2023-12-19 | 天津君诚管道实业集团有限公司 | Galvanization process for photovoltaic bracket production |
Citations (111)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1507717A (en) | 1923-05-31 | 1924-09-09 | John L Rich | Process for extracting petroleum by underground workings |
US1520737A (en) | 1924-04-26 | 1924-12-30 | Robert L Wright | Method of increasing oil extraction from oil-bearing strata |
US1734033A (en) | 1929-07-01 | 1929-11-05 | Wilfred H Geis | Device for orientating whipstocks |
US1735012A (en) | 1926-10-05 | 1929-11-12 | Rich John Lyon | Process and means for extracting petroleum |
US1804819A (en) | 1928-05-02 | 1931-05-12 | Jr Edward A Spencer | Side wall drilling organization |
US1816260A (en) * | 1930-04-05 | 1931-07-28 | Lee Robert Edward | Method of repressuring and flowing of wells |
US1900164A (en) | 1932-07-05 | 1933-03-07 | Dana Drexler | Method and apparatus for drilling oil wells |
US1900163A (en) | 1931-05-02 | 1933-03-07 | Dana Drexler | Method and apparatus for drilling oil wells |
US1901454A (en) | 1929-11-01 | 1933-03-14 | Laurence C Kelly | Method of cementing whipstocks in well bores |
US1923448A (en) | 1930-10-17 | 1933-08-22 | Blackwell And Sunde Inc | Whipstock |
US2043225A (en) | 1935-07-05 | 1936-06-09 | Arthur L Armentrout | Method and apparatus for testing the productivity of the formation in wells |
US2058327A (en) | 1935-05-14 | 1936-10-20 | Edward K Lane | Whipstock |
US2118650A (en) | 1934-05-14 | 1938-05-24 | Lee Angular Drill Corp | Well drilling mechanism |
US2147537A (en) | 1936-08-22 | 1939-02-14 | George A Lowrey | Method of completing wells |
US2155129A (en) | 1938-01-18 | 1939-04-18 | Elwin B Hall | Drillable well liner |
US2164266A (en) | 1938-02-16 | 1939-06-27 | Security Engineering Co Inc | Method and apparatus for producing fluid from wells |
US2171416A (en) | 1937-02-23 | 1939-08-29 | Lee Angular Drill Corp | Method of treating a producing formation |
US2173035A (en) | 1938-02-16 | 1939-09-12 | Security Engineering Co Inc | Method of sidetracking wells |
US2198016A (en) | 1938-08-18 | 1940-04-23 | James C Rogers | Lateral drill mechanism |
US2205119A (en) | 1939-04-17 | 1940-06-18 | Security Engineering Co Inc | Method of setting drillable liners in wells |
US2211803A (en) | 1939-08-07 | 1940-08-20 | Wallace A Warburton | Method and equipment for multiple whipstock drilling and lining |
US2271005A (en) | 1939-01-23 | 1942-01-27 | Dow Chemical Co | Subterranean boring |
US2281414A (en) | 1940-11-07 | 1942-04-28 | Continental Oil Co | Combined bridge plug and drilable whipstock |
US2281801A (en) | 1938-12-20 | 1942-05-05 | Joseph H Reynolds | Method of and means for pumping wells |
US2297029A (en) | 1940-01-02 | 1942-09-29 | Lane Wells Co | Whipstocking sleeve for drillable liners |
US2324682A (en) | 1941-03-26 | 1943-07-20 | Fohs Oil Company | Side wall coring tool |
US2331293A (en) | 1941-11-05 | 1943-10-12 | Sperry Sun Well Surveying Co | Whipstock |
US2386514A (en) | 1942-06-11 | 1945-10-09 | Reed Roller Bit Co | Side hole coring device |
US2397070A (en) * | 1944-05-10 | 1946-03-19 | John A Zublin | Well casing for lateral bores |
US2404341A (en) | 1944-06-15 | 1946-07-16 | John A Zublin | Method of producing oil and retaining gas through deviating bores |
US2434239A (en) | 1944-06-15 | 1948-01-06 | John A Zublin | Method of producing oil |
US2452920A (en) | 1945-07-02 | 1948-11-02 | Shell Dev | Method and apparatus for drilling and producing wells |
US2456331A (en) | 1944-05-02 | 1948-12-14 | Standard Oil Dev Co | Core barrel |
US2492079A (en) * | 1943-12-09 | 1949-12-20 | Eastman Oil Well Survey Co | Apparatus for completing wells |
US2642267A (en) | 1951-01-17 | 1953-06-16 | John A Zublin | Apparatus for initiating and drilling deviating curved bores from existing vertical wll bores |
US2669430A (en) * | 1951-11-06 | 1954-02-16 | John A Zublin | Apparatus for drilling deviating bores utilizing a plurality of straight tubular drill guide sections |
US2696264A (en) | 1951-10-15 | 1954-12-07 | Andrew J Colmerauer | Flexible well liner |
US2726847A (en) | 1952-03-31 | 1955-12-13 | Oilwell Drain Hole Drilling Co | Drain hole drilling equipment |
US2788956A (en) | 1955-08-03 | 1957-04-16 | Texas Co | Generation of carbon monoxide and hydrogen by underground gasification of coal |
US2797893A (en) | 1954-09-13 | 1957-07-02 | Oilwell Drain Hole Drilling Co | Drilling and lining of drain holes |
US2804926A (en) | 1953-08-28 | 1957-09-03 | John A Zublin | Perforated drain hole liner |
US2821362A (en) | 1955-07-26 | 1958-01-28 | Wayne A Jones | Extensible whipstock |
US2857002A (en) | 1956-03-19 | 1958-10-21 | Texas Co | Recovery of viscous crude oil |
US2858107A (en) | 1955-09-26 | 1958-10-28 | Andrew J Colmerauer | Method and apparatus for completing oil wells |
US3064729A (en) | 1959-12-08 | 1962-11-20 | Jersey Prod Res Co | Oil recovery method |
US3159214A (en) | 1961-06-05 | 1964-12-01 | Pan American Petroleum Corp | Method for injecting and recovering fluids from a formation |
US3223158A (en) | 1962-12-10 | 1965-12-14 | Socony Mobil Oil Co Inc | In situ retorting of oil shale |
US3285335A (en) | 1963-12-11 | 1966-11-15 | Exxon Research Engineering Co | In situ pyrolysis of oil shale formations |
US3330360A (en) | 1964-08-10 | 1967-07-11 | Otis Eng Co | Multiple zone producing apparatus |
US3330349A (en) * | 1964-09-11 | 1967-07-11 | Halliburton Co | Method and apparatus for multiple string completions |
US3354958A (en) * | 1965-10-14 | 1967-11-28 | Phillips Petroleum Co | Oil recovery using steam |
US3587743A (en) | 1970-03-17 | 1971-06-28 | Pan American Petroleum Corp | Explosively fracturing formations in wells |
US3842912A (en) | 1973-09-04 | 1974-10-22 | Mwl Tool & Supply Co | Method and apparatus for deep gas well completions |
US3938592A (en) | 1970-03-23 | 1976-02-17 | Ivan Timofeevich Aladiev | Rock-exploitation method based on thermodynamic cycles utilizing in-situ energy source |
US4007797A (en) | 1974-06-04 | 1977-02-15 | Texas Dynamatics, Inc. | Device for drilling a hole in the side wall of a bore hole |
US4022279A (en) | 1974-07-09 | 1977-05-10 | Driver W B | Formation conditioning process and system |
US4068729A (en) | 1976-06-14 | 1978-01-17 | Standard Oil Company (Indiana) | Apparatus for multiple wells through a single caisson |
US4099783A (en) | 1975-12-05 | 1978-07-11 | Vladimir Grigorievich Verty | Method for thermoshaft oil production |
US4153109A (en) | 1977-05-19 | 1979-05-08 | Baker International Corporation | Method and apparatus for anchoring whipstocks in well bores |
US4160481A (en) | 1977-02-07 | 1979-07-10 | The Hop Corporation | Method for recovering subsurface earth substances |
US4182423A (en) | 1978-03-02 | 1980-01-08 | Burton/Hawks Inc. | Whipstock and method for directional well drilling |
US4222611A (en) | 1979-08-16 | 1980-09-16 | United States Of America As Represented By The Secretary Of The Interior | In-situ leach mining method using branched single well for input and output |
SU787611A1 (en) | 1978-06-26 | 1980-12-15 | Долинское Управление Буровых Работ Производственного Объединения "Укрнефть" | Method of driving and casing a multibottom well |
US4249777A (en) | 1979-07-24 | 1981-02-10 | The United States Of America As Represented By The Secretary Of The Interior | Method of in situ mining |
US4258800A (en) | 1979-05-03 | 1981-03-31 | Petro-Drive, Inc. | Hinged conductor casing for deviated driving and method therefor |
US4279301A (en) | 1979-12-13 | 1981-07-21 | Texaco Inc. | Method for improving the effective permeability of formations |
US4285399A (en) | 1980-07-21 | 1981-08-25 | Baker International Corporation | Apparatus for setting and orienting a whipstock in a well conduit |
US4304299A (en) | 1980-07-21 | 1981-12-08 | Baker International Corporation | Method for setting and orienting a whipstock in a well conduit |
US4317492A (en) | 1980-02-26 | 1982-03-02 | The Curators Of The University Of Missouri | Method and apparatus for drilling horizontal holes in geological structures from a vertical bore |
US4396075A (en) * | 1981-06-23 | 1983-08-02 | Wood Edward T | Multiple branch completion with common drilling and casing template |
US4396230A (en) * | 1981-06-23 | 1983-08-02 | Wood Edward T | Multiple branch well containing one producer and one injector well |
US4397355A (en) | 1981-05-29 | 1983-08-09 | Masco Corporation | Whipstock setting method and apparatus |
US4397360A (en) | 1981-07-06 | 1983-08-09 | Atlantic Richfield Company | Method for forming drain holes from a cased well |
US4402551A (en) | 1981-09-10 | 1983-09-06 | Wood Edward T | Method and apparatus to complete horizontal drain holes |
US4415205A (en) * | 1981-07-10 | 1983-11-15 | Rehm William A | Triple branch completion with separate drilling and completion templates |
US4436165A (en) | 1982-09-02 | 1984-03-13 | Atlantic Richfield Company | Drain hole drilling |
US4444276A (en) | 1980-11-24 | 1984-04-24 | Cities Service Company | Underground radial pipe network |
US4489782A (en) * | 1983-12-12 | 1984-12-25 | Atlantic Richfield Company | Viscous oil production using electrical current heating and lateral drain holes |
US4519463A (en) | 1984-03-19 | 1985-05-28 | Atlantic Richfield Company | Drainhole drilling |
US4523652A (en) | 1983-07-01 | 1985-06-18 | Atlantic Richfield Company | Drainhole drilling assembly and method |
US4550781A (en) | 1984-06-06 | 1985-11-05 | A-Z International Tool Company | Method of and apparatus for cutting and recovering of submarine surface casing |
US4554982A (en) | 1984-08-03 | 1985-11-26 | Hydril Company | Apparatus for forming boreholes |
US4573541A (en) * | 1983-08-31 | 1986-03-04 | Societe Nationale Elf Aquitaine | Multi-drain drilling and petroleum production start-up device |
US4573540A (en) | 1984-11-19 | 1986-03-04 | Mobil Oil Corporation | Method for drilling deviated wellbores |
US4601353A (en) | 1984-10-05 | 1986-07-22 | Atlantic Richfield Company | Method for drilling drainholes within producing zone |
US4605076A (en) | 1984-08-03 | 1986-08-12 | Hydril Company | Method for forming boreholes |
US4646836A (en) | 1984-08-03 | 1987-03-03 | Hydril Company | Tertiary recovery method using inverted deviated holes |
US4696345A (en) | 1986-08-21 | 1987-09-29 | Chevron Research Company | Hasdrive with multiple offset producers |
US4714117A (en) | 1987-04-20 | 1987-12-22 | Atlantic Richfield Company | Drainhole well completion |
US4742871A (en) * | 1985-07-31 | 1988-05-10 | Societe Nationale Elf Aquitaine (Production) | Device for positioning a tool within a wellbore flow string |
US4771830A (en) | 1987-05-01 | 1988-09-20 | Schlumberger Technology Corp. | Apparatus for positioning well tools in deviated well bores |
US4807704A (en) | 1987-09-28 | 1989-02-28 | Atlantic Richfield Company | System and method for providing multiple wells from a single wellbore |
US4852666A (en) | 1988-04-07 | 1989-08-01 | Brunet Charles G | Apparatus for and a method of drilling offset wells for producing hydrocarbons |
US4928767A (en) | 1988-03-28 | 1990-05-29 | Baroid Technology, Inc. | Method and apparatus for setting and retrieving a deflection tool |
US5012877A (en) | 1989-11-30 | 1991-05-07 | Amoco Corporation | Apparatus for deflecting a drill string |
US5052482A (en) * | 1990-04-18 | 1991-10-01 | S-Cal Research Corp. | Catalytic downhole reactor and steam generator |
US5085275A (en) * | 1990-04-23 | 1992-02-04 | S-Cal Research Corporation | Process for conserving steam quality in deep steam injection wells |
US5109924A (en) | 1989-12-22 | 1992-05-05 | Baker Hughes Incorporated | One trip window cutting tool method and apparatus |
US5115872A (en) * | 1990-10-19 | 1992-05-26 | Anglo Suisse, Inc. | Directional drilling system and method for drilling precise offset wellbores from a main wellbore |
US5127457A (en) * | 1990-02-20 | 1992-07-07 | Shell Oil Company | Method and well system for producing hydrocarbons |
US5148877A (en) | 1990-05-09 | 1992-09-22 | Macgregor Donald C | Apparatus for lateral drain hole drilling in oil and gas wells |
US5289876A (en) | 1992-07-28 | 1994-03-01 | Natural Reserves Group, Inc. | Completing wells in incompetent formations |
US5301760A (en) | 1992-09-10 | 1994-04-12 | Natural Reserves Group, Inc. | Completing horizontal drain holes from a vertical well |
US5318122A (en) | 1992-08-07 | 1994-06-07 | Baker Hughes, Inc. | Method and apparatus for sealing the juncture between a vertical well and one or more horizontal wells using deformable sealing means |
US5318121A (en) | 1992-08-07 | 1994-06-07 | Baker Hughes Incorporated | Method and apparatus for locating and re-entering one or more horizontal wells using whipstock with sealable bores |
US5322127A (en) | 1992-08-07 | 1994-06-21 | Baker Hughes Incorporated | Method and apparatus for sealing the juncture between a vertical well and one or more horizontal wells |
US5325924A (en) | 1992-08-07 | 1994-07-05 | Baker Hughes Incorporated | Method and apparatus for locating and re-entering one or more horizontal wells using mandrel means |
US5337808A (en) | 1992-11-20 | 1994-08-16 | Natural Reserves Group, Inc. | Technique and apparatus for selective multi-zone vertical and/or horizontal completions |
US5353876A (en) | 1992-08-07 | 1994-10-11 | Baker Hughes Incorporated | Method and apparatus for sealing the juncture between a verticle well and one or more horizontal wells using mandrel means |
US5388648A (en) | 1993-10-08 | 1995-02-14 | Baker Hughes Incorporated | Method and apparatus for sealing the juncture between a vertical well and one or more horizontal wells using deformable sealing means |
GB2295840A (en) | 1994-12-06 | 1996-06-12 | Baker Hughes Inc | Method for multi-lateral completion and cementing the juncture with lateral wellbores |
Family Cites Families (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US702006A (en) * | 1900-08-09 | 1902-06-10 | James G Huffman | Well-casing and strainer. |
US698020A (en) * | 1901-09-03 | 1902-04-22 | James G Huffman | Method of making wells. |
US1660999A (en) * | 1926-10-04 | 1928-02-28 | James A Macdonell | Well-drilling apparatus |
US2032509A (en) * | 1935-04-27 | 1936-03-03 | Phillips Petroleum Co | Wellhole sampler |
US2178845A (en) * | 1936-10-10 | 1939-11-07 | Baker Oil Tools Inc | Safety circulation medium for well casings |
US2383496A (en) * | 1941-03-06 | 1945-08-28 | Nebolsine Ross | Method of and apparatus for installing lateral wells in fluidsaturable earth |
US2544601A (en) * | 1945-04-23 | 1951-03-06 | Myron M Kinley | Insert orifice and tool therefor |
US2504462A (en) * | 1948-03-24 | 1950-04-18 | Sprague Theodore | Apparatus for sealing oil wells |
US2707997A (en) * | 1952-04-30 | 1955-05-10 | Zandmer | Methods and apparatus for sealing a bore hole casing |
US2740476A (en) * | 1952-11-05 | 1956-04-03 | Ranney Method Water Supplies I | Method and apparatus for collecting water |
US2889137A (en) * | 1958-02-13 | 1959-06-02 | Robert K Walker | Apparatus for drilling laterals from well shafts |
US3120268A (en) * | 1960-02-19 | 1964-02-04 | Nat Petroleum Corp Ltd | Apparatus for providing ducts through casing in a well |
US3312284A (en) * | 1963-10-09 | 1967-04-04 | Aqua Ran Water Supplies Inc | Apparatus for cleaning infiltration type water collector |
US3301337A (en) * | 1964-05-05 | 1967-01-31 | Alpha Trace Inc | Apparatus for completing a well |
US3395758A (en) * | 1964-05-27 | 1968-08-06 | Otis Eng Co | Lateral flow duct and flow control device for wells |
US3390724A (en) * | 1966-02-01 | 1968-07-02 | Zanal Corp Of Alberta Ltd | Duct forming device with a filter |
US3419089A (en) * | 1966-05-20 | 1968-12-31 | Dresser Ind | Tracer bullet, self-sealing |
US3461977A (en) * | 1968-05-27 | 1969-08-19 | Harriet A Taggart | Casing perforating and screen plug setting device |
US3690380A (en) * | 1970-06-22 | 1972-09-12 | Donovan B Grable | Well apparatus and method of placing apertured inserts in well pipe |
US3826310A (en) * | 1973-01-18 | 1974-07-30 | Shell Oil Co | Plug-displaced sandpacking process |
US3918522A (en) * | 1974-01-28 | 1975-11-11 | Jr George O Suman | Well completion method and system |
US5038859A (en) | 1988-04-15 | 1991-08-13 | Tri-State Oil Tools, Inc. | Cutting tool for removing man-made members from well bore |
DE3832715A1 (en) * | 1988-09-27 | 1990-03-29 | Preussag Ag | Arrangement for producing a deflecting bore |
US5044432A (en) * | 1990-08-10 | 1991-09-03 | Fmc Corporation | Well pipe hanger with metal sealing annulus valve |
US5193616A (en) * | 1991-08-06 | 1993-03-16 | Cooper Industries, Inc. | Tubing hanger seal assembly |
US5224556A (en) * | 1991-09-16 | 1993-07-06 | Conoco Inc. | Downhole activated process and apparatus for deep perforation of the formation in a wellbore |
US5165478A (en) * | 1991-09-16 | 1992-11-24 | Conoco Inc. | Downhole activated process and apparatus for providing cathodic protection for a pipe in a wellbore |
US5311936A (en) * | 1992-08-07 | 1994-05-17 | Baker Hughes Incorporated | Method and apparatus for isolating one horizontal production zone in a multilateral well |
US5474131A (en) * | 1992-08-07 | 1995-12-12 | Baker Hughes Incorporated | Method for completing multi-lateral wells and maintaining selective re-entry into laterals |
-
1993
- 1993-01-04 US US07/814,585 patent/US5462120A/en not_active Ceased
-
1997
- 1997-05-22 US US08/861,457 patent/USRE37867E1/en not_active Expired - Lifetime
-
2001
- 2001-04-04 US US09/824,738 patent/USRE38636E1/en not_active Expired - Lifetime
- 2001-06-04 US US09/871,813 patent/USRE38642E1/en not_active Ceased
- 2001-09-04 US US09/944,115 patent/USRE38616E1/en not_active Expired - Lifetime
- 2001-09-21 US US09/956,806 patent/USRE39141E1/en not_active Expired - Lifetime
-
2005
- 2005-04-08 US US11/038,005 patent/USRE40067E1/en not_active Expired - Lifetime
Patent Citations (114)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1507717A (en) | 1923-05-31 | 1924-09-09 | John L Rich | Process for extracting petroleum by underground workings |
US1520737A (en) | 1924-04-26 | 1924-12-30 | Robert L Wright | Method of increasing oil extraction from oil-bearing strata |
US1735012A (en) | 1926-10-05 | 1929-11-12 | Rich John Lyon | Process and means for extracting petroleum |
US1804819A (en) | 1928-05-02 | 1931-05-12 | Jr Edward A Spencer | Side wall drilling organization |
US1734033A (en) | 1929-07-01 | 1929-11-05 | Wilfred H Geis | Device for orientating whipstocks |
US1901454A (en) | 1929-11-01 | 1933-03-14 | Laurence C Kelly | Method of cementing whipstocks in well bores |
US1816260A (en) * | 1930-04-05 | 1931-07-28 | Lee Robert Edward | Method of repressuring and flowing of wells |
US1923448A (en) | 1930-10-17 | 1933-08-22 | Blackwell And Sunde Inc | Whipstock |
US1900163A (en) | 1931-05-02 | 1933-03-07 | Dana Drexler | Method and apparatus for drilling oil wells |
US1900164A (en) | 1932-07-05 | 1933-03-07 | Dana Drexler | Method and apparatus for drilling oil wells |
US2118650A (en) | 1934-05-14 | 1938-05-24 | Lee Angular Drill Corp | Well drilling mechanism |
US2058327A (en) | 1935-05-14 | 1936-10-20 | Edward K Lane | Whipstock |
US2043225A (en) | 1935-07-05 | 1936-06-09 | Arthur L Armentrout | Method and apparatus for testing the productivity of the formation in wells |
US2147537A (en) | 1936-08-22 | 1939-02-14 | George A Lowrey | Method of completing wells |
US2171416A (en) | 1937-02-23 | 1939-08-29 | Lee Angular Drill Corp | Method of treating a producing formation |
US2155129A (en) | 1938-01-18 | 1939-04-18 | Elwin B Hall | Drillable well liner |
US2173035A (en) | 1938-02-16 | 1939-09-12 | Security Engineering Co Inc | Method of sidetracking wells |
US2164266A (en) | 1938-02-16 | 1939-06-27 | Security Engineering Co Inc | Method and apparatus for producing fluid from wells |
US2198016A (en) | 1938-08-18 | 1940-04-23 | James C Rogers | Lateral drill mechanism |
US2281801A (en) | 1938-12-20 | 1942-05-05 | Joseph H Reynolds | Method of and means for pumping wells |
US2271005A (en) | 1939-01-23 | 1942-01-27 | Dow Chemical Co | Subterranean boring |
US2205119A (en) | 1939-04-17 | 1940-06-18 | Security Engineering Co Inc | Method of setting drillable liners in wells |
US2211803A (en) | 1939-08-07 | 1940-08-20 | Wallace A Warburton | Method and equipment for multiple whipstock drilling and lining |
US2297029A (en) | 1940-01-02 | 1942-09-29 | Lane Wells Co | Whipstocking sleeve for drillable liners |
US2281414A (en) | 1940-11-07 | 1942-04-28 | Continental Oil Co | Combined bridge plug and drilable whipstock |
US2324682A (en) | 1941-03-26 | 1943-07-20 | Fohs Oil Company | Side wall coring tool |
US2331293A (en) | 1941-11-05 | 1943-10-12 | Sperry Sun Well Surveying Co | Whipstock |
US2386514A (en) | 1942-06-11 | 1945-10-09 | Reed Roller Bit Co | Side hole coring device |
US2492079A (en) * | 1943-12-09 | 1949-12-20 | Eastman Oil Well Survey Co | Apparatus for completing wells |
US2456331A (en) | 1944-05-02 | 1948-12-14 | Standard Oil Dev Co | Core barrel |
US2397070A (en) * | 1944-05-10 | 1946-03-19 | John A Zublin | Well casing for lateral bores |
US2434239A (en) | 1944-06-15 | 1948-01-06 | John A Zublin | Method of producing oil |
US2404341A (en) | 1944-06-15 | 1946-07-16 | John A Zublin | Method of producing oil and retaining gas through deviating bores |
US2452920A (en) | 1945-07-02 | 1948-11-02 | Shell Dev | Method and apparatus for drilling and producing wells |
US2642267A (en) | 1951-01-17 | 1953-06-16 | John A Zublin | Apparatus for initiating and drilling deviating curved bores from existing vertical wll bores |
US2696264A (en) | 1951-10-15 | 1954-12-07 | Andrew J Colmerauer | Flexible well liner |
US2669430A (en) * | 1951-11-06 | 1954-02-16 | John A Zublin | Apparatus for drilling deviating bores utilizing a plurality of straight tubular drill guide sections |
US2726847A (en) | 1952-03-31 | 1955-12-13 | Oilwell Drain Hole Drilling Co | Drain hole drilling equipment |
US2804926A (en) | 1953-08-28 | 1957-09-03 | John A Zublin | Perforated drain hole liner |
US2797893A (en) | 1954-09-13 | 1957-07-02 | Oilwell Drain Hole Drilling Co | Drilling and lining of drain holes |
US2821362A (en) | 1955-07-26 | 1958-01-28 | Wayne A Jones | Extensible whipstock |
US2788956A (en) | 1955-08-03 | 1957-04-16 | Texas Co | Generation of carbon monoxide and hydrogen by underground gasification of coal |
US2858107A (en) | 1955-09-26 | 1958-10-28 | Andrew J Colmerauer | Method and apparatus for completing oil wells |
US2857002A (en) | 1956-03-19 | 1958-10-21 | Texas Co | Recovery of viscous crude oil |
US3064729A (en) | 1959-12-08 | 1962-11-20 | Jersey Prod Res Co | Oil recovery method |
US3159214A (en) | 1961-06-05 | 1964-12-01 | Pan American Petroleum Corp | Method for injecting and recovering fluids from a formation |
US3223158A (en) | 1962-12-10 | 1965-12-14 | Socony Mobil Oil Co Inc | In situ retorting of oil shale |
US3285335A (en) | 1963-12-11 | 1966-11-15 | Exxon Research Engineering Co | In situ pyrolysis of oil shale formations |
US3330360A (en) | 1964-08-10 | 1967-07-11 | Otis Eng Co | Multiple zone producing apparatus |
US3330349A (en) * | 1964-09-11 | 1967-07-11 | Halliburton Co | Method and apparatus for multiple string completions |
US3354958A (en) * | 1965-10-14 | 1967-11-28 | Phillips Petroleum Co | Oil recovery using steam |
US3587743A (en) | 1970-03-17 | 1971-06-28 | Pan American Petroleum Corp | Explosively fracturing formations in wells |
US3938592A (en) | 1970-03-23 | 1976-02-17 | Ivan Timofeevich Aladiev | Rock-exploitation method based on thermodynamic cycles utilizing in-situ energy source |
US3842912A (en) | 1973-09-04 | 1974-10-22 | Mwl Tool & Supply Co | Method and apparatus for deep gas well completions |
US4007797A (en) | 1974-06-04 | 1977-02-15 | Texas Dynamatics, Inc. | Device for drilling a hole in the side wall of a bore hole |
US4022279A (en) | 1974-07-09 | 1977-05-10 | Driver W B | Formation conditioning process and system |
US4099783A (en) | 1975-12-05 | 1978-07-11 | Vladimir Grigorievich Verty | Method for thermoshaft oil production |
US4068729A (en) | 1976-06-14 | 1978-01-17 | Standard Oil Company (Indiana) | Apparatus for multiple wells through a single caisson |
US4160481A (en) | 1977-02-07 | 1979-07-10 | The Hop Corporation | Method for recovering subsurface earth substances |
US4153109A (en) | 1977-05-19 | 1979-05-08 | Baker International Corporation | Method and apparatus for anchoring whipstocks in well bores |
US4182423A (en) | 1978-03-02 | 1980-01-08 | Burton/Hawks Inc. | Whipstock and method for directional well drilling |
SU787611A1 (en) | 1978-06-26 | 1980-12-15 | Долинское Управление Буровых Работ Производственного Объединения "Укрнефть" | Method of driving and casing a multibottom well |
US4258800A (en) | 1979-05-03 | 1981-03-31 | Petro-Drive, Inc. | Hinged conductor casing for deviated driving and method therefor |
US4249777A (en) | 1979-07-24 | 1981-02-10 | The United States Of America As Represented By The Secretary Of The Interior | Method of in situ mining |
US4222611A (en) | 1979-08-16 | 1980-09-16 | United States Of America As Represented By The Secretary Of The Interior | In-situ leach mining method using branched single well for input and output |
US4279301A (en) | 1979-12-13 | 1981-07-21 | Texaco Inc. | Method for improving the effective permeability of formations |
US4317492A (en) | 1980-02-26 | 1982-03-02 | The Curators Of The University Of Missouri | Method and apparatus for drilling horizontal holes in geological structures from a vertical bore |
US4285399A (en) | 1980-07-21 | 1981-08-25 | Baker International Corporation | Apparatus for setting and orienting a whipstock in a well conduit |
US4304299A (en) | 1980-07-21 | 1981-12-08 | Baker International Corporation | Method for setting and orienting a whipstock in a well conduit |
US4444276A (en) | 1980-11-24 | 1984-04-24 | Cities Service Company | Underground radial pipe network |
US4397355A (en) | 1981-05-29 | 1983-08-09 | Masco Corporation | Whipstock setting method and apparatus |
US4396075A (en) * | 1981-06-23 | 1983-08-02 | Wood Edward T | Multiple branch completion with common drilling and casing template |
US4396230A (en) * | 1981-06-23 | 1983-08-02 | Wood Edward T | Multiple branch well containing one producer and one injector well |
US4397360A (en) | 1981-07-06 | 1983-08-09 | Atlantic Richfield Company | Method for forming drain holes from a cased well |
US4415205A (en) * | 1981-07-10 | 1983-11-15 | Rehm William A | Triple branch completion with separate drilling and completion templates |
US4402551A (en) | 1981-09-10 | 1983-09-06 | Wood Edward T | Method and apparatus to complete horizontal drain holes |
US4436165A (en) | 1982-09-02 | 1984-03-13 | Atlantic Richfield Company | Drain hole drilling |
US4523652A (en) | 1983-07-01 | 1985-06-18 | Atlantic Richfield Company | Drainhole drilling assembly and method |
US4573541A (en) * | 1983-08-31 | 1986-03-04 | Societe Nationale Elf Aquitaine | Multi-drain drilling and petroleum production start-up device |
US4489782A (en) * | 1983-12-12 | 1984-12-25 | Atlantic Richfield Company | Viscous oil production using electrical current heating and lateral drain holes |
US4519463A (en) | 1984-03-19 | 1985-05-28 | Atlantic Richfield Company | Drainhole drilling |
US4550781A (en) | 1984-06-06 | 1985-11-05 | A-Z International Tool Company | Method of and apparatus for cutting and recovering of submarine surface casing |
US4646836A (en) | 1984-08-03 | 1987-03-03 | Hydril Company | Tertiary recovery method using inverted deviated holes |
US4605076A (en) | 1984-08-03 | 1986-08-12 | Hydril Company | Method for forming boreholes |
US4554982A (en) | 1984-08-03 | 1985-11-26 | Hydril Company | Apparatus for forming boreholes |
US4601353A (en) | 1984-10-05 | 1986-07-22 | Atlantic Richfield Company | Method for drilling drainholes within producing zone |
US4573540A (en) | 1984-11-19 | 1986-03-04 | Mobil Oil Corporation | Method for drilling deviated wellbores |
US4742871A (en) * | 1985-07-31 | 1988-05-10 | Societe Nationale Elf Aquitaine (Production) | Device for positioning a tool within a wellbore flow string |
US4696345A (en) | 1986-08-21 | 1987-09-29 | Chevron Research Company | Hasdrive with multiple offset producers |
US4714117A (en) | 1987-04-20 | 1987-12-22 | Atlantic Richfield Company | Drainhole well completion |
US4771830A (en) | 1987-05-01 | 1988-09-20 | Schlumberger Technology Corp. | Apparatus for positioning well tools in deviated well bores |
US4807704A (en) | 1987-09-28 | 1989-02-28 | Atlantic Richfield Company | System and method for providing multiple wells from a single wellbore |
US4928767A (en) | 1988-03-28 | 1990-05-29 | Baroid Technology, Inc. | Method and apparatus for setting and retrieving a deflection tool |
US4852666A (en) | 1988-04-07 | 1989-08-01 | Brunet Charles G | Apparatus for and a method of drilling offset wells for producing hydrocarbons |
US5012877A (en) | 1989-11-30 | 1991-05-07 | Amoco Corporation | Apparatus for deflecting a drill string |
US5109924A (en) | 1989-12-22 | 1992-05-05 | Baker Hughes Incorporated | One trip window cutting tool method and apparatus |
US5127457A (en) * | 1990-02-20 | 1992-07-07 | Shell Oil Company | Method and well system for producing hydrocarbons |
US5052482A (en) * | 1990-04-18 | 1991-10-01 | S-Cal Research Corp. | Catalytic downhole reactor and steam generator |
US5085275A (en) * | 1990-04-23 | 1992-02-04 | S-Cal Research Corporation | Process for conserving steam quality in deep steam injection wells |
US5148877A (en) | 1990-05-09 | 1992-09-22 | Macgregor Donald C | Apparatus for lateral drain hole drilling in oil and gas wells |
US5115872A (en) * | 1990-10-19 | 1992-05-26 | Anglo Suisse, Inc. | Directional drilling system and method for drilling precise offset wellbores from a main wellbore |
US5289876A (en) | 1992-07-28 | 1994-03-01 | Natural Reserves Group, Inc. | Completing wells in incompetent formations |
US5318121A (en) | 1992-08-07 | 1994-06-07 | Baker Hughes Incorporated | Method and apparatus for locating and re-entering one or more horizontal wells using whipstock with sealable bores |
US5318122A (en) | 1992-08-07 | 1994-06-07 | Baker Hughes, Inc. | Method and apparatus for sealing the juncture between a vertical well and one or more horizontal wells using deformable sealing means |
US5322127A (en) | 1992-08-07 | 1994-06-21 | Baker Hughes Incorporated | Method and apparatus for sealing the juncture between a vertical well and one or more horizontal wells |
US5325924A (en) | 1992-08-07 | 1994-07-05 | Baker Hughes Incorporated | Method and apparatus for locating and re-entering one or more horizontal wells using mandrel means |
US5353876A (en) | 1992-08-07 | 1994-10-11 | Baker Hughes Incorporated | Method and apparatus for sealing the juncture between a verticle well and one or more horizontal wells using mandrel means |
US5322127C1 (en) | 1992-08-07 | 2001-02-06 | Baker Hughes Inc | Method and apparatus for sealing the juncture between a vertical well and one or more horizontal wells |
US5301760A (en) | 1992-09-10 | 1994-04-12 | Natural Reserves Group, Inc. | Completing horizontal drain holes from a vertical well |
US5301760C1 (en) | 1992-09-10 | 2002-06-11 | Natural Reserve Group Inc | Completing horizontal drain holes from a vertical well |
US5337808A (en) | 1992-11-20 | 1994-08-16 | Natural Reserves Group, Inc. | Technique and apparatus for selective multi-zone vertical and/or horizontal completions |
US5388648A (en) | 1993-10-08 | 1995-02-14 | Baker Hughes Incorporated | Method and apparatus for sealing the juncture between a vertical well and one or more horizontal wells using deformable sealing means |
GB2282835A (en) | 1993-10-08 | 1995-04-19 | Baker Hughes Inc | Method and apparatus for sealing the juncture between a vertical well and one or more horizontal wells using deformable sealing means |
GB2295840A (en) | 1994-12-06 | 1996-06-12 | Baker Hughes Inc | Method for multi-lateral completion and cementing the juncture with lateral wellbores |
Non-Patent Citations (214)
Title |
---|
A. Damgaard, D.S. Bangert, D.J. Murray, R.P. Rubbo and G.W. Stout, A Unique Method for Perforating, Fracturing and Competing Horizontal Wells, SPE 19282. |
A. Eddison and J. Symons, Downhole Adjustable Gauge Stabilizer Improves Drilling Efficiency in Directional Wells, SPE 20454, pp. 509-516. |
A. Spreux, A. Louis, M. Rocca, Logging Horizontal Wells-Field Practice for Various Techniques, SPE 16565, pp. 1-14. |
A.A. Gavignet and I.J. Sobey, A Model for the Transport of Cuttings in Highly Deviated Wells, SPE 15417. |
Ahmed, U., Horizontal Well Completion Recommendations Through Optimized Formation Evaluation, SPE 22992, Nov. 4, 1991, pp. 423-435. |
Alain Spreux, Christian Georges, and Jacques Lessi, Most Problems in Horizontal Completions Are Resolved, Technology, Oil & Gas Journal, Jun. 13, 1988, pp. 48-52. |
Andrew Gallup, B.L. Wilson and Robert Marshall, ESP's Placed in Horizontal Lateral Increase Production, Oil & Gas Journal, Jun. 18, 1990, pp. 56-60, 62-63. |
Anthony W. Gorody, TEDSI Develops Horizontal Drilling Technology, Oil & Gas Journal, Oct. 1, 1984, OGJ Report, pp. 118, 120, 125, 126. |
Bernhard Prevedel, Case History: How One Operator Drilled Horizontally Through a Salt Dome, World Oil, Dec. 1985, pp. 69, 73, 76, 80. |
Bruce Woodlan and G.E. Powell, Casing Design in Directionally Drilled Wells, SPE 5352, pp. 1-12. |
Butler, R.M., "A New Approach to the Modeling of Steam-Assisted Gravity Drainage," J.Cdn.Pet.Tech., May-Jun. 1985, pp. 417-421. |
C. Zurdo, C. Georges, and M. Martin, Mud and Cement for Horizontal Wells, SPE 15464. |
C.J. Perry, Directional Drilling with PDC Bits in the Gulf of Thailand, SPE 15616. |
C.M. Matthews and L.J. Dunn, Drilling and Production Practices to Mitigate Sucker Rod/Tubing Wear—Related Failures in Directional Wells, SPE 22852, pp. 363-374. |
C.W. White, Drilling and Completion of a Horizontal Lower Spraberry Well Including Multiple Hydraulic Fracture Treatments, SPE 19721, pp. 205-210. |
Cameron White and Mark Hopmann, Controlling Flow in Horizontal Wells, World Oil, Nov. 1991. |
Cameron White, Formation Characteristics Dictate Completion Design, Oil & Gas Journal, Dec. 3, 1990, pp. 58-62, 64. |
Carl W. Stang, Alternative Electronic Logging Technique Locates Fractures in Austin Chalk Horizontal Well, Oil & Gas Journal, Nov. 6, 1989, Technology, pp. 42-45. |
Cementing of Horizontal Wells, Horizontal Well Completions, pp. 9-14. |
Chris Zimmerman and Donny Winslow, How to Select the Right Tools for Stimulating Horizontal Wells, World Oil, Nov. 1989, pp. 53-36. |
Christensen, Axel, Recent Achievements in Drilling and Completion of Multiple Lateral Drainholes in Chalk Reservoirs, Customer Presentation?, 1992!. |
Christian Maritotti and Evelyne Kou, Elf Improves Horizontal Drilling at Rospo Mare, Petroleum Engineer International, Aug. 1988, pp. 30, 32, 35. |
Cooper, et al., "Deep Heavy-Oil Recovery by Steam Injection Using Twin Horizontal Drainholes," Society of Petroleum Engineers 24088, Mar. 30-Apr. 1, 1992. |
Cooper, G.A., and M. Gondouin, "Improved Steam Stimulation of Heat Oil Wells," Final Report on California Competitive Technology Project No. CT 90 A-046-TW (submitted Nov. 1991). |
Correspondence, from Matt W. Carson to William E. Shull, Dec. 2, 1996. |
Correspondence, from William E. Shull to Matt W. Carson, Oct. 2, 1996. |
D. Bryant, T. Hudson, and S. Hoover, Use of Low-Density Particles for Packing a Highly Deviated Well, SPE 20984, pp. 387-395. |
D. Kerr and K. Lesley, Mechanical Aspects of Medium Radius Well Design, SPE 17618, pp. 719-726. |
D. Malekzadeh and D. Tiab, Interference Testing of Horizontal Wells, SPE 22733, pp. 717-727. |
D. W. Sherrard, B.W. Brice and D. G. MacDonald, Application of Horizontal Wells at Prudhoe Bay, SPE 15376, pp. 1-8, tables 1-15. |
D.B. Christian, Planning and Operational Requirements for a Shallow-Objective, High-Angle Well in the Gulf of Mexico, SPE Drilling Engineering, Sep. 1988, pp. 241-247. |
D.B. Gaudin and J.C. Beasley, A Comparison of MWD and Wireline Steering Tool Guidance Systems in Horizontal Drilling, SPE 22536, pp. 7-18. |
D.D. Cramer, Guides Exist for Fracture Treatment in Horizontal Wells, OGJ Special, Mar. 27, 1989, Oil & Gas Journal, pp. 41, 44, 46, 48, 49. |
D.J. Hall, J.L. Walker, E.G. Schmelzl, and T.B. Haene, Logging and Perforating of Horizontal Wells: An Innovative Approach, SPE 21836, pp. 307-316. |
D.K. Trichel and M.P. Ohanlan, Unique Articulated Downhole Motor Holds Promising Future for Short Radius Horizontal Drilling, SPE 20417, pp. 137-149. |
D.R. Holbert, New Interest in Drainhole Drilling Revives Technology, World Oil, Mar. 1981, pp. 57, 58, 61, 62, 64, 66, 70, 72. |
D.R. Schroeter and H.W. Chan, Successful Application of Drilling Technology Extends Directional Capability, SPE Drilling Engineering, Sep. 1989, pp. 230-236. |
David Ackert, Manifred Boetel, Toni Marzalek, Christian Clavier, Peter Goode, Michael Thambynayagam and Ted Stagg, Looking Sideways for Oil, The Technical Review, vol. 36, No. 1, pp. 22-31. |
Dennis Dann David Jetelina, New Logging Approach Detects Fractures in Horizontal Wells, Petroleum Engineer International Sep. 1990, pp. 30, 32, 33, 35, 36. |
Denny Kerr, Designing Tangent Sections for Medium-Radius Horizontal Wells, World Oil, Mar. 1991, pp. 45-47. |
Denny Kerr, How to Drill a Smooth Medium-Radius Well, World Oil, Mar. 1990, pp. 46-47. |
Derry D. Sparlin and Raymond W. Hagen, Jr., Controlling Sand in a Horizontal Completion, World Oil, Nov. 1988, pp. 54-58. |
Douglas Gust, Horizontal Drilling Evolving from Art to Science, Technology, Jul. 24, 1989, Oil & Gas Journal, pp. 43-46, 49-52. |
Dr. A.S. Pocovi and Lie. L. Gustavino, Dr. A. Pozzo and Eng. J.A. Musmarra, Comparing Cost and Performance of Horizontal Wells, World Oil, Mar. 1991, pp. 39, 40, 42-44. |
Drilling Fluids for Horizontal Wells, Oilfield Review, vol. 2, No. 3, pp. 8-10. |
E.P. Deliac, J.P. Messines, and B.A. Thierree, Mining Techique Finds Applications in Oil Exploration, Oil & Gas Journal, May 6,1991, pp. 84, 86, 88, 90. |
Eastman, H. John, Lateral Drain Hole Drilling, Petroleum Engineer, 03/55. |
Eastman, H. John, Lateral Drain Hole Drilling, Petroleum Engineer, 11/54. |
Eastman, H. John, Lateral Drain Hole Drilling, Petroleum Engineer, 12/54. |
Ernie Brown, Ron Thomas, Arthur Milne, The Challenge of Completing and Stimulating Horizontal Wells, Oilfield Review, vol. 2., No. 3, pp. 52-63. |
Exhibit A: Plaintiffs Original Petition, Jun. 21, 1996. |
Exhibit B: Defendants' Defendants' Original Answer, Jul. 29, 1996. |
Exhibit C: Agreed Protective Order (signed by Judge), Oct. 11, 1996. |
Exhibit D: Scheduling Order, Oct. 17, 1996. |
Exhibit E: Defendants' Original Counterclaim, Apr. 23, 1997. |
Exhibit F: Plaintiffs First Amended Original Petition, Sep. 4, 1997. |
Exhibit G: Defendants' Motion for Leave to File Defendants' Amended Motion for Summary Judgment on All Claims in Plaintiffs First Amended Original Petition, Sep. 12, 1997. |
Exhibit H: Defendants' Amended Motion for Summary Judgment on All Claims in Plaintiffs First Amended Original Petition, Sep. 12, 1997. |
Exhibit I: Plaintiffs Second Amended Original Petition, Sep. 25, 1997. |
Exhibit J: Plaintiffs Response to Defendants' Amended Motion for Summary Judgment on All Claims in Plaintiffs First Amended Original Petition, Oct. 30, 1997. |
Exhibit K: Stipulation Between NRG and Halliburton Regarding Exchange of "Confidential" and "Highly Confidential" Information. |
Exhibit L: Defendants' Reply Memorandum in Support of Motion for Summary Judgment on All Claims Based on Defendants' Independent Development of Information Contained in Baker Hughes' Patents, Dec. 3, 1997. |
Exhibit M: Plaintiffs Third Amended Original Petition, Mar. 3, 1998. |
Exhibit N: Supplemental Agreed Protective Order Between Baker Hughes Incorporated et al., Halliburton Energy Services, Inc., Halliburton Company and Sperry-Sun Drilling Services, Inc., Mar. 30, 1998. |
F.R. Myal and K-H. Frohne, Slant-Hole Completion Test in the Piceance Basin, Colorado, SPE 21866, pp. 611-622. |
Fincher, Roger W., "Short-Radius Lateral Drilling: A Completion Alternative," PE Int'l, 02/87. |
Floyd Harvey, Fluid Program Built Around Hole Cleaning, Protecting Formation, Oil & Gas Journal, Nov. 5, 1990, pp. 37-41. |
Fracturing of Horizontal Wells, Horizontal Well Completions, Western International pp. 23-30. |
Fred L. Babins, Problems in Cementing Horizontal Wells, Reservoir Selection for Horizontal Wells, pp. 1-8. |
Fuh, G., Dew, E.G., Ramsey, C.A., and Collins, K., Borehole Stability Analysis for the Design of First Horizontal Well Drilled in th UK's Southern 'V' Field, SPE 20408, Sep. 23, 1990, pp. 31-42. |
G. Norel, C. Bubois, and G. Georges, Test Bench Checks Cement in Horizontal Holes, Petroleum Engineer International, Nov. 1988, pp. 54-59. |
G.E. King, Perforating the Horizontal Well, Journal of Petroleum Technology, Jul. 1989, pp. 671-672. |
G.F. Fuh, D.B. Deom, and R.D. Turner, Wellbore Stability and Drilling Results from the First Horizontal Well in the Kotter Field Offshore The Netherlands, SPE 22544, pp. 101-109. |
G.K. McKown, Drillstring Design Optimization for High-Angle Wells, SPE/IADC 18650, pp. 275-282. |
Gary M. Griggs, How to Design a Medium-Radius Horizontal Well, Petroleum Engineer International, Sep. 1989, pp. 26, 30, 31, 32, 36, 37. |
Gavin Clark, Piyush Shah, Bruno Deruyck, D.K. Gupta and S.K. Sharma, Horizontal Well Testing in India, Oilfield Review, vol. 2, No. 3, pp. 64-67. |
G-F. Fuh and P.K. Loose, Horizontal Wellbore Stability for Openhole Completions, SPE 19717, pp. 155-164. |
Glen Tolle, Thomas Dellinger, Mobil Identifies Extended-Reach-Drilling Advantages, Possibilities in North Sea, Oil & Gas Journal, May 1986, Technology, pp. 78, 81-86. |
Gondouin, et al., The Challenge of West Sak Heavy Oil: Analysis of an Innovative Approach, SPE 22077, May 29, 1991. |
Gondouin, Heavy Oil Recovery Process, 4<st >Qtrly. Report, DOE-T4, 31/91. |
Gondouin, Heavy Oil Recovery Process, 4st Qtrly. Report, DOE-T4, 31/91. |
Gondouin, Heavy Oil Recovery Process, Abstract of 1<st >Qtr. Report, DOE-T1, Feb. 31, 1990. |
Gondouin, Heavy Oil Recovery Process, Abstract of 1st Qtr. Report, DOE-T1, Feb. 31, 1990. |
Gondouin, Heavy Oil Recovery Process, Third Qtrly. Report, DOE-T3, Oct. 15, 1990. |
Guntis Moritis, Horizontal Drilling Scores More Successes, Oil & Gas Journal, OGJ Special, Feb. 26, 1990, pp. 53, 54, 58, 62, 63, 64. |
Guntis Moritis, Horizontal Drilling Technology Keeps Advancing, Oil & Gas Journal, OGJ Special, Mar. 11, 1991, pp. 49-53. |
Guy Feneyrou, French Three-Leg Multidrain Well Improves Production, OGJ Report, Oct. 1, 1984, Oil & Gas Journal, pp. 49-53. |
H. Delafon, BHA Prediction Software Improves Directional Drilling, Part 1, World Oil, Mar. 1989, pp. 51-56, 60. |
H. Delafon, BHA Prediction Software Improves Directional Drilling, Part 2, World Oil, Apr. 1989, pp. 45, 46, 47, 48, 50. |
H. Karisson, R. Cobbley, and G.E. Jaques, New Developments in Short, Medium, and Long-Radius Lateral Drilling, SPE/IADC 18706, pp. 725-736. |
H.J. Vrielink and A.M. Hippman, Optimization of Slant Well Drilling in the Lindberg Field, SPE Drilling Engineering, Dec. 1989, pp. 307-314. |
Haraldur Karisson and Ron Bitto, Worldwide Experience Shows Horizontal Well Success, World Oil, Mar. 1989, pp. 51-54, 56. |
Hardeman, P., Beckingham 36 Horizontal Well, SPE Drilling Engineering, Mar. 1989, pp. 17-23. |
Hesse, Karl, Multilateral Drilling-A Case History, Customer Presentation?, Nov. 25, 1992. |
Holifield & Associates, Pearsall and Giddings Austin Chalk Horizontal/Directional Drilling Program, Quote to Customer?, Jun. 1, 1991. |
Holton, David S., How Shell Handles Remedial Jobs at Ventura, Petroleum Engineer, 01/63. |
Horizontal Drilling Records Recognized, Petroleum Engineer International, Feb. 1988, p. 35. |
Horizontal Drilling Stays Hot; Petroleum Engineer International, Apr. 1989, Petroleum Engineer International, p. 24. |
Horizontal Well Case Histories, Horizontal Well Completions, Western International, pp. 31-37. |
J. Bryant, D. Watson, W. Wisniewski, R. Patterson and L. Smith, Applications and Limitations of Horizontal Drilling in Oklahoma, SPE 22569, pp. 313-326. |
J. Lessi and A. Spreux, Completion of Horizontal Drainholes, SPE 17572, pp. 209-218. |
J. Misselbrook, G. Wilde and K. Falk, The Development and Use of a Coiled-Tubing Simulation for Horizontal Applications, SPE 22822, pp. 29-41. |
J.B. Weirich, T.E. Zaleski Jr., and P.M. Mulcahy, Perforating the Horizontal Well: Designs and Techniques Prove Successful, SPE 16929, pp. 503-508. |
J.D. Fultz, F.J. Pittard, F.D. Sawyer and W.R. Farmer, Slim-Hole Drilling in Harsh Environments, IADC/SPE 19949, pp. 333-340. |
J.E. Fontenot, Successful High Angle Completions, Cementing, and Drilling's Impact, SPE 17628, pp. 831-842. |
J.L. Hood III, M.D. Mueller, and M.G. Mims, The Uses of Buoyancy in Completing High-Drag Horizontal Wellbores, SPE 23027, pp. 757-764. |
J.P. Ashton, J. Liput, R. Lemons, and J. Summerlin, Gravel Packing Horizontal and Highly Deviated Openhole Completions Using a Single-Screen Prepacked Liner in Offshore California Fields, SPE 19718, pp. 165-178. |
J.P. Wilkerson, J.H. Smith, T.P. Stagg and D.A. Walters, Horizontal Drilling Techniques at Prudhoe Bay, Alaska, SPE 15372. |
James A. Dech, David D. Hearn, Frank J. Schuh and Bob Lenhart, New Tools Allow Medium-Radius Horizontal Drilling, Technology, Jul. 14, 1986, Oil & Gas Journal, pp. 95-99. |
Jean-Francois Glannesini, Horizontal Drilling Is Becoming Commonplace: Here's How It's It's Done, World Oil, Mar. 1989, p. 35, 37, 36, 38, 40. |
Jeff H. Littleton, Sohio Studies Extended-Reach Drilling for Prudhoe Bay, Petroleum Engineer International, Oct. 1985, pp. 28, 32, 34. |
Jiang Wu, Hans C. JuvKam-Wold, Drag and for Horizontal Wells Simplified for Field Use, Oil & Gas Journal, Apr. 29, 1991, pp. 49-53, 56. |
Jiang Wu, Ping Chen and Hans C. Juvkam-Wold, Casing Centralization—Centralization of Casing in Horizontal Wells, Popular Horizontal, Apr./Jun. 1991, pp. 14-21. |
Jim Fultz and Fred Pittard, Bottomhole System Works Completes Horizontal Wells, World Oil, Mar. 1990, pp. 48-50. |
John F. Greenip Jr., How to Design Casing Strings for Horizontal Wells, Petroleum Engineer International, Dec. 1989; pp. 34-38. |
Joshi, S.D., "A Review of Horizontal Well and Drainhole Technology" SPE paper 16868, presented at the 62<nd >Annual Technical Conference and Exhibition of the Society of Petroleum Engineers, Dallas, TX, Sep. 27-30, 1987. |
Joshi, S.D., "A Review of Horizontal Well and Drainhole Technology" SPE paper 16868, presented at the 62nd Annual Technical Conference and Exhibition of the Society of Petroleum Engineers, Dallas, TX, Sep. 27-30, 1987. |
Joshi, S.D., Proper Completion Critical for Horizontal Wells, Special Report, Johsi Technologies International, Inc., Jan. 1990. |
Jurgens, R., Bitto, R., Henderson, B., White, C., and Mullins, G., Horizontal Drilling and Completions: A Review of Available Technology, Petroleum Engineer International, Feb., 1991, pp. 14-21. |
Kenneth B. Gunn, Well Cored to 9,800 Ft. in Paraquay, Oil & Gas Journal, May 13, 1991, pp. 51-55. |
Kevin T. Corbett and Rapier Dawson, Drillstring Design for Directional Wells, Technology, Apr. 30, 1984, Oil & Gas Journal, pp. 61-66. |
Kuich, Seismic and Horizontal Drilling Unlock Austin Chalk, World Oil, Sep. 1990, pp. 47, 48, 50, 52, 54. |
L. Keelean, S.S. Harris and N. Petronio, Short Radius Drilling Technology Utilizing Mobile Service/Workover Rig, SPE/IADC 18711, pp. 765-772. |
L. McDonald Schetky, Shape-Memory Alloys, Nov. 1979, vol. 241, No. 5, pp. 2-10. |
L. Shale, Development of Air Drilling Motor Holds Promise for Specialized Directional Drilling Applications, SPE 22564, pp. 275-286. |
L.R.B. Hammons, W.C. Barnett, E.K. Fisher and D.H. Sellers, Stratigraphic Control and Formation Evaluation of Horizontal Wells Using MWD, SPE 22538, pp. 25-38. |
Larry E. Pendleton and A. Behrooz Ramesh, Bechtel Develops Innovative Method for Horizontal Drilling, Technology, May 27, 1985, Oil & Gas Journal, pp. 95-99. |
Les Shale, Downhole Motor Specifically Designed for Directional Air Drilling, Oil and Gas Journal, Feb. 3, 1992, pp. 45-49. |
Lindsay Fraser, Effective Ways to Clean and Stabilize High-Angle Holes, Petroleum Engineer International, Nov. 1990, pp. 30, 32, 34, 35. |
M.A. Wilson and F.L. Sabins, A Laboratory Investigation of Cementing Horizontal Wells, SPE Drilling Engineering, Sep. 1988, pp. 275-280. |
M.B. Webster, G.E. Otott Jr. and D.L. Rice, Cementing High-Angle-Wells Using Cement-Expanded Formation Packers and/or Casing Rotation, SPE/IADC 16136, pp. 745-754. |
M.F. Cooney, T. Rogers, E.S. Stacey and R.N. Stephens, Case History of an Opposed-Bore, Dual Horizontal Well in the Austin Chalk Formation of South Texas, SPE/IADC 21985, pp. 737-748. |
M.J. Landman and W.H. Goldthorpe, Optimization of Perforation Distribution for Horizontal Wells, SPE 23005, pp. 567-576. |
M.R. Islam and A.E. George, Sand Control in Horizontal Wells in Heavy Oil Reservoirs, SPE 18789, pp. 437-452. |
M.Y. Soliman, James L. Hunt and A.M. El Rabaa, Facturing Aspects of Horizontal Wells, Aug. 1990, JPT. |
Matrix Stimulation of Horizontal Wells, Western International, pp. 15-21. |
Maurer Engineering, Inc., "Evaluation of Branch and Horizontal Boreholes for in Situ Leach Mining," U.S. Dept. of the Interior, Bureau of Mines Paper (Maurer), 07/8. |
Michael J. Economides, John D. McLennan, Ernest Brown, and Jean-Claude Roegiers, Performance and Stimulation of Horizontal Wells, World Oil, Jul. 1989, pp. 69-72, 76, 77. |
Michael M. Power, Roger Chapman, and Robert O'Neal, Horizontal Drilling Below 14,600 Ft; Petroleum Engineer International, Nov. 1990, p. 36. |
Michael M. Power, Roger Chapman, and Robert O'Neal, Horizontal Well Sets Depth Record Completing Deep Horizontal Well, Petroleum Engineer International, Nov. 1990, pp. 37-38. |
Mohamed Soliman, Bob Rose, Wadood El Rabaa and James L. Hunt, Planning Hydraulically Fractured Horizontal Completions, World Oil, Sep. 1989, pp. 54-56, 58. |
Muriby, et al., Horizontal Drilling Success Offshore ABU Dhabi, SPE 21311, Nov. 16, 1991. |
Natural Reserves Group, Inc. v. Baker Hughes, Inc. Docket Sheet, Jul. 24, 1998.* * |
Natural Reserves Group, Inc. v. Baker Hughes, Inc. et al. (District Court Harris County, Texas 333rd Judicial District) No. 96-31380—Pleadings and documents. |
New Logging Techniques, Petroleum Engineer International, Nov. 1990, pp. 27-29. |
O. Rivas, A Newsky, M. Cedeno, P. Rivera, Sucker Rod Centralizers for Direction Wells, SPE 21131. |
O.L.A. Santos, Important Aspects of Well Control for Horizontal Drilling Including Deepwater Situations, SPE/IADC 21993, pp. 785-796. |
P.A. Goode and D.J. Wilkinson, Inflow Performance of Partially Open Horizontal Wells, SPE 19341, pp. 309-320. |
P.E. Harness, M.D. Hansen, G.A. Terzian, S.H. Fowler, Jr. and F.J. Golino, An Overview of Reeled-Tubing-Conveyed Production Logging Capabilities in California, SPE 20028, pp. 155-163. |
Parcevaux, Philippe, Guides Emerge for Cementing Horizontal Strings, OGJ, Oct. 19, 1987. |
Parsons, et al., "Short-Radius Lateral Drilling: A Completion Alternative," Society of Petroleum Engineers (SPE), Paper #15943, Nov. 12, 1986, Richardson, Texas. |
Pat Herbert, Drilling with New-Generation Positive Displacement Motors, SPE 10239. |
Peter Betts, Curt Blount, Bill Broman, Brian Clark, Larry Hibbard, Alain Louis and Paul Oosthoek, Acquiring and Interpreting Logs in Horizontal Wells, Oilfield Review, vol. 2, No. 3., pp. 34-51. |
Pope, C.D., and Handren, P.J., Completion Techniques for Horizontal Wells in the Pearsall Austin Chalk, SPE 20682, Sep. 23, 1990, pp. 657-664. |
Prevedel, B., "New Techniques in Horizontal and Drainhole Drilling Optimization: Lehrte 41 Lateral Drilling Project," SPE 15694, Mar. 7, 1987. |
R. Ehlers, L. Kracht and J. Witte, Case History of Horizontal Wells Drilled with Navigation Technology in European Operations, SPE/IADC 18654, pp. 315-324. |
R.A. Skopec, M.M. Mann, D. Jeffers and S.P. Grier, Horizontal Core Acquisition and Orientation for Formation Evaluation, SPE 20418, pp. 153-166. |
R.C. Haas and C.O. Stokley, Drilling and Completing a Horizontal Well in Fractured Carbonate, World Oil, Oct. 1989, pp. 39, 40, 42, 44, 45. |
R.C. Leaf and F.J. Pittard, Review of Horizontal Methods and Drilling Technology, SPE 21862, pp. 575-584. |
R.C. Wilson and D.N. Willis, Successful High Angle Drilling in the Statfjord Field, SPE 15465, pp. 1-13. |
R.e. Cooper and J.C. Troncoso, An Overview of Horizontal Well Completion Technology, SPE 17582, pp. 335-350. |
R.E. Cooper, Coiled Tubing in Horizontal Wells SPE 17581, pp. 323-334. |
R.H. Reiley, J.W. Black, T.O. Stagg, D.A. Walters and G.R. Atol, Cementing of Liners in Horizontal and High-Angle Wells at Prudhoe Bay, Alaska, SPE 1668s, pp. 583-590. |
R.H. Reiley, J.W. Black, T.O. Stagg, D.A. Walters and G.R. Atol, Improving Liner Cementing in High-Angle/Horizontal Wells, World Oil, Jul. 1988, pp. 69, 71, 73, 74. |
R.J. Tailby, J.H. Yonker and J.L. Pearce, A New Technique for Servicing Horizontal Wells, SPE 22823, pp. 43-58. |
R.L. Cook, J.W. Nicholson, M.G. Sheppard and W. Westlake, First Real Time Measurements of Downhole Vibrations, Forces, and Pressure Used to Monitor Directional Drilling Operations, SPE/IADC 18651, pp. 283-290. |
Rainer Jurgens, Ron Bitto, Bruce Henderson, Cameron White and Gus Mullins, Horizontal Drilling and Completions: A Review of Available Technology, Petroleum Engineer International, Mar., 1991, pp. 32-34, 36-37. |
Ray H. Holifield, Bill Rehm, Recompletion by Horizonatal Drilling Pays Off, World Oil, Mar. 1989, pp. 42, 43, 50. |
Reservoir Selection for Horizontal Wells, Western International, pp. 1-8. |
Richard S. Carden, Air Drilling Has Some Pluses for Horizontal Wells, Oil & Gas Journal, Apr. 8, 1991, pp. 76-78. |
Robert D. Grace, Mike Pippin, Downhole Fires During Air Drilling: Causes and Cures, World Oil, May 1989, pp. 42-44. |
Ron Matson and Rod Bennett, Cementing Horizontal Holes Becoming More Common, Oil & Gas Journal, Dec. 17, 1990, pp. 40-46. |
S. Barua "Computation of Heat Transfer in Wellbores with Single and Dual Completions," SPE paper 22868, presented at the 66th Annual Technical Conference and Exhibition of the Society of Petroleum Engineers, Dallas, TX, Oct. 6-9, 1991. |
S. Schellenberg, T. Rogers and L. Smith, Deviation Control with Steerable System Lowers Well Costs in Southern Oklahoma, SPE 22567, pp. 299-312. |
S.A. Andersen, S.A. Hansen, and K. Fjeldgaard, Horizontal Drilling and Completion: Denmark, SPE 18349, pp. 155-165. |
S.B. Claytor Jr. and J. Speed, Steerable Systems Drilling: The Right Angle for Horizontal Drilling, SPE 19466, pp. 7-16. |
S.B. Claytor, K.J. Manning and D.L. Schmalzried, Drilling a Medium-Radius Horizontal Wells with Aerated Drilling Fluid: A Case Study, SPE/IADC 21988, pp. 759-773. |
S.B. Nice and W.H. Fertl, Logging, Competing Extended-Reach and Horizontal Wells, World Oil, Mar. 1991, pp. 49, 50, 52, 53, 55, 56. |
S.H. Fowler, Jr. and C.W. Pleasants, Operation and Utilization of Hydraulic-Actuated Service Tools for Reeled Tubing; SPE 20678, pp. 631-640. |
Schlumberger, Horizontal Wells-Reach Out For Reservoir Data to Maximize Productivity from Your Horizontal Well; Petroleum Engineer International, Nov. 1990, pp. 40-41. |
Sid B. Nice and W.H. Fertl, New Logging, Completion Techniques Boost Horizontal Well Productivity, Petroleum Engineer International, Nov. 1990, pp. 20, 22, 23, 26. |
Sid B. Nice, Leading Edge Logging, Well Logging and Completion Technology for Horizontal Wellbores, Popular Horizontal, p. 4. |
Siegried K. Schueler, Horizontal Well Improves Recovery in Deep Sour Gas Field, Oil & Gas Journal, Mar. 23, 1992, pp. 93, 94, 96, 97. |
SPE 20005, JPT, Apr. 1990, pp. 399-400. |
Staff Report, Getting to the Bottom with Slant-Hole Logging Tools, Petroleum Engineer International, Feb. 1988, pp. 32, 34. |
Stagg and Reiley, Horizontal Well Completions in Alaska, World Oil, Mar. 1990, pp. 37-44. |
Steenbock, et al., "Alternative Drainhole Drilling System—Theoretical Background and Practical Experience." |
Stephen A. Graham and Greg Nazzal, Second Lateral in Horizontal Well Solves Water, Problem Oil & Gas Journal, Mar. 18, 1991, pp. 111-114. |
Stephen A. Graham, Bruce Henderson & Greg Nazzal, Drilling a Dual-Bore Horizontal Well in the Austin Chalk: A Case History, ASME 91-PET. |
Steven D. Moore, Meridian Oil Finds Success with Horizontal Wells; Petroleum Engineer International, Nov. 1989, pp. 17, 18, 19, 20, 22. |
Stormont, D.H., "Increasing Drainage of Oil into Well by Drain-Hole Drilling," Oil and Gas Journal, Aug. 17, 1953. |
Svend Aage Andersen, John M. Conlin, Kjeld Fjeldgaard, Exploiting Reservoirs with Horizontal Wells: The Maersk Experience, Oilfield Review, vol. 2, No. 3, pp. 11-21. |
T.E. Zaleski, Jr., Sand-Control Alternatives for Horizontal Wells, JPT, May 1991. |
T.J. Moo and M.W. Tweedy, Planning and Drilling Australia's First Medium-Radius Horisontal Wells, SPE 23013, pp. 629-640. |
T.K. Li, V. Chandelle, and J. Brych, Lateral Drilling: A New Application Shows Promise, World Oil, Jun. 1986, pp. 68-71. |
T.M. Gaynor, Downhole Control of Deviation with Steerable Straight-Hole Turbodrills, SPE Drilling Engineering, Mar. 1988. |
T.P. Frick and M.J. Economides, Horizontal Well Damage Characterization and Removal, SPE 21795, pp. 429-438. |
Talk et al., Special Liner Design Improves Dual Lateral Horizontal Well, OGJ, Aug. 31, 1992. |
Theodore E. Zaleski, Jr and Jefferson P. Ashton, Gravel Packing Feasible in Horizontal Well Completions, Oil & Gas Journal, Jun. 11, 1990, pp. 33-37. |
Todd Talbot, Dual Horizontal Well Completion, Baker Oil Tools, Dec. 8, 1992. |
Tony Beckett and Lee Hoffpauir, Test Off Philippines Boosts Horizontal Drilling Technology, Petroleum Engineer International, Nov. 1989, pp. 24, 25, 26, 28, 30, 32. |
Trevor Burgess and Patrick Van Slijke, Horizontal Drilling Comes of Age, Oilfield Review, vol. 2, No. 3, pp. 22-33. |
U. Ahmed and S. Jacobsen, Practical Aspects of Horizontal Well Technology: A Perspective, SPE 21260. |
W. Dickinson, R.G. Knoll, R. Nordlund and W. Dickinson, Flexible Sand Barrier (FSB): A Novel Sand Control System, SPE 18787, pp. 419-424. |
W. Dickinson, R.R. Anderson and R.W. Dickinson, The Ultrashort-Radius Radial System, SPE Drilling Engineering, Sep. 1989. |
W.B. Bradley, C.E. Murphey, R.T. McLamore, and L.L. Dickson, Advantages of Heavy Metal Collars in Directional Drilling and Deviation Control, Journal of Petroleum Technology, May 1976, pp. 521-530. |
W.D. Moore III, ARCO Drills Horizontal Drainhole for Better Reservoir Placement, Oil & Gas Journal, Sep. 15, 1980, pp. 139-148. |
Wade Dickinson, Erick Dickinson, Herman Dykstra and John M. Nees, Horizontal Radials Enhance Oil Production from a Therman Project, Oil & Gas Journal, May 4, 1992, pp. 116, 118, 120, 122, 123, 124. |
Wade Dickinson, Michael J. Pesavento, R. Wayne Dickinson, Data Acquistion, Analysis, and Control While Drilling with Horizontal Water Jet Drilling Systems, CIM/SPE 90-127, pp. 127-1 thru 127-10. |
Warren Jones, Unusual Stresses Require Attention to Bit Selection, Oil & Gas Journal, Oct. 22, 1990, pp. 81-85. |
William J. Lang and Marion B. Jett, High Expectations for Horizontal Drilling Becoming Reality, Oil & Gas Journal, Sep. 24, 1990, OGJ Special, pp. 70, 74, 76, 79. |
William King, Selecting Bits for Extended Reach and Horizontal Wells, World Oil, Apr. 1990, pp. 55-57, 59-60. |
William P. Diamond and David C. Oyler, Drilling Long Horizontal Coalbed Methane Drainage Holes from a Directional Surface Borehole, SPE/DOE 8968, pp. 341-346. |
Y. Tsukano and M. Ueno, Development of Lightweight Steel Drillpipe with 165-ksi Yield Strength, IADC/SPE 19960, pp. 403-412. |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8376039B2 (en) | 1998-11-20 | 2013-02-19 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US8511372B2 (en) | 1998-11-20 | 2013-08-20 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface |
US8434568B2 (en) | 1998-11-20 | 2013-05-07 | Vitruvian Exploration, Llc | Method and system for circulating fluid in a well system |
US8291974B2 (en) | 1998-11-20 | 2012-10-23 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US8297350B2 (en) | 1998-11-20 | 2012-10-30 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface |
US8297377B2 (en) | 1998-11-20 | 2012-10-30 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US8316966B2 (en) | 1998-11-20 | 2012-11-27 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US9551209B2 (en) | 1998-11-20 | 2017-01-24 | Effective Exploration, LLC | System and method for accessing subterranean deposits |
US8371399B2 (en) | 1998-11-20 | 2013-02-12 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US8464784B2 (en) | 1998-11-20 | 2013-06-18 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US8813840B2 (en) | 1998-11-20 | 2014-08-26 | Efective Exploration, LLC | Method and system for accessing subterranean deposits from the surface and tools therefor |
US8505620B2 (en) | 1998-11-20 | 2013-08-13 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US8376052B2 (en) | 1998-11-20 | 2013-02-19 | Vitruvian Exploration, Llc | Method and system for surface production of gas from a subterranean zone |
US8469119B2 (en) | 1998-11-20 | 2013-06-25 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US8479812B2 (en) | 1998-11-20 | 2013-07-09 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US7234526B2 (en) | 2002-05-02 | 2007-06-26 | Halliburton Energy Services, Inc. | Method of forming a sealed wellbore intersection |
US20040182579A1 (en) * | 2002-05-02 | 2004-09-23 | Halliburton Energy Services, Inc. | Expanding wellbore junction |
US8333245B2 (en) | 2002-09-17 | 2012-12-18 | Vitruvian Exploration, Llc | Accelerated production of gas from a subterranean zone |
US20050173112A1 (en) * | 2004-02-05 | 2005-08-11 | Kadir Kavaklioglu | Annulus plugging detection using a pressure transmitter in gas-lift oil production |
US9513241B2 (en) | 2010-12-23 | 2016-12-06 | Schlumberger Technology Corporation | Systems and methods for interpreting multi-phase fluid flow data |
US9587460B2 (en) * | 2013-05-16 | 2017-03-07 | Halliburton Energy Services, Inc. | System and method for deploying a casing patch |
US10941622B2 (en) * | 2019-01-23 | 2021-03-09 | Cameron International Corporation | System and methodology utilizing conductor sharing offset shoe |
US20200232289A1 (en) * | 2019-01-23 | 2020-07-23 | Cameron International Corporation | System and methodology utilizing conductor sharing offset shoe |
Also Published As
Publication number | Publication date |
---|---|
USRE38636E1 (en) | 2004-10-26 |
USRE37867E1 (en) | 2002-10-08 |
USRE38616E1 (en) | 2004-10-12 |
US5462120A (en) | 1995-10-31 |
USRE39141E1 (en) | 2006-06-27 |
USRE40067E1 (en) | 2008-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
USRE38642E1 (en) | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes | |
CA2293427C (en) | System for drilling and completing multilateral wells | |
EP0840834B1 (en) | Apparatus and process for drilling and completing multiple wells | |
US5330007A (en) | Template and process for drilling and completing multiple wells | |
EP0996812B1 (en) | Deformed multiple well template and process of use | |
US5346016A (en) | Apparatus and method for centralizing pipe in a wellbore | |
US20040007829A1 (en) | Downhole seal assembly and method for use of same | |
MXPA05000551A (en) | Wellbore sealing system and method. | |
EP1204808B1 (en) | Drilling and completion system for multilateral wells | |
US20240279989A1 (en) | Non-magnetic openhole whipstock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FEPP | Fee payment procedure |
Free format text: PETITION RELATED TO MAINTENANCE FEES FILED (ORIGINAL EVENT CODE: PMFP); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FEPP | Fee payment procedure |
Free format text: PETITION RELATED TO MAINTENANCE FEES GRANTED (ORIGINAL EVENT CODE: PMFG); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
PRDP | Patent reinstated due to the acceptance of a late maintenance fee |
Effective date: 20070116 |
|
CC | Certificate of correction |