US20190024367A1 - Concrete dowel placement system and method of making the same - Google Patents
Concrete dowel placement system and method of making the same Download PDFInfo
- Publication number
- US20190024367A1 US20190024367A1 US16/141,137 US201816141137A US2019024367A1 US 20190024367 A1 US20190024367 A1 US 20190024367A1 US 201816141137 A US201816141137 A US 201816141137A US 2019024367 A1 US2019024367 A1 US 2019024367A1
- Authority
- US
- United States
- Prior art keywords
- sheath
- tubular element
- concrete
- polymer
- inner sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000004519 manufacturing process Methods 0.000 title description 8
- 238000000034 method Methods 0.000 claims abstract description 49
- 238000001125 extrusion Methods 0.000 claims description 42
- 229920000642 polymer Polymers 0.000 claims description 38
- 230000002787 reinforcement Effects 0.000 claims description 9
- 238000001746 injection moulding Methods 0.000 claims description 6
- 238000002788 crimping Methods 0.000 claims description 4
- 239000000463 material Substances 0.000 abstract description 37
- 238000005336 cracking Methods 0.000 abstract description 10
- 238000010276 construction Methods 0.000 abstract description 5
- 238000002347 injection Methods 0.000 abstract description 5
- 239000007924 injection Substances 0.000 abstract description 5
- 230000008602 contraction Effects 0.000 abstract description 4
- 230000001788 irregular Effects 0.000 description 5
- 239000000853 adhesive Substances 0.000 description 4
- 230000001070 adhesive effect Effects 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000003313 weakening effect Effects 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910001092 metal group alloy Inorganic materials 0.000 description 1
- 238000003801 milling Methods 0.000 description 1
- ORQBXQOJMQIAOY-UHFFFAOYSA-N nobelium Chemical compound [No] ORQBXQOJMQIAOY-UHFFFAOYSA-N 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000000135 prohibitive effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
- 229920001169 thermoplastic Polymers 0.000 description 1
- 229920001187 thermosetting polymer Polymers 0.000 description 1
- 239000004634 thermosetting polymer Substances 0.000 description 1
- 210000003462 vein Anatomy 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/48—Dowels, i.e. members adapted to penetrate the surfaces of two parts and to take the shear stresses
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C48/00—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
- B29C48/03—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor characterised by the shape of the extruded material at extrusion
- B29C48/131—Curved articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C48/00—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
- B29C48/25—Component parts, details or accessories; Auxiliary operations
- B29C48/30—Extrusion nozzles or dies
-
- B29C47/0023—
-
- B29C47/0028—
-
- B29C47/003—
-
- B29C47/20—
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C48/00—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
- B29C48/03—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor characterised by the shape of the extruded material at extrusion
- B29C48/09—Articles with cross-sections having partially or fully enclosed cavities, e.g. pipes or channels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C48/00—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
- B29C48/03—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor characterised by the shape of the extruded material at extrusion
- B29C48/09—Articles with cross-sections having partially or fully enclosed cavities, e.g. pipes or channels
- B29C48/11—Articles with cross-sections having partially or fully enclosed cavities, e.g. pipes or channels comprising two or more partially or fully enclosed cavities, e.g. honeycomb-shaped
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C48/00—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
- B29C48/03—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor characterised by the shape of the extruded material at extrusion
- B29C48/12—Articles with an irregular circumference when viewed in cross-section, e.g. window profiles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C48/00—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
- B29C48/16—Articles comprising two or more components, e.g. co-extruded layers
- B29C48/18—Articles comprising two or more components, e.g. co-extruded layers the components being layers
- B29C48/21—Articles comprising two or more components, e.g. co-extruded layers the components being layers the layers being joined at their surfaces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C48/00—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
- B29C48/25—Component parts, details or accessories; Auxiliary operations
- B29C48/30—Extrusion nozzles or dies
- B29C48/32—Extrusion nozzles or dies with annular openings, e.g. for forming tubular articles
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/02—Arrangement or construction of joints; Methods of making joints; Packing for joints
- E01C11/04—Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
- E01C11/14—Dowel assembly ; Design or construction of reinforcements in the area of joints
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/04—Devices for laying inserting or positioning reinforcing elements or dowel bars with or without joint bodies; Removable supports for reinforcing or load transfer elements; Devices, e.g. removable forms, for making essentially horizontal ducts in paving, e.g. for prestressed reinforcements
- E01C23/045—Removable, e.g. reusable supports for positioning reinforcing or load transfer elements, adapted or not to also hold joint bodies
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4114—Elements with sockets
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/48—Dowels, i.e. members adapted to penetrate the surfaces of two parts and to take the shear stresses
- E04B1/483—Shear dowels to be embedded in concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/04—Cores for anchor holes or the like around anchors embedded in the concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C48/00—Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
- B29C48/001—Combinations of extrusion moulding with other shaping operations
- B29C48/0013—Extrusion moulding in several steps, i.e. components merging outside the die
- B29C48/0015—Extrusion moulding in several steps, i.e. components merging outside the die producing hollow articles having components brought in contact outside the extrusion die
- B29C48/0016—Extrusion moulding in several steps, i.e. components merging outside the die producing hollow articles having components brought in contact outside the extrusion die using a plurality of extrusion dies
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29L—INDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
- B29L2031/00—Other particular articles
- B29L2031/10—Building elements, e.g. bricks, blocks, tiles, panels, posts, beams
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29L—INDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
- B29L2031/00—Other particular articles
- B29L2031/727—Fastening elements
- B29L2031/7284—Dowels
Definitions
- the present disclosure relates generally to a system for use in concrete construction and a method for making the system. More specifically, the present disclosure relates to a system for placing slip dowels into concrete slabs accurately and a method for making the system.
- a “cold joint” in concrete may refer to a weakened interface between two sections of concrete that harden at different times.
- a concrete slab is formed by pouring concrete into a form all at once, where the concrete is allowed to harden.
- the interface between a previously poured section of concrete and a more recently poured section is called a cold joint.
- a cold joint in concrete is typically weaker under tension than concrete that has been allowed to dry without any cold joints, and this weakness at the cold joint may cause problems after the concrete hardens. Due to this weakness, cold joints often become uneven or buckled due to thermal expansion and contraction of the concrete. Compaction of the underlaying soil caused by improper substrate preparation before pouring the concrete can also cause buckling or cracking at the cold joint. Further, too much water moisture may accumulate on the end face of the first concrete section before the second concrete section is poured and hardens. If the water freezes, undesirable cracking in the concrete may occur due to ice expansion against the concrete. In terms of aesthetics, cold joints often form a visual line at the interface of the two concrete sections, which is often undesirable.
- slip dowels long steel rods, known as “slip dowels,” into the edge portions of adjoining concrete sections so that the concrete sections may slide freely along one or more of the slip dowels.
- This key feature, the ability to slide freely, may allow linear expansion and contraction of the concrete sections while substantially maintaining the concrete in a common plane, thus preventing undesirable buckling, bulging, or unevenness at the cold joint.
- slip dowels are placed in substantially parallel alignment relative to each other to allow the concrete sections to slide along the slip dowels.
- the purpose of placing the slip dowels may be defeated when the dowels are not positioned in substantially parallel relation to each other because, in such a case, the concrete sections are not able to slide along the slip dowels.
- nonparallel placement of slip dowels can cause cracking in the concrete as well as faulting, i.e., misalignment of the concrete sections at the cold joint.
- various systems, methods, and devices have been developed for installing slip dowels properly.
- first method concrete may be poured into a first form. After the first pour hardens sufficiently, an edge of the form, usually a wooden stud, may be removed. Next, a series of holes, arranged in a straight line, may be drilled into the first concrete slab along the exposed edge from which the form has been removed. The depth and diameter of the individual holes may vary depending on the purpose of the concrete slabs and the size of the concrete slabs to be supported. Generally, these holes are at least twelve inches deep and typically have a diameter of approximately five-eighths of an inch, which is complimentary to typical slip dowels having a diameter of five-eighths of an inch.
- dowel rods may be inserted into each hole so that one end of each dowel rod is positioned within the first section of concrete.
- the remainder of each dowel extends into the adjacent area where the second slab of concrete is to be poured.
- concrete may be poured into the adjacent area and is permitted to harden with the dowels inside.
- the dowels are held firmly within the second section, but are permitted to slide longitudinally within the drilled holes of the first section. This allows longitudinal expansion and contraction of the two concrete sections while at the same time preventing buckling or faulting at the cold joint.
- the “drilling method” of placing slip dowels described above is very labor intensive. It can take about ten minutes to drill a five-eighths inch diameter by twelve inches long hole into the first concrete section. Additionally, the drilling equipment, bits, accessories, and associated setup time tends to be very expensive. Moreover, the construction workers who drill the holes and place the slip dowels must have sufficient training to ensure generally parallel arrangement of each dowel to the other dowels and to the underlying support surface.
- a second widely-used method of placing slip dowels involves using wax-treated cardboard sleeves positioned over one end of each individual dowel.
- a series of holes may be drilled through one edge of a concrete form and smooth dowels may be inserted through each hole.
- Wax-treated cardboard sleeves may be placed over one end of each dowel and the first pour may be made within the form. After the first pour hardens, the previously-drilled form may be stripped away, leaving the individual dowels extending into the adjacent open space where the second pour is to be made. Subsequently, the second pour may be made and allowed to harden.
- the slip dowels are held firmly by the concrete of the second pour but are permitted to slide longitudinally against the inner surfaces of the wax-treated cardboard sleeves within the first concrete section.
- the waxed cardboard sleeves facilitate longitudinal slippage of the dowels, while at the same time holding the two concrete slabs in a common plane, preventing undesirable buckling or angular movement at the cold joint.
- Alternative prior art dowel placement devices may comprise elongated, hollow tubes sized to receive portions of dowel rods.
- the tubes may be mounted to one edge of a concrete form in generally parallel relation to each other via integral base portions.
- a first concrete pour may be made over the tubes.
- the edge of the concrete form to which the tubes are mounted may be stripped away from the first slab.
- dowel rods may be inserted into the exposed open ends of the tubes embedded within the first slab.
- the portions of the dowel rods not inserted into the tubes extend into an adjacent area where a second pour of concrete may be made. Concrete poured into the adjacent area completely covers the outer surfaces of the dowel rods which are held firmly within the second slab formed when the second pour hardens.
- the dowels, though being held firmly within the second slab are permitted to slide longitudinally within the tubes embedded in the first slab.
- Prior art placement devices have been manufactured using injection molding. Injection molding can be cost prohibitive and have other problems innate with the method itself. Such problems include burning of the material being molded, thus weakening its final structure; flashing, i.e., excess molded material attached to the molded product which requires extra time and effort to remove; and short shotting, i.e., when a region of the mold lacks sufficient quantity of injected material, resulting in a physical deformity in the final molded product.
- the disclosure specifically addresses and alleviates the above-identified deficiencies in the art.
- the disclosure is directed to a concrete dowel placement system and method of making the concrete dowel placement system.
- the method allows for cost-efficient manufacturing of the system.
- the concrete dowel placement system allows for easy and accurate placement of slip dowels into concrete.
- a method of constructing a concrete dowel placement system includes the step of constructing a coupler.
- the step of constructing a coupler includes the step of extruding a polymer to form a first tubular element.
- the step of constructing a coupler also includes the step of extruding a polymer to form a second tubular element, the second tubular element having a dimensional size different from a dimensional size of the first tubular element.
- the step of constructing a coupler additionally includes the step of attaching an end portion of the second tubular element to an end portion of the first tubular element.
- the method includes the step of extruding or injection molding a polymer to form an elongated, tubular, dowel-receiving sheath, the sheath having an outer surface, at least one interior opening extending along the entire length of the sheath and the sheath being configured to be slidably extensible over the coupler to frictionally engage one of the first tubular element and the second tubular element.
- the method may also include the step of attaching an end cap to an end portion of the sheath to completely cover the at least one interior opening at the end of the sheath.
- the step of extruding a polymer to form the first tubular element may include forming a body having a circular cross-sectional configuration along a longitudinal axis during extrusion of the polymer.
- the step of extruding a polymer to form the first tubular element may include forming the first tubular element to have an inner sleeve and a plurality of splines extending radially outward from the inner sleeve and longitudinally along the inner sleeve.
- the step of extruding a polymer to form the first tubular element may include forming the first tubular element to have a quadrangular configuration along a longitudinal axis during extrusion of the polymer.
- the first tubular element may define opposed first tubular element end portions having maximum outer diameters approximately equal to each other, and the second tubular element may define opposed tubular element end portions having maximum outer diameters approximately equal to each other.
- the step of extruding a polymer to form the first tubular element may include forming at least one reinforcement wall between an inner sleeve and an outer sleeve during extrusion of the polymer.
- the step of extruding a polymer to form a sheath may include forming at least one linear rib protrusion, raised helical element, helical groove element, or linear groove element along a longitudinal axis of the sheath on an outer surface of the sheath during extrusion of the polymer. Additionally, this step may include forming a sinusoidal outer surface or a helical uneven outer surface on the sheath during extrusion of the polymer.
- the coupler includes a first tubular element having an inner sleeve disposed about a central axis to define an aperture. An outer body is disposed radially outward of the inner sleeve.
- the coupler also includes a second tubular element having an inner sleeve disposed about a central axis to define an aperture. An outer body is disposed radially outward of the inner sleeve.
- the concrete dowel placement system also has a sheath having an outer surface, an interior opening extending along the entire length of the sheath and being slidably extensible over the coupler to frictionally engage one of the first tubular element and the second tubular element.
- the concrete dowel placement system may also include an end cap attachable to the interior opening at the end of the sheath to completely cover the interior opening at the end of the sheath.
- the outer body of the first tubular element may include a plurality of splines extending longitudinally along the inner sleeve.
- Another embodiment of the disclosure relates to an additional method of making a concrete dowel placement system including the step of extruding a polymer to form a tubular element.
- the tubular element has at least one interior opening extending along the entire length of the tubular element.
- the method further includes the step of extruding a polymer to form a sheath.
- the method may also include the step of forming a coupler by removing some of the polymer from a first length portion of the tubular element so that the first length portion of the tubular element is of a different dimensional size than a second length portion of the tubular element.
- FIG. 1 is an upper perspective view of an embodiment of a concrete dowel placement system
- FIG. 2 is a front cross-sectional view of an embodiment of a first tubular element having four reinforcement walls;
- FIG. 3 is an upper perspective view of an extrusion die head having a first extrusion aperture
- FIG. 4 is an upper perspective view of an extrusion die head have a second extrusion aperture
- FIG. 5 is a side cross-sectional view of embodiments of a first tubular element and a second tubular element
- FIG. 6 is a side cross-sectional view of an embodiment of a coupler
- FIG. 7 is a front cross-sectional view of an embodiment of a sheath having rib protrusions on an outer surface of the sheath;
- FIG. 8 is a perspective view of an embodiment of a sheath having a helical element on an outer surface of the sheath;
- FIG. 9 is a front cross-sectional view of an embodiment of a coupler disposed within an embodiment of a sheath
- FIG. 10 is a side cross-sectional view of an embodiment of a tubular element
- FIG. 11 is a side cross-sectional view of an embodiment of a coupler
- FIG. 12 is a side cross-sectional exploded view of the concrete dowel placement system of FIG. 1 ;
- FIG. 13 is a side cross-sectional view of the concrete dowel placement system of FIG. 1 employing a first orientation of a coupler having an outer sleeve of a first diameter at a distal end;
- FIG. 14 is a side cross-sectional view of the concrete dowel placement system of FIG. 1 employing a second orientation of a coupler having an outer sleeve of a second diameter at a distal end;
- FIG. 15 is a side cross-sectional view of the concrete dowel placement system of FIG. 13 disposed within a first concrete section;
- FIG. 16 is a side cross-sectional view of the concrete dowel placement system of FIG. 15 wherein a form section and the coupler have been removed;
- FIG. 17 is a side cross-sectional view of the concrete dowel placement system of FIG. 16 wherein a portion of a slip dowel is disposed within an interior opening of a sheath;
- FIG. 18 is a side cross-sectional view of the concrete dowel placement system of FIG. 17 wherein an exposed portion of the slip dowel is disposed within a second concrete section;
- FIG. 19 is an elevational view of another embodiment of a tubular element and a screw adapted for use as part of a concrete dowel placement system;
- FIG. 20 is a cross sectional view of the tubular element depicted in FIG. 19 ;
- FIG. 21 is a side, partial cross sectional view of a concrete dowel placement system including the tubular element depicted in FIG. 19 ;
- FIG. 22 is another embodiment of a coupler adapted for use as part of a concrete dowel placement system.
- FIG. 23 is a perspective view of a sheath with a textured surface and a cap
- FIG. 24 is a transverse cross sectional view of the sheath of FIG. 23 taken along line 24 - 24 ;
- FIG. 25 is a perspective view of a sheath with a textured surface and a cap
- FIG. 26 is a transverse cross sectional view of the sheath of FIG. 25 taken along line 26 - 26 ;
- FIG. 27 is a perspective view of a sheath with a sealed end cap
- FIG. 28 is a longitudinal cross sectional view of the sheath of FIG. 27 taken along the line 28 - 28 ;
- FIG. 29 is a perspective view of a sheath with a crimped end.
- FIG. 30 is a longitudinal cross sectional view of the sheath of FIG. 29 taken along the line 30 - 30 .
- the concrete dowel placement system 10 generally includes a coupler 12 , a sheath 14 , and an end cap 20 .
- the concrete dowel placement system 10 may be used to form a concrete structure.
- the coupler 12 includes a first tubular element 22 having an outer sleeve 24 and an inner sleeve 26 defining an aperture 28 extending along the entire length of the outer sleeve 24 .
- the first tubular element 22 further includes at least one reinforcement wall 30 between the outer sleeve 24 and the inner sleeve 26 .
- the reinforcement wall 30 secures the inner sleeve 26 to the outer sleeve 24 so that the inner sleeve 26 may receive a securing device 18 .
- FIG. 2 shows a front cross-sectional view of a first tubular element 22 that includes four reinforcement walls 30 .
- the first tubular element 22 may include any number of reinforcement walls 30 .
- the first tubular element 22 may be formed via extrusion, which may include extruding a material, such as a polymer, preferably a thermoplastic polymer, through a die head 32 to form the first tubular element 22 .
- the extrusion die head 32 may include an extrusion aperture 34 .
- FIGS. 3 and 4 illustrate exemplary extrusion die heads 32 through which the extrusion of the material may be performed.
- Each extrusion die head 32 includes an extrusion aperture 34 through which a material is extruded.
- extrusion apertures 34 a and 34 b show exemplary extrusion apertures 34 a and 34 b where the extrusion apertures 34 , in minor part, or substantially define the cross sectional shape of the first tubular element 22 formed during extrusion.
- the material may be extruded by alternative methods other than through die heads 32 having extrusion apertures 34 . It is contemplated that the extrusion may occur through any shaped space such that the extruded material acquires a cross-sectional shape which is substantially the same as the shape of the shaped space during extrusion.
- the extruded material may alternatively be a thermosetting polymer or any other material that may be appreciated by one of ordinary skill of the art that does not depart from the spirit of the present disclosure.
- the material may be any polymer that falls within the scope of the materials discussed above, that will not chemically react with concrete so as to substantially weaken the polymer or the concrete during the lifespan of the use of the polymer within the concrete.
- the first tubular element 22 may be formed via extrusion to have a circular cross sectional configuration in a plane perpendicular to a longitudinal axis, so as to resemble a traditional pipe or tube. This circular configuration allows for less material to be used in order to manufacture the first tubular element 22 , thus reducing cost.
- the first tubular element 22 may be formed via extrusion to have a quadrangular configuration.
- the coupler 12 of the concrete dowel placement system 10 further includes a second tubular element 36 of a different dimensional size than the first tubular element 22 .
- the second tubular element 36 includes an outer sleeve 25 and an inner sleeve 27 defining an aperture 29 extending along the entire length of the outer sleeve 25 .
- the second tubular element 36 further includes at least one reinforcement wall between the inner sleeve 27 and the outer sleeve 25 .
- the second tubular element 36 may differ from the first tubular element 22 in size only, and thus, the cross-sectional configuration depicted in FIG.
- the second tubular element 36 may also be representative of a cross-sectional view of an exemplary embodiment of the second tubular element 36 , albeit on a different scale. It is further contemplated that the second tubular element 36 may be formed via extrusion as described herein. More specifically, the second tubular element 36 may be formed via extrusion through an extrusion die head 32 or by any other form of extrusion that would be appreciated by a person of ordinary skill in the art.
- first tubular element 22 and second tubular element 36 it is further contemplated that at least one of the first tubular element 22 and the second tubular element 36 may be formed to have a diameter of slightly less than five-eighths inches so that a slip dowel 56 with a diameter of about five-eighths inches may be used with the concrete dowel placement system 10 as will be discussed in further detail herein.
- first tubular element 22 nor the second tubular element 36 is about five-eighths inches, but rather is of some other dimensional size.
- the second tubular element 36 may be formed to have the same configuration as the first tubular element 22 , but it is also contemplated that the configurations of the first tubular element 22 and the second tubular element 36 may be different.
- the first tubular element 22 is formed to have a circular configuration while the second tubular element 36 is formed to have a quadrangular configuration.
- Other alternative configurations are also contemplated, such as oval or rounded rectangle configurations.
- an end portion of the outer sleeve 25 of the second tubular element 36 is attached to an end portion of the outer sleeve 24 of the first tubular element 22 to form the coupler 12 .
- the first tubular element 22 and second tubular element 36 may be attached at absolute ends, but it is also contemplated that attachment may be achieved by inserting an end portion of the first tubular element 22 into a hollow of an end portion of the second tubular element 36 .
- the concrete dowel placement system 10 further includes an elongated, tubular, dowel-receiving sheath 14 (see FIGS. 1 and 12 ) having at least one interior opening 38 extending along the entire length of the sheath 14 , the sheath 14 being slidably extensible over one of the first tubular element 22 and the second tubular element 36 to frictionally engage the sheath 14 to the coupler 12 .
- the sheath 14 having an empty and smooth interior opening 38 allows for the desired unrestricted slippage of the slip dowel 56 within the sheath 14 once the slip dowel 56 has been placed within a second concrete section 58 .
- sheath 14 may be formed to have a longitudinal length of about twelve inches so that a slip dowel 56 may be advanced twelve inches into a section of concrete as will be discussed in further detail herein, but it is alternatively contemplated that any other length sufficient for placing a slip dowel 56 may be used.
- the sheath 14 may be formed via extrusion through an extrusion die head or any other process of extrusion that would be known by a person of ordinary skill in the art, such as the processes described above. Further, it is contemplated that the sheath 14 may be formed via extrusion to include a completely smooth outer surface 40 , but it is also contemplated that the outer surface 40 of the sheath 14 may be formed to be not completely smooth. For example, the sheath 14 may be formed via extrusion to include at least one or a plurality of elements on the outer surface 40 of the sheath 14 that extend along the longitudinal axis of the sheath 14 .
- Such elements may include linear rib protrusions 42 or linear grooves.
- the outer surface 40 of the sheath 14 may be formed to also include raised or grooved helical elements 44 .
- FIG. 7 shows a cross-sectional view of an embodiment of a sheath 14 including rib protrusions 42 on the outer surface 40 of the sheath 14 .
- FIG. 8 is an upper perspective view of a sheath 14 that includes a raised helical element 44 on the outer surface 40 of the sheath 14 .
- the sheath 14 may be formed via extrusion to include a sinusoidal outer surface 40 on the sheath 14 or a helical uneven outer surface 40 on the sheath 14 .
- the external features formed on the outer surface of the sheath e.g., ribs or raised elements, may mitigate cracks formation in the concrete.
- FIG. 9 shows a front cross-sectional view of an embodiment of a concrete dowel placement system 10 where a sheath 14 has been slibably extended over a coupler 12 .
- the concrete dowel placement system 10 may also include an end cap 20 attachable to an end portion of the sheath 14 to completely cover the interior opening 38 at the end of the sheath 14 .
- the end cap 20 helps prevent pourable concrete from entering the interior opening 38 of the sheath 14 while the concrete hardens.
- the end cap 20 may be a element of duct tape or construction tape, a cap, a plug, a element of film, or any blockade that is either permanently affixed or removably attached to the distal end of the sheath 14 .
- the sheath 14 may include have an outer surface 40 textured to provide additional surface area. Concrete is more prone to cracking when attached to smooth surfaces. Adding surface area to the sheath 14 may help to reduce the possibility of cracking of the concrete.
- a regular texture pattern may repeat over the outer surface 40 in a predictable sequence. An irregular texture pattern would not repeat over the outer surface 40 in a predictable sequence.
- the texturing may be a negative form of texturing. In negative texturing, material has been removed from the outer surface to create the texture. Alternatively, the texturing may be other positive protrusions, that is, material may have been added to the outer surface 40 of the sheath 14 .
- the texturing may have a negative random pattern.
- Such texturing can be created by distressing the outer surface 40 of an extruded sheath 14 with a wire brush.
- a texture may be formed after extrusion by taking heavy wire brushes to the smooth outer surface 40 of the extruded sheath 14 .
- the heavy wire brush bristles may create a randomized or irregular gouged pattern in the outer surface 40 .
- the wire brush may create additional surface area on the outer surface 40 . The added and irregular surface area may allow for a lower instance of cracking in the concrete formed around the sheath 14 .
- the texturing may be of a negative regular pattern.
- the sheath 14 may be injection molded.
- the mold may include a portion which forms dimples 302 in the outer surface 40 of the sheath 14 .
- the dimple 302 pattern in the outer surface 40 may be regular.
- the dimples 302 may be arranged in alternating offset longitudinal rows which span substantially the length of the sheath 14 .
- the dimples 302 are irregularly formed on the outer surface 40 .
- the individual dimples 302 may all have the same shape or may have more than one shape.
- the shape of the outer perimeter of the dimples 302 may vary, or the depths of the dimples may vary, or both. The presence of the texture is more important than the precise form of the dimples.
- the sheath 14 may be injection molded in a mold designed to add material to the sheath as compared to a sheath 14 with a smooth outer surface 40 .
- the material may be in a positive regular texture pattern.
- material may be added to form knobs 160 of the sheath 14 of FIG. 25 .
- the knobs 160 may be arranged in a regular, or repeating, pattern.
- a regular pattern of exclusively raised knobs 160 is shown in FIGS. 25 and 26 .
- the knobs 160 may be arranged in alternating offset longitudinal rows which span substantially the length of the sheath 14 .
- the raised knobs may be placed in an irregular or non-repeating pattern.
- the knobs 160 may be formed exclusively, as is shown in FIG. 25 , or may be formed in combination with the dimples 302 ( FIG. 23 ).
- the knobs 160 and dimples 302 ( FIG. 23 ) on the outer surface 40 may be formed in either a regular or irregular arrangement. Because the knobs add material to the sheath 14 , rather than removing material as with the negative texturing in sheath 14 of comparable wall thickness, the additional material can add strength to the sheath 14 .
- the sheath 14 may be injection molded with a smooth outer surface 40 .
- the outer surface 40 may then be textured.
- the outer surface may be textured using a heavy wire brush, with the key difference that the texturing occurs after injection molding of the sheath 14 , rather than extrusion of the sheath 14 .
- the heavy wire brush bristles may create a randomized gouged pattern in the outer surface 40 .
- the texturing of the wire brush may create additional surface area on the outer surface 40 , which helps prevent cracking of the concrete.
- the sheath 14 may have a cap 20 formed from the same piece of material as the sheath 14 .
- the sheath 14 and cap 20 may be injection molded, so that the sheath 14 and the cap 20 may form a single piece of material.
- the longitudinal cross section of the sheath 14 is not closed or crimped. Rather, the cross section is the same as the two-piece sheath and cap configuration, but is all formed from the same piece of material.
- the sheath 14 may include some form of texturing as described above.
- the sheath may have raised ribs 42 on the exterior surface 40 .
- the cross section of a free end portion 150 of the sheath 14 may be altered to close the free end portion 150 .
- the free end portion 150 may be pinched or crimped to close an opening 152 of the free end portion 150 .
- Pinching or crimping may be used as an alternative to using an end cap. The pinching or crimping alters the transverse cross section of the sheath 14 at the free end portion 150 .
- the sheath 14 may be pinched at the opening 152 so that the opening 152 is collapsed, with each of two 180-degree arcs of the opening 152 compressed to form a straight line. The two lines abut one another to close off the opening 152 .
- the profile of the free end portion 150 When viewed from a first orientation of the sheath 14 , the profile of the free end portion 150 appears triangular, with the point of the triangle at a tip 154 of the free end portion 150 . When viewed rotated 90 degrees from the first orientation the free end portion 150 appears trapezoidal, with the wider end oriented toward the tip 154 of the free end portion 150 .
- the closure of the free end portion 150 may be maintained by welding the material of the tip 154 together, or by using an adhesive to join the material, or by using mechanical fasteners.
- the sheath 14 may include some form of texturing as described above. For example, the sheath may have raised ribs 42 on the exterior surface 40 .
- the coupler 12 may be formed by first extruding a material, such as a polymer, to form a tubular element 46 having a first length portion 48 and a second length portion 50 .
- the tubular element 46 further includes at least one interior opening 38 extending along the entire length of the tubular element 46 .
- FIG. 10 illustrates a cross-sectional view of an exemplary embodiment of a tubular element 46 .
- this method includes removing some of the material from the first length portion 48 of the tubular element 46 so that the first length portion 48 of the tubular element 46 is of a different dimensional size than the second length portion 50 of the tubular element 46 , thus ultimately forming a coupler 12 .
- the step of removing some of the material from a first length portion 48 of the tubular element 46 may be by lathing, milling, or computer numerical control machining devices.
- the concrete dowel placement system 10 discussed above may be used to form a concrete structure, however, before any concrete is poured, at least one coupler 12 is affixed to a form section 16 .
- a form is used to define the shape of the concrete once it hardens.
- the coupler 12 may be affixed using a securing device 18 .
- the securing device 18 may be a nail, screw, or any other device similar in nature so that the coupler 12 may be securely affixed to the form section 16 .
- the coupler 12 may also be affixed to the form section 16 using adhesive placed on a proximal end of the coupler 12 , or any other appropriate method of attachment that would be appreciated by one of ordinary skill of the art.
- the configuration of the coupler 12 and the corresponding sheath 14 allows the coupler 12 to be formed without a flange at the end portion which abuts the form section 16 .
- the outer sleeve 24 of each tubular element of the coupler 12 may define the maximum outer diameter of the coupler 12 , and the tubular elements themselves are capable of withstanding the forces associated with pouring concrete around the sheath 14 .
- a plurality of couplers 12 is affixed to the form section 16 in a straight line; the line may run generally parallel to the underlying support surface 54 .
- the form section 16 to which the couplers 12 are attached is part of a complete form used to dictate the shape of the concrete once the concrete hardens. That is, the form section 16 is part of a complete form that forms a boundary for concrete that is poured within the boundary.
- the form is arranged upon the underlying support surface 54 so that concrete remains within the boundary defined by the form when the concrete is poured within the form.
- the form may be made of wooden studs or planks, plastic slabs, or any supports that will not chemically react with the concrete in a way that adversely affects the shape or structural integrity of the concrete.
- a sheath 14 is slidably disposed over each of the couplers 12 and may be held in place by friction or by other means of attachment, such as adhesives.
- One of ordinary skill in the art will appreciate that the fit between each coupler 12 and its corresponding sheath 14 is tight and sealed enough so that it is unlikely that pourable concrete can leak into the sheaths 14 when the concrete is poured. Concrete leaking into the interior of the sheaths 14 can negatively impact one of the functions of the concrete dowel placement system 10 , which is to allow slip dowels 56 to slide freely within the sheaths 14 .
- the secure and sealed connection between the coupler 12 and the form section 16 can be maintained during the pouring of the concrete and until the concrete hardens. That is, the connection between the coupler 12 and sheath 14 is strong enough such that the pouring of the concrete does not break or disrupt the connection.
- An attachable end cap 20 may be disposed on a distal end of the sheath 14 to completely cover the opening 38 at the end of the sheath 14 to prevent pourable concrete from leaking into the interior of the sheath 14 after the concrete is poured over the concrete dowel placement system 10 .
- the coupler 12 may have at least two positional orientations. As shown in FIG. 13 , in one orientation, the smaller end of the coupler 12 is affixed to the form section 16 .
- the smaller end may have a diameter or cross-sectional area that is smaller than the diameter or cross-sectional area of the bigger end. This permits a sheath 14 with an interior size similar to the bigger end of the coupler 12 to slidably engage the bigger end of the coupler 12 .
- a bigger end portion of the coupler 12 may be affixed to the form section 16 .
- a sheath 14 with an interior size similar to the size of the smaller end of the coupler 12 may slidably engage the smaller end of the coupler 12 .
- the coupler 12 may have at least two different orientations upon the form section 16 to allow connectability with at least two different sheaths 14 having different dimensions. It is to be appreciated that regardless of the positional orientation of the coupler 12 , the connection between the coupler 12 and the sheath 14 is tight and sealed enough to prevent pourable concrete from substantially intruding into the interior of the sheath 14 .
- concrete may be poured within a first form.
- concrete is poured onto the underlaying support surface 54 and within the first form.
- the poured concrete makes contact with the sheath 14 and the end cap 20 .
- the pourable concrete may completely cover the outer surfaces 40 of the sheath 14 and the end cap 20 that are exposed to the pourable concrete.
- this portion of concrete is a first concrete section 52 .
- the concrete of the hardened first concrete section 52 affixes to the sheath 14 to prevent movement between the sheath 14 and the hardened first concrete section 52 . As shown in FIG.
- the interior of the sheath 14 remains hollow except possibly for a portion of the end cap 20 which may be disposed within an end portion of the sheath 14 if the end cap 20 is in the form of, for example, a plug.
- the empty interior of the sheath 14 allows a slip dowel 56 to be inserted within the sheath 14 at a later time.
- the form section 16 and coupler 12 are removed.
- the removal of the form section 16 and coupler 12 exposes an edge surface of the first concrete section 52 , the edge surface allowing access to the interior of the sheath 14 .
- a slip dowel 56 may be advanced into the sheath 14 as shown in FIG. 17 .
- the slip dowel 56 may be a smooth steel rod, but it is contemplated that the slip dowel 56 may be made of aluminum, iron, or any other suitable metal or metal alloy strong enough to endure longitudinal or vertical compression and expansion forces that may occur between sections of concrete without bending substantially. Further, the entire outer surface of the slip dowel 56 need not be smooth. For example, a length portion of the slip dowel 56 may include a ribbed outer surface, similar to the outer surface of typical re-bar, or include other features on the outer surface such that the slip dowel 56 is unsmooth.
- edge surface of the first concrete section 52 allows access to a plurality of interior openings 38 of sheaths 14 aligned generally in parallel within the first concrete section 52 , thus allowing for a plurality of generally parallel-aligned slip dowels 56 to be inserted into sheaths 14 .
- the slip dowel 56 may be fully advanced within the sheath 14 so as to make contact with the end cap 20 , but it is also contemplated that the slip dowel 56 may be only partially advanced within the sheath 14 to allow space between the inserted end of the slip dowel 56 and the end cap 20 .
- the space can help prevent undesirable pressure within the first concrete section 52 and the second concrete section 58 that may be caused by the slip dowel 56 pressing against the end cap 20 when the concrete expands. Such pressure can potentially expedite undesirable weakening of the concrete.
- the slip dowel 56 projects into an area immediately adjacent to the first concrete section 52 to define an exposed segment, allowing for a second concrete section 58 to be poured over the exposed segment of the slip dowel 56 .
- the second concrete section 58 may be formed.
- a second form is prepared and disposed upon the underlaying support surface 54 , bounding the area immediately adjacent to the first concrete section 52 and encompassing the exposed segments of the slip dowels 56 .
- concrete is poured within the second form and the concrete is allowed to make contact with the exposed segments of the slip dowels 56 .
- the concrete may also completely cover the outer surfaces of the slip dowels 56 . After the concrete hardens, this portion of concrete is the second concrete section 58 and the form may be removed.
- a cold joint 60 forms at the interface.
- the second concrete section 58 In contrast to the first concrete section 52 , which includes a sheath 14 and an end cap 20 disposed within, the second concrete section 58 has no portion of a concrete dowel placement system 10 disposed within, and thus makes contact with the slip dowels 56 .
- This contact with the slip dowels 56 allows the second concrete section 58 to adhere to the slip dowels 56 , thus prohibiting movement between the slip dowels 56 and the second concrete section 58 .
- This adhesion allows the slip dowels 56 to slide longitudinally within the sheaths 14 and across the cold joint 60 .
- the second concrete section 58 holds onto to the slip dowels 56 while the sheaths 14 disposed within the first concrete section 52 allow the slip dowels 56 to slide back and forth freely within the sheaths 14 .
- the ability for the slip dowels 56 to slide freely within the sheaths 14 aids in preventing buckling and bulging of the concrete at the cold joint 60 .
- Buckling and bulging is often undesirable because it can result in cracks in the concrete, thus reducing the structural integrity of the concrete, and in the case of a pedestrian application, can pose a safety hazard by increasing the risk of people tripping on the cracks. Cracks and bulging in the concrete may also be considered aesthetically unappealing.
- the ability for the slip dowels 56 to slide freely within the sheaths 14 also allows the interface between the first concrete section 52 and the second concrete section 58 to remain aligned, thus preventing faulting, i.e., undesirable skewing of the first concrete section 52 and the second concrete section 58 at the cold joint 60 . Skewing at the cold joint 60 may damage the concrete, weaken the concrete, or result in undesirable aesthetics.
- FIGS. 19-21 there is depicted yet another embodiment of a coupler 100 including a tubular element 102 including an inner sleeve 104 and a plurality of splines 106 extending along the inner sleeve 104 .
- the coupler in FIGS. 19-21 does not include an outer sleeve coaxially disposed relative to the inner sleeve 104 .
- the splines 106 extend radially outward from the inner sleeve 104 to provide an outer engagement surface adapted to frictionally engage the sheath 108 .
- the use of splines 106 may allow the coupler 100 to be formed using less material, and thus, cost savings may be achieved.
- the inner sleeve 104 depicted in FIGS. 19-21 is a cylindrical tube disposed about a central axis 110 , and thus, includes an inner surface 112 defining an aperture 114 extending along the length of the inner sleeve 104 .
- the aperture 114 is sized and configured to receive a fastener 116 , such as a nail, screw, or the like for securing the coupler 100 to the concrete form 118 .
- the inner sleeve 104 includes a first end 120 and an opposing second end 122 , wherein the first end 120 is adapted to be disposed in abutting contact with the concrete form 118 when the coupler 100 is attached thereto.
- the plurality of splines 106 are coupled to the inner sleeve 104 , with each spline 106 extending radially outward from an outer surface 124 of the inner sleeve 104 , so as to define a coupler outer diameter, D.
- the coupler 100 is configured such that the outer diameter D is sized and configured so as to enable the sheath 108 to be advanced over the coupler 100 , with an inner surface 126 of the sheath 108 frictionally engaging with the splines 106 .
- Each spline 106 also extends axially along the outer surface 124 of the inner sleeve 104 between the first and second ends 120 , 122 thereof.
- the coupler 100 includes eight splines 106 spaced evenly around the outer circumference of the inner sleeve 104 , e.g., the splines 106 are spaced apart by about 45 degrees. As shown in FIGS. 19 and 21 , the splines 106 extend completely between the first and second ends 120 , 122 , with the splines 106 having a beveled surface 128 adjacent the second end 122 . However, it is understood that in other implementations, the splines 106 may extend only partially between the first and second ends 120 , 122 .
- the coupler 100 may be formed via extrusion, wherein an extrusion die having an opening corresponding to the cross section depicted in FIG. 20 is used to form the coupler 100 , as described in more detail above.
- extrusion die having an opening corresponding to the cross section depicted in FIG. 20 is used to form the coupler 100 , as described in more detail above.
- other materials and manufacturing techniques may also be used without departing from the spirit and scope of the present disclosure.
- FIGS. 19-21 show the coupler 100 being of a substantially uniform configuration between the first and second ends 120 , 122 thereof.
- the outer diameter D is substantially uniform along the length of the coupler 100 .
- the coupler 100 is adapted for use with a sheath 108 having an inner opening that is of a specific diameter, which corresponds to the outer diameter D of the coupler 100 .
- a coupler 200 including a first tubular element 202 defining a first outer diameter, D 1 , and a second tubular element 204 defining a second outer diameter, D 2 , greater than the first outer diameter D 1 .
- the first and second tubular elements 202 , 204 are coupled to each other at a joint 205 , either through the use of an adhesive, or other joining elements known in the art.
- the first tubular element 202 includes a first inner sleeve 206 and a plurality of first splines 208
- the second tubular element 204 includes a second inner sleeve 210 and a plurality of second splines 212 .
- the plurality of first splines 208 define the first outer diameter D 1
- the plurality of second splines 212 define the second outer diameter D 2
- the first tubular element 202 defines a first abutment end 214
- the second tubular element 204 defines a second abutment end 216
- the first and second abutment ends 214 , 216 each being adapted to be positioned in abutting contact with a concrete form 118 , depending on the intended use of the coupler 200 , e.g., whether the coupler 200 is to be used with a sheath adapted to frictionally engage the outer surface of the splines 208 on the first tubular element 202 , or the splines 212 on the second tubular element 204 .
- the coupler 200 is attached to the form 118 with the second abutment end 216 coupled to the form, and the first tubular element 202 extending away from the form.
- the coupler 200 is attached to the form 118 with the first abutment end 214 coupled to the form, and the second tubular element 204 extending away from the form.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Manufacturing & Machinery (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
- The present application is a continuation-in-part patent application of U.S. patent application Ser. No. 15/587,141 filed on May 4, 2017, which is a continuation patent application of U.S. patent application Ser. No. 14/874,997 filed on Oct. 5, 2015, the entire contents of which are incorporated herein by reference.
- Not Applicable
- The present disclosure relates generally to a system for use in concrete construction and a method for making the system. More specifically, the present disclosure relates to a system for placing slip dowels into concrete slabs accurately and a method for making the system.
- In construction, a “cold joint” in concrete may refer to a weakened interface between two sections of concrete that harden at different times. Typically, a concrete slab is formed by pouring concrete into a form all at once, where the concrete is allowed to harden. Although, sometimes it is desirable to form a continuous section of concrete by pouring it piecewise in sections at different times, allowing each section to harden to some extent before the next adjacent section is poured and allowed to harden. The interface between a previously poured section of concrete and a more recently poured section is called a cold joint.
- A cold joint in concrete is typically weaker under tension than concrete that has been allowed to dry without any cold joints, and this weakness at the cold joint may cause problems after the concrete hardens. Due to this weakness, cold joints often become uneven or buckled due to thermal expansion and contraction of the concrete. Compaction of the underlaying soil caused by improper substrate preparation before pouring the concrete can also cause buckling or cracking at the cold joint. Further, too much water moisture may accumulate on the end face of the first concrete section before the second concrete section is poured and hardens. If the water freezes, undesirable cracking in the concrete may occur due to ice expansion against the concrete. In terms of aesthetics, cold joints often form a visual line at the interface of the two concrete sections, which is often undesirable.
- To resist buckling, bulging, or displacement of concrete at the cold joint, it is common to insert long steel rods, known as “slip dowels,” into the edge portions of adjoining concrete sections so that the concrete sections may slide freely along one or more of the slip dowels. This key feature, the ability to slide freely, may allow linear expansion and contraction of the concrete sections while substantially maintaining the concrete in a common plane, thus preventing undesirable buckling, bulging, or unevenness at the cold joint.
- To function properly, it is typically important to properly position the slip dowels within adjoining concrete sections. For instance, most slip dowels are placed in substantially parallel alignment relative to each other to allow the concrete sections to slide along the slip dowels. Thus, the purpose of placing the slip dowels may be defeated when the dowels are not positioned in substantially parallel relation to each other because, in such a case, the concrete sections are not able to slide along the slip dowels. Further, nonparallel placement of slip dowels can cause cracking in the concrete as well as faulting, i.e., misalignment of the concrete sections at the cold joint. Thus, various systems, methods, and devices have been developed for installing slip dowels properly.
- In the prior art, two methods of installing slip dowels have become widely used. According to the first method, concrete may be poured into a first form. After the first pour hardens sufficiently, an edge of the form, usually a wooden stud, may be removed. Next, a series of holes, arranged in a straight line, may be drilled into the first concrete slab along the exposed edge from which the form has been removed. The depth and diameter of the individual holes may vary depending on the purpose of the concrete slabs and the size of the concrete slabs to be supported. Generally, these holes are at least twelve inches deep and typically have a diameter of approximately five-eighths of an inch, which is complimentary to typical slip dowels having a diameter of five-eighths of an inch.
- After the series of holes are drilled into the edge of the first portion of concrete, dowel rods may be inserted into each hole so that one end of each dowel rod is positioned within the first section of concrete. The remainder of each dowel extends into the adjacent area where the second slab of concrete is to be poured. Next, concrete may be poured into the adjacent area and is permitted to harden with the dowels inside. After the second section of concrete hardens, the dowels are held firmly within the second section, but are permitted to slide longitudinally within the drilled holes of the first section. This allows longitudinal expansion and contraction of the two concrete sections while at the same time preventing buckling or faulting at the cold joint.
- The “drilling method” of placing slip dowels described above is very labor intensive. It can take about ten minutes to drill a five-eighths inch diameter by twelve inches long hole into the first concrete section. Additionally, the drilling equipment, bits, accessories, and associated setup time tends to be very expensive. Moreover, the construction workers who drill the holes and place the slip dowels must have sufficient training to ensure generally parallel arrangement of each dowel to the other dowels and to the underlying support surface.
- A second widely-used method of placing slip dowels involves using wax-treated cardboard sleeves positioned over one end of each individual dowel. By this method, a series of holes may be drilled through one edge of a concrete form and smooth dowels may be inserted through each hole. Wax-treated cardboard sleeves may be placed over one end of each dowel and the first pour may be made within the form. After the first pour hardens, the previously-drilled form may be stripped away, leaving the individual dowels extending into the adjacent open space where the second pour is to be made. Subsequently, the second pour may be made and allowed to harden. As a result, the slip dowels are held firmly by the concrete of the second pour but are permitted to slide longitudinally against the inner surfaces of the wax-treated cardboard sleeves within the first concrete section. Thus, the waxed cardboard sleeves facilitate longitudinal slippage of the dowels, while at the same time holding the two concrete slabs in a common plane, preventing undesirable buckling or angular movement at the cold joint.
- Although this second method is widely used, it is commonly associated with a variety of problems. For example, after the first pour is made, the free ends of the dowels are likely to project as much as eighteen inches through the forms and into the adjacent open space allowed for the second pour. Because the drilled section of the form must be slid over those exposed sections of the dowels to accomplish stripping or removal of the form, it is not uncommon for the exposed portions of the dowels to become bent, and thus, not substantially parallel. Also, the drilled section of the form may become damaged or broken during the removal process, thus preventing its reuse.
- Unfortunately, both of the popular methods of placing slip dowels discussed above often cause the slip dowels to be positioned at various angles rather than in the desired aligned arrangement. When this occurs, the necessary slippage of the slip dowels is impeded or prevented and the likelihood of cracking and faulting in the concrete increases.
- Alternative prior art dowel placement devices may comprise elongated, hollow tubes sized to receive portions of dowel rods. The tubes may be mounted to one edge of a concrete form in generally parallel relation to each other via integral base portions. Next a first concrete pour may be made over the tubes. After the first pour hardens, the edge of the concrete form to which the tubes are mounted may be stripped away from the first slab. Then, dowel rods may be inserted into the exposed open ends of the tubes embedded within the first slab. The portions of the dowel rods not inserted into the tubes extend into an adjacent area where a second pour of concrete may be made. Concrete poured into the adjacent area completely covers the outer surfaces of the dowel rods which are held firmly within the second slab formed when the second pour hardens. The dowels, though being held firmly within the second slab, are permitted to slide longitudinally within the tubes embedded in the first slab.
- Even though these prior art placement devices have advantages over the previously described dowel placement methods, several disadvantages inhibit their usefulness. In particular, the attachment of the base portions of these prior art placement devices to a concrete form often requires the use of multiple fasteners, making the attachment process difficult and time-consuming. Additionally, in the prior art placement devices, both the tube and its integral base portion used to facilitate the connection of the tube to the concrete form are embedded in the first slab, thus necessitating that additional placement devices be attached to the concrete form prior to its reuse. Further, the prior art placement devices are generally only suited for attachment to a concrete form, and not to reinforcement materials, such as rebar or wire mesh. As such, these prior art placement devices do not lend themselves to use within the interior areas of a poured slab, but rather are limited to use along the periphery of the slab which is defined by the concrete form to which the placement devices must be attached.
- Another problem with prior art concrete dowel placement devices is the high manufacturing cost. Prior art placement devices have been manufactured using injection molding. Injection molding can be cost prohibitive and have other problems innate with the method itself. Such problems include burning of the material being molded, thus weakening its final structure; flashing, i.e., excess molded material attached to the molded product which requires extra time and effort to remove; and short shotting, i.e., when a region of the mold lacks sufficient quantity of injected material, resulting in a physical deformity in the final molded product.
- Accordingly, there remains a need in the art for methods and/or systems for facilitating the proper placement of slip dowels, and methods for manufacturing such placement systems, which overcome the previously described deficiencies associated with prior art placement devices and systems.
- The present disclosure specifically addresses and alleviates the above-identified deficiencies in the art. In this regard, the disclosure is directed to a concrete dowel placement system and method of making the concrete dowel placement system. As will be discussed in more detail below, the method allows for cost-efficient manufacturing of the system. The concrete dowel placement system allows for easy and accurate placement of slip dowels into concrete.
- According to one embodiment, a method of constructing a concrete dowel placement system includes the step of constructing a coupler. The step of constructing a coupler includes the step of extruding a polymer to form a first tubular element. The step of constructing a coupler also includes the step of extruding a polymer to form a second tubular element, the second tubular element having a dimensional size different from a dimensional size of the first tubular element. The step of constructing a coupler additionally includes the step of attaching an end portion of the second tubular element to an end portion of the first tubular element. Further, the method includes the step of extruding or injection molding a polymer to form an elongated, tubular, dowel-receiving sheath, the sheath having an outer surface, at least one interior opening extending along the entire length of the sheath and the sheath being configured to be slidably extensible over the coupler to frictionally engage one of the first tubular element and the second tubular element.
- It is contemplated that the method may also include the step of attaching an end cap to an end portion of the sheath to completely cover the at least one interior opening at the end of the sheath.
- It is further contemplated that the step of extruding a polymer to form the first tubular element may include forming a body having a circular cross-sectional configuration along a longitudinal axis during extrusion of the polymer. The step of extruding a polymer to form the first tubular element may include forming the first tubular element to have an inner sleeve and a plurality of splines extending radially outward from the inner sleeve and longitudinally along the inner sleeve. The step of extruding a polymer to form the first tubular element may include forming the first tubular element to have a quadrangular configuration along a longitudinal axis during extrusion of the polymer. The first tubular element may define opposed first tubular element end portions having maximum outer diameters approximately equal to each other, and the second tubular element may define opposed tubular element end portions having maximum outer diameters approximately equal to each other.
- The step of extruding a polymer to form the first tubular element may include forming at least one reinforcement wall between an inner sleeve and an outer sleeve during extrusion of the polymer.
- The step of extruding a polymer to form a sheath may include forming at least one linear rib protrusion, raised helical element, helical groove element, or linear groove element along a longitudinal axis of the sheath on an outer surface of the sheath during extrusion of the polymer. Additionally, this step may include forming a sinusoidal outer surface or a helical uneven outer surface on the sheath during extrusion of the polymer.
- Another embodiment of the disclosure relates to a concrete dowel placement system having a coupler. The coupler includes a first tubular element having an inner sleeve disposed about a central axis to define an aperture. An outer body is disposed radially outward of the inner sleeve. The coupler also includes a second tubular element having an inner sleeve disposed about a central axis to define an aperture. An outer body is disposed radially outward of the inner sleeve. The concrete dowel placement system also has a sheath having an outer surface, an interior opening extending along the entire length of the sheath and being slidably extensible over the coupler to frictionally engage one of the first tubular element and the second tubular element.
- The concrete dowel placement system may also include an end cap attachable to the interior opening at the end of the sheath to completely cover the interior opening at the end of the sheath.
- The outer body of the first tubular element may include a plurality of splines extending longitudinally along the inner sleeve.
- Another embodiment of the disclosure relates to an additional method of making a concrete dowel placement system including the step of extruding a polymer to form a tubular element. The tubular element has at least one interior opening extending along the entire length of the tubular element. The method further includes the step of extruding a polymer to form a sheath. The method may also include the step of forming a coupler by removing some of the polymer from a first length portion of the tubular element so that the first length portion of the tubular element is of a different dimensional size than a second length portion of the tubular element.
- The present disclosure is best understood by reference to the following detailed description when read in conjunction with the accompanying drawings.
- These and other features and advantages of the various embodiments disclosed herein will be better understood with respect to the following description and drawings, in which like numbers refer to like parts throughout, and in which;
-
FIG. 1 is an upper perspective view of an embodiment of a concrete dowel placement system; -
FIG. 2 is a front cross-sectional view of an embodiment of a first tubular element having four reinforcement walls; -
FIG. 3 is an upper perspective view of an extrusion die head having a first extrusion aperture; -
FIG. 4 is an upper perspective view of an extrusion die head have a second extrusion aperture; -
FIG. 5 is a side cross-sectional view of embodiments of a first tubular element and a second tubular element; -
FIG. 6 is a side cross-sectional view of an embodiment of a coupler; -
FIG. 7 is a front cross-sectional view of an embodiment of a sheath having rib protrusions on an outer surface of the sheath; -
FIG. 8 is a perspective view of an embodiment of a sheath having a helical element on an outer surface of the sheath; -
FIG. 9 is a front cross-sectional view of an embodiment of a coupler disposed within an embodiment of a sheath; -
FIG. 10 is a side cross-sectional view of an embodiment of a tubular element; -
FIG. 11 is a side cross-sectional view of an embodiment of a coupler; -
FIG. 12 is a side cross-sectional exploded view of the concrete dowel placement system ofFIG. 1 ; -
FIG. 13 is a side cross-sectional view of the concrete dowel placement system ofFIG. 1 employing a first orientation of a coupler having an outer sleeve of a first diameter at a distal end; -
FIG. 14 is a side cross-sectional view of the concrete dowel placement system ofFIG. 1 employing a second orientation of a coupler having an outer sleeve of a second diameter at a distal end; -
FIG. 15 is a side cross-sectional view of the concrete dowel placement system ofFIG. 13 disposed within a first concrete section; -
FIG. 16 is a side cross-sectional view of the concrete dowel placement system ofFIG. 15 wherein a form section and the coupler have been removed; -
FIG. 17 is a side cross-sectional view of the concrete dowel placement system ofFIG. 16 wherein a portion of a slip dowel is disposed within an interior opening of a sheath; -
FIG. 18 is a side cross-sectional view of the concrete dowel placement system ofFIG. 17 wherein an exposed portion of the slip dowel is disposed within a second concrete section; -
FIG. 19 is an elevational view of another embodiment of a tubular element and a screw adapted for use as part of a concrete dowel placement system; -
FIG. 20 is a cross sectional view of the tubular element depicted inFIG. 19 ; -
FIG. 21 is a side, partial cross sectional view of a concrete dowel placement system including the tubular element depicted inFIG. 19 ; and -
FIG. 22 is another embodiment of a coupler adapted for use as part of a concrete dowel placement system. -
FIG. 23 is a perspective view of a sheath with a textured surface and a cap; -
FIG. 24 is a transverse cross sectional view of the sheath ofFIG. 23 taken along line 24-24; -
FIG. 25 is a perspective view of a sheath with a textured surface and a cap; -
FIG. 26 is a transverse cross sectional view of the sheath ofFIG. 25 taken along line 26-26; -
FIG. 27 is a perspective view of a sheath with a sealed end cap; -
FIG. 28 is a longitudinal cross sectional view of the sheath ofFIG. 27 taken along the line 28-28; -
FIG. 29 is a perspective view of a sheath with a crimped end; and -
FIG. 30 is a longitudinal cross sectional view of the sheath ofFIG. 29 taken along the line 30-30. - Common reference numerals are used throughout the drawings and the detailed description to indicate the same elements.
- The detailed description set forth below in connection with the appended drawings is intended as a description of some, but not all, of contemplated embodiments of the disclosure, and is not intended to represent the only form in which the present disclosure may be constructed or utilized. The description sets forth the functions and the sequence of steps for developing and operating the disclosure in connection with the illustrated embodiments.
- It is to be understood, however, that the same or equivalent functions and sequences may be accomplished by different embodiments that are also intended to be encompassed within the spirit and scope of the disclosure. It is further understood that the use of relational terms such as first and second, top and bottom, and the like are used solely to distinguish one entity from another entity without necessarily requiring or implying any actual such relationship or order between such entities.
- Referring to
FIG. 1 , a perspective view of an embodiment of a concretedowel placement system 10 in accordance with an aspect of the present disclosure is illustrated. The concretedowel placement system 10 generally includes acoupler 12, asheath 14, and anend cap 20. The concretedowel placement system 10 may be used to form a concrete structure. - Now referring to
FIG. 2 , thecoupler 12 includes a firsttubular element 22 having anouter sleeve 24 and aninner sleeve 26 defining anaperture 28 extending along the entire length of theouter sleeve 24. The firsttubular element 22 further includes at least onereinforcement wall 30 between theouter sleeve 24 and theinner sleeve 26. Thereinforcement wall 30 secures theinner sleeve 26 to theouter sleeve 24 so that theinner sleeve 26 may receive a securingdevice 18. By way of example and not limitation,FIG. 2 shows a front cross-sectional view of a firsttubular element 22 that includes fourreinforcement walls 30. However, it is also contemplated that the firsttubular element 22 may include any number ofreinforcement walls 30. - Referring to
FIGS. 3 and 4 , the firsttubular element 22 may be formed via extrusion, which may include extruding a material, such as a polymer, preferably a thermoplastic polymer, through adie head 32 to form the firsttubular element 22. The extrusion diehead 32 may include an extrusion aperture 34.FIGS. 3 and 4 illustrate exemplary extrusion die heads 32 through which the extrusion of the material may be performed. Each extrusion diehead 32 includes an extrusion aperture 34 through which a material is extruded. By way of example and not limitation,FIGS. 3 and 4 show exemplary extrusion apertures 34 a and 34 b where the extrusion apertures 34, in minor part, or substantially define the cross sectional shape of the firsttubular element 22 formed during extrusion. Further, it is also contemplated that the material may be extruded by alternative methods other than through die heads 32 having extrusion apertures 34. It is contemplated that the extrusion may occur through any shaped space such that the extruded material acquires a cross-sectional shape which is substantially the same as the shape of the shaped space during extrusion. - By way of example and not limitation, it is contemplated that the extruded material may alternatively be a thermosetting polymer or any other material that may be appreciated by one of ordinary skill of the art that does not depart from the spirit of the present disclosure. Further, the material may be any polymer that falls within the scope of the materials discussed above, that will not chemically react with concrete so as to substantially weaken the polymer or the concrete during the lifespan of the use of the polymer within the concrete.
- The first
tubular element 22 may be formed via extrusion to have a circular cross sectional configuration in a plane perpendicular to a longitudinal axis, so as to resemble a traditional pipe or tube. This circular configuration allows for less material to be used in order to manufacture the firsttubular element 22, thus reducing cost. Alternatively, the firsttubular element 22 may be formed via extrusion to have a quadrangular configuration. - As shown in
FIG. 5 , thecoupler 12 of the concretedowel placement system 10 further includes a secondtubular element 36 of a different dimensional size than the firsttubular element 22. The secondtubular element 36 includes anouter sleeve 25 and aninner sleeve 27 defining anaperture 29 extending along the entire length of theouter sleeve 25. The secondtubular element 36 further includes at least one reinforcement wall between theinner sleeve 27 and theouter sleeve 25. The secondtubular element 36 may differ from the firsttubular element 22 in size only, and thus, the cross-sectional configuration depicted inFIG. 2 may also be representative of a cross-sectional view of an exemplary embodiment of the secondtubular element 36, albeit on a different scale. It is further contemplated that the secondtubular element 36 may be formed via extrusion as described herein. More specifically, the secondtubular element 36 may be formed via extrusion through anextrusion die head 32 or by any other form of extrusion that would be appreciated by a person of ordinary skill in the art. - With regard to the first
tubular element 22 and secondtubular element 36, it is further contemplated that at least one of the firsttubular element 22 and the secondtubular element 36 may be formed to have a diameter of slightly less than five-eighths inches so that aslip dowel 56 with a diameter of about five-eighths inches may be used with the concretedowel placement system 10 as will be discussed in further detail herein. Although, it is also contemplated that neither the firsttubular element 22 nor the secondtubular element 36 is about five-eighths inches, but rather is of some other dimensional size. Additionally, the secondtubular element 36 may be formed to have the same configuration as the firsttubular element 22, but it is also contemplated that the configurations of the firsttubular element 22 and the secondtubular element 36 may be different. By way of example and not limitation, according to one embodiment, the firsttubular element 22 is formed to have a circular configuration while the secondtubular element 36 is formed to have a quadrangular configuration. Other alternative configurations are also contemplated, such as oval or rounded rectangle configurations. - By the embodiment of a
coupler 12 shown inFIG. 6 , an end portion of theouter sleeve 25 of the secondtubular element 36 is attached to an end portion of theouter sleeve 24 of the firsttubular element 22 to form thecoupler 12. The firsttubular element 22 and secondtubular element 36 may be attached at absolute ends, but it is also contemplated that attachment may be achieved by inserting an end portion of the firsttubular element 22 into a hollow of an end portion of the secondtubular element 36. - The concrete
dowel placement system 10 further includes an elongated, tubular, dowel-receiving sheath 14 (seeFIGS. 1 and 12 ) having at least oneinterior opening 38 extending along the entire length of thesheath 14, thesheath 14 being slidably extensible over one of the firsttubular element 22 and the secondtubular element 36 to frictionally engage thesheath 14 to thecoupler 12. Thesheath 14 having an empty and smoothinterior opening 38 allows for the desired unrestricted slippage of theslip dowel 56 within thesheath 14 once theslip dowel 56 has been placed within a secondconcrete section 58. Further, thesheath 14 may be formed to have a longitudinal length of about twelve inches so that aslip dowel 56 may be advanced twelve inches into a section of concrete as will be discussed in further detail herein, but it is alternatively contemplated that any other length sufficient for placing aslip dowel 56 may be used. - It is contemplated that the
sheath 14, similar to other components of the concretedowel placement system 10, may be formed via extrusion through an extrusion die head or any other process of extrusion that would be known by a person of ordinary skill in the art, such as the processes described above. Further, it is contemplated that thesheath 14 may be formed via extrusion to include a completely smoothouter surface 40, but it is also contemplated that theouter surface 40 of thesheath 14 may be formed to be not completely smooth. For example, thesheath 14 may be formed via extrusion to include at least one or a plurality of elements on theouter surface 40 of thesheath 14 that extend along the longitudinal axis of thesheath 14. Such elements may includelinear rib protrusions 42 or linear grooves. Theouter surface 40 of thesheath 14 may be formed to also include raised or groovedhelical elements 44.FIG. 7 shows a cross-sectional view of an embodiment of asheath 14 includingrib protrusions 42 on theouter surface 40 of thesheath 14. Additionally,FIG. 8 is an upper perspective view of asheath 14 that includes a raisedhelical element 44 on theouter surface 40 of thesheath 14. In a similar vein, it is contemplated that thesheath 14 may be formed via extrusion to include a sinusoidalouter surface 40 on thesheath 14 or a helical unevenouter surface 40 on thesheath 14. The external features formed on the outer surface of the sheath, e.g., ribs or raised elements, may mitigate cracks formation in the concrete. - The aforementioned elements and characteristic features that may be formed on the
outer surface 40 of thesheath 14 allow for improved attachment between the concrete and thesheath 14, as concrete is more prone to cracking when it is attached to completely smooth surfaces. A secure, crack-resistant attachment between thesheath 14 and the concrete is critical because the secure attachment allows theslip dowel 56 to slide within thesheath 14 without disrupting the functionality of thesheath 14 as will be discussed in more detail below. To clarify how thesheath 14 may engage thecoupler 12,FIG. 9 shows a front cross-sectional view of an embodiment of a concretedowel placement system 10 where asheath 14 has been slibably extended over acoupler 12. - The concrete
dowel placement system 10 may also include anend cap 20 attachable to an end portion of thesheath 14 to completely cover theinterior opening 38 at the end of thesheath 14. Theend cap 20 helps prevent pourable concrete from entering theinterior opening 38 of thesheath 14 while the concrete hardens. Theend cap 20 may be a element of duct tape or construction tape, a cap, a plug, a element of film, or any blockade that is either permanently affixed or removably attached to the distal end of thesheath 14. - As shown in
FIGS. 23-26 , thesheath 14 may include have anouter surface 40 textured to provide additional surface area. Concrete is more prone to cracking when attached to smooth surfaces. Adding surface area to thesheath 14 may help to reduce the possibility of cracking of the concrete. A regular texture pattern may repeat over theouter surface 40 in a predictable sequence. An irregular texture pattern would not repeat over theouter surface 40 in a predictable sequence. Further, the texturing may be a negative form of texturing. In negative texturing, material has been removed from the outer surface to create the texture. Alternatively, the texturing may be other positive protrusions, that is, material may have been added to theouter surface 40 of thesheath 14. - As one example, the texturing may have a negative random pattern. Such texturing can be created by distressing the
outer surface 40 of an extrudedsheath 14 with a wire brush. As discussed above, such a texture may be formed after extrusion by taking heavy wire brushes to the smoothouter surface 40 of the extrudedsheath 14. The heavy wire brush bristles may create a randomized or irregular gouged pattern in theouter surface 40. By removing material, the wire brush may create additional surface area on theouter surface 40. The added and irregular surface area may allow for a lower instance of cracking in the concrete formed around thesheath 14. - Alternatively, the texturing may be of a negative regular pattern. In one exemplary embodiment, the
sheath 14 may be injection molded. As shown inFIGS. 23 and 24 , the mold may include a portion which formsdimples 302 in theouter surface 40 of thesheath 14. Thedimple 302 pattern in theouter surface 40 may be regular. For example, as shown inFIG. 23 , thedimples 302 may be arranged in alternating offset longitudinal rows which span substantially the length of thesheath 14. In other exemplary embodiments, thedimples 302 are irregularly formed on theouter surface 40. Theindividual dimples 302 may all have the same shape or may have more than one shape. For example, the shape of the outer perimeter of thedimples 302 may vary, or the depths of the dimples may vary, or both. The presence of the texture is more important than the precise form of the dimples. - Alternatively, the
sheath 14 may be injection molded in a mold designed to add material to the sheath as compared to asheath 14 with a smoothouter surface 40. The material may be in a positive regular texture pattern. As discussed above, in a positive texturing, material may be added to formknobs 160 of thesheath 14 ofFIG. 25 . Theknobs 160 may be arranged in a regular, or repeating, pattern. A regular pattern of exclusively raisedknobs 160 is shown inFIGS. 25 and 26 . As shown inFIG. 25 , theknobs 160 may be arranged in alternating offset longitudinal rows which span substantially the length of thesheath 14. In other exemplary embodiments, the raised knobs may be placed in an irregular or non-repeating pattern. Theknobs 160 may be formed exclusively, as is shown inFIG. 25 , or may be formed in combination with the dimples 302 (FIG. 23 ). Theknobs 160 and dimples 302 (FIG. 23 ) on theouter surface 40 may be formed in either a regular or irregular arrangement. Because the knobs add material to thesheath 14, rather than removing material as with the negative texturing insheath 14 of comparable wall thickness, the additional material can add strength to thesheath 14. - As yet another alternative, the
sheath 14 may be injection molded with a smoothouter surface 40. Theouter surface 40 may then be textured. As described above, the outer surface may be textured using a heavy wire brush, with the key difference that the texturing occurs after injection molding of thesheath 14, rather than extrusion of thesheath 14. The heavy wire brush bristles may create a randomized gouged pattern in theouter surface 40. The texturing of the wire brush may create additional surface area on theouter surface 40, which helps prevent cracking of the concrete. - As shown in
FIGS. 27 and 28 , thesheath 14 may have acap 20 formed from the same piece of material as thesheath 14. By way of example and not limitation, thesheath 14 andcap 20 may be injection molded, so that thesheath 14 and thecap 20 may form a single piece of material. Thus, the longitudinal cross section of thesheath 14 is not closed or crimped. Rather, the cross section is the same as the two-piece sheath and cap configuration, but is all formed from the same piece of material. Thesheath 14 may include some form of texturing as described above. For example, the sheath may have raisedribs 42 on theexterior surface 40. - Alternatively, as shown in
FIGS. 29 and 30 , the cross section of afree end portion 150 of thesheath 14 may be altered to close thefree end portion 150. As shown inFIGS. 29 and 30 , thefree end portion 150 may be pinched or crimped to close anopening 152 of thefree end portion 150. Pinching or crimping may be used as an alternative to using an end cap. The pinching or crimping alters the transverse cross section of thesheath 14 at thefree end portion 150. Thesheath 14 may be pinched at theopening 152 so that theopening 152 is collapsed, with each of two 180-degree arcs of theopening 152 compressed to form a straight line. The two lines abut one another to close off theopening 152. When viewed from a first orientation of thesheath 14, the profile of thefree end portion 150 appears triangular, with the point of the triangle at atip 154 of thefree end portion 150. When viewed rotated 90 degrees from the first orientation thefree end portion 150 appears trapezoidal, with the wider end oriented toward thetip 154 of thefree end portion 150. The closure of thefree end portion 150 may be maintained by welding the material of thetip 154 together, or by using an adhesive to join the material, or by using mechanical fasteners. Thesheath 14 may include some form of texturing as described above. For example, the sheath may have raisedribs 42 on theexterior surface 40. - An additional embodiment of the disclosure relates to another method of constructing a
coupler 12. Now referring toFIGS. 10 and 11 , in this embodiment, thecoupler 12 may be formed by first extruding a material, such as a polymer, to form atubular element 46 having afirst length portion 48 and asecond length portion 50. Thetubular element 46 further includes at least oneinterior opening 38 extending along the entire length of thetubular element 46. By way of example and not limitation,FIG. 10 illustrates a cross-sectional view of an exemplary embodiment of atubular element 46. - Next, as
FIG. 11 shows, this method includes removing some of the material from thefirst length portion 48 of thetubular element 46 so that thefirst length portion 48 of thetubular element 46 is of a different dimensional size than thesecond length portion 50 of thetubular element 46, thus ultimately forming acoupler 12. - By way of example and not limitation, the step of removing some of the material from a
first length portion 48 of thetubular element 46 may be by lathing, milling, or computer numerical control machining devices. - Now referring to
FIGS. 12 and 13 , the concretedowel placement system 10 discussed above may be used to form a concrete structure, however, before any concrete is poured, at least onecoupler 12 is affixed to aform section 16. A form is used to define the shape of the concrete once it hardens. Thecoupler 12 may be affixed using a securingdevice 18. The securingdevice 18 may be a nail, screw, or any other device similar in nature so that thecoupler 12 may be securely affixed to theform section 16. Alternatively, thecoupler 12 may also be affixed to theform section 16 using adhesive placed on a proximal end of thecoupler 12, or any other appropriate method of attachment that would be appreciated by one of ordinary skill of the art. According to various aspects of the present disclosure, the configuration of thecoupler 12 and the correspondingsheath 14 allows thecoupler 12 to be formed without a flange at the end portion which abuts theform section 16. Thus, theouter sleeve 24 of each tubular element of thecoupler 12 may define the maximum outer diameter of thecoupler 12, and the tubular elements themselves are capable of withstanding the forces associated with pouring concrete around thesheath 14. In a contemplated embodiment, to prepare to pour a large section of concrete, a plurality ofcouplers 12 is affixed to theform section 16 in a straight line; the line may run generally parallel to theunderlying support surface 54. - It is to be appreciated that the
form section 16 to which thecouplers 12 are attached is part of a complete form used to dictate the shape of the concrete once the concrete hardens. That is, theform section 16 is part of a complete form that forms a boundary for concrete that is poured within the boundary. - The form is arranged upon the
underlying support surface 54 so that concrete remains within the boundary defined by the form when the concrete is poured within the form. The form may be made of wooden studs or planks, plastic slabs, or any supports that will not chemically react with the concrete in a way that adversely affects the shape or structural integrity of the concrete. - A
sheath 14 is slidably disposed over each of thecouplers 12 and may be held in place by friction or by other means of attachment, such as adhesives. One of ordinary skill in the art will appreciate that the fit between eachcoupler 12 and its correspondingsheath 14 is tight and sealed enough so that it is unlikely that pourable concrete can leak into thesheaths 14 when the concrete is poured. Concrete leaking into the interior of thesheaths 14 can negatively impact one of the functions of the concretedowel placement system 10, which is to allowslip dowels 56 to slide freely within thesheaths 14. Further, regardless of the method used to secure thecoupler 12 to theform section 16, it is contemplated that the secure and sealed connection between thecoupler 12 and theform section 16 can be maintained during the pouring of the concrete and until the concrete hardens. That is, the connection between thecoupler 12 andsheath 14 is strong enough such that the pouring of the concrete does not break or disrupt the connection. - An
attachable end cap 20 may be disposed on a distal end of thesheath 14 to completely cover theopening 38 at the end of thesheath 14 to prevent pourable concrete from leaking into the interior of thesheath 14 after the concrete is poured over the concretedowel placement system 10. - Now referring to the cross-sectional view of two different orientations of a concrete
dowel placement system 10 ofFIGS. 13 and 14 , thecoupler 12 may have at least two positional orientations. As shown inFIG. 13 , in one orientation, the smaller end of thecoupler 12 is affixed to theform section 16. The smaller end may have a diameter or cross-sectional area that is smaller than the diameter or cross-sectional area of the bigger end. This permits asheath 14 with an interior size similar to the bigger end of thecoupler 12 to slidably engage the bigger end of thecoupler 12. Alternatively, as shown inFIG. 14 , a bigger end portion of thecoupler 12 may be affixed to theform section 16. In this case, asheath 14 with an interior size similar to the size of the smaller end of thecoupler 12 may slidably engage the smaller end of thecoupler 12. Thus, thecoupler 12 may have at least two different orientations upon theform section 16 to allow connectability with at least twodifferent sheaths 14 having different dimensions. It is to be appreciated that regardless of the positional orientation of thecoupler 12, the connection between thecoupler 12 and thesheath 14 is tight and sealed enough to prevent pourable concrete from substantially intruding into the interior of thesheath 14. - Next, concrete may be poured within a first form. Now referring to
FIG. 15 , concrete is poured onto the underlayingsupport surface 54 and within the first form. The poured concrete makes contact with thesheath 14 and theend cap 20. It is contemplated that the pourable concrete may completely cover theouter surfaces 40 of thesheath 14 and theend cap 20 that are exposed to the pourable concrete. Once the concrete hardens, this portion of concrete is a firstconcrete section 52. The concrete of the hardened firstconcrete section 52 affixes to thesheath 14 to prevent movement between thesheath 14 and the hardened firstconcrete section 52. As shown inFIG. 15 , after the firstconcrete section 52 is established, the interior of thesheath 14 remains hollow except possibly for a portion of theend cap 20 which may be disposed within an end portion of thesheath 14 if theend cap 20 is in the form of, for example, a plug. The empty interior of thesheath 14 allows aslip dowel 56 to be inserted within thesheath 14 at a later time. - Referring to
FIGS. 16 and 17 , after the firstconcrete section 52 hardens, theform section 16 andcoupler 12 are removed. The removal of theform section 16 andcoupler 12 exposes an edge surface of the firstconcrete section 52, the edge surface allowing access to the interior of thesheath 14. Thus, aslip dowel 56 may be advanced into thesheath 14 as shown inFIG. 17 . - The
slip dowel 56 may be a smooth steel rod, but it is contemplated that theslip dowel 56 may be made of aluminum, iron, or any other suitable metal or metal alloy strong enough to endure longitudinal or vertical compression and expansion forces that may occur between sections of concrete without bending substantially. Further, the entire outer surface of theslip dowel 56 need not be smooth. For example, a length portion of theslip dowel 56 may include a ribbed outer surface, similar to the outer surface of typical re-bar, or include other features on the outer surface such that theslip dowel 56 is unsmooth. It is further contemplated that the edge surface of the firstconcrete section 52 allows access to a plurality ofinterior openings 38 ofsheaths 14 aligned generally in parallel within the firstconcrete section 52, thus allowing for a plurality of generally parallel-aligned slip dowels 56 to be inserted intosheaths 14. - The
slip dowel 56 may be fully advanced within thesheath 14 so as to make contact with theend cap 20, but it is also contemplated that theslip dowel 56 may be only partially advanced within thesheath 14 to allow space between the inserted end of theslip dowel 56 and theend cap 20. The space can help prevent undesirable pressure within the firstconcrete section 52 and the secondconcrete section 58 that may be caused by theslip dowel 56 pressing against theend cap 20 when the concrete expands. Such pressure can potentially expedite undesirable weakening of the concrete. - The
slip dowel 56 projects into an area immediately adjacent to the firstconcrete section 52 to define an exposed segment, allowing for a secondconcrete section 58 to be poured over the exposed segment of theslip dowel 56. - Now referring to
FIG. 18 , next, the secondconcrete section 58 may be formed. A second form is prepared and disposed upon the underlayingsupport surface 54, bounding the area immediately adjacent to the firstconcrete section 52 and encompassing the exposed segments of the slip dowels 56. Then, concrete is poured within the second form and the concrete is allowed to make contact with the exposed segments of the slip dowels 56. The concrete may also completely cover the outer surfaces of the slip dowels 56. After the concrete hardens, this portion of concrete is the secondconcrete section 58 and the form may be removed. - Since the edge surface of the second
concrete section 58 that makes contact with the edge surface of the firstconcrete section 52 hardens at a different time than the edge surface of the firstconcrete section 52, a cold joint 60 forms at the interface. - In contrast to the first
concrete section 52, which includes asheath 14 and anend cap 20 disposed within, the secondconcrete section 58 has no portion of a concretedowel placement system 10 disposed within, and thus makes contact with the slip dowels 56. This contact with the slip dowels 56 allows the secondconcrete section 58 to adhere to the slip dowels 56, thus prohibiting movement between the slip dowels 56 and the secondconcrete section 58. This adhesion allows the slip dowels 56 to slide longitudinally within thesheaths 14 and across the cold joint 60. As the firstconcrete section 52 and the secondconcrete section 58 expand and contract, the secondconcrete section 58 holds onto to the slip dowels 56 while thesheaths 14 disposed within the firstconcrete section 52 allow the slip dowels 56 to slide back and forth freely within thesheaths 14. - The ability for the slip dowels 56 to slide freely within the
sheaths 14 aids in preventing buckling and bulging of the concrete at the cold joint 60. Buckling and bulging is often undesirable because it can result in cracks in the concrete, thus reducing the structural integrity of the concrete, and in the case of a pedestrian application, can pose a safety hazard by increasing the risk of people tripping on the cracks. Cracks and bulging in the concrete may also be considered aesthetically unappealing. - The ability for the slip dowels 56 to slide freely within the
sheaths 14 also allows the interface between the firstconcrete section 52 and the secondconcrete section 58 to remain aligned, thus preventing faulting, i.e., undesirable skewing of the firstconcrete section 52 and the secondconcrete section 58 at the cold joint 60. Skewing at the cold joint 60 may damage the concrete, weaken the concrete, or result in undesirable aesthetics. - Referring now to
FIGS. 19-21 , there is depicted yet another embodiment of acoupler 100 including atubular element 102 including aninner sleeve 104 and a plurality ofsplines 106 extending along theinner sleeve 104. Notably, the coupler inFIGS. 19-21 does not include an outer sleeve coaxially disposed relative to theinner sleeve 104. Rather, thesplines 106 extend radially outward from theinner sleeve 104 to provide an outer engagement surface adapted to frictionally engage thesheath 108. The use ofsplines 106, rather than an outer sleeve, may allow thecoupler 100 to be formed using less material, and thus, cost savings may be achieved. - The
inner sleeve 104 depicted inFIGS. 19-21 is a cylindrical tube disposed about acentral axis 110, and thus, includes aninner surface 112 defining anaperture 114 extending along the length of theinner sleeve 104. Theaperture 114 is sized and configured to receive afastener 116, such as a nail, screw, or the like for securing thecoupler 100 to theconcrete form 118. Theinner sleeve 104 includes afirst end 120 and an opposingsecond end 122, wherein thefirst end 120 is adapted to be disposed in abutting contact with theconcrete form 118 when thecoupler 100 is attached thereto. - The plurality of
splines 106 are coupled to theinner sleeve 104, with eachspline 106 extending radially outward from anouter surface 124 of theinner sleeve 104, so as to define a coupler outer diameter, D. Thecoupler 100 is configured such that the outer diameter D is sized and configured so as to enable thesheath 108 to be advanced over thecoupler 100, with aninner surface 126 of thesheath 108 frictionally engaging with thesplines 106. Eachspline 106 also extends axially along theouter surface 124 of theinner sleeve 104 between the first and second ends 120, 122 thereof. In the exemplary embodiment, thecoupler 100 includes eightsplines 106 spaced evenly around the outer circumference of theinner sleeve 104, e.g., thesplines 106 are spaced apart by about 45 degrees. As shown inFIGS. 19 and 21 , thesplines 106 extend completely between the first and second ends 120, 122, with thesplines 106 having abeveled surface 128 adjacent thesecond end 122. However, it is understood that in other implementations, thesplines 106 may extend only partially between the first and second ends 120, 122. - The
coupler 100 may be formed via extrusion, wherein an extrusion die having an opening corresponding to the cross section depicted inFIG. 20 is used to form thecoupler 100, as described in more detail above. Of course, other materials and manufacturing techniques may also be used without departing from the spirit and scope of the present disclosure. -
FIGS. 19-21 show thecoupler 100 being of a substantially uniform configuration between the first and second ends 120, 122 thereof. In this respect, the outer diameter D is substantially uniform along the length of thecoupler 100. Thus, thecoupler 100 is adapted for use with asheath 108 having an inner opening that is of a specific diameter, which corresponds to the outer diameter D of thecoupler 100. - However, referring now to
FIG. 22 , there is depicted another embodiment of acoupler 200 including a firsttubular element 202 defining a first outer diameter, D1, and a secondtubular element 204 defining a second outer diameter, D2, greater than the first outer diameter D1. The first and secondtubular elements tubular element 202 includes a firstinner sleeve 206 and a plurality offirst splines 208, while the secondtubular element 204 includes a secondinner sleeve 210 and a plurality ofsecond splines 212. The plurality offirst splines 208 define the first outer diameter D1, and the plurality ofsecond splines 212 define the second outer diameter D2. The firsttubular element 202 defines afirst abutment end 214, while the secondtubular element 204 defines asecond abutment end 216, with the first and second abutment ends 214, 216 each being adapted to be positioned in abutting contact with aconcrete form 118, depending on the intended use of thecoupler 200, e.g., whether thecoupler 200 is to be used with a sheath adapted to frictionally engage the outer surface of thesplines 208 on the firsttubular element 202, or thesplines 212 on the secondtubular element 204. In particular, if thecoupler 200 is to be used with a sheath which engages withsplines 208 on the firsttubular element 202, thecoupler 200 is attached to theform 118 with thesecond abutment end 216 coupled to the form, and the firsttubular element 202 extending away from the form. Conversely, if thecoupler 200 is to be used with a sheath which engages withsplines 212 on the secondtubular element 204, thecoupler 200 is attached to theform 118 with thefirst abutment end 214 coupled to the form, and the secondtubular element 204 extending away from the form. - The particulars shown herein are by way of example and for purposes of illustrative discussion of the embodiments of the present disclosure only and are presented in the cause of providing what is believed to be the most useful and readily understood description of the principles and conceptual aspects of the present disclosure. In this regard, no attempt is made to show structural details of the present disclosure in more detail than is necessary for the fundamental understanding of the present disclosure, the description taken with the drawings making apparent to those skilled in the art how the several forms of the present disclosure may be embodied in practice.
Claims (20)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/141,137 US20190024367A1 (en) | 2015-10-05 | 2018-09-25 | Concrete dowel placement system and method of making the same |
US15/930,362 US20200299953A1 (en) | 2015-10-05 | 2020-05-12 | Concrete dowel placement system and method of making the same |
US17/469,400 US11623380B2 (en) | 2015-10-05 | 2021-09-08 | Concrete dowel placement system and method of making the same |
US18/186,078 US12059832B2 (en) | 2015-10-05 | 2023-03-17 | Concrete dowel placement system and method of making the same |
US18/661,451 US20240308126A1 (en) | 2015-10-05 | 2024-05-10 | Concrete dowel placement system and method of making the same |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/874,997 US20170096810A1 (en) | 2015-10-05 | 2015-10-05 | Concrete dowel placement system and method of making the same |
US15/587,141 US10858825B2 (en) | 2015-10-05 | 2017-05-04 | Concrete dowel placement system and method of making the same |
US16/141,137 US20190024367A1 (en) | 2015-10-05 | 2018-09-25 | Concrete dowel placement system and method of making the same |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/587,141 Continuation-In-Part US10858825B2 (en) | 2015-10-05 | 2017-05-04 | Concrete dowel placement system and method of making the same |
Related Child Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US201715930362A Continuation | 2015-10-05 | 2017-05-12 | |
US15/930,362 Continuation US20200299953A1 (en) | 2015-10-05 | 2020-05-12 | Concrete dowel placement system and method of making the same |
Publications (1)
Publication Number | Publication Date |
---|---|
US20190024367A1 true US20190024367A1 (en) | 2019-01-24 |
Family
ID=65018415
Family Applications (5)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/141,137 Abandoned US20190024367A1 (en) | 2015-10-05 | 2018-09-25 | Concrete dowel placement system and method of making the same |
US15/930,362 Abandoned US20200299953A1 (en) | 2015-10-05 | 2020-05-12 | Concrete dowel placement system and method of making the same |
US17/469,400 Active US11623380B2 (en) | 2015-10-05 | 2021-09-08 | Concrete dowel placement system and method of making the same |
US18/186,078 Active US12059832B2 (en) | 2015-10-05 | 2023-03-17 | Concrete dowel placement system and method of making the same |
US18/661,451 Pending US20240308126A1 (en) | 2015-10-05 | 2024-05-10 | Concrete dowel placement system and method of making the same |
Family Applications After (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/930,362 Abandoned US20200299953A1 (en) | 2015-10-05 | 2020-05-12 | Concrete dowel placement system and method of making the same |
US17/469,400 Active US11623380B2 (en) | 2015-10-05 | 2021-09-08 | Concrete dowel placement system and method of making the same |
US18/186,078 Active US12059832B2 (en) | 2015-10-05 | 2023-03-17 | Concrete dowel placement system and method of making the same |
US18/661,451 Pending US20240308126A1 (en) | 2015-10-05 | 2024-05-10 | Concrete dowel placement system and method of making the same |
Country Status (1)
Country | Link |
---|---|
US (5) | US20190024367A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20190301106A1 (en) * | 2018-03-30 | 2019-10-03 | United States Of America As Represented By The Secretary Of The Army | Electro-active vitreous enamel coated dowel bar |
US20210402666A1 (en) * | 2015-10-05 | 2021-12-30 | Shaw & Sons, Inc. | Concrete dowel placement system and method of making the same |
CN114293563A (en) * | 2022-01-12 | 2022-04-08 | 佳木斯大学 | Civil engineering is safety support structure for foundation ditch |
US11346116B1 (en) * | 2022-01-28 | 2022-05-31 | Carlos Contreras | Block out chair system used to make a block out or a pass-through in a concrete slab |
CN114932670A (en) * | 2022-05-21 | 2022-08-23 | 临海伟星新型建材有限公司 | Preparation method of novel electrical sheath pipeline |
US11959231B2 (en) | 2020-03-17 | 2024-04-16 | Shaw & Sons, Inc. | Concrete dowel placement method and apparatus |
US12129672B2 (en) | 2020-08-04 | 2024-10-29 | Raise The Bar Detailing | Device and method for forming voids in concrete |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7100262B2 (en) * | 2019-02-28 | 2022-07-13 | 日本電信電話株式会社 | Reinforced concrete structure |
Family Cites Families (148)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US754215A (en) | 1903-07-15 | 1904-03-08 | Morris A Hayward | Flooring end joint. |
US1045562A (en) | 1911-12-28 | 1912-11-26 | Joseph Kennedy | Concrete insert. |
US1699557A (en) | 1924-03-10 | 1929-01-22 | Roy V Yeager | Screed anchoring and leveling device |
US1545267A (en) | 1924-06-03 | 1925-07-07 | Edward A Marye | Dowel concrete joint |
US1592681A (en) | 1925-05-21 | 1926-07-13 | Verner G H Grothe | Screed support |
US1728936A (en) | 1926-08-25 | 1929-09-24 | Nathan C Johnson | Concrete construction |
US1631576A (en) | 1926-10-11 | 1927-06-07 | Claude E Bowers | Device for connecting the abutting ends of concrete slabs |
US1767575A (en) | 1928-03-21 | 1930-06-24 | Herman C Bujack | Sleeper tie |
US1755219A (en) | 1929-02-18 | 1930-04-22 | Associated Factories Corp | Expansion joint in concrete pavements |
US1838635A (en) | 1929-03-26 | 1931-12-29 | Pilj Carl | Guide bar support for concrete gauges |
US1826062A (en) | 1930-01-23 | 1931-10-06 | Roscoe D Farmer | Joint form for paving |
US1852673A (en) | 1930-01-31 | 1932-04-05 | Pilj Carl | Floor screed support |
US1939007A (en) | 1931-01-27 | 1933-12-12 | John N Heltzel | Adjustable concrete form |
US1953846A (en) | 1931-06-18 | 1934-04-03 | Robert W Briggs | Expansion joint for concrete articles |
US1942494A (en) | 1931-07-03 | 1934-01-09 | Edward A Robertson | Dowel bar cap and stop |
US2066448A (en) | 1932-02-15 | 1937-01-05 | Bahr Starting Gate Corp | Starting gate with self-aligning spiked stall partitions |
US2365550A (en) | 1934-01-24 | 1944-12-19 | John N Heltzel | Expansion joint |
US2181005A (en) | 1935-05-20 | 1939-11-21 | Cal C Chambers | Dowel bar structure |
US2039420A (en) | 1935-07-29 | 1936-05-05 | Isett John Warren | Method of constructing, repairing, and widening concrete roads |
US2095060A (en) | 1935-11-01 | 1937-10-05 | Henry A Taubensee | Joint for concrete slabs |
US2108107A (en) | 1935-12-02 | 1938-02-15 | Wees Russell J De | Means for anchoring structural elements to concrete supporting bodies |
DK52370C (en) | 1935-12-10 | 1936-11-30 | Kunstvaeverske Julie Marie Ove | Irrigator. |
US2096702A (en) | 1936-02-07 | 1937-10-19 | James H Jacobson | Dowel bar bearing |
US2110738A (en) | 1936-06-05 | 1938-03-08 | Acme Steel & Malleable Iron Wo | Road joint forming means or the like |
US2166220A (en) | 1936-11-16 | 1939-07-18 | Older Clifford | Concrete road joint |
US2129568A (en) | 1938-03-17 | 1938-09-06 | Biasi Charles P De | Screed support |
US2277203A (en) | 1938-07-01 | 1942-03-24 | Boult Louise Gertrude | Method of constructing concrete flooring and like surfaces |
US2262704A (en) | 1938-09-30 | 1941-11-11 | Francis M Tompkins | Apparatus used in connection with laying, drying, and curing concrete |
US2275272A (en) | 1938-12-12 | 1942-03-03 | Jr Edward W Scripture | Method of curing concrete |
US2269703A (en) | 1939-04-08 | 1942-01-13 | Robert M Bagwill | Expansion joint and rod supporting assembly |
US2296453A (en) | 1941-04-16 | 1942-09-22 | George J Saffert | Method of molding concrete products |
US2331949A (en) | 1942-07-24 | 1943-10-19 | Marvin E Whiteman | Screed support |
US2319526A (en) | 1942-08-28 | 1943-05-18 | Stanley J Wearn | Screed support |
US2373284A (en) | 1943-09-21 | 1945-04-10 | James J Armstrong | Adjustable screed |
US2508443A (en) | 1946-08-20 | 1950-05-23 | John E Carter | Sealed joint for concrete slab road pavements |
US2636426A (en) | 1946-09-18 | 1953-04-28 | The Union Savings Trus Company | Dowel bar adjusting and aligning device |
US2551826A (en) | 1948-05-11 | 1951-05-08 | Sr Paul W Cox | Concrete screed legs |
US2746365A (en) | 1951-11-16 | 1956-05-22 | Joseph A Darneille | Road construction |
DK79813C (en) | 1953-02-06 | 1955-09-05 | Andreas Dyrbye | Template holder for use in masonry of arches and connectors in window and door openings. |
FR1094449A (en) | 1953-11-20 | 1955-05-20 | Winged dowel | |
US2902742A (en) | 1954-07-26 | 1959-09-08 | Matich Brothers | Side form for concrete pavement |
US2823539A (en) | 1955-06-14 | 1958-02-18 | Ronald C Kersh | Screed supporting pad |
US2980215A (en) | 1957-11-12 | 1961-04-18 | Englund Ernest | Tubular interlocking joint |
US3007199A (en) | 1959-01-20 | 1961-11-07 | Albert Andy | Extruding head filter |
GB914692A (en) | 1959-08-31 | 1963-01-02 | Tecaiemit Ltd | Improvements in flexible tubes and the manufacture thereof |
US3333380A (en) | 1964-02-07 | 1967-08-01 | Wolf Heinz | Adjustable leveling implement for finishing cast concrete layers |
US3284973A (en) | 1964-04-10 | 1966-11-15 | Ames | Cement finishing apparatus |
US3279335A (en) | 1964-07-16 | 1966-10-18 | Edward D Garner | Joint for concrete slabs |
AT281897B (en) | 1964-08-05 | 1970-06-10 | Baustahlgewebe Gmbh | Anchoring for concrete deck slabs separated by dummy joints |
US3318224A (en) | 1966-10-18 | 1967-05-09 | Acme Engineering And Mfg Corp | Ventilating and circulating air system tube hanger |
US3451179A (en) | 1967-05-04 | 1969-06-24 | Norbert A Kendzia | Screed support |
US3527486A (en) | 1967-06-27 | 1970-09-08 | Anton Gamp | Dowel-sleeve assembly |
US3700529A (en) | 1970-10-27 | 1972-10-24 | M & H Plastics Inc | Method and apparatus for tubular articles |
US3896599A (en) | 1971-12-30 | 1975-07-29 | Itt | Hanger insert for steel floor deck |
DE2226983C2 (en) | 1972-06-02 | 1973-10-31 | Gewerkschaft Schalker Eisenhuette, 4650 Gelsenkirchen | A device attached to a coke oven charging car for lifting off the filler hole cover |
US3920221A (en) | 1973-05-31 | 1975-11-18 | Clifford M Berry | Construction safety anchor means |
US3921356A (en) | 1973-06-22 | 1975-11-25 | Robert S Hughes | System and apparatus for interconnecting structural members, and method of utilizing same |
CH568457A5 (en) | 1973-09-11 | 1975-10-31 | Sonderegger Emil | Frame for concrete ceiling mfr - has trimming pole drawn over rails with level determined by spindle and pipe on formwork |
US4077177A (en) | 1974-08-09 | 1978-03-07 | Boothroyd Rodney L | Curved architectural structure of foam and cement |
US4252767A (en) | 1975-06-17 | 1981-02-24 | Daniel Zimmer | Composite building module |
US4146599A (en) | 1976-10-14 | 1979-03-27 | Lanzetta John B | Device for applying exposed aggregate and method of applying said aggregate |
US4087072A (en) | 1977-02-22 | 1978-05-02 | Olsen Audun P | Form means for fabricating pre-cast structural panels |
US4115976A (en) | 1977-03-21 | 1978-09-26 | John Rohrer Contracting Company | Method for screeding cement |
US4158937A (en) | 1978-01-12 | 1979-06-26 | Henry Wendell L | Concrete screed adjustable stirrup |
USD257503S (en) | 1979-02-01 | 1980-11-11 | The Scott & Fetzer Company | Single channel roll bar for retractable awnings |
US4281496A (en) | 1979-07-06 | 1981-08-04 | Danielsson Jan O | Method of forming concrete floors and product of the method |
US4261496A (en) | 1979-09-14 | 1981-04-14 | Four Star Corporation | Ski rack |
US4329080A (en) | 1980-09-15 | 1982-05-11 | Schlegel Corporation | Joint former |
US4449844A (en) | 1981-05-11 | 1984-05-22 | Larsen Torbjorn J | Dowel for pavement joints |
USD272517S (en) | 1981-06-15 | 1984-02-07 | Fabcon, Inc. | Combination lift insert and weld plate for use in hollow core concrete planks |
US4493584A (en) | 1981-12-17 | 1985-01-15 | Guntert & Zimmerman Const. Div., Inc. | Apparatus and process for dowel insertions |
US4437828A (en) | 1982-01-15 | 1984-03-20 | Egger David L | Screed bar assembly |
US4657430A (en) | 1983-01-24 | 1987-04-14 | Marionneaux John L | Roadway and roadway expansion joint |
DE3460289D1 (en) | 1983-03-16 | 1986-08-21 | Witschi H | Connection and stress repartition element for concrete parts |
US4496504A (en) | 1983-06-29 | 1985-01-29 | Steenson Thomas W | Method of exposing aggregate in a poured concrete panel |
US4533112A (en) | 1983-10-11 | 1985-08-06 | Western Steel Cutting, Inc. | Curb stake with integral support |
NO153901C (en) | 1983-11-07 | 1986-06-11 | Kristoffer Idland | SOEYLES SHOES, AND PROCEDURES FOR FOLDING SOEYLES SHOES. |
CA1242591A (en) | 1984-12-27 | 1988-10-04 | Ronald J. Johnston | Truss arrangement |
US4648739A (en) | 1985-03-20 | 1987-03-10 | Thomsen Bernard D | Load transfer cell assembly for concrete pavement transverse joints |
US4800702A (en) | 1986-03-03 | 1989-01-31 | Wheeler Charles F | Steel placement member |
US4752153A (en) | 1986-05-19 | 1988-06-21 | Miller Industrial Products | Compensating highway joint |
ES2017682B3 (en) | 1986-07-28 | 1991-03-01 | Siemens Ag | NUCLEAR POWER PLANT WITH A METAL REACTOR PRESSURE DEPOSIT |
US4726561A (en) | 1986-09-15 | 1988-02-23 | Worzala Jr Edward | Concrete insert apparatus |
US5205942A (en) | 1987-02-12 | 1993-04-27 | Fitzgerald Leonard R | Lipped channel formwork |
US5096155A (en) | 1987-02-12 | 1992-03-17 | Fitzgerald Leonard R | Concrete form supporting bracket |
US4748788A (en) | 1987-07-01 | 1988-06-07 | Shaw Ronald D | Surface seeded exposed aggregate concrete and method of producing same |
USD309280S (en) | 1987-09-03 | 1990-07-17 | Vicki Balfanz-Lee | Pacifier coupler for baby's garment |
US4821988A (en) | 1987-10-05 | 1989-04-18 | Jimenez Louis M | Catheter bag holder |
USD314325S (en) | 1987-10-09 | 1991-02-05 | Ziaylek Jr Theodore | Clamping set of bracket arms for supporting tubular objects |
US4899497A (en) | 1988-01-15 | 1990-02-13 | Madl Jr Jos | Foundation system and derivative bracing system for manufactured building |
US4883385A (en) | 1988-04-15 | 1989-11-28 | Dayton Superior Corporation | Load transfer assembly |
CH676615A5 (en) | 1988-04-22 | 1991-02-15 | Bau Box Ewiag | |
ES2035457T3 (en) | 1988-07-15 | 1993-04-16 | Machtle Gmbh | TACO OF FACADE. |
US5216862A (en) | 1988-10-27 | 1993-06-08 | Shaw Ronald D | Concrete dowel placement sleeves |
US5005331A (en) | 1990-04-10 | 1991-04-09 | Shaw Ronald D | Concrete dowel placement sleeves |
US4996816A (en) | 1989-10-06 | 1991-03-05 | Wiebe Jacob R | Support for elongate members in a poured layer |
US5046898A (en) | 1990-06-20 | 1991-09-10 | Mckinney Gary S | Retaining wall and building block therefor |
US5134828A (en) | 1990-12-14 | 1992-08-04 | High Industries, Inc. | Connection for joining precast concrete panels |
US5212919A (en) | 1991-01-28 | 1993-05-25 | Shaw Lee A | Nelson stud screed post assembly |
US5301485A (en) | 1991-01-28 | 1994-04-12 | Shaw Lee A | Nelson stud screed post assembly |
US5618125A (en) | 1994-01-18 | 1997-04-08 | Permaban North America, Inc. | Dowell alignment apparatus |
US5487249A (en) | 1994-03-28 | 1996-01-30 | Shaw; Ronald D. | Dowel placement apparatus for monolithic concrete pour and method of use |
USD363211S (en) | 1995-03-13 | 1995-10-17 | Apothecary Products, Inc. | Clip for a bottle and a syringe |
USD375600S (en) | 1995-07-18 | 1996-11-12 | Yazaki Industrial Chemical Co., Ltd. | Structural pipe |
USD375599S (en) | 1995-07-18 | 1996-11-12 | Yazaki Industrial Chemical Co., Ltd. | Structural pipe |
US5678952A (en) | 1995-11-16 | 1997-10-21 | Shaw; Lee A. | Concrete dowel placement apparatus |
US5797231A (en) | 1996-01-16 | 1998-08-25 | Kramer; Donald R. | Concrete slab dowel system and method for making same |
US5713174A (en) | 1996-01-16 | 1998-02-03 | Kramer; Donald R. | Concrete slab dowel system and method for making same |
US5694730A (en) | 1996-10-25 | 1997-12-09 | Noranda Inc. | Spline for joining boards |
CA2246967C (en) | 1997-09-16 | 2000-06-06 | Dennis M. Imm | An automated weldless inter-locking grating assembly for bridge decks and like structures |
US6354760B1 (en) | 1997-11-26 | 2002-03-12 | Russell Boxall | System for transferring loads between cast-in-place slabs |
US6123485A (en) | 1998-02-03 | 2000-09-26 | University Of Central Florida | Pre-stressed FRP-concrete composite structural members |
BE1012984A3 (en) | 1998-04-29 | 2001-07-03 | Eurosteel Sa | STRUCTURE FOR PAVING SEAL MATERIAL moldable. |
US6517277B2 (en) | 1998-09-22 | 2003-02-11 | Kansas State University Research Foundation | Expansion and crack joint coupler |
FI110631B (en) | 1998-10-20 | 2003-02-28 | Teraespeikko Oy | Process for the preparation of a field of ground-fixed concrete slabs and fields of ground-fixed concrete slabs |
US6145262A (en) | 1998-11-12 | 2000-11-14 | Expando-Lok, Inc. | Dowel bar sleeve system and method |
USD419700S (en) | 1998-11-20 | 2000-01-25 | Shaw Lee A | Load transfer dowel holder |
US6243994B1 (en) | 1999-01-11 | 2001-06-12 | Bebo Of America, Inc. | Joint for pre-cast concrete twin-leaf arch sections |
DE19904797C1 (en) | 1999-02-05 | 2000-12-28 | Wirtgen Gmbh | Device for inserting dowels in freshly laid pavements |
USD459205S1 (en) | 1999-02-05 | 2002-06-25 | Lee A. Shaw | Concrete dowel tube with clip |
US6210070B1 (en) | 1999-04-14 | 2001-04-03 | Ron D. Shaw | Concrete dowel slip tube with clip |
US6502359B1 (en) | 2000-02-22 | 2003-01-07 | Bometals, Inc. | Dowel placement apparatus for concrete slabs |
US6775952B2 (en) | 2001-08-01 | 2004-08-17 | Permaban North America, Inc. | System of protecting the edges of cast-in-place concrete slab on ground, construction joints |
US8302359B2 (en) | 2001-08-01 | 2012-11-06 | Russell Boxall | System of protecting the edges and construction joints of cast in place concrete slabs |
WO2003023146A1 (en) | 2001-09-13 | 2003-03-20 | Russell Boxall | Load transfer plate for in situ concrete slabs |
US8381470B2 (en) | 2001-09-13 | 2013-02-26 | Russell Boxall | Tapered load plate for transferring loads between cast-in-place slabs |
US7140398B2 (en) | 2002-01-28 | 2006-11-28 | Alliance Design And Development Group, Inc. | Sports equipment having a tubular structural member |
DE60335154D1 (en) | 2002-08-16 | 2011-01-05 | Permaban Ltd | Concrete floor slab |
US7004443B2 (en) | 2003-03-19 | 2006-02-28 | Dayton Superior Corporation | Concrete void former |
US7314333B2 (en) | 2003-08-13 | 2008-01-01 | Shaw & Sons, Inc. | Plate concrete dowel system |
US6926463B2 (en) | 2003-08-13 | 2005-08-09 | Lee A. Shaw | Disk plate concrete dowel system |
US20060275078A1 (en) | 2003-08-13 | 2006-12-07 | Shaw & Sons, Inc. | Plate concrete dowel system |
US7338230B2 (en) | 2003-08-13 | 2008-03-04 | Shaw & Sons, Inc. | Plate concrete dowel system |
US20050265802A1 (en) | 2004-05-27 | 2005-12-01 | Alltrista Zinc Products, L.P. | Environmentally protected reinforcement dowel pins and method of making |
US20060127179A1 (en) | 2004-06-10 | 2006-06-15 | Nadler Donald S | System and method for concrete slab connection |
US7637689B2 (en) | 2005-08-11 | 2009-12-29 | Russell Boxall | On-grade plates for joints between on-grade concrete slabs |
US20070134063A1 (en) * | 2005-12-14 | 2007-06-14 | Shaw And Sons, Inc. | Dowel device with closed end speed cover |
US7736088B2 (en) | 2006-07-13 | 2010-06-15 | Russell Boxall | Rectangular load plate |
US8303210B2 (en) | 2006-10-09 | 2012-11-06 | Nigel Parkes | Method for constructing adjacent cast in place concrete slabs using a template for positioning pocket formers |
AU2009222503B2 (en) | 2008-10-03 | 2015-08-27 | Leviat Pty Ltd | Dowel sleeves |
US8627626B2 (en) | 2010-04-21 | 2014-01-14 | Russell Boxall | Transferring loads across joints in concrete slabs |
US20140020320A1 (en) | 2012-07-18 | 2014-01-23 | Nigel K. Parkes | Leave-in-Place Concrete Formwork Combining Plate Dowels, Divider Plates, and/or Finishing, Armoring and/or Sealing Molding |
US20140248076A1 (en) * | 2013-03-01 | 2014-09-04 | Shaw & Sons, Inc. | Slip dowel system |
US20150197898A1 (en) * | 2014-01-15 | 2015-07-16 | Shaw & Sons, Inc. | Concrete dowel system |
US9340969B1 (en) * | 2014-11-13 | 2016-05-17 | Shaw & Sons, Inc. | Crush zone dowel tube |
US20190024367A1 (en) * | 2015-10-05 | 2019-01-24 | Shaw & Sons, Inc. | Concrete dowel placement system and method of making the same |
US20170096810A1 (en) * | 2015-10-05 | 2017-04-06 | Shaw & Sons, Inc. | Concrete dowel placement system and method of making the same |
US20210292978A1 (en) * | 2020-03-17 | 2021-09-23 | Shaw Craftsmen Concrete, Llc | Concrete dowel placement method and apparatus |
-
2018
- 2018-09-25 US US16/141,137 patent/US20190024367A1/en not_active Abandoned
-
2020
- 2020-05-12 US US15/930,362 patent/US20200299953A1/en not_active Abandoned
-
2021
- 2021-09-08 US US17/469,400 patent/US11623380B2/en active Active
-
2023
- 2023-03-17 US US18/186,078 patent/US12059832B2/en active Active
-
2024
- 2024-05-10 US US18/661,451 patent/US20240308126A1/en active Pending
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20210402666A1 (en) * | 2015-10-05 | 2021-12-30 | Shaw & Sons, Inc. | Concrete dowel placement system and method of making the same |
US11623380B2 (en) * | 2015-10-05 | 2023-04-11 | Shaw & Sons, Inc. | Concrete dowel placement system and method of making the same |
US20230226738A1 (en) * | 2015-10-05 | 2023-07-20 | Shaw & Sons, Inc. | Concrete dowel placement system and method of making the same |
US12059832B2 (en) * | 2015-10-05 | 2024-08-13 | Shaw & Sons, Inc. | Concrete dowel placement system and method of making the same |
US20190301106A1 (en) * | 2018-03-30 | 2019-10-03 | United States Of America As Represented By The Secretary Of The Army | Electro-active vitreous enamel coated dowel bar |
US10711411B2 (en) * | 2018-03-30 | 2020-07-14 | United States Of America As Represented By The Secretary Of The Army | Electro-active vitreous enamel coated dowel bar |
US11959231B2 (en) | 2020-03-17 | 2024-04-16 | Shaw & Sons, Inc. | Concrete dowel placement method and apparatus |
US12129672B2 (en) | 2020-08-04 | 2024-10-29 | Raise The Bar Detailing | Device and method for forming voids in concrete |
CN114293563A (en) * | 2022-01-12 | 2022-04-08 | 佳木斯大学 | Civil engineering is safety support structure for foundation ditch |
US11346116B1 (en) * | 2022-01-28 | 2022-05-31 | Carlos Contreras | Block out chair system used to make a block out or a pass-through in a concrete slab |
CN114932670A (en) * | 2022-05-21 | 2022-08-23 | 临海伟星新型建材有限公司 | Preparation method of novel electrical sheath pipeline |
Also Published As
Publication number | Publication date |
---|---|
US20200299953A1 (en) | 2020-09-24 |
US11623380B2 (en) | 2023-04-11 |
US12059832B2 (en) | 2024-08-13 |
US20240308126A1 (en) | 2024-09-19 |
US20230226738A1 (en) | 2023-07-20 |
US20210402666A1 (en) | 2021-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US12059832B2 (en) | Concrete dowel placement system and method of making the same | |
US20240100758A1 (en) | Concrete dowel placement system and method of making the same | |
US20200149228A1 (en) | Concrete dowel system | |
US5678952A (en) | Concrete dowel placement apparatus | |
US5005331A (en) | Concrete dowel placement sleeves | |
US5487249A (en) | Dowel placement apparatus for monolithic concrete pour and method of use | |
US5216862A (en) | Concrete dowel placement sleeves | |
US8007199B2 (en) | Dowel device with closed end speed cover | |
US9593480B2 (en) | Building block, as well as an insert piece to be applied in such a building block | |
US11959231B2 (en) | Concrete dowel placement method and apparatus | |
US20090060657A1 (en) | Concrete dowel placement device and methods of use | |
JP2017040112A (en) | Sheath coupler | |
KR20080000824U (en) | Wall penetration end cover sleeve | |
IT201800003784A1 (en) | COMPASS AND A METHOD FOR BUILDING PALISES | |
CA2237651A1 (en) | Concrete dowel placement apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
AS | Assignment |
Owner name: SHAW & SONS, INC., CALIFORNIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SHAW, RONALD D.;REEL/FRAME:049595/0450 Effective date: 20190626 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |