Nothing Special   »   [go: up one dir, main page]

SI22933A - Assembly for automatic supervision and control of the use of mooringsfor vessels including automatic floating buoys and method associated with it - Google Patents

Assembly for automatic supervision and control of the use of mooringsfor vessels including automatic floating buoys and method associated with it Download PDF

Info

Publication number
SI22933A
SI22933A SI201000034A SI201000034A SI22933A SI 22933 A SI22933 A SI 22933A SI 201000034 A SI201000034 A SI 201000034A SI 201000034 A SI201000034 A SI 201000034A SI 22933 A SI22933 A SI 22933A
Authority
SI
Slovenia
Prior art keywords
buoy
mooring
payment
vessel
ear
Prior art date
Application number
SI201000034A
Other languages
Slovenian (sl)
Inventor
Grivić@Boris
Original Assignee
SKLAD@NEPREMIÄŚNIN@d@o@o
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=42308283&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=SI22933(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by SKLAD@NEPREMIÄŚNIN@d@o@o filed Critical SKLAD@NEPREMIÄŚNIN@d@o@o
Priority to SI201000034A priority Critical patent/SI22933A/en
Priority to HR20100178A priority patent/HRP20100178A2/en
Publication of SI22933A publication Critical patent/SI22933A/en
Priority to MEP-2015-129A priority patent/ME02187B/en
Priority to PCT/SI2011/000003 priority patent/WO2011096901A1/en
Priority to ES11708592.8T priority patent/ES2546309T3/en
Priority to PT117085928T priority patent/PT2531981E/en
Priority to EP11708592.8A priority patent/EP2531981B1/en
Priority to CN201180015502.6A priority patent/CN102870140B/en
Priority to HRP20150910TT priority patent/HRP20150910T1/en

Links

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07BTICKET-ISSUING APPARATUS; FARE-REGISTERING APPARATUS; FRANKING APPARATUS
    • G07B15/00Arrangements or apparatus for collecting fares, tolls or entrance fees at one or more control points
    • G07B15/02Arrangements or apparatus for collecting fares, tolls or entrance fees at one or more control points taking into account a variable factor such as distance or time, e.g. for passenger transport, parking systems or car rental systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F17/00Coin-freed apparatus for hiring articles; Coin-freed facilities or services
    • G07F17/10Coin-freed apparatus for hiring articles; Coin-freed facilities or services for means for safe-keeping of property, left temporarily, e.g. by fastening the property

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Ocean & Marine Engineering (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Business, Economics & Management (AREA)
  • Finance (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
  • Lock And Its Accessories (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention refers to the assembly for automatic supervision and control of the use of moorings for vessels which includes automatic floating buoys and a method associated with is and refers to completely automated buoys (1) with automatic mechanism for payment and fastening of small and large boats and other vessels (2) within the selected water area (7) based on a two-way mutual communication between the buoys (1) and operative control centre (3), between the boat managers (2) and operative control centre (3) and additionally by way of an internet link (40) between them and the potential users (5) without the need for assistance by personnel. The communication is based on broadband data and information transfer by using mobile GSM technology and/or SMS messaging. Each buoy (1) features and integrated central computer (18), a communication module (20) with antenna (36) and an attachment ear (10), an alphanumeric keyboard (44) for entering identification codes and control LED diodes (14, 15) for condition signalling. The buoy (1) features a special mechanism (45) for the payment of the mooring by credit card, money or jetons. Each buoy (1) is attached to the weight (8) via a voltage sensor (9) connected to a cable rope (13), while against using an unpaid mooring it is protected among others by blades (43) at the top (42).

Description

SESTAV ZA SAMODEJNO UPRAVLJANJE IN NADZOR NAD UPORABO PRIVEZOV ZA VODNA PLOVILA, KI VKLJUČUJE AVTOMATIZIRANE PLAVAJOČE BOJE TER METODA V ZVEZI S TEMAUTOMATIC MANAGEMENT AND CONTROL SYSTEMS FOR THE USE OF WATER BOATS, INCLUDING AUTOMATED FLOATING COLORS AND METHODS Related thereto

Predmet izuma je sestav za samodejno upravljanje in nadzor nad uporabo privezov za vodna plovila, ki vključuje avtomatizirane plavajoče boje ter metoda v zvezi s tem, oziroma je natančneje popolnoma avtomatizirana boja s samodejnim mehanizmom za privez bark, čolnov in drugih vodnih plovil, opremljena za neposredno in povsem avtomatizirano delovanje znotraj sistema za upravljanje in kontrolo privezov, brez potrebne prisotnosti ljudi, s pripadajočim aktivnim sistemom za njeno pritrditev na utež na dnu.The subject of the invention is an assembly for the automatic control and control of the use of moorings for watercraft, which includes automated floating buoys and the method thereof, or more precisely the fully automatic buoyancy with an automatic mooring mechanism for boats, boats and other watercraft, equipped for direct and fully automated operation within the berth management and control system, without the necessary presence of humans, with an associated active system for attaching it to the weight at the bottom.

Izum je po mednarodni patentni klasifikaciji predvidoma uvrščen v B63B 22/00, G08G 3/00 in G07B 15/00 ter dodatno v B63B 22/02, B63B 22/24 in B63B 22/04.According to the international patent classification, the invention is allegedly classified in B63B 22/00, G08G 3/00 and G07B 15/00, and additionally in B63B 22/02, B63B 22/24 and B63B 22/04.

Tehnični problem, ki ga rešuje izum, je takšen sestav samodejnega upravljanja in nadzora na uporabo privezov za vodna plovila, ki bo omogočal direktno komuniciranje skupine boj s komunikacijskim centrom, pri čemer bo konstrukcija boje omogočala enostavno in popolnoma avtomatizirano upravljanje s privezi • · plovil ter učinkovit nadzor nad njimi, ki med drugim obsega enostavni in nadzorovani način plačilom priveza ter posredovanjem podatkov v zvezi s tem v komunikacijski center, brez potrebne prisotnosti človeka oziroma ljudi, hkrati pa bo konstrukcija boje enostavna ter kompaktna, izvedbe manjšega votlega vsebnika, oblikovanega skladno značilnemu načinu delovanja boje in celotnega nadzornega in upravljavskega sistema priveza, ki ga ta boja omogoča.A technical problem solved by the invention is such an assembly of automatic control and control over the use of moorings for watercraft, which will allow direct communication of the group of battles with the communication center, whereby the design of the buoy will allow simple and fully automated management of mooring effective control over them, which includes, among other things, an easy and controlled way of paying for the berth and transmitting data in this connection to the communication center, without the necessary presence of humans or people, while at the same time the construction of the buoy will be simple and compact, with the implementation of a small hollow container designed in accordance with the characteristic the mode of operation of the buoy and the entire berthing control and management system that this buoy enables.

Splošno znane rešitve obsegajo votle plastične boje, ki so z vrvjo ali verigo privezane na balast, najpogosteje betonski. Slabost tega je, da je mogoč neplačan in nenadzorovan privez plovil, da verige rjavijo, vrvi pa obrastejo alge, zato je njihova življenjska doba relativno kratka, vprašljiva pa je tudi njihova nosilnost.Commonly known solutions include hollow plastic buoys that are tethered to a ballast with a rope or chain, most often concrete. The disadvantage is that unpaid and uncontrolled mooring of vessels is possible for chains to rust and the ropes to spruce up algae, so their lifespan is relatively short and their carrying capacity is questionable.

Plovila se običajno privežejo direktno na vrv ali na fiksni kovinski obroč na vrhu boje. Na teh znanih bojah ni podatka o nosilnosti vrvi, verige in ne o teži balasta. Ob privezu običajno sodelujeta dve osebi, prva bojo pritegne na nivo polube, druga pa skozi obroč napelje vrv za privez plovila. Privez plovila na bojo lahko opravi ena oseba le, če so vremenskih pogojih ugodni in ob veliki izkušenosti te osebe.Vessels are usually tethered directly to a rope or to a fixed metal ring at the top of the buoy. On these known buoys, there is no indication of the load capacity of the rope, the chain and the weight of the ballast. Usually two people are involved in the mooring, the first will draw the buoy to the level of the hem, and the second draws a rope for mooring the vessel through the hoop. Boat mooring can only be done by one person if the weather conditions are favorable and with that person's great experience.

Pri tovrstnih privezih je tudi nemogoče ugotoviti lastnika oziroma upravitelja boj in zaradi tega se poraja dvom ali najem oziroma privez zaračunava upravičena oseba. Običajno države za upravljanje boj in njihovo oddajanje v najem, podeljujejo koncesije, zato je koncesijska dajatev edini možen način pobiranja davkov. V takšnih primerih lastniki oziroma uporabniki plovil le te praviloma vežejo na boje na lastno odgovornost, brez prehodnega vedenja o nosilnosti boje.In such berths, it is also impossible to identify the owner or manager of the fights, which causes the doubt or rent or berth of the eligible person. Usually, the countries that administer the fight and lease them grant concessions, so a concession tax is the only possible way to collect taxes. In such cases, the ship's owners or users, as a rule, bind them to the buoys at their own risk, without any transient knowledge of the carrying capacity of the buoy.

Za pobiranje najemnine je pri znanih bojah običajno potrebna ena oseba, ki nadzira in zaračunava določeno število boj na pripadajočem in obvladljivem področju, pri čemer pri tem potrebuje ustrezno plovilo. V teh primerih je boje nemogoče ali vsaj zelo težko v naprej rezervirati, še posebej na daljavo.For well-known buoys, picking up rent usually requires one person to monitor and charge for a certain number of fights in the relevant and manageable area, requiring a proper craft. In these cases, it is impossible or at least very difficult to book in advance, especially at a distance.

Izven sezone in v nočnem času običajno ni nikogar, ki bi nadziral in upravljal boje ter zaračunaval njihov najem, kar pomeni izpad prihodka.Out of season and during the night, there is usually no one to control and manage the fights and charge their rent, which means a loss of revenue.

Iz predhodno opisanega izhaja, da upravljanje znanih boj zahteva stalno fizično prisotnost najmanj ene osebe za izvajanje nadzora in zagotavljanja delovanja, zato so boje za privez plovil prednostno nameščene ob naseljenih obalah, na odročnih krajih, na primer na morskih in drugih otokih jih praktično ni.It follows from the foregoing that the management of known buoys requires the constant physical presence of at least one person to carry out surveillance and assurance operations, and therefore mooring buoys are preferably located off inhabited shores, in remote places, such as seas and other islands, practically absent.

Ker je navtični turizem močno v porastu, so predhodno opisane pomanjkljivosti in slabosti običajnih področij z znanimi bojami postale izredno nefunkcionalne in neracionalne, tudi moteče. Pa tudi sidranje izven njihovega območja je, ob vse bolj pogostih neurjih in drugih naravnih katastrofah, manj varno, tako za ljudi kot za plovila.As nautical tourism is on the rise, the previously described shortcomings and weaknesses of conventional battlefield areas have become extremely dysfunctional and irrational, even disturbing. Also, anchoring outside their area is less safe for people and vessels in the face of increasing storms and other natural disasters.

Sodobnejša, nam znana rešitev je znana po sistemu za kontrolo in upravljanje privezov na območju morja iz dokumenta EP 1 550 086 oziroma WO 2004/032064. Po tem dokumentu imajo boje možnost enosmerne komunikacije z lokalno kontrolno postajo, katera opravlja povratno komunikacijo z operativnim centrom. Gre torej za komunikacijo med tremi enotami v sistemu, med bojami in lokalno kontrolno postajo ter med slednjo in operativnim centrom. Pri tem se boje sestojijo iz votlega plastičnega ohišja, znotraj katerega so nameščeni elektronska enota z anteno, radiokomunikacijska naprava z anteno ter solarna plošča z baterijo, ki skupaj oblikujeta avtonomno električno napajalno enoto boje. Na dnu boje se nahaja kljuka za verigo, preko katere je boja pritrjena na utež na dnu. Boja je torej izdelana tako, da omogoča njeno komunikacijo s kontrolno postajo, ki je osnovana na Wifi standardu. Postajo za sprejem in oddajanje tvorita oddajnik/sprejemnik in antena nameščena na vrhu boje, oblike prstana. Ta postaja je programirana tako, da komunicira s plovilom s pomočjo uporabniške identifikacijske kode, ki je shranjena v operativnem centru. Asociacija med postajo in plovilom omogoča, da se, v trenutku pristajanja plovila, uskladijo postavljeni pogoji in, da se izvaja nadzor nad dovoljenim kreditom, shranjenim v operativnem centru. To pomeni, da je privez plovila na prosto bojo mogoč le tako, da upravitelj plovila pred ali po privezu obišče operativni center in plača določeni kreditni znesek oziroma ceno priveza. Če tega ne stori, ga nato opozori delavec v operativnem centru, katerega nenehna prisotnost je nujna. V kolikor je plovilo odplulo predčasno, pred iztekom plačanega časa priveza, delavec operativnega centra uporabniku plovila vrne razliko do polnega zneska, če pa plovilo odpluje kasneje, pa delavec zahteva doplačilo. Ohišje boje v bistvu tvorita diametralno nasproti si ležeča pokončna valja, katerih osnovni ploskvi se stikata in, ki v stranskem pogledu oblikujeta enovito votlo telo oblike deltoida oziroma pokončnega romba. Pri tej znani rešitvi gre torej za sistem nadzora in upravljanja pri pristajanju plovil in njihovem privezu na bojo, ki deluje na ta način, da boja sporoči kontrolnemu centru, da se je na bojo privezalo plovilo. Po izvršenem privezu obstajata dve možnosti. Prva je ta, da delavec operativnega centra odide do plovila in zaračuna privez, druga pa ta, da lahko to stori uporabnik plovila z obiskom delavca v centru. Bistvena slabost te znane rešitve je v tem, da je kljub vsem napravam v sistemu in zaradi zgolj enosmerne komunikacije med njimi, še vedno potreben človeški nadzor nad upravljanjem boj in nad plačevanjem priveza plovil in to v vseh obdobjih, praktično 24 ur na dan. Nadalje je njena pomanjkljivost tudi v tem, da se lahko uporabnik plovila na bojo priveže brez predhodnega ali kasnejšega plačila priveza, kar še dodatno zahteva stalno človeško prisotnost zaradi nadzora nad tem. Slabost tega sistema je tudi ta, da je za komunikacijo med bojami in operativnim centrom potreben najmanj en ali več vmesnih lokalnih kontrolnih centrov, zaradi česar je izvedba tega sistema zahtevna, zapletena in draga.The more modern known solution is known to us for the control and management of moorings in the sea area, from document EP 1 550 086 or WO 2004/032064. According to this document, the buoys have the possibility of a one-way communication with a local control station, which performs a reverse communication with the operations center. It is therefore communication between the three units in the system, between the battles and the local control station and between the latter and the operation center. The buoys consist of a hollow plastic housing housing an electronic antenna unit, a radio communication device with an antenna, and a solar panel with a battery that together form an autonomous electrical power unit for the buoy. At the bottom of the buoy is a chain hook, through which the buoy is attached to the weight at the bottom. The color is therefore designed to allow it to communicate with a control station based on the Wifi standard. The receiving and transmitting stations are formed by a transmitter / receiver and an antenna mounted on top of the buoy, ring-shaped. This station is programmed to communicate with the vessel using the user identification code stored in the Operations Center. The association between the station and the vessel allows, at the moment of landing of the vessel, to harmonize the set conditions and to exercise control over the authorized credit stored in the operational center. This means that a mooring berth of a vessel is only possible by having the vessel's manager visit the operational center before or after the berth and pay the specified credit amount or berth price. If he fails to do so, he is then alerted by an employee at the operations center whose continued presence is essential. If the vessel sailed early, before the paid berth time has elapsed, the operative center worker shall refund the difference to the vessel's user up to the full amount, or if the vessel sails later, the worker shall require an additional payment. The buoy housing is essentially diametrically opposed upright cylinders, the base surfaces of which contact and which, in lateral view, form a uniform hollow body shaped like a deltoid or upright rhombus. This well-known solution is therefore a control and command system for the landing of vessels and their berth, which operates in such a way that it communicates to the control center that the vessel has been moored. After the berth is completed, there are two options. The first is that the operative center worker goes to the vessel and charges for the berth, and the second is that the vessel user can do so by visiting the center worker. The essential disadvantage of this well-known solution is that despite all the devices in the system and because of the one-way communication between them, human control of the management of the battleships and the payment of the mooring of vessels is still required, at all times, practically 24 hours a day. Furthermore, its disadvantage is that the vessel's user can moor without having to pay the berth before or after, which further requires a permanent human presence to control it. The disadvantage of this system is that at least one or more intermediate local control centers is required for communication between combatants and the operations center, which makes the implementation of this system difficult, complicated and expensive.

Problem, ki je ostal nerešen, je predvsem v zahtevni izvedbi sistema oziroma naprave za nadzor in upravljanje privezov plovil, ki za komunikacijo med bojami in operativnim centrom zahteva dodatne vmesne lokalne kontrolne centre ter stalno fizično prisotnost človeka pri plačilih privezov in nadzor nad njimi ter je nadalje tudi v tem, da oblika boje in njen način pritrditve na utež na dnu, na eni • · strani omogočata nedovoljene in s tem neplačane priveze, ne omogočata pa učinkovitega nadzora nad neplačanimi privezi in nad pogoji za privez.The problem that has remained unsolved is, in particular, the demanding implementation of a system or device for monitoring and managing the mooring of vessels, which requires additional intermediate local control centers for communication between the combatants and the operational center, as well as the permanent physical presence of the person at the berth payments and control. furthermore, the shape of the buoy and its method of attachment to the bottom weight, on the one hand, allow unauthorized and therefore unpaid berths, but do not allow effective control of unpaid berths and conditions for mooring.

Po izumu je problem rešen s sestavom za samodejno upravljanje in nadzor nad uporabo privezov za vodna plovila, ki vključuje avtomatizirane plavajoče boje ter metodo v zvezi s tem, ki bo omogočala neposredno dvosmerno komunikacijo z komunikacijskim centrom in ki bo, zaradi svoje izvedbe in oblike, onemogočala privez plovila brez predhodnega ali kasnejšega plačila priveza, katerega bo mogoče izvršiti na daljavo, brez potrebne prisotnosti človeka znotraj centra, avtomatiziran pa bo tudi nadzor in opravljanje z bojami na enem ali več vodnih področjih.According to the invention, the problem is solved by an assembly for the automatic control and control of the use of moorings for watercraft, which includes automated floating buoys and a method in this connection that will allow direct two-way communication with the communication center and which, due to its construction and shape, prevent the mooring of the vessel without prior or subsequent payment of the berth, which can be made remotely, without the necessary presence of a person inside the center, and will also automate control and combat operations in one or more water areas.

Izum bo natančneje opisan na izvedbenem primeru in slikah, ki prikazujejo sl. 1 shematski prikaz delovanja sistema avtomatskega upravljanja in nadzora nad privezi znotraj področja z avtomatiziranimi plavajočimi bojami sl. 2 pritrditev boje na balast na dnu sl. 3 avtomatizirano bojo v vzdolžnem vertikalnem prerezuThe invention will be described more specifically in the embodiment and in the drawings illustrating FIG. 1 is a schematic view of the operation of an automatic berth management and control system within an automated floating buoy area. 2 attaching a buoy to the ballast at the bottom of FIG. 3 automated buoy in longitudinal vertical section

Sestav za samodejno upravljanje in nadzor nad uporabo privezov za vodna plovila, ki vključuje avtomatizirane plavajoče boje ter metodo v zvezi s tem po prijavljenem izumu, se v bistvu sestoji iz osrednjega operativno kontrolnega centra 3 s strežnikom 4, prednostno lociranega na kopnem 6 in iz poljubnega števila avtomatiziranih boj 1, lociranih znotraj pripadajočega vodnega področja 7. Operativno kontrolni center 3 je s strežnikom 4 spojen s komunikacijskim vodom 41, le ta pa je s pomočjo internetne povezave 40 dostopen potencialnim uporabnikom 5. Opisano je prikazano na sl. 1.An automatic control and monitoring system for mooring for watercraft, which includes automated floating buoys and the related method according to the invention, consists essentially of a central operational control center 3 with a server 4, preferably located on land 6 and any the number of automated fights 1 located within the associated water area 7. The operational control center 3 is connected to the server 4 by a communication line 41, which is accessible to potential users via an Internet connection 40. 1.

Operativno kontrolni center 3 brezžično in povsem samodejno komunicira z avtomatiziranimi bojami 1, hkrati pa na identičen način komunicira s strežnikom 4 ter preko njega in internetne povezave 40 z uporabniki 5. Vse opisane komunikacije potekajo v obe smeri, pri čemer je pomembno tudi to, da komunikacijska povezava med bojami 1 in operativno kontrolnim centrom 3 poteka preko širokopasovnega prenosa podatkov, torej s pomočjo mobilne GSM telefonije in/ali SMS sporočil, kar omogoča izvedba boje 1 po izumu.Operational control center 3 communicates wirelessly and fully with automated buoys 1, communicating in the same way with server 4 and through it and Internet connection 40 with users 5. All of the described communications are in both directions, and it is important that The communication link between Booms 1 and the Operational Control Center 3 is via broadband data transmission, ie by means of mobile GSM telephony and / or SMS, which enables the implementation of Boat 1 according to the invention.

Upravljalec plovila 2, ki pripluje v vodno področje 7, najprej poišče prosto bojo 1. Nato mora privez plačati v naprej, kar je pogoj za izvedbo priveza plovila 2 na izbrano bojo 1. Brez predhodnega plačila privez na bojo 1 ni mogoč, razen začasno, v primeru plačila z denarjem, žetoni ali karticami, kar bo opisano v nadaljevanju.The operator of vessel 2 entering the water area 7 first seeks a free berth 1. Thereafter he must pay the berth in advance, which is a condition for the berth of vessel 2 to be selected for buoy 1. No berth for buoy 1 is possible without prior payment, except temporarily, in the case of payment with money, tokens or cards, which will be described below.

Za plačilo priveza ima upravljalec plovila 2 dve možnosti. Prva z žetoni, kovanci ali karticami direktno na boji 1, kar označuje linija b in druga s SMS sporočilom oziroma klicem iz GSM aparata preko operativno kontrolnega centra 3, kar označuje linija a na sl. 1. Cenik priveza je upravljalcu plovila 2 dostopen oziroma viden na sleherni boji 1. Višina plačanega zneska je odvisna od predvidenega oziroma načrtovanega časa priveza plovila 2, ki ga upravljalec določi sam. Natančneje bodo načini in postopki plačil za privez na boji 1 po izumu opisani v nadaljevanju.There are two options for vessel mooring 2 to pay for mooring. The first with tokens, coins or cards directly on buoy 1, indicated by line b and the second by SMS or call from the GSM apparatus via the operational control center 3, indicated by line a in fig. 1. The price list of the berth is accessible to the operator of vessel 2 or visible on each buoy 1. The amount paid depends on the planned or planned time of berthing of vessel 2, which the operator determines himself. Specifically, the payment methods and procedures for berthing on Boat 1 according to the invention will be described below.

Pri načinu plačila preko GSM telefona poteka plačilo preko izbranega domačega ali tujega operaterja mobilne telefonije. V ta namen je vsaka boja 1 označena s kodo, na primer *19*090800#, pri čemer število 19 pomeni številko izbrane boje 1, število 090800 pa številko klicnega centra oziroma operaterja. Ko upravljalec plovila 2 pošlje na klicni center operaterja ustrezno SMS besedilo ali klic, se iz računa klicatelja na račun lastnika oziroma upravitelja vodnega področja 7 z bojami 1 prenakažejo finančna sredstva, v določenem znesku in valuti. Po • aWith the payment method via GSM phone payment is made through the selected domestic or foreign mobile telephony operator. For this purpose, each buoy 1 is identified by a code, for example * 19 * 090800 #, where number 19 represents the number of the selected buoy 1 and number 090800 the number of the call center or operator. When the operator of vessel 2 sends a text or call to the operator's call center, the funds, in a certain amount and currency, are transferred from the caller's account to the account of the owner or manager of the water area 7 with buoy 1. Po • a

potrditvi transakcije na izbrani račun kontrolni center 3 po liniji d pošlje boji 1 ukaz za zaklenitev priveza plovila 2. Empirično znaša čas od ukaza do zaklenitve 5 do 25 sekund.Confirmation of the transaction to the selected account, control center 3 sends line 1 to the buoy 1 to lock the berth of vessel 2. Empirically, the time from the command to the lock is 5 to 25 seconds.

Ko je, po liniji a ali liniji b, plačilo uspešno izvedeno, pošlje operativno kontrolni center 3 izbrani boji 1 po liniji d signal oziroma ukaz za zaklenitev. Ustrezni mehanizem na oziroma v boji 1, ki na slikah ni prikazan, zapre oziroma sklene obroč ušesa 10 z vrvjo in varen privez plovila 2 je zagotovljen. V kolikor pred tem plačilo ni bilo opravljeno ali ni bilo opravljeno uspešno, operativno kontrolni center 3 boji 1 ne izda ukaza za sklenitev prej omenjenega obroča na ušesu 10. V tem primeru privez plovila 2 ni mogoč, saj privezna vrv iz boje 1 samodejno izpade, oziroma jo v njeno uho 10 sploh ni mogoče napeljati.When, on line a or line b, the payment is successfully completed, the operating control center 3 sends to the selected bout 1 line d a signal or a lock command. A suitable mechanism on or in buoy 1, which is not shown in the figures, closes or closes the ring of the ear 10 with a rope and a secure mooring of vessel 2 is ensured. Unless the payment has been or has not been successfully completed, the Operational Control Center 3 buoys 1 does not issue an order for the conclusion of the aforementioned ring on the ear 10. In this case, mooring of vessel 2 is not possible as the mooring rope from buoy 1 automatically drops out, or it cannot even be inserted into her ear 10.

Boje 1 so z operativno kontrolnim centrom 3 komunikacijsko povezane preko GSM signala. Sleherna boja 1 pri tem sprotno obvešča operativno kontrolni center 3 tako, da mu po liniji c posreduje informacije o zasedenosti, o stanju električne napetosti, o izvršenem denarnem plačilu na boji 1, o količini zbranega denarja, žetonov ali kartic znotraj bojel, o morebitni njeni okvari in podobno. Na drugi strani operativno kontrolni center 3 po liniji d pošilja boji 1 informacije oziroma sporočila o morebitni rezervaciji, o kodi za aktiviranje in izdaja ukaz, da se ali zaklene ali odklene.Colors 1 are communicatively connected via GSM signal to the operational control center 3. Each buoy 1 informs the control center 3 operatively by providing information on occupancy, on the status of electrical voltage, on the payment made on buoy 1, on the amount of collected money, tokens or cards within the buoy, on its possible line. defects and the like. On the other hand, the Operations Control Center 3 sends, via line d, 1 information or messages about a possible reservation, an activation code and issues a command to either lock or unlock.

Informacije o stanju boj 1 znotraj določenega vodnega področja 7, na poljubni lokaciji v svetu, so potencialnim uporabnikom 5 dostopne po elektronski poti, z internetno povezavo 40 preko strežnika 4 na strani upravitelja boj 1 v izbranem vodnem področju 7. Strežniku 4 informacije posreduje operativno kontrolni center 3 po komunikacijskem vodu 41. Operativno kontrolnemu centru 3 pa, kot je predhodno že opisano, določene informacije posredujejo tudi boje 1. Na ta način si lahko potencialni uporabniki 5 pridobijo informacije o zasedenosti in nezasedenosti privezov oziroma boj 1 na opazovani lokaciji ter o ceni priveza. Po • · tej poti lahko prosto bojo 1 na izbrani lokaciji tudi rezervirajo za vnaprej določen termin tako, da jo po elektronski poti vnaprej plačajo.Information about the status of combat 1 within a designated water area 7, at any location in the world, is accessible to potential users 5 electronically, via Internet connection 40 via server 4 on the site of battle manager 1 in the selected water area 7. Forward to server 4 information center 3 via communication line 41. Operationally control center 3, as previously described, also provides certain information to buoys 1. In this way, potential users 5 can obtain information on occupancy and occupancy of berths or buoy 1 at the observed location and price. mooring. Following this route, they can also • book free booth 1 at the selected location for a predefined term by paying it electronically in advance.

Kot je prikazano na sl. 2, je boja 1 po izumu prednostno oblike valja s konico 42, oblike navzdol obrnjenega stožca. V nekem drugem izvedbenem primeru je lahko telo boje 1 tudi drugačnih, funkcijsko ustreznih oblik, na primer oblike prisekanega stožca, prav tako s konico 42 na spodnjem koncu. Konica 42 je opremljena z rezili 43.As shown in FIG. 2, the buoy 1 according to the invention is preferably a cylindrical shape with a tip 42, a downward-facing cone. In another embodiment, the boom body 1 may also be of different functionally suitable shapes, such as a truncated cone shape, also with a tip 42 at the lower end. The tip 42 is fitted with blades 43.

Na zgornji čelni ploskvi ima boja 1 izveden mehanizem 45 za plačilo z denarjem, žetoni ali s kartico, alfanumerično tipkovnico 44 za vnos kode ter kontrolni led diodi 14 in 15. V nekem drugem izvedbenem primeru je lahko mehanizem 45 lociran tudi na neki drugi lokaciji, na primer na stranski steni ohišja 23, pri čemer velja pravilo, da se nahaja nad gladino vode. Izvedba predhodno navedenih sestavnih delov boje 1 ni potrebna v primeru, ko ta deluje izključno preko omrežja GSM mobilne telefonije.In the upper face, buoy 1 has a cash, tokens or card payment mechanism 45, an alphanumeric keypad 44 for code entry, and control LEDs 14 and 15. In another embodiment, the mechanism 45 may also be located in another location, for example, on the side wall of housing 23, the rule being that it is located above the water level. It is not necessary to carry out the aforementioned components of buoy 1 when it operates exclusively through the GSM mobile telephony network.

Vnos identifikacijske kode s tipkovnico 44 je nujen v primeru aktiviranja boje 1, ki jo je uporabnik 5 predhodno rezerviral preko internetne povezave 40 in strežnika 4, torej v primeru, ko postopek delovanja in način plačila priveza ne poteka preko GSM omrežja. Mehanizem 45 je prednostno izveden v smislu pokrova, ki vodotesno pokriva odprtino 48, nad katero je nameščen, kar je prikazano na sl. 3. Na zunanji steni valjčnega dela boje 1 sta locirana displeja 11 in 12. Displej 11 je namenjen za prikaz diagrama varnosti boje 1, ki temelji na razmerju podatkov o teža plovila 2 napram hitrosti vetra. Na ta način upravljalca plovila 2 seznani s podatkom o nosilnosti same uteži 8 in s tem boje 1, glede težo plovila 2 in na moč vetra. Hkrati je na displeju 11 prikazano tudi navodilo za rokovanje z bojo 1 in po potrebi tudi kakšno drugo navodilo. Displej 11 ima tudi vlogo posredovanja navodil o postopku rokovanja z bojo 1, vključno z načini in postopki plačila priveza in delovanjem celotnega sistema. Displej 12 pa prikazuje čas trajanja priveza in/ali čas do izteka plačanega priveza. Opravlja torej funkcijo • ·Entering an identification code with the keypad 44 is necessary in the case of activation of buoy 1 previously reserved by the user 5 via the Internet connection 40 and the server 4, ie when the operation and payment method of the mooring do not proceed through the GSM network. The mechanism 45 is preferably implemented in terms of a lid that watertightly covers the opening 48 over which it is mounted, as shown in FIG. 3. Displays 11 and 12 are located on the outer wall of the roller portion of Boat 1. Display 11 is intended to show Boat 1's safety chart based on the ratio of vessel weight data 2 to wind speed. In this way, it informs the operator of vessel 2 of the load capacity of the weight 8 itself and thus of the buoy 1, the weight of the vessel 2 and the wind power. At the same time, the instruction 11 for operating the boom 1 and, if necessary, any other instruction are also shown on the display 11. Display 11 also has the role of providing guidance on the Boat Handling Procedure 1, including the modalities and procedures for berth payment and the operation of the entire system. Display 12 shows the duration of the berth and / or the time until the paid berth expires. So it performs the function • ·

odštevalnika časa do izteka priveza. Na oziroma v bojo 1 je, pod njenim vrhom in skozi odprtino 37 prednostno gibljivo nameščeno uho 10 za privez plovila 2 z mehanizmom za njegovo delovanje, ki pa ni prikazan. Pri tem izvedbenem primeru se uho 10 premočrtno giblje skozi odprtino 37 iz notranjosti ohišja 23 boje 1 navzven ter obratno. To mu omogoča predhodno omenjeni mehanizem poljubne izvedbe. Kot je prikazano na sl. 3 je v opisovanem izvedbenem primeru uho 10 oblike prekinjenega obroča z vmesnim zazorjem 35.timer until the berth expires. At or below the boom 1, under its apex and through the opening 37, a movable mooring ear 10 for mooring a vessel 2 is preferably provided, but not shown. In this embodiment, the ear 10 moves in a straight line through the opening 37 from the inside of the housing 23 of the buoy 1 outwards and vice versa. This allows him the aforementioned arbitrary execution mechanism. As shown in FIG. 3 is, in the embodiment described, the ear 10 of the discontinuous ring having a gap 35.

Če je boja 1 prosta se po prvem izvedbenem primeru uho 10 nahaja znotraj ohišja 23, oziroma je po drugem izvedbenem primeru obroč ušesa 10 sklenjen, zaprt. Ko je privez plačan, operativno kontrolni center 3 to sporoči izbrani boji 1 in ji posreduje ukaz, da se odklene, nakar se uho 10 pomakne navzven v prvem, oziroma se njegov obroč odpre v navedenem drugem primeru. V tem času upravljalec plovila 2 vstavi vrv za privez v uho 10 v prvem in skozi zazor 35 v njegovem obroču v drugem primeru. Čez nekaj časa, v prvem primeru, ustrezni mehanizem uho 10 potegne v notranjost ohišja 23, oziroma ponovno sklene obroč ušesa 10 v drugem primeru. S tem je boja 1 zaprta oziroma zaklenjena in privez varen. Ko plačan čas priveza poteče in se le ta ne podaljša, mehanizem uho 10 z vrvjo potisne navzven oziroma odpre njegov obroč, nakar vrv iz ušesa 10 izpade in plovilo 2 je sproščeno, privez pa prekinjen.If buoy 1 is free, in the first embodiment, the ear 10 is located inside the housing 23, or in the second embodiment, the ring of the ear 10 is closed, closed. When the mooring is paid, Operational Control Center 3 informs the selected buoy 1 and instructs it to unlock, after which the ear 10 moves outwards in the first, or its ring opens in the second case specified. During this time, the operator of vessel 2 inserts a mooring rope into the ear 10 in the first and through a gap 35 in its ring in the second case. After some time, in the first case, the corresponding mechanism pulls the ear 10 inside the housing 23, or re-locks the ring of the ear 10 in the second case. This keeps Boat 1 closed or locked and the berth secure. When the paid mooring time expires and does not extend, the mechanism 10 pushes the ear 10 outwards or opens its ring, after which the rope from the ear 10 drops out and the vessel 2 is released and the mooring is interrupted.

Za predhodno opisano velja, da v prvem izvedbenem primeru poseben mehanizem uho 10 potegne v in potisne iz ohišja 23 boje 1, zaradi česar je uho 10 premočrtno ali kako drugače gibljivo. V opisanem drugem izvedbenem primeru pa je uho 10 na zunanjo steno ohišja 23 boje 1 nameščeno fiksno. Pri tej izvedbi je lahko uho 10 izvedeno kot enodelni ali dvodelni obroč ali prstan, ki ga je mogoče odpirati in zapirati, skleniti in razpreti. Ustrezen mehanizem po plačilu priveza obroč, po vstavitvi vrvi plovila 2 v uho 10, zapre in ga ponovno odpre po preteku časa plačanega priveza. Obroč ušesa 10 je torej odprt vse dokler privez ni plačan in posledično privez plovila 2 na bojo 1 ni mogoč. To ne velja za primer plačila z žetoni, denarjem ali s kartico, saj je v tem primeru uho 10 ob prihodu plovila 2 zaprto. Tako se lahko privez izvede, temu pa nujno sledi plačilo. Če • ·As described above, in the first embodiment, a special mechanism pulls the ear 10 in and pushes out of the housing 23 of the buoy 1, which makes the ear 10 linear or otherwise movable. In the second embodiment described, however, the ear 10 is mounted fixedly on the outer wall of the housing 23 of the buoy 1. In this embodiment, the ear 10 may be formed as a one-piece or two-piece ring or ring that can be opened and closed, contracted and opened. The appropriate mooring mechanism, after payment, mooring the ring, after inserting the rope of vessel 2 into the ear 10, closes and reopens it after the time of paid mooring has elapsed. The ring of the ear 10 is therefore open until the mooring is paid and consequently mooring of vessel 2 to buoy 1 is not possible. This is not the case with payment by tokens, money or card, since in this case the ear 10 is closed when the vessel 2 arrives. This way the berth can be made, followed by payment. If • ·

uporabnik 5 priveza ne plača znotraj zato določenega časa, na primer v 10 minutah, se uho 10 odpre in privezna vrv plovila 2 iz njega izpade in privez je prekinjen. Uho 10 se ponovno zapre po določenem času, nakar je boja 1 pripravljena na ponovni privez istega ali nekega drugega plovila 2.user 5 does not pay for the berth within the specified time, for example, within 10 minutes, the ear 10 opens and the mooring line of vessel 2 drops out and the berth is broken. The ear 10 closes again after a period of time, after which buoy 1 is ready to be moored again by the same or another vessel 2.

Velja, da je za predhodno opisani prvi izvedbeni primer uho 10 izvedeno kot neprekinjen obroč oziroma prstan ali kot gibljiv obroč oziroma prstan, z zmožnostjo odpiranja in zapiranja, ali kot obroč, ki je na poljubni lokaciji prekinjen z zazorjem 35.For the first embodiment described previously described, the ear 10 is constructed as a continuous ring or ring, or as a movable ring or ring, capable of opening and closing, or as a ring interrupted by a gap 35 at any location.

Za predhodno opisani drugi izvedbeni primer, pri katerem je uho 10 izvedeno zunaj oziroma na zunanjo steno votlega ohišja 23 pa velja, da je uho 10 gibljive izvedbe, kar omogoča njegovo zapiranje in odpiranje.For the second embodiment described above, in which the ear 10 is made externally or on the outer wall of the hollow housing 23, however, the ear 10 is said to be a movable embodiment, which allows it to be closed and opened.

Ne glede na izvedbo po prvem ali drugem opisanem izvedbenem primeru pa velja, da je lahko uho 2 v sklopu boje 1 izvedeno še kako drugače, pri čemer se uporabi mehanizem, ki ustreza načinu izvedbe.Regardless of the embodiment of the first or second embodiment described, however, it is said that the ear 2 may be implemented in a different manner within the boom assembly 1, using a mechanism appropriate to the embodiment.

Boja 1 je na utež 8 na dnu pritrjena preko vmesnega senzorja napetosti 9 s kabelsko vrvjo 13. Na boji 1 je točka vpetja na konici 42 vrha 22 boje 1, katere debelina je prednostno enaka premeru kabelske vrvi 13. To omogoča, da v primeru nedovoljenega oziroma neplačanega priveza plovila 2, vrv za njegov privez zdrsne proti vrhu in nato dol iz boje 1. Kabelska vrv 13 je izvedena kot električni kabel 39, ki ga po celotnem obsegu obdaja pletena jeklena vrv 38. Povedano drugače, znotraj jeklene vrvi 38 je lociran ustrezni električni kabel 39 za prenos signala o natezni napetosti iz senzorja napetosti 9 v bojo 1. Pletena vrv 38 predstavlja zaščito vmesnega električnega kabla 39, hkrati pa zagotavlja potrebno natezno trdnost boji 1, potrebno za varen privez.Color 1 is attached to the weight 8 at the bottom by an intermediate voltage sensor 9 with cable rope 13. On boom 1, the clamping point at the tip 42 of tip 22 of boom 1, whose thickness is preferably equal to the diameter of cable rope 13. This allows, in the case of tampering or unpaid mooring of vessel 2, its mooring rope slides towards the top and then down from buoy 1. Cable rope 13 is made as an electric cable 39, which is surrounded by a knit steel rope along the entire circumference. In other words, inside the steel rope 38 is located a suitable electrical cable 39 to transmit the tensile signal from the voltage sensor 9 to buoy 1. The braided rope 38 provides protection for the intermediate electric cable 39 while providing the necessary tensile strength to buoy 1 required for secure mooring.

Senzor napetosti 9 ima torej vlogo momentnega oziroma nateznega stikala, ki v primeru neplačanega priveza plovila 2 na bojo 1 le tej posreduje informacijo o nedovoljenem privezu in vklopi zvočni signal alarma 19.The voltage sensor 9 therefore acts as a momentary or tensile switch, which, in the event of unpaid mooring of vessel 2 to buoy 1, provides the latter with unauthorized mooring information and switches on the alarm signal 19.

• · • ·• · · ·

Rezila 43 na konici 42 boje 1 služijo za poškodovanje in prerez vrvi v primeru nedovoljenega oziroma neplačanega priveza, ki bi jo upravitelj plovila 2 zgolj nataknil čez bojo 1 z namenom, da se izogne plačilu. Lahko so poljubne izvedbe. Na najmanj eno rezilo 43 ali v najmanj en vmesni prostor med sosednjima reziloma 43 je izvedena ZN anoda 50 v smislu galvanskega člena, ki zavaruje v vodo potopljen del boje 1 pred korozijo.The blades 43 on the tip 42 of buoy 1 serve to damage and cut the rope in the event of an unauthorized or unpaid berth, which would simply be thrown overboard by Boat 2 operator in order to avoid payment. They can be arbitrary designs. At least one blade 43 or at least one intermediate space between adjacent blades 43, a UN anode 50 is implemented in the sense of a galvanic link, which protects a submerged part of buoy 1 from corrosion in water.

Dimenzije boje 1 po prijavljenem izumu so lahko poljubne, pri čemer v zvezi s tem obstajajo koristni empirični podatki, ki se v praksi lahko ali pa tudi ne upoštevajo. Iz njih sledi, da je optimalna dolžina oziroma višina boje 1 okrog 250 cm, pri čemer je približno polovica gleda iz vode tako, da se njen vrh z ušesom 10 nahaja nekje v višini palube plovila 2, kar močno poenostavi rokovanje z njo. Iz izkušenj tudi sledi, da je optimalni premer boje 1 okrog 30 cm. Prednostno je zunanja stena boje 1 gladka, njeno votlo ohišje pa izvedeno iz nerjavečega jekla, lahko pa tudi iz drugega temu ustreznega materiala. V nekem drugem izvedbenem primeru je lahko boja 1 izvedena tudi kako drugače in iz poljubnega drugega kovinskega in/ali nekovinskega materiala, ki ustreza njenemu namenu.The dimensions of buoy 1 of the present invention may be arbitrary, with useful empirical data that may or may not be taken into account in practice. It follows that the optimum length or height of buoy 1 is about 250 cm, with about half being viewed from the water so that its top with the ear 10 is located somewhere near the deck height of vessel 2, which greatly simplifies its handling. It also follows from experience that the optimum diameter of a buoy is about 30 cm. Preferably, the outer wall of the boom 1 is smooth and its hollow housing is made of stainless steel, but may also be of another suitable material. In another embodiment, buoy 1 may also be implemented differently and from any other metal and / or non-metallic material suitable for its purpose.

Kot je na sl. 3 prikazano, tvori bojo 1 votlo ohišje 23 s konico 42 na spodnjem koncu, kar je predhodno že povedano. Ohišje 23 je izvedeno kot vodotesna zaprta posoda oblike pravilnega ali nepravilnega valja, na in v katero so nameščeni oziroma integrirani sestavni elementi boje 1.As in FIG. 3 shown, forms a hollow housing 23 with a tip 42 at the lower end, as previously stated. The housing 23 is designed as a watertight, sealed container of the shape of a regular or irregular cylinder, onto and into which the constituent elements of the boom 1 are mounted or integrated.

Znotraj ohišja 23 je vstavljen centralni računalnik 18, ki je z vodnikom 26 spojen z napajalnikom 17 ter preko njega z najmanj eno solarno ploščico 16, pri čemer je napajalnik 17 z vodnikom 25 spojen s plus polom baterije 21 z vodnikom 24 pa z najmanj eno solarno ploščico 16. Dalje je centralni računalnik 18 z vodnikom 30 spojen s komunikacijskim modulom 20, le ta pa dalje preko vodnika 31 z minus polom baterije 21 in preko vodnika 32 z zunanjo anteno 36. Dalje je centralni • ·A central computer 18 is inserted inside the housing 23, which is connected to the power supply 17 with the conductor 26 and at least one solar panel 16 via it, and the power supply 17 to the conductor 25 is connected to the plus pole of the battery 21 with the conductor 24 to at least one solar plate 16. Further, the central computer 18 with the conductor 30 is connected to the communication module 20, which then goes through the conductor 31 with the minus pole of the battery 21 and through the conductor 32 with the external antenna 36. Next is the central • ·

računalnik 18 z vodnikom 29 spojen z ušesom 10, oziroma z njegovim mehanizmom za privez ter preko vodnika 28 z najmanj dvema displejema 11 in 12, preko vodnika 49 pa je povezan tiskalnikom 47 za tiskanje računov ter z vodnikom 27 z alarmom 19, z vodnikoma 33 in 34 pa je neposredno spojen z baterijo 21. Neprikazani digitalni odštevalnik časa je integriran v displej 12, lahko pa je lociran oziroma nameščen na tudi samostojno na neki drugi lokaciji ohišja 23 boje 1.the computer 18 is connected to the ear 29 by means of the ear 10 or its mooring mechanism, and via the conductor 28 with at least two displays 11 and 12, and via the conductor 49 is connected to the printer 47 for printing invoices and to the conductor 27 by the alarm 19, with conductors 33 and 34 are directly connected to the battery 21. The non-displayed digital timer is integrated into the display 12, or may be located or independently positioned in another location of the housing 23 of the buoy 1.

Znotraj ohišja 23 je locirana tudi posoda 46 za žetone in kovance, v katero je možen dostop skozi odprtino 48, ki je izvedena v čelno steno ohišja 23 in, ki jo vodotesno pokriva mehanizem 45, za primere plačila priveza neposredno na bojiInside the enclosure 23 there is also a container 46 for tokens and coins that can be accessed through the opening 48, which is made into the front wall of the enclosure 23 and which is watertightly covered by the mechanism 45, in cases of payment of mooring directly on the buoy

1. Ob mehanizmu 45 so, prednostno na isti lokaciji, nameščeni še alfanumerična tipkovnica 44 za vnos kode ter kontrolni oziroma signalni led diodi 14 in 15, od katerih je na primer prva zelene in druga rdeče barve. Ko na boji 1 gori led dioda 14 ali zelena luč pomeni, da je le ta prosta in, da je nanjo možen privez ob predhodnem plačilu. Če gori led dioda 15 ali rdeča luč pomeni, da privez na to bojo 1 ni mogoč, saj je ali rezervirana, zasedena ali je v okvari.1. Along with mechanism 45, preferably, the alphanumeric keypad 44 for code entry and control and signal LEDs 14 and 15, for example, the first green and the second red, are located at the same location. When on LED 1, the LED 14 or green light is on, it means that it is free and berths are available at an advanced payment. If the LED 15 or red light is on, it means that mooring on this buoy 1 is not possible as it is either reserved, busy or malfunctioning.

Solarne ploščice 16 prestavljajo sončne foto celice za proizvodnjo električne energije, namenjene za delovanje vitalnih sestavnih elementov in sklopov znotraj in zunaj ohišja 23 boje 1. Solarne ploščice 16 električno energijo dovajajo v napajalnik 17, ta pa z njo napaja baterijo 21 in preko nje vse elemente znotraj ohišja 23 boje 1. Hkrati pa baterija 21 služi tudi kot skladišče električne energije za čas, ko proizvodnja le te preko solarnih ploščic 16 iz bilo katerega vzroka ni mogoča. V nekem drugem izvedbenem primeru je lahko napajanje sestavnih elementov boje 1 izvedeno tudi na nek drugačen način, ki ustreza njeni funkciji, kar pa ne vpliva na bistvo prijavljenega izuma.Solar panels 16 are solar photo cells for electricity production designed to function vital components and assemblies inside and outside the housing 23 of the buoy 1. The solar panels 16 supply electricity to the power supply 17, which feeds the battery 21 and through it all the elements inside the housing 23 of the buoy 1. At the same time, the battery 21 also serves as a storehouse of electricity for a time when it is not possible to produce it via solar panels 16 for any reason. In another embodiment, the power supply of the constituent elements of the boom 1 may also be provided in a different manner appropriate to its function, which does not affect the essence of the claimed invention.

Načini in postopki izvedbe plačila privezov na bojah 1 po izumu so predhodno že omenjeni, a bodo v nadaljevanju natančneje opisani.The methods and procedures for the payment of berths on buoys 1 according to the invention have been mentioned previously, but will be described in more detail below.

Pri načinu plačila z GSM aparatom se plovilo 2 približa boji 1, na kateri sveti led dioda 14 oziroma zelena luč kar pomeni, da je prosta. Upravljalec plovila 2, ki je hkrati uporabnik 5, na boji 1 odčita telefonsko številko za plačilo preko GSM aparata in jo vtipka v aparat ter pritisne tipko za klic ali pošlje SMS sporočilo. Operativno kontrolni center 3 zazna številko uporabnika GSM aparata in njegov račun obremeni za določen znesek, ki je enak ceni priveza za določen čas oziroma določeno obdobje. Zatem operativno kontrolni center 3 boji 1 pošlje signal z ukazom, da se zaklene. Neprikazani mehanizem postavi uho 10 v položaj, v katerem lahko upravljalec plovila 2 oziroma uporabnik 5 vanj in skozi njega potisne vrv. S tem je plovilo 2 varno privezano na izbrano bojo 1, zato na njej sveti led dioda 15, torej rdeča luč. Displej 12 uporabniku 5 oziroma upravljalcu plovila 2 pokaže točen čas trajanja plačanega priveza. Pred potekom tega časa alarm 19 z zvočnim signalom opozori uporabnika 5, da se bo čas plačanega priveza iztekel in, da se bo, po preteku tega časa, uho 10 postavilo v odprti položaj oziroma se bo odklenilo, zaradi česar bo privezna vrv iz njega izpadla in na ta način sprostila plovilo 2. V kolikor uporabnik 5 znotraj tega časa podaljšanja trajanja priveza ne doplača, se privez na opisan način sprosti in plovilo 2 lahko prosto pluje, opazovana boja 1 pa je s tem pripravljena na nov privez drugega plovila 2, kar signalizira njena led dioda 14 zelene barve.When paying with a GSM device, vessel 2 approaches Boat 1, on which the LED 14 or green light is on, which means that it is free. The operator of vessel 2, which is also a user 5, reads out a telephone number for payment via a GSM device on booth 1 and types it into the apparatus and presses the call key or sends an SMS message. Operational Control Center 3 detects the number of the GSM phone user and debits his account for a fixed amount equal to the berth price for a fixed time or for a fixed period. The Operations Control Center 3 then sends a signal with the command to lock. The unobserved mechanism puts the ear 10 in a position where the operator of the vessel 2 or user 5 can push the rope into and through it. In this way, vessel 2 is securely moored to the selected buoy 1, so LED 15 illuminates on it, hence the red light. The display 12 shows the user 5 or the operator of the vessel 2 the exact duration of the paid berth. Before this time, the alarm 19 with an audible signal warns the user 5 that the paid mooring time will expire and that, after this time, the ear 10 will be put into the open position or unlocked, causing the mooring rope to fall out of it. and thus release vessel 2. In the absence of additional charge for user 5 within this extension of the berth, the berth shall be released in the described manner and vessel 2 may sail freely, while the observed buoy 1 is thus ready for a new berth of another vessel 2, it is signaled by its LED 14 green.

V primeru, ko je boja 1 predhodno rezervirana preko internetne povezave 40 je postopek plačila priveza z GSM aparatom ta, da uporabnik 5 preko spleta oziroma internetne povezave 40 izbere bojo 1 znotraj določenega vodnega področja 7, določi čas prihoda in predviden čas odhoda ter izvrši plačilo priveza po ceniku. Zatem uporabnik 5 po povratni poti od pristojnega operativno kontrolnega centra 3 preko strežnika 4 prejme posebno številko za svoj GSM. Ko se uporabnik 5 ob napovedanem času s plovilom 2 približa rezervirani boji 1, na njej sveti led dioda 15 oziroma rdeča luč. Upravljalec plovila 2 oziroma uporabnik 5 posebno številko, ki jo je dobil ob rezervaciji, vtipka v svoj GSM in pritisne tipko za klic. Operativno kontrolni center 3 zazna številko uporabnika 5, ki je izvršil rezervacijo in boji 1 pošlje signal za zapiranje ušesa 10 za privez. Uho 10 se s pomočjo omenjenega mehanizma postavi oziroma pomakne v položaj, ki uporabniku 5 omogoči privez na bojo 1, nakar je varen privez plovila 2 na izbrano bojo 1 zagotovljen. Med tem časom na boji 1 sveti led dioda 15 rdeče barve. Displej 12 uporabniku 5 oziroma upravljalcu plovila 2 nazorno pokaže točen čas trajanja plačanega priveza. Pred potekom časa priveza alarm 19 z zvočnim signalom opozori uporabnika 5, da se bo čez nekaj časa privez iztekel, nakar se bo uho 10 odklenilo in odprlo, privezna vrv pa bo izpadla. V kolikor uporabnik 5 znotraj zato določenega časa podaljšanja trajanja priveza ne doplača, se privez prekine in sprosti plovilo 2, opazovana boja 1 pa je pripravljena na naslednji privez, kar signalizira njena led dioda 14 ali zelena luč.In case buoy 1 is pre-booked via Internet connection 40, the payment procedure for mooring with a GSM device is that the user 5 selects buoy 1 within a certain water area 7 via the Internet or Internet connection 40, determines the arrival time and the estimated departure time and makes the payment mooring at the price list. Subsequently, user 5 receives a special number for his GSM via the return route from the competent operational control center 3 via server 4. When user 5 approaches the reserved buoy 1 at scheduled time with vessel 2, LED 15 or red light illuminates on it. The operator of vessel 2 and user 5, respectively, typed the special number which he received at the time of booking, and then pressed the call key. Operational control center 3 detects the number of the user 5 who made the reservation and sends a signal 1 to close the ear 10 for mooring. By means of said mechanism, the ear 10 is positioned or moved in a position which allows the user 5 to moor to the buoy 1, after which a secure mooring of the vessel 2 to the selected buoy 1 is ensured. During this time on LED 1, LED 15 is red. Display 12 shows to the user 5 or to the operator of the vessel 2 the exact duration of the paid berth. Before the end of the mooring period, an alarm 19 with an audible signal warns the user 5 that after a while the mooring will expire, after which the ear 10 will unlock and open and the mooring rope will fall out. If user 5 does not charge extra within the specified berth extension time, berth 2 is interrupted and the vessel 2 is released and the observed buoy 1 is ready for the next berth, signaled by its LED 14 or green light.

Pri načinu plačila z bančno ali magnetno kartico, žetonom ali denarjem, se mora plovilo 2 prav tako približati boji 1, na kateri sveti led dioda 14 oziroma zelena luč kar signalizira, da je prosta. Upravljalec plovila 2 oziroma uporabnik 5 plovilo 2 priveže na bojo 1 tako, da vrv vtakne v in skozi uho 10, ki je v zaprtem položaju, torej zaklenjena. Pri tem senzor napetosti 9 na uteži 8 zazna privez plovila 2 in na displeju 12 se prikaže znesek, ki ga je potrebno plačati za privez. V nekem drugem izvedbenem primeru je lahko senzor napetosti 9 nameščen tudi na konici 42 boje 1. Uporabnik 5 na displeju 12 izpisani znesek plača z vstavitvijo bančne ali magnetne kartice ali vrže žeton ali denar v mehanizem 45, ki skozi odprtino 48 pade v zbirno posodo 46. Boja 1 opravljeno plačilo priveza zazna in na displeju 12 se prikaže čas trajanja priveza oziroma čas do izteka plačanega priveza. Če komunikacijski sistem to omogoča, lahko boja 1 o izvršenem plačilu priveza obvesti operativno kontrolni center 3. Zatem neprikazani mehanizem uho 10 zapre in zaklene in upravljalec plovila 2 lahko skozi njega potisne vrv. To stori tako, da po prvem izvedbenem primeru uho 10 potegne v ohišje 23 oziroma po drugem izvedbenem primeru zapre obroč ušesa 10.When paying by bank or magnetic card, token or cash, vessel 2 must also come close to buoy 1, on which the LED 14 or green light is on, indicating that it is free. The operator of vessel 2 or user 5 binds vessel 2 to buoy 1 by inserting the rope into and through the ear 10, which is in the closed position, thus locked. In this case, the voltage sensor 9 on the weight 8 detects the berth of the vessel 2 and the display 12 shows the amount to be paid for the berth. In another embodiment, the voltage sensor 9 may also be mounted at the tip 42 of buoy 1. The user 5 pays the amount shown on display 12 by inserting a bank or magnetic card, or throws a token or money into a mechanism 45 which falls through the opening 48 into the collection container 46 Color 1 completes the payment for the berth and detects the duration of the berth or the time until the paid berth expires in the display 12. If the communication system so permits, buoy 1 may notify the operational control center 3 of the payment made to the berth. Subsequently, the unobserved mechanism closes and locks the ear 10 and the operator of vessel 2 can push a rope through it. This is done by pulling the ear 10 into the housing 23 after the first embodiment, or by closing the ear ring 10 after the second embodiment.

V času priveza na boji 1 sveti led dioda 15 ali rdeča luč. Displej 12 uporabniku 5 oziroma upravljalcu plovila 2 pokaže točen čas trajanja plačanega priveza. Pred potekom tega časa alarm 19 z zvočnim signalom opozori uporabnika 5, da se bo čez določen čas uho 10 odklenilo in odprlo, nakar bo privezna vrv, s katero je privezano plovilo 2, iz njega izpadla. V kolikor uporabnik 5 znotraj tega časa ne doplača podaljšanja trajanja priveza se privez prekine in sprosti plovilo 2, opazovana boja 1 pa je s tem prosta oziroma pripravljena za nov privez, kar signalizira njena led dioda 14 ali zelena luč. Pri izvedbenem primeru boje 1, ki omogoča tudi plačilo s kovanci poljubne valute velja, da je pri tem postopek podoben plačilu z žetoni. Žetoni in kovanci se zbirajo v posodi 46 in se lahko iz nje odstranijo ročno ali s pomočjo ustrezne sesalne naprave.During Boat berth 1, LED 15 or red lights up. The display 12 shows the user 5 or the operator of the vessel 2 the exact duration of the paid berth. Before this time, the alarm 19 with an audible signal warns the user 5 that after a certain time the ear 10 will be unlocked and opened, after which the mooring rope with which the mooring vessel 2 will fall out of it. If user 5 does not pay extra time for mooring within this time, mooring is terminated and the vessel 2 is released and the observed buoy 1 is thus free or ready for a new mooring, which is signaled by its LED 14 or green light. For example 1, which also allows the payment of coins of any currency, the procedure is similar to the payment with tokens. The tokens and coins are collected in the container 46 and can be removed manually or by means of a suitable suction device.

Za vse predhodno navedene in opisane načine plačila priveza na boji 1 preko GSM aparatov velja, da ostane uho 10 odprto oziroma nezaklenjeno, če plačilo ni izvršeno ali, če je čas plačanega priveza potekel in s tem privez plovila 2 na bojo 1 ni mogoč. Pri vseh ostalih načinih plačila pa se uho 10 odklene in odpre, če privez na bojo 1 ni plačan. Velja tudi, da je bojo 1 opremljena s tiskalnikom 47 le v primeru, če izvedena tako, da omogoča plačilo priveza z denarjem. V nasprotnem primeru tiskalnik 47 ni potreben. V primeru plačila s kartico preko GSM pa tiskanje računa ni potrebno, saj se račun za privez na boji 1 izpiše na mesečnem računu uporabnika 5 oziroma naročnika GSM aparata.For all the above mentioned and described payment methods for berth on Boat 1 via GSM cameras, the ear 10 is left open or unlocked if payment is not made or if the paid berth has expired and therefore mooring of vessel 2 to Boat 1 is not possible. For all other payment methods, however, the ear 10 will be unlocked and opened if the berth for Boho 1 is not paid. It will also be considered that Boho 1 is equipped with a printer 47 only if it is designed to pay for mooring with money. Otherwise, printer 47 is not required. However, in the case of payment with the card via GSM, printing of the invoice is not necessary, since the invoice for berthing on Booth 1 is displayed in the monthly invoice of the user 5 or subscriber of the GSM device.

Za potrebe vzdrževanja in servisiranja je privez boje 1 na utež 8 izveden tako, da jo je prednostno mogoče na konici 22 ali pa pri senzorju napetosti 9.For maintenance and servicing purposes, mooring 1 of the boom 1 to the weight 8 is made so that it is preferably possible at the tip 22 or at the voltage sensor 9.

Claims (15)

PATENTNI ZAHTEVKIPATENT APPLICATIONS 1. Sestav za samodejno upravljanje in nadzor nad uporabo privezov za vodna plovila, ki vključuje avtomatizirane plavajoče boje ter metoda v zvezi s tem, ki se sestoji iz enega ali več vodnih področij s poljubnim številom boj, ki so sposobne komunicirati s kontrolnim centrom oziroma operativnim centrom in, ki so na pripadajoče uteži pritrjene z vrvjo, značilen po tem, da med bojami (1) in najmanj enim operativno kontrolnim centrom (3) poteka direktna komunikacija v obe smeri (a, c) in to s pomočjo širokopasovnega prenosa podatkov, praviloma SMS sporočil in/ali klicev preko GSM aparatov, zaradi česar je vsaka boja (1) opremljena s centralnim računalnikom (18) in najmanj enim komunikacijskim modulom (20) z anteno (36) in, da je operativno kontrolni center (3) na drugi strani s komunikacijskim vodom (41) ter preko najmanj enega strežnika (4) ter internetne povezave (40) na daljavo direktno dostopen poljubnemu številu potencialnih uporabnikov (5); da vsaka boja (1) obsega najmanj eno, na ali v bojo (1), oziroma na ali v njeno votlo ohišje (23), pomično ali statično nameščeno uho (10), gibljive ali fiksne izvedbe, z ali brez zazorja (35) in to na poljubni lokaciji v območju zgornje polovice boje (1), ki ga, preko neprikazanega mehanizma in vodnika (29), krmili centralni računalnik (18) po ukazih iz komunikacijskega modula (20), pridobljenih in oblikovanih na osnovi medsebojnih informacij med bojo (1) z anteno (36) in operativno kontrolnim centrom (3); da je votlo ohišje (23) boje (1) prednostno oblike valja oziroma prisekanega stožca z rahlim nagibom daljše stranice, s stožčasto izvedeno konico (42) in je, preko kabelske vrvi (13) ter vmesnega senzorja napetosti (9), pritrjena na utež (8) tako, da se jo da sneti.1. An assembly for the automatic control and monitoring of the use of moorings for watercraft, including automated floating buoys, and a method therefor consisting of one or more water areas with any number of buoys capable of communicating with the control center or operational centers and attached to the corresponding weights by a rope, characterized in that direct communication in both directions (a, c) is carried out between the buoys (1) and at least one operational control center (3) by means of broadband data transmission, as a rule, SMS messages and / or calls via GSM devices, which makes each fight (1) equipped with a central computer (18) and at least one communication module (20) with an antenna (36) and that the operational control center (3) the other side with a communication line (41) and directly accessible to any number of potential users (5) via at least one server (4) and an internet connection (40); that each buoy (1) comprises at least one, on or in the buoy (1), or on or in its hollow housing (23), movable or statically mounted ear (10), movable or fixed designs, with or without gap (35) and at any location in the area of the upper half of the buoy (1) which is controlled by the central computer (18) via commands from the communication module (20), obtained and formed on the basis of mutual information during the buoy, through a non-shown mechanism and a guide (29) (1) with an antenna (36) and an operational control center (3); that the hollow housing (23) of the boom (1) is preferably cylindrical or truncated cone with a slight inclination of the longer side, with a conical tip (42) and is attached to the weight via a cable rope (13) and an intermediate voltage sensor (9) (8) so that it can be removed. 2. Sestav po zahtevku 1, značilen po tem, da je znotraj ohišja (23) boje (1) nameščeni centralni računalnik (18) preko vodnika (26) spojen z napajalnikom (17) in dalje preko njega z vodnikom (24) na solarno ploščico (16) ter preko vodnika (25) s plus polom baterije (21), dalje je preko vodnika (27) spojen z alarmom (19), preko vodnika (28) z displejema (11, 12), preko vodnika (29) z neprikazanim mehanizmom ušesa (10), preko vodnika (30) s komunikacijskim modulom (20), ki je z vodnikom (31) spojen z minus polom baterije (21) in z vodnikom (32) z anteno (36), pri čemer je centralni računalnik (18) na baterijo (21) vezan tudi direktno in sicer preko vodnika (34) ter preko vodnika (33) z njenim minus polom in je direktno preko vodnika (49) vezan še na tiskalnik (47), ki je v ohišje (32) boje (1) vgrajen le, če je le ta izvedena tako, da omogoča plačilo s plačilno kartico, denarjem in/ali z žetonom.Assembly according to claim 1, characterized in that inside the housing (23) of the buoy (1), a central computer (18) is connected via a conductor (26) to a power supply (17) and further through it with a conductor (24) to the solar the plate (16) and via the conductor (25) with the plus pole of the battery (21), is further connected via the conductor (27) to the alarm (19), via the conductor (28) from the display (11, 12), via the conductor (29) with the unobstructed mechanism of the ear (10), via a conductor (30) with a communication module (20), which is connected to the conductor (31) by the minus terminal of the battery (21) and the conductor (32) to the antenna (36), the central computer (18) is also connected directly to the battery (21) by means of a conductor (34) and a conductor (33) with its minus pole and is directly connected via a conductor (49) to a printer (47) which is housed in a housing (32) Buoys (1) Built in only if it is designed to allow payment by credit card, money and / or token. 3. Sestav po zahtevku 1, značilen po tem, da so v zgornjem predelu boje (1) in na poljubni lokaciji znotraj območja njene zgornje polovice ter na oziroma v njenem ohišju (23) nameščeni kontrolni led diodi (14, 15), alfanumerična tipkovnica (44) ter plačilni mehanizem (45) s posodo (46) za denar in/ali žetone, pri čemer velja, da je boja (1) z mehanizmom (45) opremljena le, če je izvedena tako, da omogoča plačilo priveza s plačilno kartico, denarjem in/ali z žetonom.Assembly according to claim 1, characterized in that a control led diode (14, 15), an alphanumeric keypad, are provided in the upper part of the buoy (1) and at any location within the region of its upper half and on or in its housing (23). (44) and a payment mechanism (45) with a container (46) for money and / or tokens, the buoy (1) being said to be equipped with a mechanism (45) only if it is designed to allow the mooring to be paid by payment card, money and / or with a token. 4. Sestav po zahtevku 1, značilen po tem, da je lahko obroč ušesa (10) gibljiv ali fiksen, uho (10) pa je premočrtno, krožno ali kako drugače pomično gibljivo skozi odprtino (37), v steni ohišja (23) boje (1).Assembly according to claim 1, characterized in that the ring of the ear (10) can be movable or fixed, and the ear (10) is linear, circular or otherwise movable through the opening (37) in the wall of the housing (23) (1). 5. Sestav po zahtevku 1, značilen po tem, da je na konici (42) izvedeno najmanj eno rezilo (44) poljubne izvedbe, z najmanj eno Zn anodo (50) in, da je vrh (22) konice (42) prednostno širine, ki je enaka preseku kabelske vrvi (13).Assembly according to claim 1, characterized in that at least one blade (44) of any embodiment is provided on the tip (42), with at least one Zn anode (50), and that the tip (22) of the tip (42) is preferably of width , which is equal to the cross-section of the cable rope (13). 6. Sestav po zahtevku 2, značilen po tem, da sta lahko displeja (11, 12) v območju zgornje polovice boje (1) izvedena na poljuben način in na poljubni lokaciji, v ali na steni njenega votlega ohišja (23), kar velja tudi za solarno ploščico (16).Assembly according to claim 2, characterized in that the displays (11, 12) in the area of the upper half of the buoy (1) can be made in any way and at any location, in or on the wall of its hollow housing (23), as applicable also for solar panel (16). 7. Sestav po zahtevku 1, značilen po tem, da kabelsko vrv (13) tvori osrednji električni kabel (9), ki ga tesno obdaja jeklena pletena vrv (38) ustreznih mehanskih, zlasti trdnostih in nateznih karakteristik.Assembly according to claim 1, characterized in that the cable rope (13) is formed by a central electrical cable (9), which is tightly enclosed by a steel braided rope (38) of appropriate mechanical, in particular strength and tensile properties. 8. Sestav po zahtevku 1, značilen po tem, da sestav izveden tako, da omogoča direktno širokopasovno komunikacija med upravljalci plovil (2) oziroma uporabniki (5) sistema in bojami (1) v smeri (b) na eni in z operativno kontrolnim centrom (3) v smer (a) na drugi strani.Assembly according to claim 1, characterized in that the assembly is designed to allow direct broadband communication between vessel operators (2) or system users (5) and buoys (1) in direction (b) at one and with the operational control center (3) in direction (a) on the other side. 9. Metoda samodejnega upravljanja, nadzora in rokovanja privezov za vodna plovila, vključno z avtomatiziranimi plavajočimi bojami, značilna po tem, da operativno kontrolni center (3) samodejno, brezžično in neposredno komunicira z bojami (1), znotraj določenega vodnega področja (7) in to v smereh (a, c) in komunicira dalje preko komunikacijskega voda (41), strežnika (4) in internetne povezave (40) s potencialnimi uporabniki (5) na način, ki ne zahteva prisotnost človeka; da lahko uporabniki (5) opravijo predhodno rezervacijo boje (1), v izbranem vodnem področju (7), preko internetne povezave (40) s pomočjo strežnika (4) in komunikacijskega voda (41) v operativno kontrolnem centru (3); da v primeru komunikacije z operativnim kontrolnim centrom (3) preko GSM aparata ali preko internetne povezave (40) in strežnika (4) brez vnaprejšnjega plačila privez plovila (2) na bojo (1) ni mogoč; da je privez plovila (2) na bojo (1) brez vnaprejšnjega plačila začasno mogoč le v primeru plačila z denarjem, žetoni ali bančnimi karticami; da je boja (1) prosta, če sveti zelena luč led diode (14) in je zasedena, rezervirana ali v okvari, če sveti rdeča luč led diode (15).9. A method for the automatic control, control and operation of moorings for watercraft, including automated floating buoys, characterized in that the operational control center (3) communicates automatically, wirelessly and directly with buoys (1), within a designated water area (7). in directions (a, c) and communicating further through a communication line (41), a server (4) and an Internet connection (40) with potential users (5) in a manner that does not require the presence of a human being; that users (5) can pre-book the buoy (1) in the selected water area (7) via an Internet connection (40) by means of a server (4) and a communication line (41) in the operational control center (3); that in the case of communication with the Operations Control Center (3) via a GSM apparatus or via an Internet connection (40) and a server (4), no berth of the vessel (2) to the buoy (1) shall be possible without advance payment; that the mooring of a vessel (2) to a buoy (1) without advance payment is provisionally possible only in the case of payment with money, tokens or bank cards; that buoy (1) is free when the green LED of the LED (14) is lit and is occupied, reserved or malfunctioning if the red LED of the LED (15) is illuminated. 10. Metoda po zahtevku 9, značilna po tem, da je s pomočjo GSM klicev in/ali SMS sporočil upravljalcev plovil (2), oziroma uporabnikov (5), omogočena direktna komunikacijska povezava v smeri (a) z operativno kontrolnim centrom (3), v smeri (b) pa z sleherno bojo (1).Method according to claim 9, characterized in that a direct communication connection in the direction (a) with the operational control center (3) is enabled by means of GSM calls and / or SMS messages from the vessel operators (2) or users (5). and in direction (b) with each buoy (1). 11. Metoda po zahtevku 9, značilna po tem, da lahko uporabnik (5) predhodno rezervacijo boje (1) in plačilo priveza opravi preko internetne • · « povezave (40) in strežnika (4) v operativno kontrolnem centru (3), ki v tem primeru po smeri (c) obvesti bojo (1) o zasedenosti, uporabniku (5) pa sporoči identifikacijsko kodo.Method according to claim 9, characterized in that the user (5) can pre-book the buoy (1) and pay for the berth via an Internet connection (40) and a server (4) in the operational control center (3), which in this case, notify direction (c) to the occupier (1) of the occupancy and inform the user (5) of the identification code. 12. Metoda po zahtevku 11, značilna po tem, da upravljale plovila (2) oziroma uporabnik (5), ki po predhodni rezervaciji prispe do izbrane boje (1) , s pomočjo alfanumerične tipkovnice (44) vtipka identifikacijsko kodo, nakar se uho (10) odklene in odpre, privezna vrv plovila (2) se lahko potisne skozi njo, nakar se uho (10) ponovno zaklene oziroma se povrne v zaprti položaj in privez je izveden.Method according to claim 11, characterized in that the operator (2) or user (5), who upon prior reservation arrives at the selected buoy (1), uses the alphanumeric keypad (44) to type the identification code and then the ear ( 10) Unlock and open, the mooring rope of the vessel (2) can be pushed through it, after which the ear (10) is locked again or retracted to the closed position and the mooring is made. 13. Metoda po zahtevku 9, značilna po tem, da uporabnik (5) v primeru, ko se plačilo priveza izvede z GSM aparatom preko izbranega operaterja, na alfanumerični tipkovnici (44) vtipka identifikacijsko kodo, sestavljeno na primer iz številke boje (1) in številke operaterja, pri čemer se določen znesek za plačilo priveza iz njegovega bančnega računa nakaže na račun upravitelja opazovanega vodnega področja (7), o čemer le ta o tem obvesti operativno kontrolni center (3), ki po smeri (c) pošlje izbrani boji (1) ukaz, da pripadajoči mehanizem zaklene uho (10), s čimer je privez plovila (2) opravljen, na displeju (12) pa se izpiše čas do izteka plačanega priveza.Method according to claim 9, characterized in that the user (5), when payment for mooring is made with the GSM device through the selected operator, enters on an alphanumeric keypad (44) an identification code consisting of, for example, a buoy number (1) and the operator's number, whereby a certain amount for the payment of the berth from his bank account is transferred to the account of the manager of the observed water area (7), which the latter informs the operational control center (3), which sends direction to the selected buoy (1) command that the associated mechanism lock the ear (10), thereby mooring the vessel (2), and display on the display (12) the time until the paid berth expires. 14. Metoda po zahtevku 9, značilna po tem, da plačilo priveza z denarjem, žetonom ali kartico poteka tako, da se privezna vrv plovila (2) potisne v in/ali skozi zaprto uho (10) na boji (1), na displeju (12) se prikaže cena priveza, ki jo uporabnik (5) plača z vstavitvijo kartice, denarja ali žetona v mehanizem (45), nakar boja (1) plačilo zazna, mehanizem namesti uho (10) v zaprti položaj, na displeju (12) se prikaže čas do izteka plačanega priveza in na boji (1) sveti rdeča luč led diode (15).Method according to claim 9, characterized in that the payment of the mooring with money, a token or a card is made by pushing the mooring rope of the vessel (2) into and / or through the closed ear (10) on the buoy (1) on the display (12) displays the price of the berth paid by the user (5) by inserting a card, money or token into the mechanism (45), after which the payment (1) detects payment, the mechanism places the ear (10) in the closed position on the display (12) ) shows the time until the paid berth expires and the LED (15) flashes red on the buoy (1). 15. Metoda po zahtevkih od 9 do 14, značilna po tem, da alarm (9), pred pretekom časa priveza plovila (2) na bojo (1), z zvočnim signalom opozori uporabnika (5) o skorajšnjem izteku časa plačanega priveza, po katerem se bo uho (10), če ne bo plačano podaljšanje časa priveza, odprlo in * · privezna vrv bo izpadla, privez plovila (2) bo prekinjen, boja (1) pa bo pripravljena na nov privez, kar bo signalizirala zelena luč na diodi (14).Method according to claims 9 to 14, characterized in that the alarm (9), before the time of mooring of the vessel (2) to the buoy (1), with an audible signal, warns the user (5) about the expiry of the paid berth time, after to which the ear (10), unless paid for an extension of mooring time, will open and * · the mooring rope will fall out, the mooring of the vessel (2) will be interrupted, and the buoy (1) will be ready for a new mooring, signaling a green light on diodes (14).
SI201000034A 2010-02-02 2010-02-02 Assembly for automatic supervision and control of the use of mooringsfor vessels including automatic floating buoys and method associated with it SI22933A (en)

Priority Applications (9)

Application Number Priority Date Filing Date Title
SI201000034A SI22933A (en) 2010-02-02 2010-02-02 Assembly for automatic supervision and control of the use of mooringsfor vessels including automatic floating buoys and method associated with it
HR20100178A HRP20100178A2 (en) 2010-02-02 2010-03-29 Automatic control system for use and control of water vessel berths which includes automated floating bove and method in connection with that
MEP-2015-129A ME02187B (en) 2010-02-02 2011-01-28 System for automatic managing and controlling the use of moorings for vessels, comprising automated floating buoys and the related method
PCT/SI2011/000003 WO2011096901A1 (en) 2010-02-02 2011-01-28 System for automatic managing and controlling the use of moorings for vessels, comprising automated floating buoys and the related method
ES11708592.8T ES2546309T3 (en) 2010-02-02 2011-01-28 System to automatically manage and control the use of mooring points for boats, comprising automated floating buoys, and related method
PT117085928T PT2531981E (en) 2010-02-02 2011-01-28 System for automatic managing and controlling the use of moorings for vessels, comprising automated floating buoys and the related method
EP11708592.8A EP2531981B1 (en) 2010-02-02 2011-01-28 System for automatic managing and controlling the use of moorings for vessels, comprising automated floating buoys and the related method
CN201180015502.6A CN102870140B (en) 2010-02-02 2011-01-28 Including automatic floating buoy and the system automatically managing and controlling the use moored a boat of correlation technique
HRP20150910TT HRP20150910T1 (en) 2010-02-02 2015-08-31 System for automatic managing and controlling the use of moorings for vessels, comprising automated floating buoys and the related method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SI201000034A SI22933A (en) 2010-02-02 2010-02-02 Assembly for automatic supervision and control of the use of mooringsfor vessels including automatic floating buoys and method associated with it

Publications (1)

Publication Number Publication Date
SI22933A true SI22933A (en) 2010-06-30

Family

ID=42308283

Family Applications (1)

Application Number Title Priority Date Filing Date
SI201000034A SI22933A (en) 2010-02-02 2010-02-02 Assembly for automatic supervision and control of the use of mooringsfor vessels including automatic floating buoys and method associated with it

Country Status (8)

Country Link
EP (1) EP2531981B1 (en)
CN (1) CN102870140B (en)
ES (1) ES2546309T3 (en)
HR (2) HRP20100178A2 (en)
ME (1) ME02187B (en)
PT (1) PT2531981E (en)
SI (1) SI22933A (en)
WO (1) WO2011096901A1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9834283B2 (en) 2014-07-31 2017-12-05 Jkp Marine Pty Ltd Mooring system and mooring buoy
US10315731B2 (en) 2014-08-27 2019-06-11 Hampidjan, Hf Line for a signal buoy and methods for submerged object retrieval and monitoring
WO2018102851A1 (en) * 2016-12-05 2018-06-14 Jkp Marine Pty Ltd Modular mooring buoy system, and buoyant body and modular unit thereof
CN107226173A (en) * 2017-06-23 2017-10-03 中船黄埔文冲船舶有限公司 Delivery device and put-on method for the subsea beacon of data process system sea examination
US11267535B2 (en) 2017-11-08 2022-03-08 Bonfiglio PLATÈ Mooring buoy
CN109572936B (en) * 2018-12-04 2023-09-12 中国海洋大学 Multifunctional wave energy profile buoy system
US11420713B2 (en) * 2019-04-18 2022-08-23 Tarkan Bastiyali Buoy reservation system
WO2020229708A1 (en) 2019-05-16 2020-11-19 Ip Buoys, S.L. Mooring device for vessels
CN110780317B (en) * 2019-10-15 2023-06-09 哈尔滨工程大学 Beidou position indicating device for automatic emergency of power buoy faults and control method
SI26157A (en) 2021-03-26 2022-09-30 Seavision d.o.o. Buoy to verify the condition of a person or object tied to the mentioned buoy
IT202100012860A1 (en) * 2021-05-18 2021-08-18 Pme Mare S R L Mooring system with a plurality of buoys with automatic immersion and radio-controlled ascent

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2332946A (en) * 1998-01-02 1999-07-07 Michael Swanson Submarine exploration system and associated marine devices
FR2825544B1 (en) * 2001-05-31 2003-12-05 Schlumberger Systems & Service METHOD AND DEVICE FOR RESERVING A PARKING SPACE
ITRM20020507A1 (en) * 2002-10-07 2004-04-08 Italgest Information Technology S P A MOUNTING CONTROL AND MANAGEMENT SYSTEM.
GB0300068D0 (en) * 2003-01-03 2003-02-05 Stock Paul R Boat link
US7287484B2 (en) * 2003-05-01 2007-10-30 David Charles Landry Berthing method and system
AU2005233657A1 (en) * 2004-04-19 2005-10-27 Terry Cullen A mooring system
WO2005101274A1 (en) * 2004-04-19 2005-10-27 Roger Wayne Richard Dyhrberg A mooring system
ATE389580T1 (en) * 2006-01-03 2008-04-15 Bluewater Energy Services Bv DETACHABLE SHIP ANCHORING SYSTEM
DE602006005651D1 (en) * 2006-08-07 2009-04-23 Bluewater Energy Services Bv Ship with an anchoring system, and anchoring system
CN201291989Y (en) * 2008-08-15 2009-08-19 广州船舶及海洋工程设计研究院 Anti-typhoon wind mooring apparatus for watercraft in ocean

Also Published As

Publication number Publication date
EP2531981B1 (en) 2015-06-03
ME02187B (en) 2016-02-20
EP2531981A1 (en) 2012-12-12
CN102870140A (en) 2013-01-09
HRP20150910T1 (en) 2015-11-06
WO2011096901A4 (en) 2011-10-13
CN102870140B (en) 2016-11-23
ES2546309T3 (en) 2015-09-22
WO2011096901A1 (en) 2011-08-11
PT2531981E (en) 2015-10-12
HRP20100178A2 (en) 2011-08-31

Similar Documents

Publication Publication Date Title
SI22933A (en) Assembly for automatic supervision and control of the use of mooringsfor vessels including automatic floating buoys and method associated with it
DE69727562T2 (en) SYSTEM AND METHOD FOR TRANSMITTING INFORMATION FOR AN AMPHIBIC VEHICLE AND CONTROL SYSTEM FOR THE VEHICLE
KR101740139B1 (en) Auto Releasing New Danger Mark Buoy
CA2473779C (en) Wind farm
CN104024101A (en) Safety buoy
CN108945198A (en) Shared equipment of riding
CN109208649A (en) Wireless remote control intelligent anti-theft well lid
CN109935053A (en) Sudden landslide early warning system
US10946937B2 (en) Auto-releasable new danger mark buoy
CN114014037B (en) Intelligent cement loading and unloading monitoring system for wharf
CN209492666U (en) A kind of Ship Anchoring device
CN109360448A (en) Inland navigation craft ETC monitoring and managing method, device, system, medium and a kind of server
EP1550086B1 (en) System for controlling and managing docking in a sea area
US11420713B2 (en) Buoy reservation system
CN212709849U (en) Device is prevented invading in no-go zone based on buoy
CN102795319A (en) River bank emergency rescue case
CN214737612U (en) Full-section electric control car stopping device
DE102019125238A1 (en) Device and method for a SIM card (subscriber identity module) controlled buoy system, which is commanded, rented and controlled via an app (application software) or PWA (progressive web app) and mobile phone.
HRP20140925A2 (en) Buoy with vessel mooring detection and control
CN107380352B (en) Floating type communication relay tower
WO2021255642A2 (en) Device for distributing stand-up paddle boards and its method
CN209603064U (en) A kind of fish pier's anchor chain being adapted to large water-head encloses button facility
CN215647013U (en) Intelligent fire-fighting monitoring terminal of electric vehicle
CN103587667B (en) Turnover plate type self-supporting power seagoing vessel Plunder-proof device
Breen et al. Catch Control in the Blue Whiting Pelagic Trawl Fishery-Research Cruise Report [2022825]: FV “Vikingbank”

Legal Events

Date Code Title Description
OO00 Grant of patent

Effective date: 20100716

KO00 Lapse of patent

Effective date: 20191004