KR102728415B1 - A fixing system for formwork - Google Patents
A fixing system for formwork Download PDFInfo
- Publication number
- KR102728415B1 KR102728415B1 KR1020220092819A KR20220092819A KR102728415B1 KR 102728415 B1 KR102728415 B1 KR 102728415B1 KR 1020220092819 A KR1020220092819 A KR 1020220092819A KR 20220092819 A KR20220092819 A KR 20220092819A KR 102728415 B1 KR102728415 B1 KR 102728415B1
- Authority
- KR
- South Korea
- Prior art keywords
- tie
- formwork
- pin
- fixed
- hole
- Prior art date
Links
- 238000009415 formwork Methods 0.000 title claims abstract description 142
- 230000008878 coupling Effects 0.000 claims abstract description 79
- 238000010168 coupling process Methods 0.000 claims abstract description 79
- 238000005859 coupling reaction Methods 0.000 claims abstract description 79
- 238000012423 maintenance Methods 0.000 claims abstract description 25
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 21
- 230000000149 penetrating effect Effects 0.000 claims abstract description 5
- 238000005304 joining Methods 0.000 claims description 6
- 230000002452 interceptive effect Effects 0.000 abstract description 8
- 238000000034 method Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 6
- 238000005452 bending Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- AZDRQVAHHNSJOQ-UHFFFAOYSA-N alumane Chemical group [AlH3] AZDRQVAHHNSJOQ-UHFFFAOYSA-N 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/04—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/07—Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members
Abstract
보거푸집 간격유지시스템이 개시된다. 본 발명의 보거푸집 간격유지시스템(100)은, 보를 시공하기 위해 배치되는 제1 거푸집의 상면에 일단부가 고정되는 제1 타이와, 상기 제1 거푸집에 대향되게 배치되는 제2 거푸집의 상면에 일단부가 고정되는 제2 타이; 상기 제1 타이의 타단부 및 상기 제2 타이의 타단부에 양단부가 각각 연결되는 제1 플렛타이; 상기 제1 타이의 타단부 및 상기 제1 플렛타이의 일단부와, 상기 제2 타이의 타단부 및 상기 제1 플렛타이의 타단부를 관통하는 한 쌍의 결합핀; 및 상기 결합핀을 고정할 수 있도록 상기 결합핀의 길이방향에 대하여 교차하는 방향으로 삽입되는 한 쌍의 고정핀을 포함하되, 상기 고정핀은 상기 제1 거푸집 및 상기 제2 거푸집 내부에 배근된 철근의 위치에 간섭되지 않도록 상기 결합핀에 형성된 다수의 고정핀홀 중 어느 하나에 삽입될 수 있는 것을 특징으로 한다. 본 발명에 의하면 보거푸집의 내부에 배근된 철근의 위치에 간섭됨이 없이 상호 대향하는 한 쌍의 보거푸집을 용이하게 고정할 수 있는 보거푸집 간격유지시스템을 제공할 수 있게 된다.A formwork spacing maintenance system is disclosed. The formwork spacing maintenance system (100) of the present invention comprises: a first tie having one end fixed to an upper surface of a first formwork arranged for constructing a beam; a second tie having one end fixed to an upper surface of a second formwork arranged opposite the first formwork; a first flat tie having both ends respectively connected to the other end of the first tie and the other end of the second tie; a pair of coupling pins penetrating the other end of the first tie and one end of the first flat tie and the other end of the second tie and the other end of the first flat tie; and a pair of fixing pins inserted in a direction intersecting the longitudinal direction of the coupling pins so as to fix the coupling pins, wherein the fixing pins are characterized in that they can be inserted into any one of a plurality of fixing pin holes formed in the coupling pins so as not to interfere with the positions of reinforcing bars arranged inside the first formwork and the second formwork. According to the present invention, it is possible to provide a formwork spacing maintenance system capable of easily fixing a pair of mutually opposing formwork without interfering with the position of reinforcing bars arranged inside the formwork.
Description
본 발명은 보거푸집 간격유지시스템에 관한 것으로, 보다 상세하게는, 보거푸집의 내부에 배근된 철근의 위치에 간섭됨이 없이 상호 대향하는 한 쌍의 보거푸집을 용이하게 고정할 수 있는 보거푸집 간격유지시스템에 관한 것이다.The present invention relates to a formwork spacing maintenance system, and more specifically, to a formwork spacing maintenance system capable of easily fixing a pair of mutually opposing formwork without interfering with the position of reinforcing bars arranged inside the formwork.
일반적으로 보(Girder)는 기둥과 기둥을 연결하는 가로부재를 말한다. 이러한 보는 하중을 지지하며, 보 상측으로부터 전달되는 하중을 기둥을 통해 지면으로 전달하는 역할을 담당하므로 건축물의 안전에 있어서 매우 중요한 부분이라 볼 수 있다.In general, a girder is a horizontal member that connects columns. This girder supports the load and is responsible for transmitting the load transmitted from the upper side of the beam to the ground through the column, so it can be considered a very important part of the safety of a building.
보를 시공하기 위해서는 상호 대향되는 방향으로 한 쌍의 보거푸집을 배치하여야 하는데, 이렇게 배치된 한 쌍의 보거푸집은 상호 간에 일정한 간격이 유지되어야 하기 때문에 타이 등의 건축자재를 사용하게 된다. 즉 일측 보거푸집에 짧은 길이의 타이를 결합시키고, 타측 보거푸집에도 짧은 길이의 타이를 결합시킨 후 타이와 타이를 긴 길이의 다른 타이로 연결함으로써 상호 대향하는 한 쌍의 보거푸집 사이의 간격을 유지하게 된다. 또한 앞서 말한 짧은 타이 및 긴 타이는 서로 웨지핀 등을 사용하여 상호 체결된다.In order to construct a beam, a pair of beam forms must be arranged in opposite directions. Since a pair of beam forms arranged in this manner must maintain a certain distance from each other, building materials such as ties are used. That is, a short tie is attached to one beam form, a short tie is attached to the other beam form, and then the ties are connected with another long tie to maintain the distance between the pair of opposing beam forms. In addition, the short ties and long ties mentioned above are fastened to each other using wedge pins, etc.
그러나 이와 같은 종래의 방법은, 그 내부에 이미 배근이 완료 되어있는 다수의 철근으로 인해 짧은 타이 및 긴 타이를 결합하는 웨지핀의 위치가 간섭될 수 있는 문제가 있다.However, this conventional method has a problem in that the positions of the wedge pins that connect the short and long ties may be interfered with due to a large number of reinforcing bars already arranged inside.
즉 상호 대항되게 배치되는 한 쌍의 보거푸집의 내부에는 이미 다수의 철근이 빽빽하게 배근된 상태인데, 이러한 상태에서 상호 대향하는 한 쌍의 보거푸집의 간격을 유지하기 위해 짧은 타이 및 긴 타이를 웨지핀으로 체결하는 경우 철근의 위치로 인해 웨지핀을 끼울 수 없는 문제가 발생할 수 있는 것이다.In other words, a large number of reinforcing bars are already densely arranged inside a pair of formworks that are positioned in opposition to each other. In this state, when short ties and long ties are fastened with wedge pins to maintain the spacing between a pair of formworks that are opposed to each other, a problem may arise in which the wedge pins cannot be inserted due to the position of the reinforcing bars.
따라서 상호 대향되게 배치된 한 쌍의 보거푸집의 간격을 유지함에 있어서 배근된 철근의 위치에 간섭되지 않도록 하는 새로운 보거푸집의 간격유지시스템이 요구되는 실정이다.Therefore, a new formwork spacing maintenance system is required that maintains the spacing between a pair of formworks positioned opposite each other without interfering with the position of the placed reinforcing bars.
본 발명의 목적은, 보거푸집의 내부에 배근된 철근의 위치에 간섭됨이 없이 상호 대향하는 한 쌍의 보거푸집을 용이하게 고정할 수 있는 보거푸집 간격유지시스템을 제공하는 것이다.The purpose of the present invention is to provide a formwork spacing maintenance system capable of easily fixing a pair of mutually opposing formwork without interfering with the position of reinforcing bars arranged inside the formwork.
상기 목적은, 본 발명에 따라, 보를 시공하기 위해 배치되는 제1 거푸집의 상면에 일단부가 고정되는 제1 타이와, 상기 제1 거푸집에 대향되게 배치되는 제2 거푸집의 상면에 일단부가 고정되는 제2 타이; 상기 제1 타이의 타단부 및 상기 제2 타이의 타단부에 양단부가 각각 연결되는 제1 플렛타이; 상기 제1 타이의 타단부 및 상기 제1 플렛타이의 일단부와, 상기 제2 타이의 타단부 및 상기 제1 플렛타이의 타단부를 관통하는 한 쌍의 결합핀; 및 상기 결합핀을 고정할 수 있도록 상기 결합핀의 길이방향에 대하여 교차하는 방향으로 삽입되는 한 쌍의 고정핀을 포함하되, 상기 고정핀은 상기 제1 거푸집 및 상기 제2 거푸집 내부에 배근된 철근의 위치에 간섭되지 않도록 상기 결합핀에 형성된 다수의 고정핀홀 중 어느 하나에 삽입될 수 있는 것을 특징으로 하는 보거푸집 간격유지시스템에 의하여 달성된다.The above object is achieved by a beam formwork spacing maintenance system, comprising: a first tie, one end of which is fixed to an upper surface of a first formwork arranged to construct a beam; a second tie, one end of which is fixed to an upper surface of a second formwork arranged to face the first formwork; a first flat tie, both ends of which are respectively connected to the other end of the first tie and the other end of the second tie; a pair of coupling pins penetrating the other end of the first tie and one end of the first flat tie, and the other end of the second tie and the other end of the first flat tie; and a pair of fixing pins inserted in a direction intersecting the longitudinal direction of the coupling pins so as to fix the coupling pins, wherein the fixing pins can be inserted into any one of a plurality of fixing pin holes formed in the coupling pins so as not to interfere with the positions of reinforcing bars arranged inside the first formwork and the second formwork.
상기 제1 타이의 타단부 및 상기 제2 타이의 타단부에는 각각 제1 관통공이 형성되며, 상기 제1 플렛타이의 양단부에는 상기 제1 관통공과 연통되는 한 쌍의 제2 관통공이 형성되고, 상기 결합핀은, 상기 제1 관통공 및 상기 제2 관통공에 걸림될 수 있는 크기로 마련되는 결합핀헤드와, 상기 제1 관통공 및 상기 제2 관통공을 따라 삽입될 수 있도록 상기 결합핀헤드로부터 연장되는 결합핀바디를 포함하되, 상기 결합핀바디에는 등간격으로 이격된 3개의 고정핀홀이 형성되어 상기 고정핀이 상기 3개의 고정핀홀 중 어느 하나에 선택적으로 삽입될 수 있다.A first through hole is formed at the other end of the first tie and the other end of the second tie, respectively, a pair of second through holes are formed at both ends of the first flat tie so as to be connected to the first through hole, and the coupling pin includes a coupling pin head that is provided with a size that can be caught by the first through hole and the second through hole, and a coupling pin body that extends from the coupling pin head so as to be inserted along the first through hole and the second through hole, wherein three fixed pin holes are formed at equal intervals in the coupling pin body, so that the fixed pin can be selectively inserted into any one of the three fixed pin holes.
상기 결합핀바디는, 상기 제1 관통공 및 상기 제2 관통공을 따라 원활하게 삽입될 수 있도록 상기 결합핀헤드로부터 하측을 향해 폭이 좁아지도록 형성되는 테이퍼부를 포함하며, 상기 고정핀은, 상기 고정핀홀에 삽입되는 바(bar) 형태의 고정핀바디 및 상기 고정핀바디의 일단부로부터 상기 고정핀바디의 길이방향과 동일한 방향으로 연장되되 상기 고정핀의 삽입시 탄성이 발휘되기 위한 적어도 한 쌍의 굴곡부를 갖는 탄성접촉부를 포함할 수 있다.The above-described coupling pin body includes a tapered portion formed to have a width that becomes narrower toward the bottom from the coupling pin head so that the coupling pin body can be smoothly inserted through the first through-hole and the second through-hole, and the fixing pin may include a bar-shaped fixing pin body inserted into the fixing pin hole and an elastic contact portion that extends from one end of the fixing pin body in the same direction as the longitudinal direction of the fixing pin body and has at least one pair of bent portions for exerting elasticity when the fixing pin is inserted.
상기 제1 타이는, 일단부가 상기 제1 거푸집의 상면에 고정되고 타단부가 상기 제1 거푸집에 형성된 거푸집노치를 통과하여 상기 제2 거푸집을 향해 연장되는 타이바디; 상기 제1 거푸집의 상면에 형성된 핀홀을 따라 삽입될 수 있도록 상기 타이바디의 일단부로부터 연장절곡되는 타이핀부; 및 콘크리트의 양생 완료 후 절단될 수 있도록 상기 타이바디의 중앙부근에 형성되는 타이노치부를 포함할 수 있다.The first tie may include a tie body having one end fixed to the upper surface of the first formwork and the other end extending toward the second formwork through a formwork notch formed in the first formwork; a tie pin portion extending and bent from one end of the tie body so as to be inserted along a pinhole formed in the upper surface of the first formwork; and a tie notch portion formed near the center of the tie body so as to be cut after concrete curing is completed.
상기 보거푸집 간격유지시스템은, 상기 제1 거푸집의 일측면에 일단부가 고정되는 제3 타이와, 상기 제2 거푸집의 일측면에 일단부가 고정되는 제4 타이와, 상기 제3 타이의 타단부 및 상기 제4 타이의 타단부에 양단부가 각각 연결되는 제2 플렛타이를 더 포함하되, 상기 제3 타이 및 상기 제4 타이는 각각, 상기 제1 거푸집의 일측면과 상기 제2 거푸집의 일측면에 각각 형성된 한 쌍의 거푸집노치에 삽입되는 제1 바디부; 상기 제1 바디부와 동일한 폭과 길이를 가지며 상기 제1 바디부의 타단부로부터 연장되는 제2 바디부; 및 상기 제1 바디부 및 상기 제2 바디부의 연결지점에 형성되는 바디노치부를 포함할 수 있다.The above-described formwork spacing maintenance system may further include a third tie having one end fixed to one side of the first formwork, a fourth tie having one end fixed to one side of the second formwork, and a second flat tie having both ends respectively connected to the other end of the third tie and the other end of the fourth tie, wherein the third tie and the fourth tie may each include a first body portion inserted into a pair of formwork notches formed on one side of the first formwork and one side of the second formwork, respectively; a second body portion having the same width and length as the first body portion and extending from the other end of the first body portion; and a body notch portion formed at a connection point of the first body portion and the second body portion.
상기 보거푸집 간격유지시스템은, 상기 제3 타이의 타단부 및 상기 제2 플렛타이의 일단부와, 상기 제4 타이의 타단부 및 상기 제2 플렛타이의 타단부를 관통하는 한 쌍의 결합핀 및 상기 결합핀을 고정할 수 있도록 상기 결합핀의 길이방향에 대하여 교차하는 방향으로 삽입되는 한 쌍의 고정핀을 더 포함하되, 상기 고정핀은 상기 제1 거푸집 및 상기 제2 거푸집의 내부에 배근된 철근의 위치에 간섭되지 않도록 상기 결합핀에 형성된 다수의 고정핀홀 중 어느 하나에 삽입될 수 있다.The above-described formwork spacing maintenance system further includes a pair of coupling pins penetrating the other end of the third tie and one end of the second flat tie, the other end of the fourth tie and the other end of the second flat tie, and a pair of fixing pins inserted in a direction intersecting the longitudinal direction of the coupling pins so as to fix the coupling pins, wherein the fixing pins can be inserted into any one of a plurality of fixing pin holes formed in the coupling pins so as not to interfere with the positions of reinforcing bars arranged inside the first formwork and the second formwork.
본 발명에 의하면, 결합핀을 고정하는 고정핀이 결합핀에 형성된 다수의 고정핀홀 중 어느 하나에 선택적으로 삽입될 수 있도록 함으로써 보거푸집의 내부에 배근된 철근의 위치에 간섭됨이 없이 상호 대향하는 한 쌍의 보거푸집을 용이하게 고정할 수 있는 보거푸집 간격유지시스템을 제공할 수 있게 된다.According to the present invention, a formwork spacing maintenance system can be provided that can easily fix a pair of mutually opposing formwork without interfering with the position of reinforcing bars arranged inside the formwork by allowing a fixing pin for fixing a coupling pin to be selectively inserted into any one of a plurality of fixing pin holes formed in the coupling pin.
도 1은 본 발명의 일 실시예에 따른 제1 타이의 사시도이다.
도 2는 본 발명의 일 실시예에 따른 결합핀의 사시도이다.
도 3은 본 발명의 일 실시예에 따른 고정핀의 사시도이다.
도 4는 본 발명의 일 실시예에 따른 제3 타이의 사시도이다.
도 5는 도 1의 제1 타이, 도 2의 결합핀 및 도 3의 고정핀을 사용하여 상호 대향되게 배치된 한 쌍의 보거푸집의 상호간의 간격을 유지하는 상태를 나타낸 사용상태도이다.
도 6은 도 4의 제3 타이, 도 2의 결합핀 및 도 3의 고정핀을 사용하여 상호 대향되게 배치된 한 쌍의 보거푸집의 상호간의 간격을 유지하는 상태를 나타낸 사용상태도이다.
도 본 발명의 일 실시예에 따른 보거푸집 간격유지시스템의 전체 사용상태도이다.FIG. 1 is a perspective view of a first tie according to one embodiment of the present invention.
Figure 2 is a perspective view of a coupling pin according to one embodiment of the present invention.
FIG. 3 is a perspective view of a fixed pin according to one embodiment of the present invention.
FIG. 4 is a perspective view of a third tie according to one embodiment of the present invention.
FIG. 5 is a diagram showing a state in which the spacing between a pair of formwork members positioned opposite each other is maintained using the first tie of FIG. 1, the coupling pin of FIG. 2, and the fixing pin of FIG. 3.
Figure 6 is a usage diagram showing a state in which the spacing between a pair of formwork members positioned opposite each other is maintained using the third tie of Figure 4, the coupling pin of Figure 2, and the fixing pin of Figure 3.
This is a diagram showing the overall usage status of a formwork gap maintenance system according to one embodiment of the present invention.
이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예들을 상세하게 설명하면 다음과 같다. 다만, 본 발명을 설명함에 있어서, 이미 공지된 기능 혹은 구성에 대한 설명은, 본 발명의 요지를 명료하게 하기 위하여 생략하기로 한다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the attached drawings. However, in describing the present invention, descriptions of functions or configurations already known will be omitted in order to clarify the gist of the present invention.
또한 이하에서는 유로폼을 기준으로 하여 본 발명의 보거푸집 간격유지시스템이 설명되지만, 유로폼 이외의 갱폼 및 알루미늄폼 등에 있어서도 본 발명의 보거푸집 간격유지시스템이 시스템이 그대로 사용될 수 있음은 자명하다 할 것이다.In addition, the formwork spacing maintenance system of the present invention is described below based on the Euroform, but it will be obvious that the formwork spacing maintenance system of the present invention can be used as is for gang forms and aluminum forms other than the Euroform.
도 1은 본 발명의 일 실시예에 따른 제1 타이의 사시도이며, 도 2는 본 발명의 일 실시예에 따른 결합핀의 사시도이고, 도 3은 본 발명의 일 실시예에 따른 고정핀의 사시도이며, 도 4는 본 발명의 일 실시예에 따른 제3 타이의 사시도이며, 도 5는 도 1의 제1 타이, 도 2의 결합핀 및 도 3의 고정핀을 사용하여 상호 대향되게 배치된 한 쌍의 보거푸집의 상호간의 간격을 유지하는 상태를 나타낸 사용상태도이고, 도 6은 도 4의 제3 타이, 도 2의 결합핀 및 도 3의 고정핀을 사용하여 상호 대향되게 배치된 한 쌍의 보거푸집의 상호간의 간격을 유지하는 상태를 나타낸 사용상태도이며, 도 7은 본 발명의 일 실시예에 따른 보거푸집 간격유지시스템의 전체 사용상태도이다.FIG. 1 is a perspective view of a first tie according to an embodiment of the present invention, FIG. 2 is a perspective view of a coupling pin according to an embodiment of the present invention, FIG. 3 is a perspective view of a fixing pin according to an embodiment of the present invention, FIG. 4 is a perspective view of a third tie according to an embodiment of the present invention, FIG. 5 is a usage state diagram showing a state in which a space between a pair of formworks arranged to be opposed to each other is maintained using the first tie of FIG. 1, the coupling pin of FIG. 2, and the fixing pin of FIG. 3, FIG. 6 is a usage state diagram showing a state in which a space between a pair of formworks arranged to be opposed to each other is maintained using the third tie of FIG. 4, the coupling pin of FIG. 2, and the fixing pin of FIG. 3, and FIG. 7 is a usage state diagram of the entire formwork spacing maintenance system according to an embodiment of the present invention.
이들 도면을 참조하면 본 발명의 일 실시예에 따른 보거푸집 간격유지시스템(100)은, 제1 타이(110), 제2 타이(120), 제1 플렛타이(130), 제3 타이(140), 제4 타이(150), 제2 플렛타이(160), 결합핀(170) 및 고정핀(180)을 포함한다.Referring to these drawings, a formwork spacing maintenance system (100) according to one embodiment of the present invention includes a first tie (110), a second tie (120), a first flat tie (130), a third tie (140), a fourth tie (150), a second flat tie (160), a coupling pin (170), and a fixing pin (180).
제1 타이(110)는 보를 시공하기 위해 배치되는 제1 거푸집(M1)의 상면에 일단부가 고정되고, 타단부가 제1 플렛타이(130)의 일단부에 결합되는 구성으로, 타이바디(111), 타이핀부(113) 및 타이노치부(115)를 포함한다.The first tie (110) is configured such that one end is fixed to the upper surface of the first formwork (M1) arranged to construct the beam, and the other end is connected to one end of the first flat tie (130), and includes a tie body (111), a tie pin portion (113), and a tie notch portion (115).
타이바디(111)는 일단부가 제1 거푸집(M1)의 상면에 고정되고 타단부가 제1 거푸집(M1)에 형성된 거푸집노치(20)를 통과하여 제2 거푸집(M2)을 향해 연장되는 판재형상의 구성이다. 도 5에 도시된 바와 같이 제1 거푸집(M1)의 상면에는 거푸집노치(20)가 형성되어 있는데 타이바디(111)의 타단부는 이러한 거푸집노치(20)의 폭보다 약간 작은 폭으로 마련되어 거푸집노치(20)를 통과할 수 있게 된다.The tie body (111) is a plate-shaped structure in which one end is fixed to the upper surface of the first formwork (M1) and the other end passes through a formwork notch (20) formed in the first formwork (M1) and extends toward the second formwork (M2). As illustrated in Fig. 5, a formwork notch (20) is formed on the upper surface of the first formwork (M1), and the other end of the tie body (111) is formed with a width slightly smaller than the width of the formwork notch (20) so that it can pass through the formwork notch (20).
타이핀부(113)는 타이바디(111)의 일단부로부터 연장절곡되는 판재형상의 구성이다. 타이핀부(113)는 타이바디(111)의 제작시 그 일부를 연장절곡하거나 또는 타이바디(111)의 제작 완료 후에 타이바디(111)와 90도 각도를 이루도록 타이바디(111)에 용접 등을 통해 결합하는 방법으로 마련될 수 있다. 도 1에 도시된 바와 같이 타이핀부(113)에는 웨지핀의 삽입을 위한 구멍이 형성되어 있으며, 이러한 구멍을 통해 타이핀부(113)를 제1 거푸집(M1)의 핀홀(10)에 삽입하고 제1 거푸집(M1) 상면 프로파일의 아래쪽에서 웨지핀을 끼움으로써 제1 타이(110)가 제1 거푸집(M1)에 고정될 수 있도록 한다.The tie pin portion (113) is a plate-shaped configuration that is extended and bent from one end of the tie body (111). The tie pin portion (113) can be provided by extending and bending a portion of the tie body (111) during the manufacturing process, or by welding or the like to be joined to the tie body (111) so as to form a 90-degree angle with the tie body (111) after the manufacturing process of the tie body (111) is completed. As illustrated in FIG. 1, a hole for inserting a wedge pin is formed in the tie pin portion (113), and the tie pin portion (113) is inserted into the pin hole (10) of the first formwork (M1) through this hole, and the wedge pin is fitted at the bottom of the upper surface profile of the first formwork (M1), thereby allowing the first tie (110) to be fixed to the first formwork (M1).
타이노치부(115)는 타이바디(111)의 중앙부근에서 상호 대칭적으로 타이바디(111)의 일부를 절개하여 형성되는 구성이다. 보를 시공하기 위해 콘크리트를 타설하고 양생한 후에는 이러한 타이노치부(115)를 절단하여 제1 타이(110)의 일부분은 콘크리트 내부에 묻히고 다른 부분은 콘크리트로부터 분리되어 제1 거푸집(M1)을 탈형할 수 있도록 한다.The tie notch portion (115) is a configuration formed by cutting a portion of the tie body (111) symmetrically near the center of the tie body (111). After pouring and curing concrete to construct the beam, the tie notch portion (115) is cut so that a portion of the first tie (110) is buried in the concrete and the other portion is separated from the concrete so that the first formwork (M1) can be removed.
제2 타이(120)는 보를 시공하기 위해 배치되는 제2 거푸집(M2)의 상면에 일단부가 고정되고, 타단부가 제1 플렛타이(130)의 타단부에 결합되는 구성으로, 타이바디(미도시, 이하 동일), 타이핀부(미도시, 이하 동일) 및 타이노치부(미도시, 이하 동일)를 포함한다.The second tie (120) is configured such that one end is fixed to the upper surface of the second formwork (M2) arranged to construct the beam, and the other end is connected to the other end of the first flat tie (130), and includes a tie body (not shown, the same applies hereinafter), a tie pin portion (not shown, the same applies hereinafter), and a tie notch portion (not shown, the same applies hereinafter).
제2 타이(120)의 타이바디, 타이핀부 및 타이노치부에 관한 사항은 각각 제1 타이(110)의 타이바디(111), 타이핀부(113) 및 타이노치부(115)에 대한 것과 실질적으로 동일하므로 자세한 설명은 생략한다.The details regarding the tie body, tie pin portion and tie notch portion of the second tie (120) are substantially the same as those regarding the tie body (111), tie pin portion (113) and tie notch portion (115) of the first tie (110), so a detailed description is omitted.
제1 플렛타이(130)는 양단부가 각각 제1 타이(110) 및 제2 타이(120)에 결합되는 판재형상의 구성이다. 이를 위해 제1 타이(110)에는 제1 관통공(H1)이 형성되어 있으며, 제1 플렛타이(130)에는 제2 관통공(H2)이 형성되어 있다. 제1 관통공(H1) 및 제2 관통공(H2)을 따라서는 후술하는 결합핀(170)이 관통한 후 고정핀(180)으로 체결됨으로써 제1 타이(110) 및 제1 플렛타이(130)의 결합 및 고정이 가능해진다. 이러한 사항은 제2 타이(120) 및 제1 플렛타이(130)에 대한 결합의 경우에도 마찬가지이다.The first flat tie (130) is a plate-shaped configuration in which both ends are connected to the first tie (110) and the second tie (120), respectively. To this end, a first through hole (H1) is formed in the first tie (110), and a second through hole (H2) is formed in the first flat tie (130). A connecting pin (170), which will be described later, passes through the first through hole (H1) and the second through hole (H2) and is then fastened with a fixing pin (180), thereby enabling the connection and fixation of the first tie (110) and the first flat tie (130). This also applies to the connection of the second tie (120) and the first flat tie (130).
제3 타이(140)는 제1 거푸집(M1)의 일측면에 일단부가 고정되는 구성으로, 제1 바디부(141), 제2 바디부(143) 및 바디노치부(145)를 포함한다.The third tie (140) is configured such that one end is fixed to one side of the first formwork (M1), and includes a first body part (141), a second body part (143), and a body notch part (145).
제1 바디부(141)는 제1 거푸집(M1)의 일측면에 일단부가 고정되는 판재형상의 구성이다. 또한 제1 바디부(141)의 폭은 거푸집노치(20)의 크기보다 약간 작은 크기로 마련되어 제1 바디부(141)가 제1 거푸집(M1)의 일측면에 마련된 한 쌍의 거푸집노치(20)를 따라 완전히 삽입될 수 있도록 한다.The first body part (141) is configured in the shape of a plate material with one end fixed to one side of the first formwork (M1). In addition, the width of the first body part (141) is set to be slightly smaller than the size of the formwork notch (20) so that the first body part (141) can be completely inserted along a pair of formwork notches (20) provided on one side of the first formwork (M1).
제2 바디부(143)는 제1 바디부(141)의 타단부로부터 제2 거푸집(M2)을 향해 연장되는 판재형상의 구성이다. 한편 제2 바디부(143)는 제1 바디부(141)와 완전히 동일한 폭과 길이를 갖도록 마련되는데 이는 제3 타이(140)가 방향성의 제한이 없이 사용될 수 있도록 하기 위함이다. 즉, 작업자는 제3 타이(140)의 제1 바디부(141)를 제1 거푸집(M1)의 일측면에 결합할 수 있으나, 제1 바디부(141) 및 제2 바디부(143)가 완전히 동일한 폭과 길이를 갖는 특성상 제2 바디부(143)를 제1 거푸집(M1)의 일측면에 결합할 수도 있기 때문에 제3 타이(140)의 어느쪽을 제1 거푸집(M1)에 결합하여야 하는가의 고민없이 간편하게 제3 타이(140)를 제1 거푸집(M1)에 결합할 수 있게 된다.The second body part (143) is configured in the shape of a plate extending from the other end of the first body part (141) toward the second formwork (M2). Meanwhile, the second body part (143) is provided to have the exact same width and length as the first body part (141), so that the third tie (140) can be used without any direction restrictions. That is, the worker can attach the first body part (141) of the third tie (140) to one side of the first formwork (M1), but since the first body part (141) and the second body part (143) have the same width and length, the second body part (143) can also be attached to one side of the first formwork (M1), so the worker can easily attach the third tie (140) to the first formwork (M1) without worrying about which side of the third tie (140) should be attached to the first formwork (M1).
바디노치부(145)는 제1 바디부(141) 및 제2 바디부(143)의 연결지점에 상호 대칭적으로 제1 바디부(141) 및 제2 바디부(143)의 일부를 절개하여 형성되는 구성이다. 보를 시공하기 위해 콘크리트를 타설하고 양생한 후에는 이러한 바디노치부(145)를 절단하여 제3 타이(140) 일부분은 콘크리트 내부에 묻히고 다른 부분은 콘크리트로부터 분리되어 제1 거푸집(M1)을 탈형할 수 있도록 한다.The body notch portion (145) is formed by cutting a portion of the first body portion (141) and the second body portion (143) symmetrically at the connection point of the first body portion (141) and the second body portion (143). After pouring and curing concrete to construct the beam, the body notch portion (145) is cut so that a portion of the third tie (140) is buried in the concrete and the other portion is separated from the concrete so that the first formwork (M1) can be removed.
제4 타이(150)는 제2 거푸집(M2)의 일측면에 일단부가 고정되는 구성으로, 제1 바디부(미도시, 이하 동일), 제2 바디부(미도시, 이하 동일) 및 바디노치부(미도시, 이하 동일)를 포함한다.The fourth tie (150) is configured such that one end is fixed to one side of the second formwork (M2), and includes a first body part (not shown, same hereinafter), a second body part (not shown, same hereinafter), and a body notch part (not shown, same hereinafter).
제4 타이(150)의 제1 바디부, 제2 바디부 및 바디노치부에 관한 사항은 각각 제3 타이(140)의 제1 바디부(141), 제2 바디부(143) 및 바디노치부(145)에 대한 것과 실질적으로 동일하므로 자세한 설명은 생략한다.The details regarding the first body part, second body part and body notch part of the fourth tie (150) are substantially the same as those regarding the first body part (141), second body part (143) and body notch part (145) of the third tie (140), so a detailed description is omitted.
제2 플렛타이(160)는 양단부가 각각 제3 타이(140) 및 제4 타이(150)에 결합되는 판재형상의 구성이다. 이를 위해 제3 타이(140) 및 제4 타이(150)에는 각각 관통공이 형성되어 있으며, 제2 플렛타이(160)에도 관통공이 형성되어 있다. 이러한 관통공들을 따라서는 후술하는 결합핀(170)이 관통한 후 고정핀(180)으로 체결됨으로써 제3 타이(140), 제4 타이(150) 및 제2 플렛타이(160) 상호간의 결합 및 고정이 가능해진다.The second flat tie (160) is a plate-shaped configuration in which both ends are connected to the third tie (140) and the fourth tie (150), respectively. To this end, through holes are formed in each of the third tie (140) and the fourth tie (150), and a through hole is also formed in the second flat tie (160). A connecting pin (170), which will be described later, passes through these through holes and is then fastened with a fixing pin (180), thereby enabling the third tie (140), the fourth tie (150), and the second flat tie (160) to be connected and fixed to each other.
결합핀(170)은 제1 타이(110) 및 제2 타이(120)와 제1 플렛타이(130)를 결합하는 경우 또는 제3 타이(140) 및 제4 타이(150)와 제2 플렛타이(160)를 결합하는 경우 사용되는 구성이다. 결합핀(170)의 구성과 이를 통해 제1 타이(110) 및 제1 플렛타이(130)를 결합하는 방법에 관한 사항은 제2 타이(120) 및 제1 플렛타이(130)를 결합하는 경우와, 제3 타이(140) 및 제4 타이(150)를 제2 플렛타이(160)에 결합하는 경우에도 동일하게 적용되므로 이하에서는 결합핀(170)의 구성에 대한 것과 이러한 구성을 통해 결합핀(170)으로 제1 타이(110) 및 제1 플렛타이(130)를 결합하는 방법에 대한 사항만 설명하기로 한다.The coupling pin (170) is a configuration used when coupling the first tie (110) and the second tie (120) and the first flat tie (130), or when coupling the third tie (140) and the fourth tie (150) and the second flat tie (160). The configuration of the coupling pin (170) and the method of coupling the first tie (110) and the first flat tie (130) through the same are equally applied to the cases of coupling the second tie (120) and the first flat tie (130), and also to the cases of coupling the third tie (140) and the fourth tie (150) to the second flat tie (160). Therefore, only the configuration of the coupling pin (170) and the method of coupling the first tie (110) and the first flat tie (130) with the coupling pin (170) through the configuration will be described below.
도 2에 도시된 바와 같이, 결합핀(170)은 결합핀헤드(171)와, 결합핀헤드(171)로부터 연장되는 결합핀바디(173)를 포함한다.As shown in FIG. 2, the coupling pin (170) includes a coupling pin head (171) and a coupling pin body (173) extending from the coupling pin head (171).
결합핀헤드(171)는 전술한 제1 관통공(H1) 및 제2 관통공(H2)에 걸림될 수 있는 크기를 갖는 판재형상의 구성이며, 결합핀바디(173)는 결합핀헤드(171)의 하측면으로부터 연장되어 후술하는 고정핀(180)에 의해 고정되는 판재형상의 구성이다.The coupling pin head (171) is a plate-shaped configuration having a size that can be caught in the first through hole (H1) and second through hole (H2) described above, and the coupling pin body (173) is a plate-shaped configuration that extends from the lower surface of the coupling pin head (171) and is fixed by a fixing pin (180) described below.
고정핀(180)과의 결합을 위해 결합핀바디(173)에는 적어도 3개의 고정핀홀(173a,173b,173c)이 형성되며, 이러한 고정핀홀(173a,173b,173c)은 결합핀바디(173)의 폭방향을 따라 상호 동일한 간격만큼 이격되게 형성된다.At least three fixed pin holes (173a, 173b, 173c) are formed in the coupling pin body (173) for coupling with the fixed pin (180), and these fixed pin holes (173a, 173b, 173c) are formed to be spaced apart from each other by the same interval along the width direction of the coupling pin body (173).
이처럼 고정핀홀(173a,173b,173c)을 다수 개로 마련하는 것은 제1 거푸집(M1) 및 제2 거푸집(M2)의 내부에 배근된 철근의 위치에 간섭됨이 없이 고정핀(180)이 결합핀(170)에 삽입, 고정될 수 있도록 하기 위함이다.The purpose of providing multiple fixed pin holes (173a, 173b, 173c) in this way is to enable the fixed pin (180) to be inserted and fixed into the joining pin (170) without interfering with the position of the reinforcing bars arranged inside the first formwork (M1) and the second formwork (M2).
즉, 제1 거푸집(M1) 및 제2 거푸집(M2)을 설치하기 전에 이미 다수의 철근이 배근된 상태로 준비되게 되는데, 이때 제1 거푸집(M1)과 제2 거푸집(M2) 사이의 간격을 유지하기 위해 종래의 일반적인 타이들을 사용하는 경우 타이와 타이를 결합하기 위해 웨지핀을 끼우는 위치가 철근들에 의해 간섭될 수 있다. That is, before installing the first formwork (M1) and the second formwork (M2), a number of reinforcing bars are already prepared and placed. At this time, if conventional ties are used to maintain the gap between the first formwork (M1) and the second formwork (M2), the positions where wedge pins are inserted to connect the ties may interfere with the reinforcing bars.
이러한 간섭이 발생하게 되면 이미 배근된 철근을 다른 위치로 옮길 수는 없는 것은 당연하기 때문에 종래에는 웨지핀을 비스듬하게 끼워서 강제로 결합하거나 혹은 웨지핀을 끼우지 않고 철사 등으로 타이들을 묶는 등의 편법을 이용하는 경우가 발생되는데 이러한 편법은 시공의 안전성을 위협하는 요인이 될 수 있으며 완성된 콘크리트 구조물의 품질을 저하시키는 문제가 될 수 있는 것이다.When such interference occurs, it is obvious that already placed reinforcing bars cannot be moved to a different location. Therefore, in the past, expedient methods such as forcibly connecting by inserting wedge pins at an angle or tying the ties with wire without inserting wedge pins were used. However, such expedient methods can be a factor threatening the safety of construction and can cause problems by lowering the quality of the completed concrete structure.
따라서, 본 실시예에서는 후술하는 고정핀(180)이 결합핀바디(173)에 형성된 고정핀홀(173a,173b,173c) 중 어느 하나에 간편하게 삽입될 수 있도록 함으로써 철근의 위치에 간섭됨이 없이 제1 타이(110) 및 제1 플렛타이(130)를 간편하고 효율적으로 결합시킬 수 있도록 한다.Accordingly, in this embodiment, the fixed pin (180) described later can be easily inserted into any one of the fixed pin holes (173a, 173b, 173c) formed in the coupling pin body (173), thereby enabling the first tie (110) and the first flat tie (130) to be easily and efficiently connected without interfering with the position of the reinforcing bar.
한편, 본 실시예의 결합핀(170)의 결합핀바디(173)는 결합핀헤드(171)로부터 연장되는 방향을 따라 점차 폭이 감소하도록 마련되는 테이퍼부(T)를 갖는다. 이러한 테이퍼부(T)의 존재에 따라 결합핀(170)은 제1 관통공(H1) 및 제2 관통공(H2)을 따라 원활하게 삽입될 수 있게 되므로 결합핀(170)을 사용하여 제1 타이(110) 및 제1 플렛타이(130)를 결합하는 작업의 편의를 도모할 수 있게 된다.Meanwhile, the coupling pin body (173) of the coupling pin (170) of the present embodiment has a tapered portion (T) whose width is gradually reduced along the direction extending from the coupling pin head (171). Due to the presence of this tapered portion (T), the coupling pin (170) can be smoothly inserted along the first through hole (H1) and the second through hole (H2), thereby facilitating the work of coupling the first tie (110) and the first flat tie (130) using the coupling pin (170).
고정핀(180)은 제1 타이(110) 및 제1 플렛타이(130)를 따라 삽입된 결합핀의 길이방향과 교차하는 방향으로 삽입되어 결합핀(170)을 완전히 고정하기 위한 것으로, 바(bar) 형태의 고정핀바디(181)와 고정핀바디(181)의 일단부로부터 연장 절곡되는 탄성접촉부(183)를 포함한다.The fixed pin (180) is inserted in a direction intersecting the longitudinal direction of the coupling pin inserted along the first tie (110) and the first flat tie (130) to completely fix the coupling pin (170), and includes a bar-shaped fixed pin body (181) and an elastic contact portion (183) that extends and bends from one end of the fixed pin body (181).
고정핀바디(181)는 전술한 결합핀(170)의 고정핀홀(173a,173b,173c) 중 어느 하나에 선택적으로 삽입되는 바 형태의 구성이다.The fixed pin body (181) is a bar-shaped configuration that is selectively inserted into one of the fixed pin holes (173a, 173b, 173c) of the aforementioned coupling pin (170).
탄성접촉부(183)는 고정핀바디(181)의 일단부로부터 고정핀바디(181)의 길이방향과 동일한 방향으로 연장절곡되는 구성으로, 그 몸체의 일부가 굴곡되는 한 쌍의 굴곡부(185,186)를 포함한다.The elastic contact portion (183) is configured to extend and bend in the same direction as the longitudinal direction of the fixed pin body (181) from one end of the fixed pin body (181), and includes a pair of bending portions (185, 186) in which a part of the body is bent.
굴곡부(185,186)는 고정핀(180)의 고정핀바디(181)를 결합핀(170)에 삽입하는 경우 고정핀바디(181)가 고정핀홀(173a,173b,173c) 중 어느 하나에 완전히 밀착될 수 있도록 탄성이 발휘되도록 하는 구성이다. The bending portion (185, 186) is configured to exert elasticity so that when the fixed pin body (181) of the fixed pin (180) is inserted into the coupling pin (170), the fixed pin body (181) can be completely attached to one of the fixed pin holes (173a, 173b, 173c).
즉 제1 타이(110) 및 제1 플렛타이(130)의 관통공(H1, H2)를 따라 결합핀(170)을 삽입하고 결합핀바디(173)에 형성된 고정핀홀(173a,173b,173c) 중 어느 하나를 따라 고정핀바디(181)를 삽입하게 되면 고정핀바디(181)는 고정핀홀(173a,173b,173c)에서 여유공간이 생긴 상태로 삽입되는데 이러한 여유공간을 없애고 고정핀바디(181)의 일측면이 고정핀홀(173a,173b,173c)에 완전히 밀착될 수 있도록 탄성접촉부(183)에 굴곡부(185,186)를 마련한다.That is, when the coupling pin (170) is inserted along the through-holes (H1, H2) of the first tie (110) and the first flat tie (130) and the fixed pin body (181) is inserted along one of the fixed pin holes (173a, 173b, 173c) formed in the coupling pin body (173), the fixed pin body (181) is inserted with a free space in the fixed pin hole (173a, 173b, 173c). In order to eliminate this free space and ensure that one side of the fixed pin body (181) is completely in contact with the fixed pin hole (173a, 173b, 173c), a curved portion (185, 186) is provided in the elastic contact portion (183).
이제 이하에서는 전술한 사항들 및 도 5 내지 도 7을 참조하여 본 실시예의 보거푸집 간격유지시스템(100)의 사용방법에 대한 사항을 간략하게 설명하기로 한다.Hereinafter, with reference to the aforementioned matters and FIGS. 5 to 7, a method of using the formwork gap maintenance system (100) of the present embodiment will be briefly described.
보를 시공하기 위하여 작업자는 먼저 제1 거푸집(M1)을 설치하고, 제1 거푸집(M1)에 대향되는 방향으로 제2 거푸집(M2)를 설치하는 과정을 거치게 된다. 물론 이때 제1 거푸집(M1) 및 제2 거푸집(M2)의 사이에는 다수의 철근(미도시)이 배근된 상태가 된다.In order to construct a beam, workers first install the first formwork (M1), and then install the second formwork (M2) in a direction opposite to the first formwork (M1). Of course, at this time, a number of reinforcing bars (not shown) are placed between the first formwork (M1) and the second formwork (M2).
제1 거푸집(M1) 및 제2 거푸집(M2)의 설치가 완료되면, 그 내부에 타설될 콘크리트의 면압에 의해 거푸집들(M1, M2)이 밀려나지 않도록 제1 거푸집(M1)과 제2 거푸집(M2) 사이의 간격을 유지하기 위한 장치를 설치한다.When the installation of the first formwork (M1) and the second formwork (M2) is completed, a device is installed to maintain the gap between the first formwork (M1) and the second formwork (M2) so that the formworks (M1, M2) are not pushed out by the surface pressure of the concrete to be poured inside them.
이때 먼저 제1 거푸집(M1)의 상면에 제1 타이(110)를 고정하는데, 이를 위해 제1 타이(110)의 타이핀부(113)를 제1 거푸집(M1)의 핀홀(10)에 끼우고 제1 거푸집(M1) 상면 프로파일 아래쪽에서 웨지핀을 타이핀부(113)와 교차하는 방향으로 삽입함으로써 제1 타이(110)가 제1 거푸집(M1)의 상면에 고정되도록 한다.At this time, first, the first tie (110) is fixed to the upper surface of the first formwork (M1). To this end, the tie pin portion (113) of the first tie (110) is inserted into the pin hole (10) of the first formwork (M1), and a wedge pin is inserted from the lower side of the upper surface profile of the first formwork (M1) in a direction intersecting with the tie pin portion (113), thereby fixing the first tie (110) to the upper surface of the first formwork (M1).
동일한 방법으로 제2 거푸집(M2)의 상면에 제2 타이(120)를 고정하며, 이러한 고정작업이 완료되면 제1 타이(110) 및 제2 타이(120)에 제1 플렛타이(130)를 결합하는 과정을 진행한다.In the same way, the second tie (120) is fixed to the upper surface of the second formwork (M2), and when this fixing operation is completed, the process of joining the first flat tie (130) to the first tie (110) and the second tie (120) is performed.
즉, 제1 타이(110)의 제1 관통공(H1) 및 제1 플렛타이(130)의 제2 관통공(H2)을 따라 결합핀(170)을 삽입하는데 이때 결합핀헤드(171)는 관통공들(H1, H2)에 걸림된 상태가 되며 결합핀바디(173)가 제1 플렛타이(130)의 아래쪽으로 돌출된 상태가 된다.That is, the coupling pin (170) is inserted along the first through-hole (H1) of the first tie (110) and the second through-hole (H2) of the first flat tie (130). At this time, the coupling pin head (171) is caught in the through-holes (H1, H2) and the coupling pin body (173) protrudes downward from the first flat tie (130).
이후 작업자는 배근된 철근의 위치에 간섭되지 않는 지점을 고려하여 결합핀바디(173)에 형성된 고정핀홀(173a,173b,173c) 중 어느 하나의 고정핀홀에 고정핀(180)을 삽입 고정시키는 작업을 진행하고 제2 타이(120)를 제2 거푸집(M2)의 상면에 고정하는 작업도 동일한 방법으로 진행한다.Thereafter, the worker proceeds with the work of inserting and fixing a fixing pin (180) into one of the fixing pin holes (173a, 173b, 173c) formed in the joint pin body (173) while considering a point that does not interfere with the position of the placed reinforcing bar, and also proceeds with the work of fixing the second tie (120) to the upper surface of the second formwork (M2) using the same method.
도 7과 같이, 다수의 제1 타이(110), 제2 타이(120) 및 제1 플렛타이(130)를 사용하여 제1 거푸집(M1) 및 제2 거푸집(M2)의 상면의 간격을 유지하는 작업을 마친 후에는 제3 타이(140), 제4 타이(150) 및 제2 플렛타이(160)를 이용하여 제1 거푸집(M1) 및 제2 거푸집(M2)의 측면의 간격을 유지하는 과정을 진행한다.As shown in Fig. 7, after the work of maintaining the gap between the upper surfaces of the first formwork (M1) and the second formwork (M2) using a plurality of first ties (110), second ties (120), and first flat ties (130) is completed, the process of maintaining the gap between the sides of the first formwork (M1) and the second formwork (M2) is performed using the third tie (140), the fourth tie (150), and the second flat ties (160).
즉, 제3 타이(140)의 일단부를 제1 거푸집(M1)의 측면에 웨지핀을 사용하여 고정한 후 제3 타이(140)의 타단부 및 제2 플렛타이(160)를 결합핀(170) 및 고정핀(180)을 사용하여 결합 및 고정하는 과정을 진행하며, 제4 타이(150)의 일단부를 제2 거푸집(M2)의 측면에 고정하는 과정도 동일하게 진행한다. 이들 작업이 완료되면 도 7과 같이 다수의 제3 타이(140), 제4 타이(150) 및 제2 플렛타이(160)를 사용하여 제1 거푸집(M1) 및 제2 거푸집(M2)의 측면 사이의 간격을 유지하는 작업이 모두 완료되도록 한다.That is, after one end of the third tie (140) is fixed to the side of the first formwork (M1) using a wedge pin, the other end of the third tie (140) and the second flat tie (160) are combined and fixed using a joining pin (170) and a fixing pin (180). The process of fixing one end of the fourth tie (150) to the side of the second formwork (M2) is also performed in the same manner. When these tasks are completed, the task of maintaining the gap between the sides of the first formwork (M1) and the second formwork (M2) using a plurality of third ties (140), fourth ties (150), and second flat ties (160) is all completed, as shown in FIG. 7.
이와 같은 간격유지작업을 모두 마친 후에는 제1 거푸집(M1) 및 제2 거푸집(M2)의 내부에 콘크리트를 타설하고 양생함으로써 보를 시공하게 된다.After all of this spacing work is completed, the beam is constructed by pouring concrete inside the first formwork (M1) and the second formwork (M2) and allowing it to cure.
본 발명의 보거푸집 간격유지시스템(100)은 결합핀(170)을 고정하는 고정핀(180)이 결합핀(170)에 형성된 다수의 고정핀홀(173a,173b,173c) 중 어느 하나에 선택적으로 삽입될 수 있도록 함으로써 보거푸집의 내부에 배근된 철근의 위치에 간섭됨이 없이 상호 대향하는 한 쌍의 보거푸집을 용이하게 고정할 수 있는 장점을 가진다.The formwork spacing maintenance system (100) of the present invention has the advantage of being able to easily fix a pair of mutually opposing formwork without interfering with the position of reinforcing bars arranged inside the formwork by allowing a fixing pin (180) for fixing a joining pin (170) to be selectively inserted into any one of a plurality of fixing pin holes (173a, 173b, 173c) formed in the joining pin (170).
앞에서, 본 발명의 특정한 실시예가 설명되고 도시되었지만 본 발명은 기재된 실시예에 한정되는 것이 아니고, 본 발명의 사상 및 범위를 벗어나지 않고 다양하게 수정 및 변형할 수 있음은 이 기술의 분야에서 통상의 지식을 가진 자에게 자명한 일이다. 따라서, 그러한 수정예 또는 변형예들은 본 발명의 기술적 사상이나 관점으로부터 개별적으로 이해되어서는 안되며, 변형된 실시예들은 본 발명의 특허청구범위에 속한다 하여야 할 것이다.Although specific embodiments of the present invention have been described and illustrated above, it will be apparent to those skilled in the art that the present invention is not limited to the described embodiments, and that various modifications and variations can be made without departing from the spirit and scope of the present invention. Accordingly, such modifications or variations should not be understood individually from the technical spirit or perspective of the present invention, and the modified embodiments should fall within the scope of the claims of the present invention.
100 : 보거푸집 간격유지시스템 110 : 제1 타이
120: 제2 타이 130 : 제1 플렛타이
140 : 제3 타이 150: 제4 타이
160 : 제2 플렛타이 170 : 결합핀
173a,173b,173c : 고정핀홀 180 : 고정핀
M1 : 제1 거푸집 M2 : 제2 거푸집100: Formwork spacing maintenance system 110: 1st tie
120: 2nd tie 130: 1st flat tie
140: 3rd tie 150: 4th tie
160: 2nd flat tie 170: Coupling pin
173a,173b,173c: Fixed pin hole 180: Fixed pin
M1: 1st formwork M2: 2nd formwork
Claims (6)
상기 제1 타이의 타단부 및 상기 제2 타이의 타단부에 양단부가 각각 연결되는 제1 플렛타이;
상기 제1 타이의 타단부 및 상기 제1 플렛타이의 일단부와, 상기 제2 타이의 타단부 및 상기 제1 플렛타이의 타단부를 관통하는 한 쌍의 결합핀; 및
상기 결합핀을 고정할 수 있도록 상기 결합핀의 길이방향에 대하여 교차하는 방향으로 삽입되는 한 쌍의 고정핀을 포함하되,
상기 고정핀은 상기 제1 거푸집 및 상기 제2 거푸집 내부에 배근된 철근의 위치에 간섭되지 않도록 상기 결합핀에 폭방향을 따라 형성된 다수의 고정핀홀 중 어느 하나에 삽입될 수 있는 것을 특징으로 하는 보거푸집 간격유지시스템.A first tie having one end fixed to the upper surface of a first formwork placed to construct a beam, and a second tie having one end fixed to the upper surface of a second formwork placed facing the first formwork;
A first flat tie having two ends each connected to the other end of the first tie and the other end of the second tie;
A pair of coupling pins penetrating the other end of the first tie and one end of the first flat tie, and the other end of the second tie and the other end of the first flat tie; and
Including a pair of fixing pins inserted in a direction crossing the longitudinal direction of the above-mentioned coupling pin so as to fix the above-mentioned coupling pin,
A formwork spacing maintenance system characterized in that the above fixing pin can be inserted into any one of a plurality of fixing pin holes formed along the width direction of the connecting pin so as not to interfere with the positions of reinforcing bars arranged inside the first formwork and the second formwork.
상기 제1 타이의 타단부 및 상기 제2 타이의 타단부에는 각각 제1 관통공이 형성되며, 상기 제1 플렛타이의 양단부에는 상기 제1 관통공과 연통되는 한 쌍의 제2 관통공이 형성되고,
상기 결합핀은, 상기 제1 관통공 및 상기 제2 관통공에 걸림될 수 있는 크기로 마련되는 결합핀헤드와, 상기 제1 관통공 및 상기 제2 관통공을 따라 삽입될 수 있도록 상기 결합핀헤드로부터 연장되는 결합핀바디를 포함하되,
상기 결합핀바디에는 등간격으로 이격된 3개의 고정핀홀이 형성되어 상기 고정핀이 상기 3개의 고정핀홀 중 어느 하나에 선택적으로 삽입될 수 있는 것을 특징으로 하는 보거푸집 간격유지시스템.In the first paragraph,
A first through hole is formed at each end of the first tie and the other end of the second tie, and a pair of second through holes communicating with the first through hole are formed at both ends of the first flat tie.
The above-mentioned coupling pin includes a coupling pin head that is sized to be caught in the first through-hole and the second through-hole, and a coupling pin body that extends from the coupling pin head so as to be inserted along the first through-hole and the second through-hole.
A formwork spacing maintenance system characterized in that three fixed pin holes spaced at equal intervals are formed in the above-mentioned coupling pin body, and the fixed pin can be selectively inserted into any one of the three fixed pin holes.
상기 결합핀바디는, 상기 제1 관통공 및 상기 제2 관통공을 따라 원활하게 삽입될 수 있도록 상기 결합핀헤드로부터 하측을 향해 폭이 좁아지도록 형성되는 테이퍼부를 포함하며,
상기 고정핀은, 상기 고정핀홀에 삽입되는 바(bar) 형태의 고정핀바디 및 상기 고정핀바디의 일단부로부터 상기 고정핀바디의 길이방향과 동일한 방향으로 연장되되 상기 고정핀의 삽입시 탄성이 발휘되기 위한 적어도 한 쌍의 굴곡부를 갖는 탄성접촉부를 포함하는 것을 특징으로 하는 보거푸집 간격유지시스템.In the second paragraph,
The above-mentioned coupling pin body includes a tapered portion formed so that the width thereof becomes narrower toward the bottom from the coupling pin head so that it can be smoothly inserted through the first through hole and the second through hole.
A formwork gap maintenance system characterized in that the above fixed pin includes a bar-shaped fixed pin body inserted into the fixed pin hole and an elastic contact portion extending from one end of the fixed pin body in the same direction as the longitudinal direction of the fixed pin body and having at least one pair of bent portions for exerting elasticity when the fixed pin is inserted.
상기 제1 타이는,
일단부가 상기 제1 거푸집의 상면에 고정되고 타단부가 상기 제1 거푸집에 형성된 거푸집노치를 통과하여 상기 제2 거푸집을 향해 연장되는 타이바디;
상기 제1 거푸집의 상면에 형성된 핀홀을 따라 삽입될 수 있도록 상기 타이바디의 일단부로부터 연장절곡되는 타이핀부; 및
콘크리트의 양생 완료 후 절단될 수 있도록 상기 타이바디의 중앙부근에 형성되는 타이노치부를 포함하는 것을 특징으로 하는 보거푸집 간격유지시스템.In the first paragraph,
The above first tie,
A tie body having one end fixed to the upper surface of the first formwork and the other end extending toward the second formwork through a formwork notch formed in the first formwork;
A tie pin portion that extends and bends from one end of the tie body so that it can be inserted along a pin hole formed on the upper surface of the first formwork; and
A formwork spacing maintenance system characterized by including a tie notch formed near the center of the tie body so that the tie body can be cut after concrete curing is completed.
상기 제1 거푸집의 일측면에 일단부가 고정되는 제3 타이와, 상기 제2 거푸집의 일측면에 일단부가 고정되는 제4 타이와,
상기 제3 타이의 타단부 및 상기 제4 타이의 타단부에 양단부가 각각 연결되는 제2 플렛타이를 더 포함하되,
상기 제3 타이 및 상기 제4 타이는 각각,
상기 제1 거푸집의 일측면과 상기 제2 거푸집의 일측면에 각각 형성된 한 쌍의 거푸집노치에 삽입되는 제1 바디부;
상기 제1 바디부와 동일한 폭과 길이를 가지며 상기 제1 바디부의 타단부로부터 연장되는 제2 바디부; 및
상기 제1 바디부 및 상기 제2 바디부의 연결지점에 형성되는 바디노치부를 포함하는 것을 특징으로 하는 보거푸집 간격유지시스템.In the first paragraph,
A third tie having one end fixed to one side of the first formwork, a fourth tie having one end fixed to one side of the second formwork,
Further comprising a second flat tie, each end of which is connected to the other end of the third tie and the other end of the fourth tie,
The third tie and the fourth tie are respectively,
A first body part inserted into a pair of formwork notches formed on one side of the first formwork and one side of the second formwork, respectively;
A second body part having the same width and length as the first body part and extending from the other end of the first body part; and
A formwork gap maintenance system characterized by including a body notch portion formed at a connecting point between the first body portion and the second body portion.
상기 제3 타이의 타단부 및 상기 제2 플렛타이의 일단부와, 상기 제4 타이의 타단부 및 상기 제2 플렛타이의 타단부를 관통하는 한 쌍의 결합핀 및 상기 결합핀을 고정할 수 있도록 상기 결합핀의 길이방향에 대하여 교차하는 방향으로 삽입되는 한 쌍의 고정핀을 더 포함하되,
상기 고정핀은 상기 제1 거푸집 및 상기 제2 거푸집의 내부에 배근된 철근의 위치에 간섭되지 않도록 상기 결합핀에 형성된 다수의 고정핀홀 중 어느 하나에 삽입될 수 있는 것을 특징으로 하는 보거푸집 간격유지시스템.
In paragraph 5,
It further includes a pair of coupling pins penetrating the other end of the third tie and one end of the second flat tie, the other end of the fourth tie and the other end of the second flat tie, and a pair of fixing pins inserted in a direction crossing the longitudinal direction of the coupling pin so as to fix the coupling pins.
A formwork spacing maintenance system characterized in that the above fixing pin can be inserted into any one of a plurality of fixing pin holes formed in the above joining pin so as not to interfere with the positions of reinforcing bars arranged inside the first formwork and the second formwork.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220092819A KR102728415B1 (en) | 2022-07-26 | A fixing system for formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220092819A KR102728415B1 (en) | 2022-07-26 | A fixing system for formwork |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20240015238A KR20240015238A (en) | 2024-02-05 |
KR102728415B1 true KR102728415B1 (en) | 2024-11-14 |
Family
ID=
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200472031Y1 (en) * | 2013-04-23 | 2014-04-01 | 이재혁 | Space keep goods for bean mold |
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200472031Y1 (en) * | 2013-04-23 | 2014-04-01 | 이재혁 | Space keep goods for bean mold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2012005600A (en) | Structural reinforcement. | |
KR100947340B1 (en) | Shear reinforcement device for junctional region of slab and column, and manufacturing mathod of it | |
KR100947339B1 (en) | Shear reinforcement device for junctional region of column-slab | |
KR102728415B1 (en) | A fixing system for formwork | |
JP4078367B2 (en) | Cable-stayed cable fixing structure | |
JP2020056244A (en) | Column-beam joint portion structure of building | |
KR20240015238A (en) | A fixing system for formwork | |
KR20110019188A (en) | Combination structure | |
JP2020165144A (en) | Beam structure, support member for beam main reinforcement, and reinforcement method for beam main reinforcement | |
JP4943795B2 (en) | Joint between steel pipe column and flat slab | |
KR100308757B1 (en) | Development Devices and Methods of Precast Reinforced Concrete Beam Reinforcements in Beam-Column Joint | |
KR101355147B1 (en) | Shear reinforcement device for junctional region of column-slab | |
JPH0711156B2 (en) | Method for joining reinforced concrete columns and steel beams | |
JP7123782B2 (en) | Joint structure of diaphragm wall | |
JP7087260B2 (en) | Column-beam joint structure | |
US20220195685A1 (en) | CLT Structure | |
JP6188323B2 (en) | Beam pin connection structure | |
KR20090009350A (en) | Shear reinforcement assembly for a slab-column connection and shear reinforcement structure using the same | |
JP2002115369A (en) | Prefabricated reinforcement member | |
JP2016142063A (en) | Joining method of reinforced concrete column and steel beam | |
JP3838566B2 (en) | Structure for preventing lateral buckling of steel beam and its construction method | |
US4020132A (en) | Construction joint for reinforced concrete structures | |
JP7421930B2 (en) | Deck plate support member, deck plate support structure, and deck plate support method | |
KR101357263B1 (en) | Shear reinforcement device for junctional region of column-slab | |
JP6381744B2 (en) | Column beam frame |