KR102493444B1 - Vessel stability device and load-out method using the same - Google Patents

Vessel stability device and load-out method using the same Download PDF

Info

Publication number
KR102493444B1
KR102493444B1 KR1020180102230A KR20180102230A KR102493444B1 KR 102493444 B1 KR102493444 B1 KR 102493444B1 KR 1020180102230 A KR1020180102230 A KR 1020180102230A KR 20180102230 A KR20180102230 A KR 20180102230A KR 102493444 B1 KR102493444 B1 KR 102493444B1
Authority
KR
South Korea
Prior art keywords
frame
outrigger
floating body
support
restraining
Prior art date
Application number
KR1020180102230A
Other languages
Korean (ko)
Other versions
KR20200026360A (en
Inventor
박지호
Original Assignee
삼성중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성중공업 주식회사 filed Critical 삼성중공업 주식회사
Priority to KR1020180102230A priority Critical patent/KR102493444B1/en
Publication of KR20200026360A publication Critical patent/KR20200026360A/en
Application granted granted Critical
Publication of KR102493444B1 publication Critical patent/KR102493444B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C3/00Launching or hauling-out by landborne slipways; Slipways

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명에 따른 부유체 안정장치는 부유체에 마련되고, 외벽에서 육상 쪽으로 돌출되는 아웃트리거; 육상에 설치되고, 상기 아웃트리거와 접하는 지지면을 상기 아웃트리거 쪽으로 이동시키는 지지승강부를 구비하는 지지프레임; 및 상기 지지프레임 상측에 설치되고, 상기 아웃트리거의 외면을 둘러싸며 아웃트리거의 이동을 구속하는 구속프레임;을 포함한다.A floating body stabilization device according to the present invention includes an outrigger provided on a floating body and protruding from an outer wall toward land; a support frame installed on the land and having a support lifting part for moving a support surface in contact with the outrigger toward the outrigger; and a constraining frame installed on the upper side of the support frame, surrounding an outer surface of the outrigger and restricting movement of the outrigger.

Description

부유체 안정장치 및 그를 이용한 로드아웃 방법{VESSEL STABILITY DEVICE AND LOAD-OUT METHOD USING THE SAME}Floating body stabilizer and load-out method using the same {VESSEL STABILITY DEVICE AND LOAD-OUT METHOD USING THE SAME}

본 발명은 안정적으로 로드아웃을 수행하기 위한 부유체 안정장치 및 그를 이용한 로드아웃 방법에 관한 것이다.The present invention relates to a floating body stabilizer for stably performing loadout and a loadout method using the same.

일반적으로, 선박을 건조하기 위해서는 해안에 도크를 마련하고, 도크의 내부에서 선박을 건조한 후, 도크를 개방하여 해수를 도크의 내부로 유입시켜, 선박이 진수되도록 하는 방법을 주로 이용하고 있다.In general, in order to build a ship, a method of preparing a dock on the shore, drying the ship inside the dock, opening the dock to introduce seawater into the dock, and launching the ship is mainly used.

그런데, 최근들어, 도크를 건설할 공간이 부족해지고, 도크건설에 따른 비용이 상승됨에 따라, 육상에서 선박을 건조한 후 플로팅도크로 이송하여 선박을 진수시키는 육상건조방법이 개발되었다.However, in recent years, as the space for constructing a dock becomes insufficient and the cost of dock construction increases, a land-building method of launching a ship by transferring it to a floating dock after drying a ship on land has been developed.

전술한 육상건조방법은 육상에 설치된 지지대의 상부에 올려진 상태로 선박을 건조한 후, 레일에 설치된 로드아웃(Load out)설비를 이용하여 선박을 들어 바다에 떠있는 플로팅도크까지 로드아웃시킨 후, 플로팅도크를 가라앉혀 진수시키는 것이다. In the above-described onshore drying method, after drying the ship while being placed on top of a support installed on land, using a load out facility installed on a rail, the ship is lifted and loaded out to a floating dock floating in the sea, It is to sink the floating dock and launch it.

중량물을 해상으로 이동시키기 위해서, 육상에 중량물이 적치된 위치로부터 운송선 위치까지 로드아웃 레일을 설치하고, 로드아웃 레일 위에 설치된 로드아웃 설비를 이용하여 운송선까지 이송하는 것이 일반적이다. 즉, 대형의 중량물이나 해양 구조물을 육상에서 제작한 후, 안벽(QUAY)에서 중하중 스키드 웨이를 이용하여 화물을 이송하게 된다. 스키드 웨이는 육상에 설치되고, 운송선에도 육상에 설치된 스키드 웨이와 연결되도록 설치된다. 그리고, 육상에 설치된 스키드 웨이와 운송선에 설치된 스키드 웨이를 연결하는 링크 빔 구조물이 설치된다.In order to move heavy objects by sea, it is common to install load-out rails from a location where the heavy objects are stacked on land to a location of a transport ship, and transport them to a transport ship using load-out facilities installed on the load-out rail. That is, after manufacturing a large heavy object or marine structure on land, the cargo is transported using a heavy load skidway at the quay wall (QUAY). The skid way is installed on land, and the transport ship is also installed to be connected to the skid way installed on land. And, a link beam structure connecting the skidway installed on land and the skidway installed on the transport ship is installed.

한편, 기존에는 중량물을 육상에서 제작한 이후 운송선으로 로드아웃시킬 때 운송선의 안정성(Vessel Stability)이 부족하였다. 운송선은 부두에 정박해 있다고 하더라도 파도에 의해 운송선이 상승하거나 하강을 반복하며 , 중량물의 무게에 의한 무게중심 변화가 지속적으로 발생하기 때문이다.On the other hand, in the past, vessel stability was lacking when heavy objects were manufactured on land and then loaded out to a transport vessel. This is because even if the transport ship is moored at the pier, the transport ship repeatedly rises or falls due to waves, and the center of gravity changes continuously due to the weight of the heavy object.

한국 공개특허공보 제10-2009-0084096호(2009. 08. 05. 공개)Korean Patent Publication No. 10-2009-0084096 (published on August 5, 2009)

본 발명은 안정적으로 로드아웃을 수행하기 위한 부유체 안정장치 및 그를 이용한 로드아웃 방법을 제공하는데 그 목적이 있다.An object of the present invention is to provide a floating body stabilization device for stably performing loadout and a loadout method using the same.

본 발명의 일 측면에 따르면, 부유체에 마련되고, 외벽에서 육상 쪽으로 돌출되는 아웃트리거; 육상에 설치되고, 상기 아웃트리거와 접하는 지지면을 상기 아웃트리거 쪽으로 이동시키는 지지승강부를 구비하는 지지프레임; 및 상기 지지프레임 상측에 설치되고, 상기 아웃트리거의 외면을 둘러싸며 아웃트리거의 이동을 구속하는 구속프레임;을 포함하는 부유체 안정장치가 제공될 수 있다.According to one aspect of the present invention, the outrigger provided on the floating body and protruding from the outer wall toward the land; a support frame installed on the land and having a support lifting part for moving a support surface in contact with the outrigger toward the outrigger; and a restraining frame installed above the support frame, surrounding an outer surface of the outrigger, and restricting movement of the outrigger.

상기 구속프레임은 상기 아웃트리거의 위쪽에 설치되는 상부프레임과, 상기 아웃트리거 좌우에 배치되는 측부프레임을 포함하고, 상기 상부프레임에는 상부구속부가 마련되고, 상기 측부프레임에는 측부구속부가 마련되어, 상기 지지승강부와 함께 상기 아웃트리거의 상하좌우 이동을 구속하도록 마련될 수 있다.The restraining frame includes an upper frame installed above the outrigger, and side frames disposed on the left and right of the outrigger, and an upper restraining part is provided on the upper frame, and a side restraining part is provided on the side frame, so that the support It may be provided to restrict vertical and horizontal movement of the outrigger together with the lifting unit.

상기 지지프레임과 상부프레임에는 아웃트리거가 끼워지는 위치 바깥쪽에 가설구조물이 설치되고, 상기 가설구조물은 상기 상부구속부 또는 측부구속부 설치작업을 작업자가 수행할 수 있도록, 상기 발판프레임에서 연장되고 지면에 이격하여 위치하는 발판과, 상기 발판을 지지하도록 상기 지지프레임과 상부프레임에 고정설치되는 보강프레임을 포함할 수 있다.In the support frame and the upper frame, a temporary structure is installed outside the position where the outrigger is fitted, and the temporary structure extends from the scaffolding frame so that the operator can perform the installation work of the upper restraint or side restraint and the ground It may include a scaffold positioned apart from each other, and a reinforcing frame fixed to the support frame and the upper frame to support the scaffold.

상기 상부구속부와 상기 측부구속부에는 상기 아웃트리거와 접하는 지지면을 상기 아웃트리거 쪽으로 이동시키는 가압부가 마련될 수 있다.A pressing part for moving a support surface in contact with the outrigger toward the outrigger may be provided in the upper restraining part and the side restraining part.

본 발명의 다른 측면에 따르면, 상기 아웃트리거가 상기 지지승강부 상측에 위치하도록 부유체를 이동시키는 배치단계; 육상과 부유체를 연결하는 스키드 웨이가 설치될 수 있도록 밸러스트를 조절하여 부유체 높이를 정위치시키는 높이조절단계; 상기 지지승강부를 작동시켜 상기 지지면이 상기 아웃트리거에 접하도록 하는 안착단계; 상기 구속프레임을 상기 지지프레임 상부에 설치하는 구속프레임 설치단계;를 포함하는 부유체 안정장치를 이용한 로드아웃 방법이 제공될 수 있다.According to another aspect of the present invention, the arrangement step of moving the floating body so that the outrigger is positioned above the lifting support portion; A height adjustment step of adjusting the height of the floating body by adjusting the ballast so that a skidway connecting the land and the floating body can be installed; A seating step of operating the support lifting part so that the support surface comes into contact with the outrigger; A loadout method using a floating body stabilization device may be provided, including a restraint frame installation step of installing the restraint frame on top of the support frame.

상부프레임과 아웃트리거 사이 공간으로 상부구속부를 삽입하고, 상기 상부구속부를 상기 상부프레임에 고정설치하는 상부구속부 체결단계; 및 측부프레임과 아웃트리거 사이 공간으로 측부구속부를 삽입하고, 상기 측부구속부를 상기 측부프레임에 고정설치하는 측부구속부 체결단계;를 더 포함할 수 있다.An upper restraining part fastening step of inserting an upper restraining part into a space between an upper frame and an outrigger, and fixing the upper restraining part to the upper frame; and inserting the side restraint into the space between the side frame and the outrigger, and fixing the side restraint to the side frame.

상기 구속프레임 설치단계는 상기 구속프레임에 고정 설치된 가설구조물을 상기 구속프레임과 함께 설치하는 과정을 포함하는 부유체 안정장치를 이용할 수 있다.The installation of the restraining frame may include a process of installing a temporary structure fixed to the restraining frame together with the restraining frame.

본 발명에 따른 부유체 안정장치 및 그를 이용한 로드아웃 방법은 부유체로 중량물을 이송시키는 로드아웃 수행시 안정성(Stability)을 향상시킬 수 있다. 또한, 로드아웃 수행을 위한 부유체 부력조절(Ballasting) 시간을 줄이고, 부유체를 계선(Mooring)시키는 힘(Force)을 보조할 수 있다.The floating body stabilization device and the loadout method using the same according to the present invention can improve stability during loadout in which a heavy object is transferred to a floating body. In addition, it is possible to reduce the time required for balancing the buoyancy of the floating body for loadout, and to assist the force for mooring the floating body.

도 1은 종래 로드아웃 방식에 대한 평면도이다.
도 2는 종래 로드아웃 방식에 대한 측면도이다.
도 3은 본 발명의 일실시예에 따른 아웃트리거가 설치된 선박의 평면도이다.
도 4는 본 발명의 일실시예에 따른 부유체 안정장치의 사시도이다.
도 5는 본 발명의 일실시예에 따른 부유체 안정장치를 이용한 로드아웃 방법에 대한 제1 순서도이다.
도 6은 본 발명의 일실시예에 따른 부유체 안정장치를 이용한 로드아웃 방법에 대한 제2 순서도이다.
도 7은 도 6에 대응하는 부유체 안정장치에 대한 후방 사시도이다.
도 8은 본 발명의 일실시예에 따른 부유체 안정장치를 이용한 로드아웃 방법에 대한 제3 순서도이다.
도 9는 본 발명의 일실시예에 따른 부유체 안정장치를 이용한 로드아웃 방법에 대한 제4 순서도이다.
도 10은 본 발명의 일실시예에 따른 부유체 안정장치를 이용한 로드아웃 방법에 대한 제5 순서도이다.
1 is a plan view of a conventional load-out method.
2 is a side view of a conventional load-out method.
3 is a plan view of a ship in which an outrigger is installed according to an embodiment of the present invention.
4 is a perspective view of a floating body stabilization device according to an embodiment of the present invention.
5 is a first flow chart for a loadout method using a floating body stabilizer according to an embodiment of the present invention.
6 is a second flow chart for a loadout method using a floating body stabilizer according to an embodiment of the present invention.
Figure 7 is a rear perspective view of the floating body stabilizer corresponding to Figure 6;
8 is a third flowchart for a loadout method using a floating body stabilizer according to an embodiment of the present invention.
9 is a fourth flowchart for a loadout method using a floating body stabilizer according to an embodiment of the present invention.
10 is a fifth flow chart for a loadout method using a floating body stabilizer according to an embodiment of the present invention.

이하에서는 본 발명의 실시예들을 첨부 도면을 참조하여 상세히 설명한다. 이하에 소개되는 실시예들은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 본 발명의 사상이 충분히 전달될 수 있도록 하기 위해 예로서 제공되는 것이다. 본 발명은 이하 설명되는 실시예들에 한정되지 않고 다른 형태로 구체화될 수도 있다. 본 발명을 명확하게 설명하기 위하여 설명과 관계없는 부분은 도면에서 생략하였으며 도면들에 있어서, 구성요소의 폭, 길이, 두께 등은 편의를 위하여 과장되어 표현될 수 있다. 명세서 전체에 걸쳐서 동일한 참조번호들은 동일한 구성요소들을 나타낸다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. The embodiments introduced below are provided as examples to sufficiently convey the spirit of the present invention to those skilled in the art. The present invention is not limited to the embodiments described below and may be embodied in other forms. In order to clearly explain the present invention, parts irrelevant to the description are omitted from the drawings, and in the drawings, the width, length, thickness, etc. of components may be exaggerated for convenience. Like reference numbers indicate like elements throughout the specification.

도 1은 종래 로드아웃 방식에 대한 평면도이고, 도 2는 그에 대한 측면도이다. 도면을 참조하여 로드아웃 과정을 설명하기로 한다. 로드아웃은 육상건조방식으로 건조된 선박 등의 중량물(31)을 해상으로 이동시키기 위해서 수행하는 것으로, 안벽(24)과 부유체(10), 즉 플로팅 도크 사이에 스키드 웨이(22)를 설치하고, 대용량의 유압 윈치(도시하지 않음)을 이용하여 중량물(31)을 스키드 웨이(22) 상에서 밀어서, 대형해양 구조물인 선박 등의 중량물(31)을 운반시키는 과정을 포함한다.1 is a plan view of a conventional load-out method, and FIG. 2 is a side view thereof. A load-out process will be described with reference to the drawings. Load-out is performed to move a heavy object 31 such as a ship built by land-building method to the sea, and a skidway 22 is installed between the quay wall 24 and the floating body 10, that is, the floating dock, , A process of transporting the heavy object 31 such as a ship, which is a large offshore structure, by pushing the heavy object 31 on the skidway 22 using a large-capacity hydraulic winch (not shown).

부유체(10)는 육상에서 건조된 선박의 바다 진수 시, 선박이 위치하는 것으로, 상단에 중량물(32)이 안착되는 서포트를 구비하는 그릴리지 빔(11)이 등간격으로 다수개 설치되고, 그릴리지 빔(11) 상단에는 스키드 웨이(22)와 연결되는 스키드 빔(미도시)이 설치된다. 스키드 빔과 그릴리지 빔(17)은 서로 직교하도록 즉, 종방향으로 설치된 스키드빔의 하단에 횡방향으로 다수개의 그릴리지 빔(11)이 위치하도록 설치되어 있다. 이와 같이 설치된 스키드 빔과 그릴리지 빔(11)은 선박이 바지로 이동될 시, 하중을 분산시키게 된다.The floating body 10 is where the ship is located when a ship built on land is launched into the sea, and a plurality of grillage beams 11 having a support on which a heavy object 32 is seated on the top are installed at equal intervals, A skid beam (not shown) connected to the skid way 22 is installed at the upper end of the grillage beam 11 . The skid beam and the grillage beam 17 are installed so that they are orthogonal to each other, that is, a plurality of grillage beams 11 are positioned in the transverse direction at the lower end of the skid beam installed in the longitudinal direction. The skid beam and grillage beam 11 installed in this way distribute the load when the ship is moved to the barge.

콘크리트 매트(21)는 선박 등의 중량물(31) 이동시 육상(20)에 작용하는 집중하중을 분산시키기 위한 것이다. 선박을 육상에서 건조하는 경우 선수/선미 부분에 선체의 하중을 지지 할 수 있는 반목의 수량은 제한적이므로, 이로 인해 선박은 이동시 집중하중을 받게 된다. 콘크리트 매트(21)는 파일(Pile) 등을 이용하여 육상(20)에서 발생되는 집중하중현상을 분산하기 위하여 설치된다.The concrete mat 21 is for dispersing a concentrated load acting on the land 20 when a heavy object 31 such as a ship moves. When a ship is built on land, the number of halves capable of supporting the load of the hull at the bow/stern is limited, so the ship receives a concentrated load when moving. The concrete mat 21 is installed to distribute the concentrated load phenomenon generated on the land 20 using a pile or the like.

스키드 웨이(22)는 콘크리트 매트(21) 상단에 설치되는 것으로, 스키드 웨이(22)의 위치와 개수는 가장 안전하고 효율적으로 선적할 수 있는 위치와 개수를 고려하여 마련된다. 이러한 스키드 웨이(22)는 부유체(10)가 부둣가 등 육지 인근에 정박한 후에 닻줄 및 계류로프 등으로 선박을 고정한 후에 설치된다. 스키드 웨이(22)는 육상에 설치되고, 부유체(10)에도 육상에 설치된 스키드 웨이(22)와 연결되도록 설치된다.The skid way 22 is installed on top of the concrete mat 21, and the position and number of the skid way 22 are prepared in consideration of the position and number that can be loaded most safely and efficiently. Such a skidway 22 is installed after the floating body 10 is anchored near a land such as a wharf and after fixing the ship with an anchor line and a mooring rope. The skidway 22 is installed on land, and the floating body 10 is also installed to be connected to the skidway 22 installed on land.

연결다리(23)는 육상에 설치된 스키드 웨이(22)와 부유체(10)에 설치된 스키드 빔을 연결한다. 한편, 부유체(10)는 아무리 부두에 정박해 있다고 하더라도 파도에 의해 부유체(10)가 상승하거나 하강할 때에도 연결을 유지해야 하므로, 연결다리(23)는 육상에 설치된 스키드 웨이(22)와 부유체(10)에 설치된 스키드 웨이(22)에 양 단이 각각 핀에 의해 힌지결합되어 부유체(10)의 승하강에 따라 경사지도록 마련된다.The connection bridge 23 connects the skid way 22 installed on land and the skid beam installed on the floating body 10 . On the other hand, since the floating body 10 must maintain the connection even when the floating body 10 rises or descends due to waves no matter how much it is anchored at the pier, the connection bridge 23 is connected to the skidway 22 installed on land. Both ends of the skidway 22 installed on the floating body 10 are hinged by pins, and provided to be inclined as the floating body 10 ascends and descends.

도 3은 본 발명의 일실시예에 따른 아웃트리거(200)가 설치된 선박의 평면도이고, 도 4는 부유체 안정장치의 사시도이다.3 is a plan view of a ship in which an outrigger 200 is installed according to an embodiment of the present invention, and FIG. 4 is a perspective view of a floating body stabilization device.

도면을 참조하면, 본 발명의 일실시예에 따른 부유체 안정장치(100)는 부유체(10) 외벽(12)에서 육상 쪽으로 돌출되는 아웃트리거(200), 육상에 설치되는 지지승강부(111)를 구비하는 지지프레임(110), 및 지지프레임(110) 상측에 설치되고 아웃트리거(200)의 외면을 둘러싸며 아웃트리거(200)의 이동을 구속하는 구속프레임(120,130,140)을 포함하며, 이러한 부유체 안정장치(100)는 해수면의 흐름 또는 중량물의 이동에 따른 무게중심 변동으로 부유체(10)가 흔들리는 것을 막고, 로드아웃이 안정적으로 진행되게 한다.Referring to the drawings, the floating body stabilization device 100 according to an embodiment of the present invention includes an outrigger 200 protruding toward the land from the outer wall 12 of the floating body 10, and a support elevation part 111 installed on the land. It includes a support frame 110 having a , and a restraining frame 120 , 130 , 140 installed on the upper side of the support frame 110 and surrounding the outer surface of the outrigger 200 and restricting the movement of the outrigger 200 , The floating body stabilizing device 100 prevents the floating body 10 from shaking due to a change in the center of gravity due to the flow of the sea level or the movement of a heavy object, and allows the loadout to proceed stably.

아웃트리거(200)는 부유체(10) 외벽(12)으로부터 육상(20) 쪽으로 돌출되는 부분으로, 수직방향 강성을 위한 수직프레임(210)과 수평방향 강성을 위한 수평프레임(220)을 포함할 수 있다. 이러한 아웃트리거(200)는 부유체(10) 외면(12)을 따라 이격하여 제1 내지 제4 아웃트리거(201,202,203,204)가 마련될 수 있다. 이러한 아웃트리거(200)는 부유체(10)에 마련되는 그릴리지 빔(11)에서 연장된 형태로 마련될 수 있다.The outrigger 200 is a part that protrudes from the outer wall 12 of the floating body 10 toward the land 20, and includes a vertical frame 210 for vertical rigidity and a horizontal frame 220 for horizontal rigidity. can The outriggers 200 may be spaced apart along the outer surface 12 of the floating body 10 to provide first to fourth outriggers 201 , 202 , 203 , and 204 . The outrigger 200 may be provided in a form extending from the grillage beam 11 provided on the floating body 10 .

지지프레임(110)은 육상(20)의 안벽(24) 가까이 설치되는 프레임 구조체로써, 지지프레임(110)에는 상부면 중앙에 지지승강부(111)가 마련되어 아웃트리거(200)를 지지할 수 있다. 이때 지지승강부(111)는 아웃트리거(200)와 접하는 지지면(111a)을 아웃트리거(200) 쪽으로 이동시킬 수 있는 유압잭으로써, 아웃트리거(200)의 높이에 대응하여 지지면(111a)을 이동시킨다.The support frame 110 is a frame structure installed near the quay wall 24 of the land 20, and the support frame 110 has a support lifting part 111 in the center of the upper surface to support the outrigger 200. . At this time, the support lifting part 111 is a hydraulic jack capable of moving the support surface 111a in contact with the outrigger 200 toward the outrigger 200, and the support surface 111a corresponding to the height of the outrigger 200 move

구속프레임(120,130,140)은 아웃트리거(200)의 위쪽에 설치되는 상부프레임(120)과, 아웃트리거(200) 좌우에 배치되는 측부프레임(130,140)을 포함하고, 상부프레임(120)에는 상부구속부(121)가 마련되고, 측부프레임(130,140)에는 측부구속부(141)가 마련되어, 지지승강부(111)와 함께 아웃트리거(200)의 상하좌우 이동을 구속하도록 마련된다.The restraining frames 120, 130, 140 include an upper frame 120 installed above the outrigger 200 and side frames 130, 140 disposed on the left and right of the outrigger 200, and the upper frame 120 includes an upper restraining part 121 is provided, and side restraining parts 141 are provided on the side frames 130 and 140, and are provided to restrain up, down, left and right movement of the outrigger 200 together with the support lifting part 111.

제1 측부프레임(130)은 도 4를 기준으로 지지프레임(110)의 좌측에 마련되고, 제2 측부프레임(140)은 지지프레임(110)의 우측에 마련되고, 상부프레임(120)은 제1 측부프레임(130)과 제2 측부프레임(140)을 아웃트리거(200) 상측에서 연결할 수 있다. 이러한 구속프레임(120,130,140)은 지지프레임(110)과 함께 아웃트리거(200)를 둘러싸는 형태로 마련된다.The first side frame 130 is provided on the left side of the support frame 110 with reference to FIG. 4, the second side frame 140 is provided on the right side of the support frame 110, and the upper frame 120 is The first side frame 130 and the second side frame 140 may be connected from the upper side of the outrigger 200 . These constraining frames 120 , 130 , 140 are provided in a form surrounding the outrigger 200 together with the support frame 110 .

상부프레임(120)과 아웃트리거(200) 사이에는 그 간격에 대응되는 높이를 갖는 상부구속부(121)가 마련되고, 제1 측부프레임(130) 또는 제2 측부프레임(140)과 아웃트리거(200) 사이에는 그 간격에 대응되는 폭을 갖는 측부구속부(141)가 마련된다.An upper restraining part 121 having a height corresponding to the interval is provided between the upper frame 120 and the outrigger 200, and the first side frame 130 or the second side frame 140 and the outrigger ( 200) is provided with a side restraining portion 141 having a width corresponding to the interval.

이러한 상부구속부(121)와 측부구속부(141)에는 도시되지는 않았으나, 아웃트리거(200)와 접하는 지지면을 각각 아웃트리거(200) 쪽으로 이동시키는 가압부가 마련될 수 있다. 이때 상부구속부(121)와 측부구속부(141)는 유압식으로 작동하는 유압잭으로 이루어질 수 있다.Although not shown, the upper restraining part 121 and the side restraining part 141 may be provided with a pressing part for moving a support surface in contact with the outrigger 200 toward the outrigger 200, respectively. At this time, the upper restraining part 121 and the side restraining part 141 may be made of a hydraulic jack that operates hydraulically.

지지프레임(110)과 상부프레임(120)에는 아웃트리거(200)가 끼워지는 위치 바깥쪽에 가설구조물(150)이 설치될 수 있다. 가설구조물(150)은 외벽(12)에서 아웃트리거(200)가 돌출되는 방향으로 마련될 수 있으며, 이러한 가설구조물(150)은 상부구속부(121) 또는 측부구속부(141) 설치작업을 작업자가 수행할 수 있도록, 발판프레임(151)에서 연장되고 지면에 이격하여 위치하는 발판(152)과, 발판(152)을 지지하도록 지지프레임(110)과 상부프레임(120)에 고정설치되는 보강프레임(153)을 포함할 수 있다.In the support frame 110 and the upper frame 120, a temporary structure 150 may be installed outside the position where the outrigger 200 is fitted. The temporary structure 150 may be provided in a direction in which the outrigger 200 protrudes from the outer wall 12, and the temporary structure 150 performs the installation work of the upper restraint part 121 or the side restraint part 141. A scaffold 152 extending from the scaffold frame 151 and positioned away from the ground, and a reinforcement frame fixed to the support frame 110 and the upper frame 120 to support the scaffold 152 so that the (153) may be included.

발판프레임(151)은 지지프레임(110)에서 아웃트리거(200) 바깥쪽으로 연장되어 발판(152)이 안착되는 지지체 역할을 수행한다. 보강프레임(153)은 발판프레임(151) 상에 고정 설치된 발판(152) 상부로 연장되며, 상부프레임(120)에서 아웃트리거(200) 바깥쪽으로 연장된 프레임과 연결된다. 이러한 발판프레임(151)과 보강프레임(153)은 서로 용접 등의 방식으로 고정설치되며, 아웃트리거(200)가 돌출되는 방향으로 'ㄷ'자 형상의 구조체를 만들 수 있다.The scaffolding frame 151 extends from the support frame 110 to the outside of the outrigger 200 and serves as a support body on which the scaffolding 152 is seated. The reinforcing frame 153 extends to the top of the scaffold 152 fixedly installed on the scaffold frame 151, and is connected to the frame extending from the upper frame 120 to the outrigger 200. The scaffolding frame 151 and the reinforcing frame 153 are fixed to each other by welding or the like, and a 'c'-shaped structure can be made in the direction in which the outrigger 200 protrudes.

도 5는 본 발명의 일실시예에 따른 부유체 안정장치를 이용한 로드아웃 방법에 대한 제1 순서도이고, 도 6은 로드아웃 방법에 대한 제2 순서도이고, 도 7은 도 6에 대응하는 부유체 안정장치에 대한 후방 사시도이다. 그리고 도 8은 로드아웃 방법에 대한 제3 순서도이고, 도 9는 로드아웃 방법에 대한 제4 순서도이고, 도 10은 로드아웃 방법에 대한 제5 순서도이다.5 is a first flow chart for a load-out method using a floating body stabilizer according to an embodiment of the present invention, FIG. 6 is a second flow chart for a load-out method, and FIG. 7 is a floating body corresponding to FIG. This is a rear perspective view of the stabilizer. 8 is a third flow chart for the loadout method, FIG. 9 is a fourth flow chart for the loadout method, and FIG. 10 is a fifth flow chart for the loadout method.

도 5를 참조하면, 아웃트리거(200)가 지지승강부(111) 상측에 위치하도록 부유체(10)를 이동시키는 배치단계가 수행될 수 있다.Referring to FIG. 5 , a disposition step of moving the floating body 10 so that the outrigger 200 is positioned above the support elevation part 111 may be performed.

도 6을 참조하면, 상술한 배치단계 다음으로, 육상과 부유체(10)를 연결하는 스키드 웨이(22)가 설치될 수 있도록 밸러스트를 조절하여 부유체(10) 높이를 정위치시키는 높이조절단계와, 지지승강부(111)를 작동시켜 지지면(111a)이 아웃트리거(200)에 접하도록 하는 안착단계와, 구속프레임(120,130,140)을 지지프레임(110) 상부에 설치하는 구속프레임(120,130,140) 설치단계가 순차로 수행될 수 있다. Referring to FIG. 6, after the above-described arrangement step, the height adjustment step of adjusting the height of the floating body 10 by adjusting the ballast so that the skidway 22 connecting the land and the floating body 10 can be installed And, a seating step of operating the support elevation part 111 so that the support surface 111a comes into contact with the outrigger 200, and the restraint frames 120, 130, 140 for installing the restraint frames 120, 130, 140 on the upper part of the support frame 110 The installation steps can be performed sequentially.

이때, 구속프레임(120,130,140) 설치단계에서는 구속프레임(120,130,140)에 고정 설치된 가설구조물(150)을 구속프레임(120,130,140)과 함께 설치하는 과정을 포함할 수 있다.At this time, the step of installing the restraining frames 120 , 130 , and 140 may include a process of installing the temporary structure 150 fixed to the restraining frames 120 , 130 , and 140 together with the restraining frames 120 , 130 , and 140 .

구속프레임(120,130,140) 설치단계 다음으로는, 도 8을 참조하면, 상부프레임(120)과 아웃트리거(200) 사이 공간으로 상부구속부(121)를 삽입하고, 상부구속부(121)를 상부프레임(120)에 고정설치하는 상부구속부(121) 체결단계가 수행될 수 있다. Next to the step of installing the restraining frames (120, 130, 140), referring to FIG. 8, the upper restraining part 121 is inserted into the space between the upper frame 120 and the outrigger 200, and the upper restraining part 121 is inserted into the upper frame. The fastening step of the upper restraining part 121 fixed to the 120 may be performed.

도 9를 참조하면, 배치단계 다음으로는, 측부프레임(130,140)과 아웃트리거(200) 사이 공간으로 측부구속부(141)를 삽입하고, 측부구속부(141)를 측부프레임(130,140)에 고정설치하는 측부구속부(141) 체결단계를 포함한다. 이때, 측부구속부(141)는 제1 측부프레임(130)과 제2 측부프레임(140) 중 어느 하나에만 설치될 수 있고, 양쪽에 복수개가 설치될 수 있으며, 이에 한정하지 않는다.Referring to FIG. 9 , next to the arrangement step, the side restraining part 141 is inserted into the space between the side frames 130 and 140 and the outrigger 200, and the side restraining part 141 is fixed to the side frames 130 and 140. It includes the step of fastening the side restraint 141 to be installed. At this time, the side restraining part 141 may be installed on only one of the first side frame 130 and the second side frame 140, and may be installed in plurality on both sides, but is not limited thereto.

도 10을 참조하면, 아웃트리거(200)는 안정장치(100)에 의해 상하좌우가 구속되고, 이로써 부유체(10)로 중량물을 이송시키는 로드아웃 수행시 안정성(Stability)을 향상시킬 수 있다. 또한, 로드아웃 수행을 위한 부유체 부력조절(Ballasting) 시간을 줄이고, 부유체를 계선(Mooring)시키는 힘(Force)을 보조할 수 있다. 한편, 로드아웃을 완료한 이후, 아웃트리거(200)를 구속 해제하는 방식은 상술한 로드아웃 방법의 역순으로 진행될 수 있으며, 이에 한정하지 않는다.Referring to FIG. 10 , the outrigger 200 is restrained up, down, left and right by the stabilizing device 100, and thus stability can be improved during load-out to transfer a heavy object to the floating body 10. In addition, it is possible to reduce the time required for balancing the buoyancy of the floating body for loadout, and to assist the force for mooring the floating body. Meanwhile, a method of releasing the restraint of the outrigger 200 after completing the loadout may be performed in the reverse order of the above-described loadout method, but is not limited thereto.

본 발명은 첨부된 도면에 도시된 일 실시예를 참고로 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 수 있을 것이다. 따라서 본 발명의 진정한 범위는 첨부된 청구 범위에 의해서만 정해져야 할 것이다.The present invention has been described with reference to an embodiment shown in the accompanying drawings, but this is only exemplary, and those skilled in the art can make various modifications and equivalent other embodiments therefrom. You will understand. Therefore, the true scope of the present invention should be defined only by the appended claims.

10: 부유체 11: 그릴리지
12: 외벽 20: 육상
21: 콘크리트 매트 22: 스키드 웨이
23: 연결다리 24: 안벽
31: 중량물 32: 중량물
100: 안정장치 110: 지지프레임
111: 지지승강부 111a: 지지면
120: 상부프레임 121: 상부구속부
130: 제1 측부프레임 140: 제2 측부프레임
141: 측부구속부 150: 가설구조물
151: 발판프레임 152: 발판
153: 보강프레임 200: 아웃트리거
210: 수직프레임 220: 수평프레임
10: floating body 11: grillage
12: outer wall 20: land
21: concrete mat 22: skid way
23: connecting bridge 24: quay
31: heavy material 32: heavy material
100: stabilizer 110: support frame
111: support lifting part 111a: support surface
120: upper frame 121: upper restraint
130: first side frame 140: second side frame
141: side restraint 150: temporary structure
151: scaffolding frame 152: scaffolding
153: reinforcement frame 200: outrigger
210: vertical frame 220: horizontal frame

Claims (7)

부유체에 마련되고, 외벽에서 육상 쪽으로 돌출되는 아웃트리거;
육상에 설치되고, 상기 아웃트리거와 접하는 지지면을 상기 아웃트리거 쪽으로 이동시키는 지지승강부를 구비하는 지지프레임; 및
상기 지지프레임 상측에 설치되고, 상기 아웃트리거의 외면을 둘러싸며 아웃트리거의 이동을 구속하는 구속프레임;을 포함하는 부유체 안정장치.
An outrigger provided on the floating body and protruding from the outer wall toward the land;
a support frame installed on the land and having a support lifting part for moving a support surface in contact with the outrigger toward the outrigger; and
A floating body stabilization device comprising a; restraint frame installed on the upper side of the support frame, surrounding the outer surface of the outrigger and restraining the movement of the outrigger.
제1항에 있어서,
상기 구속프레임은
상기 아웃트리거의 위쪽에 설치되는 상부프레임과, 상기 아웃트리거 좌우에 배치되는 측부프레임을 포함하고,
상기 상부프레임에는 상부구속부가 마련되고, 상기 측부프레임에는 측부구속부가 마련되어, 상기 지지승강부와 함께 상기 아웃트리거의 상하좌우 이동을 구속하도록 마련되는 부유체 안정장치.
According to claim 1,
The constraining frame is
It includes an upper frame installed above the outrigger and a side frame disposed on the left and right of the outrigger,
An upper restraining part is provided on the upper frame, and a side restraining part is provided on the side frame to restrain up, down, left, and right movement of the outrigger together with the support elevation part.
제2항에 있어서,
상기 지지프레임과 상부프레임에는 상기 아웃트리거가 끼워지는 위치 바깥쪽에 가설구조물이 설치되고,
상기 가설구조물은 상기 상부구속부 또는 측부구속부 설치작업을 작업자가 수행할 수 있도록, 지지프레임에서 아웃트리거 바깥쪽으로 연장되는 발판프레임과, 상기 발판프레임에서 연장되고 지면에 이격하여 위치하는 발판과, 상기 발판을 지지하도록 상기 지지프레임과 상부프레임에 고정설치되는 보강프레임을 포함하는 부유체 안정장치.
According to claim 2,
In the support frame and the upper frame, a temporary structure is installed outside the position where the outrigger is fitted,
The temporary structure includes a scaffolding frame extending from the support frame to the outside of the outrigger, a scaffolding frame extending from the scaffolding frame and spaced apart from the ground so that the operator can perform the installation work of the upper restraint part or the side restraint part, A floating body stabilizer comprising a reinforcing frame fixed to the support frame and the upper frame to support the scaffold.
제2항에 있어서,
상기 상부구속부 또는 상기 측부구속부에는
상기 아웃트리거와 접하는 지지면을 상기 아웃트리거 쪽으로 이동시키는 가압부가 마련되는 부유체 안정장치.
According to claim 2,
The upper restraining part or the side restraining part has
A floating body stabilizer having a pressing unit for moving a support surface in contact with the outrigger toward the outrigger.
제1항에 따른 부유체 안정장치를 이용한 로드아웃 방법에 있어서,
상기 아웃트리거가 상기 지지승강부 상측에 위치하도록 부유체를 이동시키는 배치단계;
육상과 부유체를 연결하는 스키드 웨이가 설치될 수 있도록 밸러스트를 조절하여 부유체 높이를 정위치시키는 높이조절단계;
상기 지지승강부를 작동시켜 상기 지지면이 상기 아웃트리거에 접하도록 하는 안착단계;
상기 구속프레임을 상기 지지프레임 상부에 설치하는 구속프레임 설치단계;를 포함하는 부유체 안정장치를 이용한 로드아웃 방법.
In the loadout method using the floating body stabilizer according to claim 1,
a disposition step of moving the floating body so that the outrigger is positioned above the support elevation part;
A height adjustment step of adjusting the height of the floating body by adjusting the ballast so that a skidway connecting the land and the floating body can be installed;
A seating step of operating the support lifting part so that the support surface comes into contact with the outrigger;
A loadout method using a floating body stabilization device comprising a; restraint frame installation step of installing the restraint frame on top of the support frame.
제5항에 있어서,
상부프레임과 상기 아웃트리거 사이 공간으로 상부구속부를 삽입하고, 상기 상부구속부를 상기 상부프레임에 고정설치하는 상부구속부 체결단계; 및
측부프레임과 상기 아웃트리거 사이 공간으로 측부구속부를 삽입하고, 상기 측부구속부를 상기 측부프레임에 고정설치하는 측부구속부 체결단계;를 더 포함하는 부유체 안정장치를 이용한 로드아웃 방법.
According to claim 5,
An upper restraining part fastening step of inserting an upper restraining part into a space between an upper frame and the outrigger, and fixing the upper restraining part to the upper frame; and
The loadout method using the floating body stabilizer further comprising a side restraint fastening step of inserting a side restraint into a space between the side frame and the outrigger, and fixing and installing the side restraint to the side frame.
제5항에 있어서,
상기 구속프레임 설치단계는
상기 구속프레임에 고정 설치된 가설구조물을 상기 구속프레임과 함께 설치하는 과정을 포함하는 부유체 안정장치를 이용한 로드아웃 방법.
According to claim 5,
The restraining frame installation step is
A loadout method using a floating body stabilization device comprising the step of installing a temporary structure fixed to the restraining frame together with the restraining frame.
KR1020180102230A 2018-08-29 2018-08-29 Vessel stability device and load-out method using the same KR102493444B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180102230A KR102493444B1 (en) 2018-08-29 2018-08-29 Vessel stability device and load-out method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180102230A KR102493444B1 (en) 2018-08-29 2018-08-29 Vessel stability device and load-out method using the same

Publications (2)

Publication Number Publication Date
KR20200026360A KR20200026360A (en) 2020-03-11
KR102493444B1 true KR102493444B1 (en) 2023-01-30

Family

ID=69809859

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180102230A KR102493444B1 (en) 2018-08-29 2018-08-29 Vessel stability device and load-out method using the same

Country Status (1)

Country Link
KR (1) KR102493444B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100949891B1 (en) 2004-10-08 2010-03-25 현대중공업 주식회사 On-ground building method for conventional type of ship with transverse load-out
KR101611183B1 (en) 2014-10-28 2016-04-11 대우조선해양 주식회사 a method of launching a ship and a link-beam assembly

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090059827A (en) * 2007-12-07 2009-06-11 현대중공업 주식회사 Altitude control system of ship with transverse load-out
KR100950556B1 (en) 2008-01-31 2010-03-30 현대삼호중공업 주식회사 Load-out equipment
KR101775035B1 (en) * 2010-12-31 2017-09-05 대우조선해양 주식회사 Apparatus for supporting topside of floating marine structure
KR20150076480A (en) * 2013-12-27 2015-07-07 현대중공업 주식회사 Support structure for Load-Out of heavy structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100949891B1 (en) 2004-10-08 2010-03-25 현대중공업 주식회사 On-ground building method for conventional type of ship with transverse load-out
KR101611183B1 (en) 2014-10-28 2016-04-11 대우조선해양 주식회사 a method of launching a ship and a link-beam assembly

Also Published As

Publication number Publication date
KR20200026360A (en) 2020-03-11

Similar Documents

Publication Publication Date Title
KR100949891B1 (en) On-ground building method for conventional type of ship with transverse load-out
FI114306B (en) Procedure and pontoon for mounting a deck on a floating sea engineering substructure
KR101341763B1 (en) Preloading to reduce loads and save steel on topsides and grillage of catamaran systems
US6840713B1 (en) Device for positioning and lifting a marine structure, particularly a platform deck
KR101075160B1 (en) Ship launching method using divided Shipbuilding
US6565286B2 (en) Method for fabricating and assembling a floating offshore structure
CN102356021B (en) For loading and transport the slippery boots assembly of macrostructure
US6299383B1 (en) Method for deck installations on offshore substructure
AU2010216206B2 (en) Skid beam assembly for loading and transporting large structures
KR102493444B1 (en) Vessel stability device and load-out method using the same
US11795647B2 (en) Installation arrangement with jack-up rig and a barge and a method for setting up the installation arrangement
KR102309460B1 (en) Port Plants and Methods for Mooring Floating Bodies in Port Plants
KR101566523B1 (en) Method for building ship
EP2945849A1 (en) An apparatus and a method for transportation, installation and retrieval of marine structures
KR102474394B1 (en) Transportation systems for underwater structures, transportation and dismantling methods for underwater structures
KR20140062279A (en) A barge for loading out marine topside facility
KR20140025751A (en) A mooring system for barge for loading out marine topside facility
KR20140025776A (en) A mooring system for barge for loading out marine topside facility
KR20140025756A (en) A mooring system for barge for loading out marine topside facility
KR20140025741A (en) A mooring system for barge for loading out marine topside facility
KR20150010022A (en) Using the buoyancy apparatus for semi-submersible offshore platform distribute method of construction and semi-submersible offshore structures

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant