Nothing Special   »   [go: up one dir, main page]

JPS6117973B2 - - Google Patents

Info

Publication number
JPS6117973B2
JPS6117973B2 JP52040122A JP4012277A JPS6117973B2 JP S6117973 B2 JPS6117973 B2 JP S6117973B2 JP 52040122 A JP52040122 A JP 52040122A JP 4012277 A JP4012277 A JP 4012277A JP S6117973 B2 JPS6117973 B2 JP S6117973B2
Authority
JP
Japan
Prior art keywords
hole
precast
slurry
mixed
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP52040122A
Other languages
Japanese (ja)
Other versions
JPS53125312A (en
Inventor
Shigeaki Hiraoka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP4012277A priority Critical patent/JPS53125312A/en
Publication of JPS53125312A publication Critical patent/JPS53125312A/en
Publication of JPS6117973B2 publication Critical patent/JPS6117973B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 この発明は土留壁、止水壁等を構成する地中壁
の施工法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a construction method for underground walls constituting earth retaining walls, water-stop walls, etc.

従来土留壁等はシートパイル類の打込みが一般
であるが公害問題によつて施工できない場合があ
る。そして現場打ちコンクリートによる地中壁は
施工に高度の技術が要求され、またプレキヤスト
部材を使用する方が強度を確実にコントロールで
きる利点がある。
Conventionally, earth retaining walls and the like are generally constructed using sheet piles, but this may not be possible due to pollution problems. In-ground walls made of cast-in-place concrete require advanced technology to construct, and the use of precast members has the advantage of being able to control strength more reliably.

ところでプレキヤスト材を建込む場合、削孔の
排土処理が必要である。また削孔とプレキヤスト
部材との間〓には埋戻しが必要であるが、単に土
では地中壁として利用できない。
By the way, when building with precast materials, it is necessary to remove the soil from drilling holes. Also, backfilling is required between the drilled hole and the precast member, but simply earth cannot be used as an underground wall.

この発明は前記事情に鑑み開発した工法で、以
下図示した実施例によつて説明する。
This invention is a construction method developed in view of the above circumstances, and will be explained below with reference to the illustrated embodiments.

施工に際しては先ずスタンドパイプ1を沈設す
る。次いでスタンドパイプ1内にリバース機2を
挿入し、泥水工法を利用して所要深さまで穴3を
削孔する。次いでプレキヤスト部材として例えば
H形鋼4を穴3内に挿入する。次いで前記穴3と
H形鋼4との間に改良土砂5を充填し、次いでス
タンドパイプ1を引抜く、それらを連続して施工
する。(第1図乃至第10図参照) 連続して施工する際には穴3を一つ置きに削
孔、H形鋼4と改良土砂5の充填をなし、次いで
その中間部を同様に施工する。
During construction, first the stand pipe 1 is sunk. Next, a reversing machine 2 is inserted into the standpipe 1, and a hole 3 is drilled to a required depth using the muddy water method. Next, for example, an H-beam 4 as a precast member is inserted into the hole 3. Next, improved soil 5 is filled between the hole 3 and the H-shaped steel 4, and then the stand pipe 1 is pulled out, and these are constructed in succession. (See Figures 1 to 10) When performing continuous construction, drill every other hole 3 and fill with H-beam 4 and improved soil 5, and then perform construction in the same way in the middle. .

改良土砂としては削孔によつて排出した泥水状
の土砂より余分の水分をスクリーンで分離し、次
いでスラリーミキサーに入れてスラリー化し、こ
れに所定量のセメント類の硬化材料を配合し、二
次ミキシングプラントで混合し、コンクリートポ
ンプで穴内に圧送圧入する。
The improved soil is made by separating excess moisture from the muddy soil discharged by drilling holes with a screen, then putting it into a slurry mixer to form a slurry, mixing it with a predetermined amount of hardening material such as cement, and making it into a secondary slurry. It is mixed in a mixing plant and then forced into the hole using a concrete pump.

穴3内へのH形鋼の挿入は二列、三列あるいは
一つ置きの穴に挿入してもよい。(第1図乃至第
12図参照) さらにH形鋼に代えて鋼管6を挿入してもよ
い。そしてこの場合鋼管6内にも改良土砂5を充
填する。(第12図参照) その他プレキヤスト部材として鋼矢板、鋼管矢
板、鉄筋コンクリート矢板7、または矢板8等が
使用される。なお第13図は先に穴3内に挿入し
た矢板8の側縁に設けた雌継手9に、隣接する穴
3内に次に挿入する矢板8の側縁に設けた雄継手
を案内させながら挿入して隣接する矢板相互を接
続したものである。
The H-beams may be inserted into the holes 3 in two rows, three rows, or every other row. (See FIGS. 1 to 12) Furthermore, a steel pipe 6 may be inserted instead of the H-shaped steel. In this case, the steel pipe 6 is also filled with improved soil 5. (See Figure 12) Other precast members that may be used include steel sheet piles, steel pipe sheet piles, reinforced concrete sheet piles 7, or sheet piles 8. In addition, in FIG. 13, the female joint 9 provided on the side edge of the sheet pile 8 inserted into the hole 3 first is guided by the male joint provided on the side edge of the sheet pile 8 to be inserted next into the adjacent hole 3. These are inserted to connect adjacent sheet piles.

また前記穴は円型に限られず、長方型であつて
もよい。
Furthermore, the hole is not limited to a circular shape, but may be rectangular.

この発明は以上の構成からなり、大きめに削孔
した穴にプレキヤスト材を建込むとともに、穴と
プレキヤスト部材との間〓に硬化材料等を混合し
た改良土砂を利用して連続した地中壁を造成で
き、プレキヤスト部材の安定した耐力と相俟つて
確実な地中壁となしうる。特にこの発明では削孔
にリバース機を使用するから土砂は地上に泥水状
となつて水を含んで排出されるが、この土砂より
水分を順次スクリーンで分離し、次いでスラリー
ミキサーでスラリー化し、これにセメント類の硬
化材料を混合し、二次ミキシングプラントで所定
の配合に混合し、所要の強度、および単位体積重
量がえられるように調合するといつた一貫作業に
より充填すべき土砂が容易にえられ、この改良し
た土砂をコンクリートポンプにより圧入充填する
ので排出土砂の有効利用ができ、処分しなければ
ならない排出土砂も少く施工費が低減でき、かつ
硬化材料等を混合した土砂が圧入充填されるから
地盤強化は顕著である。
This invention has the above-mentioned configuration, and in addition to building a precast material into a hole that has been drilled to a large size, a continuous underground wall is built between the hole and the precast material by using improved soil mixed with a hardening material, etc. This allows for reliable underground walls, combined with the stable strength of the precast members. In particular, in this invention, since a reverse machine is used for drilling holes, the earth and sand becomes muddy water on the ground and is discharged containing water.The water is successively separated from this earth and sand by a screen, and then it is turned into a slurry by a slurry mixer. The earth and sand to be filled can be easily prepared through the integrated process of mixing hardening materials such as cement, mixing the mixture to a predetermined composition in a secondary mixing plant, and blending to obtain the required strength and unit volume weight. Since this improved soil is press-filled using a concrete pump, the discharged soil can be used effectively, the amount of discharged soil that must be disposed of is reduced, and construction costs can be reduced, and the soil mixed with hardened materials can be press-filled. The ground reinforcement is remarkable.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図と第2図、第3図と第4図、第5図と第
6図、第7図と第8図、および第9図と第10図
は施工過程の順序に示した横断面図と縦断面図、
第11図、第12図、第13図は変形例を示した
横断面図である。 1……スタンドパイプ、2……リバース機、3
……穴、4……H形鋼、5……改良土砂、6……
鋼管、7……コンクリート矢板、8……矢板、9
……継手。
Figures 1 and 2, Figures 3 and 4, Figures 5 and 6, Figures 7 and 8, and Figures 9 and 10 are cross sections shown in the order of the construction process. Figures and longitudinal sections,
FIGS. 11, 12, and 13 are cross-sectional views showing modified examples. 1...stand pipe, 2...reverse machine, 3
... Hole, 4 ... H-shaped steel, 5 ... Improved soil, 6 ...
Steel pipe, 7... Concrete sheet pile, 8... Sheet pile, 9
...Joint.

Claims (1)

【特許請求の範囲】[Claims] 1 リバース機により大きめに削孔した穴にプレ
キヤスト材を建込み、次いで前記削孔によつて地
上に排出した泥水状の土砂より余分の水分をスク
リーンで分離し、スラリーミキサーに入れてスラ
リー化し、これに所定量のセメント類の硬化材料
を配合し、ミキシングプラントで混合して所要の
強度をもたらすように調合した改良土砂を前記穴
とプレキヤスト材との間〓にコンクリートポンプ
により圧入充填し、かつそれらを連続して施工す
ることを特徴とする地中壁の施工法。
1. Precast material is built into a hole drilled to a larger size by a reverse machine, and then excess water is separated from the muddy soil discharged to the ground by the drilling with a screen, and the material is put into a slurry mixer to form a slurry. This is mixed with a predetermined amount of hardening material such as cement, and mixed in a mixing plant to provide the required strength.The improved soil is then injected into the space between the hole and the precast material using a concrete pump, and A construction method for underground walls that is characterized by constructing them in succession.
JP4012277A 1977-04-07 1977-04-07 Method of placing underground wall Granted JPS53125312A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4012277A JPS53125312A (en) 1977-04-07 1977-04-07 Method of placing underground wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4012277A JPS53125312A (en) 1977-04-07 1977-04-07 Method of placing underground wall

Publications (2)

Publication Number Publication Date
JPS53125312A JPS53125312A (en) 1978-11-01
JPS6117973B2 true JPS6117973B2 (en) 1986-05-10

Family

ID=12572008

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4012277A Granted JPS53125312A (en) 1977-04-07 1977-04-07 Method of placing underground wall

Country Status (1)

Country Link
JP (1) JPS53125312A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH068704Y2 (en) * 1988-07-04 1994-03-09 島野工業株式会社 Fishing cooler
KR20220084109A (en) 2019-11-11 2022-06-21 프로그래스 가부시키가이샤 How to prevent exposure to anticancer drugs

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59224725A (en) * 1983-05-31 1984-12-17 Osaka Cement Kk Sheathing work
JP5158555B2 (en) * 2006-09-11 2013-03-06 忠平 直哉 Ground improvement method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4940967A (en) * 1972-08-23 1974-04-17
JPS51136316A (en) * 1975-05-21 1976-11-25 Nitto Kogyo Kk Method of constructing continuous columns of underground wall
JPS51142816A (en) * 1975-06-04 1976-12-08 Kumagai Gumi Co Ltd Method of constructing columns of water stopping land slid protection wall

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4940967A (en) * 1972-08-23 1974-04-17
JPS51136316A (en) * 1975-05-21 1976-11-25 Nitto Kogyo Kk Method of constructing continuous columns of underground wall
JPS51142816A (en) * 1975-06-04 1976-12-08 Kumagai Gumi Co Ltd Method of constructing columns of water stopping land slid protection wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH068704Y2 (en) * 1988-07-04 1994-03-09 島野工業株式会社 Fishing cooler
KR20220084109A (en) 2019-11-11 2022-06-21 프로그래스 가부시키가이샤 How to prevent exposure to anticancer drugs

Also Published As

Publication number Publication date
JPS53125312A (en) 1978-11-01

Similar Documents

Publication Publication Date Title
US3802204A (en) Retaining wall and method for construction of the same
GB2102866A (en) Constructing retaining walls
US20020071725A1 (en) Earth support and permanent structural foundation wall
US4453366A (en) Process of forming a continuous wall in the ground
JP2000352296A (en) Method o constructing passage just under underground structure
JPS6117973B2 (en)
JPH10152985A (en) Constructing method of retaining wall
US3195311A (en) Wall construction
JP3676441B2 (en) Pit and construction method of basement using it
JPS5936058B2 (en) How to construct a structure using underground continuous walls
JPH0721196B2 (en) Reverse construction method of underground structure
JPS58189414A (en) Construction of sheathing wall
JPS6065825A (en) Method of constructing landslide protection wall having newel pile
JPS582294B2 (en) Continuous basement wall construction method
JPS5664028A (en) Sheathing construction work by antecedent support framework
JPS6018769B2 (en) Construction method of underground structure
JP2558414B2 (en) Construction method of the main retaining wall and the retaining wall
JPH02266015A (en) Constructing underground continuous wall
JPS5841227Y2 (en) Element for mountain retainer
JP2601140B2 (en) Independent mountain retaining wall method
DE4302986C2 (en) Process for the production of a structure in the form of a cover with precast reinforced concrete piles
RU1818417C (en) Method for erection of underground structure
JPS6049735B2 (en) How to form a basement
JPS6049734B2 (en) How to form a basement
Walker DSM saves the dam