JPH0835210A - Tower-like structure and construction method thereof - Google Patents
Tower-like structure and construction method thereofInfo
- Publication number
- JPH0835210A JPH0835210A JP6171462A JP17146294A JPH0835210A JP H0835210 A JPH0835210 A JP H0835210A JP 6171462 A JP6171462 A JP 6171462A JP 17146294 A JP17146294 A JP 17146294A JP H0835210 A JPH0835210 A JP H0835210A
- Authority
- JP
- Japan
- Prior art keywords
- precast
- block
- tower
- steel material
- pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、橋脚等の塔状構造物
及びその構築工法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tower-like structure such as a bridge pier and a construction method thereof.
【0002】[0002]
【従来の技術】一般に、例えば、橋脚等の塔状構造物を
構築する場合、まず、橋脚基礎部を構築し、この橋脚基
礎部の上部に、軸方向鋼材及びせん断補強鋼材を配設
し、これら軸方向鋼材及びせん断補強鋼材を囲むように
型枠を配設し、型枠によって区画された箇所へコンクリ
ートを打設していた。2. Description of the Related Art Generally, for example, in the case of constructing a tower structure such as a pier, first, a pier foundation is constructed, and an axial steel material and a shear reinforcing steel material are arranged on the pier foundation. A mold was arranged so as to surround the axial steel material and the shear-reinforced steel material, and concrete was placed in the areas partitioned by the mold.
【0003】[0003]
【発明が解決しようとする課題】ところで、上記従来の
構築工法にあっては、コンクリート打設のための煩雑な
型枠作業(型枠の運搬、据え付け、脱型、移動、清掃、
解体、処分等の各種作業)、せん断補強鋼材配設作業が
必要であり、また、鉄筋組み立て作業及び型枠作業の際
に、広い足場及び支保工部材が必要であった。このよう
に、従来の構築工法にあっては、多大な労力が必要であ
り、工期の長期化が免れず、このような問題は、高橋脚
においては顕著であった。By the way, in the above-mentioned conventional construction method, complicated form work for placing concrete (transportation, installation, demolding, movement, cleaning of formwork,
Various works such as dismantling and disposal), shear reinforced steel material arranging work, and wide scaffolding and supporting members were required at the time of rebar assembling work and formwork work. As described above, in the conventional construction method, a great deal of labor is required, and the construction period is unavoidably prolonged, and such a problem is remarkable in the high pier.
【0004】この発明は、上記事情に鑑みてなされたも
ので、極めて容易にかつ短期間にて、構築することが可
能な塔状構造物及びその構築工法を提供することを目的
としている。The present invention has been made in view of the above circumstances, and an object thereof is to provide a tower-like structure which can be constructed extremely easily and in a short period of time, and a construction method thereof.
【0005】[0005]
【課題を解決するための手段】上記目的を達成するため
に、請求項1記載の塔状構造物は、中空部を有する複数
のプレキャストブロックが積層され、該プレキャストブ
ロックの前記中空部内に、軸方向鋼材が配設されかつコ
ンクリートが打設されてなり、前記プレキャストブロッ
クは、表裏がプレキャスト板からなりかつこれらプレキ
ャスト板にせん断補強鋼材が設けられた複数のブロック
体の端部同士を接合することにより組み立てられてな
り、これらブロック体を構成するプレキャスト板同士の
間が前記中空部とされてなることを特徴としている。請
求項2記載の塔状構造物は、請求項1記載の塔状構造物
において、前記プレキャストブロックが、前記ブロック
体の接合箇所にて、それぞれのブロック体に配設された
前記せん断補強鋼材がラップされてなることを特徴とし
ている。In order to achieve the above object, the tower-like structure according to claim 1 has a structure in which a plurality of precast blocks having a hollow portion are laminated, and a shaft is provided in the hollow portion of the precast block. Direction steel material is disposed and concrete is cast, the front and back sides of the precast plate are precast plates, and the end portions of a plurality of block bodies provided with shear reinforcing steel material are joined to each other. It is characterized in that the hollow parts are formed between the precast plates constituting these block bodies. The tower-like structure according to claim 2 is the tower-like structure according to claim 1, wherein the precast block is the shear-reinforced steel material disposed in each block body at a joint portion of the block bodies. It is characterized by being wrapped.
【0006】請求項3記載の塔状構造物の構築工法は、
表裏がプレキャスト板とされ、これらプレキャスト板に
せん断補強鋼材が設けられ、前記プレキャスト板同士の
間が中空部とされてなる複数のブロック体の端部同士を
接合することにより組立られてなるプレキャストブロッ
クを組み上げ、前記プレキャスト板同士の間からなる中
空部に軸方向鋼材を配設し、コンクリートを打設するこ
とを特徴としている。The method for constructing a tower structure according to claim 3 is
The front and back are precast plates, shear reinforcing steel material is provided on these precast plates, and the precast block is assembled by joining the end portions of a plurality of block bodies having a hollow portion between the precast plates. Are assembled, an axial steel material is arranged in a hollow portion formed between the precast plates, and concrete is poured.
【0007】[0007]
【作用】そして、請求項1記載の塔状構造物によれば、
プレキャストブロック自体が塔状構造物の構造体として
用いられるので、構築時の型枠が不要とされる。また、
プレキャストブロックにせん断補強鋼材が配設されてい
るため、構築時のその配設作業が不要とされる。また、
構造物の外面がプレキャスト板によって覆われた構造で
あるので、外気によるコンクリートの劣化が防止され
る。請求項2記載の塔状構造物によれば、プレキャスト
ブロックを構成するブロック体のせん断補強鋼材同士
が、ブロック体同士の接合箇所にてラップしているの
で、ブロック体同士の接合が確実に行なわれる。According to the tower structure of claim 1,
Since the precast block itself is used as the structure of the tower-shaped structure, the formwork at the time of construction is unnecessary. Also,
Since the shear-reinforced steel material is arranged in the precast block, the work of arranging it during construction is unnecessary. Also,
Since the outer surface of the structure is covered with the precast plate, deterioration of the concrete due to outside air can be prevented. According to the tower-shaped structure of claim 2, since the shear-reinforced steel materials of the block bodies forming the precast block are wrapped at the joint portions of the block bodies, the block bodies are reliably joined. Be done.
【0008】請求項3記載の塔状構造物の構築工法によ
れば、ブロック体の端部同士を接合することによりプレ
キャストブロックを組み立てるとともに上方へ組み上
げ、プレキャストブロックの、ブロック体を構成するプ
レキャスト板同士の間からなる中空部へ、軸方向鋼材を
配設するとともにコンクリートを打設することにより、
外面がプレキャスト板によって覆われた塔状構造物が構
築される。According to the method for constructing a tower-like structure according to claim 3, the precast block is assembled by assembling the precast block by joining the end portions of the block body together and is assembled upward, and the precast plate constituting the block body of the precast block is assembled. By arranging the axial steel material and placing concrete in the hollow part formed between the two,
A tower-like structure whose outer surface is covered with a precast plate is constructed.
【0009】[0009]
【実施例】以下、本発明の塔状構造物及びその構築工法
の実施例を図によって説明する。なお、本実施例では、
塔状構造物として橋脚を例にとって説明する。図1にお
いて、符号1は、構築途中の橋脚(塔状構造物)であ
る。この橋脚1は、橋脚基礎部2の上部に現場打ちにて
構築された橋脚下部3と、この橋脚下部3の上部に構築
されたプレキャスト部4とから構成されている。なお、
この橋脚下部3は、省略することも可能である。EXAMPLES Examples of the tower-like structure and its construction method of the present invention will be described below with reference to the drawings. In this example,
A pier will be described as an example of the tower-like structure. In FIG. 1, reference numeral 1 is a pier (tower-shaped structure) under construction. This pier 1 is composed of a pier lower part 3 built on the upper part of the pier foundation part 2 by cast-in-place, and a precast part 4 built on the upper part of the pier lower part 3. In addition,
This pier lower part 3 can be omitted.
【0010】プレキャスト部4は、複数のプレキャスト
ブロック5を組み上げたもので、これらプレキャストブ
ロック5は、図2に示すように、孔部を有する平面形状
とされている。このプレキャストブロック5は、図3に
示すように、複数のブロック体6、つまり、プレキャス
トブロック5の外周を構成する側部ブロック体6a、6
bと、側部ブロック体6a同士の間に組み付けられる中
間ブロック体6cとを組み立てたもので、それぞれのブ
ロック体6は、その表裏がプレキャスト板7からなり、
これらプレキャスト板7にせん断補強鋼材8を配設した
構造とされている。即ち、側部ブロック体6a、6bの
それぞれの端部を突き合わせるとともに、一方の側部ブ
ロック体6aの中間部に、中間ブロック体6cの端部を
突き合わせることにより、これら複数のブロック体6か
らなるプレキャストブロック5が組み立てられるように
なっている。The precast portion 4 is an assembly of a plurality of precast blocks 5, and these precast blocks 5 have a planar shape having holes as shown in FIG. As shown in FIG. 3, the precast block 5 includes a plurality of block bodies 6, that is, side block bodies 6 a and 6 that form the outer periphery of the precast block 5.
b and an intermediate block body 6c assembled between the side block bodies 6a are assembled, and each block body 6 includes a precast plate 7 on its front and back sides,
The precast plate 7 has a structure in which a shear reinforcing steel material 8 is arranged. That is, the end portions of the side block bodies 6a and 6b are abutted against each other, and the end portion of the intermediate block body 6c is abutted against the middle portion of one side block body 6a. The precast block 5 consisting of is assembled.
【0011】そして、このように、ブロック体6をプレ
キャストブロック5に組み立てることにより、それぞれ
のブロック体6に配設されたせん断補強鋼材8が互いに
ラップするようになっている。プレキャストブロック5
には、複数の接合ボルト9が設けられており、これら接
合ボルト9が、下方側のプレキャストブロック5の接合
用ナット(図示略)へ締結されて、プレキャストブロッ
ク5同士が上下に接合されている。また、プレキャスト
部4におけるプレキャストブロック5を構成するブロッ
ク体6のせん断補強鋼材8が配設された中空部11に
は、軸方向鋼材12(図5参照)が配設され、さらに、
コンクリートが打設されいる。即ち、これら軸方向鋼材
12及びコンクリートによって、プレキャストブロック
5が一体化されてプレキャスト部4とされている。な
お、図1中符号14は、作業用の足場である。By assembling the block bodies 6 into the precast blocks 5 in this way, the shear reinforcing steel materials 8 arranged in the respective block bodies 6 are arranged to wrap each other. Precast block 5
Is provided with a plurality of joining bolts 9, and these joining bolts 9 are fastened to joining nuts (not shown) of the lower precast block 5 to join the precast blocks 5 to each other vertically. . Further, in the hollow portion 11 in which the shear reinforcing steel material 8 of the block body 6 constituting the precast block 5 in the precast portion 4 is disposed, the axial steel material 12 (see FIG. 5) is disposed, and further,
Concrete is placed. That is, the precast block 5 is integrated with the axial steel material 12 and concrete to form the precast portion 4. Reference numeral 14 in FIG. 1 is a scaffold for work.
【0012】次に、上記構造の橋脚1を構築する構築工
法を、図4及び図5を参照しながら、図6のフローチャ
ート図に沿って説明する。 (1)まず、橋脚基礎部を構築した後、現場打ちコンク
リートで、プレキャストブロック5の1段分程度の高さ
の橋脚下部3を構築する(ステップS1)。 (2)次いで、ブロック体6を吊り上げて橋脚下部3の
上部にてプレキャストブロック5に組み立てて、橋脚下
部3の上部にプレキャストブロック5を所定段数(約5
段)積層させ、それぞれのプレキャストブロック5同士
を接合ボルト9によって接合させる(図4参照)(ステ
ップS2)。Next, a construction method for constructing the pier 1 having the above structure will be described with reference to FIGS. 4 and 5 and along the flowchart of FIG. (1) First, after constructing the pier foundation, the pier lower part 3 having a height of about one step of the precast block 5 is constructed by cast-in-place concrete (step S1). (2) Next, the block body 6 is lifted up and assembled into the precast block 5 at the upper part of the pier lower part 3, and the precast block 5 is provided on the upper part of the pier lower part 3 by a predetermined number of stages (about 5
Steps) are stacked, and the precast blocks 5 are joined together by the joining bolts 9 (see FIG. 4) (step S2).
【0013】(3)この状態において、プレキャストブ
ロック5を構成するブロック体6のプレキャスト板7同
士の間の中空部11へクレーン等によって軸方向鋼材1
2を配設する(図5参照)(ステップS3)。 (4)その後、ブロック体6の中空部11内にコンクリ
ートを打設する(ステップS4)。 (5)コンクリートの硬化後、上記(3)〜(5)の作
業を、所定回数繰り返し行なうことにより、所定高さの
橋脚1を構築する(ステップS5)。(3) In this state, the axial steel material 1 is made by a crane or the like into the hollow portion 11 between the precast plates 7 of the block body 6 constituting the precast block 5.
2 is provided (see FIG. 5) (step S3). (4) Then, concrete is poured into the hollow portion 11 of the block body 6 (step S4). (5) After the concrete is hardened, the operations (3) to (5) are repeated a predetermined number of times to construct the pier 1 with a predetermined height (step S5).
【0014】以上、説明したように、本実施例の塔状構
造物及びその構築工法によれば、型枠作業、つまり、型
枠の運搬、据え付け、移動、脱型、清掃、解体、処分
等、そして、せん断補強鋼材の配設作業等の極めて煩雑
な各種作業を不要とすることができ、現場作業員を削減
することができる。また、従来のように、型枠を脱型し
て転用する必要がない故、この脱型のためのコンクリー
ト養生時間を必要とせず、このために工期短縮を図るこ
とができる。さらには、膨大な足場を不要とすることが
できるとともに、型枠を支持する支保工も不要とするこ
とができ、これら足場、支保工の設置作業にかかる労力
を省力化することができる。また、プレキャストブロッ
クによって橋脚の外面を構成することができるので、外
気に対する耐久性に優れた橋脚とすることができる。As described above, according to the tower-like structure and its construction method of the present embodiment, formwork, that is, transportation, installation, movement, demolding, cleaning, disassembly, disposal of the form, etc. And, it is possible to eliminate extremely complicated various works such as the work of arranging the shear reinforcing steel material, and the number of field workers can be reduced. Further, unlike the conventional case, since it is not necessary to demold and repurpose the mold, the concrete curing time for demolding is not required, and therefore the construction period can be shortened. Furthermore, it is possible to eliminate the need for a huge amount of scaffolding and the supporting work for supporting the formwork, and it is possible to save the labor required to install these scaffolding and supporting work. Further, since the outer surface of the pier can be configured by the precast block, the pier can be made excellent in durability against the outside air.
【0015】なお、上記実施例では、塔状構造物として
橋脚を例にとって説明したが、本実施例の塔状構造物及
びその構築工法によって構築可能な塔状構造物として
は、橋脚に限定されることはない。In the above embodiments, the piers have been described as an example of the tower-like structure, but the tower-like structure of this embodiment and the tower-like structure that can be constructed by the construction method thereof are not limited to piers. There is no such thing.
【0016】[0016]
【発明の効果】以上、説明したように、本発明の塔状構
造物及びその構築工法によれば、下記の効果を得ること
ができる。請求項1記載の塔状構造物によれば、プレキ
ャストブロック自体が塔状構造物の構造体として用いら
れるので、構築時における型枠を不要とすることができ
る。これにより、従来必要であった煩雑な型枠作業、つ
まり、型枠の運搬、据え付け、移動、脱型、清掃、解
体、処分等の各種作業を不要とすることができ、現場作
業員を削減することができる。また、従来のように型枠
を脱型して転用する必要がない故、この脱型のためのコ
ンクリート養生期間を必要とせず、このために工期短縮
を図ることができる。また、プレキャストブロックにせ
ん断補強鋼材が埋設されているため、構築時におけるせ
ん断補強鋼材の配設作業を不要とすることができる。さ
らには、膨大な足場を不要とすることができるととも
に、型枠を支持する支保工も不要とすることができ、こ
れら足場、支保工の設置作業にかかる労力を省力化する
ことができる。しかも、プレキャストブロックによって
構造物の外面が覆われているので、外気に対する耐久性
に優れた塔状構造物とすることができる。請求項2記載
の塔状構造物によれば、プレキャストブロックを構成す
るブロック体のせん断補強鋼材同士が、ブロック体同士
の接合箇所にてラップしているので、ブロック体同士の
接合を確実に行なうことができる。As described above, according to the tower structure and its construction method of the present invention, the following effects can be obtained. According to the tower-shaped structure of the first aspect, since the precast block itself is used as the structure of the tower-shaped structure, the formwork at the time of construction can be eliminated. This eliminates the need for complicated formwork that was required in the past, that is, various types of work such as transporting, installing, moving, demolding, cleaning, dismantling, and disposing of the formwork, reducing the number of site workers. can do. Further, unlike the conventional case, it is not necessary to demold and repurpose the mold, so that a concrete curing period for this demolding is not required, and therefore the construction period can be shortened. Further, since the shear-reinforced steel material is embedded in the precast block, the work of disposing the shear-reinforced steel material at the time of construction can be eliminated. Furthermore, it is possible to eliminate the need for a huge amount of scaffolding and the supporting work for supporting the formwork, and it is possible to save the labor required to install these scaffolding and supporting work. Moreover, since the outer surface of the structure is covered with the precast block, it is possible to obtain a tower structure having excellent durability against the outside air. According to the tower-like structure of claim 2, since the shear-reinforced steel materials of the block bodies forming the precast block are wrapped at the joint portions of the block bodies, the block bodies are securely joined. be able to.
【0017】請求項3記載の塔状構造物によれば、ブロ
ック体を矩形状に組み立ててプレキャストブロックとす
るとともに上方へ組み上げ、このプレキャストブロック
の、ブロック体を構成するプレキャスト板同士の間から
なる中空部へ、軸方向鋼材を配設するとともにコンクリ
ートを打設することにより、極めて容易に塔状構造物を
構築することができる。According to the third aspect of the tower-shaped structure, the block bodies are assembled in a rectangular shape to form a precast block, and the precast blocks are assembled upward, and the precast blocks are formed between the precast plates constituting the block body. By arranging the steel material in the axial direction and placing concrete in the hollow portion, it is possible to construct a tower-like structure extremely easily.
【図1】本発明の塔状構造物及びその構築工法の実施例
を説明する橋脚の側面図である。FIG. 1 is a side view of a pier explaining an embodiment of a tower structure and a construction method thereof according to the present invention.
【図2】本発明の塔状構造物及びその構築工法の実施例
を説明するプレキャストブロックの平面図である。FIG. 2 is a plan view of a precast block illustrating an example of a tower-like structure and a construction method thereof according to the present invention.
【図3】本発明の塔状構造物及びその構築工法の実施例
を説明する分解したプレキャストブロックの平面図であ
る。FIG. 3 is a plan view of a disassembled precast block for explaining an example of the tower-shaped structure and its construction method of the present invention.
【図4】本発明の塔状構造物の構築工法の実施例を説明
する塔状構造物の側面図である。FIG. 4 is a side view of a tower-like structure for explaining an example of a method for constructing a tower-like structure according to the present invention.
【図5】本発明の塔状構造物の構築工法の実施例を説明
する塔状構造物の側面図である。FIG. 5 is a side view of a tower-like structure for explaining an example of a method for constructing a tower-like structure according to the present invention.
【図6】本発明の実施例の塔状構造物の構築工法による
橋脚の構築作業工程を説明するフローチャート図であ
る。FIG. 6 is a flow chart for explaining a bridge pier construction work process by the tower structure construction method according to the embodiment of the present invention.
1 橋脚(塔状構造物) 5 プレキャストブロック 6 ブロック体 7 プレキャスト板 8 せん断補強鋼材 11 中空部 12 軸方向鋼材 1 Bridge pier (tower structure) 5 Precast block 6 Block body 7 Precast plate 8 Shear reinforced steel material 11 Hollow part 12 Axial steel material
───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 E04G 21/16 C3 E04H 12/12 E04C 1/10 Q ─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification code Internal reference number FI Technical display area E04G 21/16 C3 E04H 12/12 E04C 1/10 Q
Claims (3)
ックが積層され、該プレキャストブロックの前記中空部
内に、軸方向鋼材が配設されかつコンクリートが打設さ
れてなり、 前記プレキャストブロックは、表裏がプレキャスト板か
らなりかつこれらプレキャスト板にせん断補強鋼材が設
けられた複数のブロック体の端部同士を接合することに
より組み立てられてなり、これらブロック体を構成する
プレキャスト板同士の間が前記中空部とされてなること
を特徴とする塔状構造物。1. A plurality of precast blocks having a hollow portion are laminated, and an axial steel material is placed and concrete is cast in the hollow portion of the precast block. The precast block has front and back surfaces precast. These precast plates are assembled by joining the ends of a plurality of block bodies provided with shear-reinforced steel to these precast plates, and the hollow parts are formed between the precast plates forming these block bodies. A tower-like structure characterized by being formed.
ック体の接合箇所にて、それぞれのブロック体に配設さ
れた前記せん断補強鋼材がラップされてなることを特徴
とする請求項1記載の塔状構造物。2. The tower structure according to claim 1, wherein the precast block is formed by wrapping the shear reinforcing steel material provided in each block body at a joint portion of the block bodies. Stuff.
レキャスト板にせん断補強鋼材が設けられ、前記プレキ
ャスト板同士の間が中空部とされてなる複数のブロック
体の端部同士を接合することにより組立られてなるプレ
キャストブロックを組み上げ、前記プレキャスト板同士
の間からなる中空部に軸方向鋼材を配設し、コンクリー
トを打設することを特徴とする塔状構造物の構築工法。3. Assembling by joining end portions of a plurality of block bodies having front and back sides made of precast plates, provided with shear-reinforced steel material on these precast plates, and forming hollow portions between the precast plates. A method for constructing a tower-like structure, comprising assembling a precast block thus obtained, arranging an axial steel material in a hollow portion formed between the precast plates, and placing concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6171462A JPH0835210A (en) | 1994-07-22 | 1994-07-22 | Tower-like structure and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6171462A JPH0835210A (en) | 1994-07-22 | 1994-07-22 | Tower-like structure and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH0835210A true JPH0835210A (en) | 1996-02-06 |
Family
ID=15923563
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP6171462A Pending JPH0835210A (en) | 1994-07-22 | 1994-07-22 | Tower-like structure and construction method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0835210A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT410343B (en) * | 2001-01-24 | 2003-03-25 | Rund Stahl Bau Gmbh & Co | METHOD FOR PRODUCING A TOWER-LIKE CONSTRUCTION |
JP2016089341A (en) * | 2014-10-29 | 2016-05-23 | 鹿島建設株式会社 | Method of manufacturing precast member, and precast member |
JP2019148108A (en) * | 2018-02-27 | 2019-09-05 | 三井住友建設株式会社 | Bridge pier construction method |
KR20210047481A (en) * | 2019-10-22 | 2021-04-30 | 김상훈 | Core wall structure of composite cassion for offshore runway |
KR20210047482A (en) * | 2019-10-22 | 2021-04-30 | 김상훈 | Core wall structure of independent cassion for offshore runway |
-
1994
- 1994-07-22 JP JP6171462A patent/JPH0835210A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT410343B (en) * | 2001-01-24 | 2003-03-25 | Rund Stahl Bau Gmbh & Co | METHOD FOR PRODUCING A TOWER-LIKE CONSTRUCTION |
JP2016089341A (en) * | 2014-10-29 | 2016-05-23 | 鹿島建設株式会社 | Method of manufacturing precast member, and precast member |
JP2019148108A (en) * | 2018-02-27 | 2019-09-05 | 三井住友建設株式会社 | Bridge pier construction method |
KR20210047481A (en) * | 2019-10-22 | 2021-04-30 | 김상훈 | Core wall structure of composite cassion for offshore runway |
KR20210047482A (en) * | 2019-10-22 | 2021-04-30 | 김상훈 | Core wall structure of independent cassion for offshore runway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3880288B2 (en) | Precast segment and bridge girder forming method using the same | |
JPH0835210A (en) | Tower-like structure and construction method thereof | |
JP4136049B2 (en) | Concrete pier construction method | |
JPH09268520A (en) | Precast panel for buried frame and construction method of concrete structure using panel | |
JP3973577B2 (en) | Bridge, bridge structure and bridge construction method | |
CN211817929U (en) | Concrete combined permanent formwork | |
JPH10102423A (en) | Pca form and construction method of pier using the same pca form | |
JP3824242B2 (en) | Viaduct-free support construction method | |
JPH0835260A (en) | Tower-form structure and building method thereof | |
JPH0978532A (en) | Work execution method for concrete bridge pier | |
JP2959325B2 (en) | Construction method of steel frame reinforced concrete structure | |
JPH07268813A (en) | Construction method of concrete structure | |
JPH1136229A (en) | Construction method for reinforced concrete bridge pier | |
JP3388454B2 (en) | Bridge pier construction method | |
JPS6151524B2 (en) | ||
JPH0665973A (en) | Constructing method of reinforced concrete structure such as foundation, wall, etc., and structure thereof | |
JPH05239810A (en) | Constructing method for reinforced concrete arch bridge | |
JPH06193178A (en) | Flat slab working method | |
JPS61290137A (en) | Construction of columnar pillar | |
JP2001200594A (en) | Method for constructing structure consisting of column with large section and beam | |
JPH1121860A (en) | Construction method for wall-form concrete structure | |
KR100345526B1 (en) | Reinforced truss using expanded metal | |
JPH09264031A (en) | Form for constructing concrete structure | |
JP2936130B2 (en) | Construction method of steel frame concrete structure | |
JPH10196027A (en) | Deck panel for concrete form |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20021008 |