Nothing Special   »   [go: up one dir, main page]

JP3999883B2 - Bathroom heating dryer - Google Patents

Bathroom heating dryer Download PDF

Info

Publication number
JP3999883B2
JP3999883B2 JP22259398A JP22259398A JP3999883B2 JP 3999883 B2 JP3999883 B2 JP 3999883B2 JP 22259398 A JP22259398 A JP 22259398A JP 22259398 A JP22259398 A JP 22259398A JP 3999883 B2 JP3999883 B2 JP 3999883B2
Authority
JP
Japan
Prior art keywords
bathroom
control unit
control
case
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP22259398A
Other languages
Japanese (ja)
Other versions
JP2000055394A (en
Inventor
憲一 中島
富士雄 前田
勝雄 鈴木
哲男 内藤
泰英 石崎
佐藤  進
啓良 笠原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP22259398A priority Critical patent/JP3999883B2/en
Publication of JP2000055394A publication Critical patent/JP2000055394A/en
Application granted granted Critical
Publication of JP3999883B2 publication Critical patent/JP3999883B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/12Hot water central heating systems using heat pumps

Landscapes

  • Central Heating Systems (AREA)
  • Accessory Of Washing/Drying Machine, Commercial Washing/Drying Machine, Other Washing/Drying Machine (AREA)
  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)
  • Drying Of Solid Materials (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は,浴室や脱衣室(以下,浴室等という)を4方向吹出により暖房又は乾燥を行うことが可能な浴室暖房乾燥機に関する。
【0002】
【従来の技術】
一般住宅における浴室等の温度は,まだ誰も入浴していない場合には,外気温とさほど変らないため,高齢者のように環境適応力が低下した人にとっては,冬場等における急激な温度変化が大きなヒートショックとなり,急激な血圧変動を引き起し死亡事故が発生することがある。
【0003】
一方,近年住宅事情の変化により,浴室等の換気を十分に行うことができない場合があり,浴室等の壁や天井にカビが発生し易く,当該浴室等を乾燥できる手段が望まれている。
【0004】
更に,住宅事情の変化により,洗濯物を乾かすための物干場を確保することが困難な場合も少なくなく,浴室等を物干場として使用することが提案されている。
【0005】
かかる要求に対して,例えば特開平9−66199号公報におけるような浴室暖房乾燥機が提案されている。
【0006】
上記公報にかかる浴室暖房乾燥機10は,図25及び図26に示すように,熱源機11からの温水が循環する熱交換器12,浴室等の空気を当該熱交換器12を介して循環させるクロスフローファン13,浴室等の空気を換気するための換気用ファン14,クロスフローファン13や換気用ファン14に電力を供給する電源ブロック18等を有している。
【0007】
そして,当該浴室暖房乾燥機10は,浴室等の天井に設けられた開口に設置され,天井裏で温水配管16や排気ダクト15が接続された構成となっている。
【0008】
浴室暖房乾燥機10,温水配管16及び排気ダクト15等の据付施工及びこれらのメンテナンスは,開口に隣接して設けられた点検口17から天井裏に手を伸して,時には天井裏に入り込んで行うようになっている。
【0009】
なお,浴室等に限らず一般的な部屋は,化粧板が野縁等により支持されて形成される天井,その上に設けらてネダ等により支持された天井(例えば,2階の床となるもの)とが存在し,これらで挟まれた空間が天井裏を構成している。そこで,本明細書では化粧板により貼られた天井を浴室天井等と記載し,その上の天井を本天井と記載する。
【0010】
【発明が解決しようとする課題】
しかしながら,上記構成にかかる浴室暖房乾燥機10は,温風の吹出しをクロスフローファン13により行うため,吹出方向が一方向吹出となって浴室等内に大きな温度分布が生じる問題があった。
【0011】
図27は,かかる一方向吹出の場合について浴室の温度分布をシュミュレーションした結果を示している。同図からわかるように,浴室等の主要空間を体温(36度)前後に設定すると,吹出口近傍の温度を40度以上にしなければならない。
【0012】
このことは,浴室温度が低いことによるヒートショックについては予防できるが,逆に高温によるヒートショックによりのぼせて転倒したりする危険がある。
【0013】
また,温風は浴室等の壁に当らない構成なので,入浴者が浴室等の壁に触れて冷たい思いをしたり,浴室等の乾燥を行う場合には乾燥効率が悪くなる問題がある。
【0014】
さらに,近年施工される家屋の浴室等は,規格寸法(例えば,1坪タイプ等)が多く,また浴室天井等に用いられる化粧板も規格寸法のものが多くなっている。従って,浴室暖房乾燥機10や点検口17を最適な場所に設けることが困難となる問題がある。
【0015】
即ち,浴室等には,浴槽は勿論,戸や窓等が設けられており,これらに依存して温度分布が決るため,浴室暖房乾燥機の設置位置を決定する際には,これらの位置や大きさ等を勘案して最適位置に設ける必要がある。
【0016】
このような最適位置の決定は,実際の温度分布を想定して施工する必要があるため,据付施工にはこれらの知識や経験のある作業者が不可欠となって,作業性を低下させる要因となると共に施工費用が高くなる問題がある。
【0017】
また,最適位置を決定しても,当該最適位置が浴室天井の隅であったり化粧板の継目(メジ)の位置と一致しない場合には不体裁(意匠が悪くなる)になるので,最適位置を取るか体裁を取るかを選択しなければならなくなる問題がある。
【0018】
また,保守点検において,例えば電源ブロック18やモータ等の交換にはマイナスドライバを用いて係合箇所を解除しなければならず,構成が複雑になると共に,作業性が悪くなったり,誤って電源ブロック18やモータ等を落したりする恐れがある。
【0019】
そこで,本発明は,4方向吹出を可能にして効率的に浴室等の暖房及び乾燥が行えるようにすると共に,点検口を用いなくても容易に据付及びメンテナンスができるようにし,かつ,メンテナンス時において取外した電装部品が落下したりしないようにした浴室暖房乾燥機を提供することを目的とする。
【0020】
【課題を解決するための手段】
上記課題を解決するため,請求項1にかかる発明は,浴室等の空気を吸気して,これを温風にした後,再度浴室等に送風する加熱部,該加熱部からの温風を4つの第1〜第4吹出口に導く導風部,浴室等の空気等を換気する換気部,加熱部や換気部を駆動制御する制御部を収納する底面開口の本体ケースと,該本体ケースの底面開口及び該本体ケースが据付けられる天井の据付開口を着脱可能に覆うグリルとを備え,制御部は,加熱部が収納される加熱室とは仕切板により区画された制御室内にあって,底面開口の制御部ケースに下方に引出し可能に収納して成ると共に,制御部が,制御部ケースから落下するのを防止する落下防止手段を有し,かつ第4吹出口と位置が一致するように第4吹出窓が設けられて制御室をカバーする制御室カバーの裏面に,加熱室と制御室とが連通することなく,第4吹出窓を加熱室に連通させる温風ガイドを固着すると共に,この温風ガイドには制御部ケースの底面開口の蓋が固着されていることを特徴とする。
【0021】
請求項2にかかる発明は,落下防止手段が,制御ケースに設けられた落下防止用爪係止と,制御部の電装部品支持部材に設けられた落下防止用爪とから構成されて,制御部の電装部品支持部材が制御ケースから所定量抜出したときに,落下防止用爪落下防止用爪係止に係合して当該制御部の落下を防止してなることを特徴とする。
【0022】
請求項3にかかる発明は,落下防止手段が,制御部ケースに設けられた抜防止用突起係合穴と,制御部の電装部品支持部材に設けられた抜防止用突起とから構成されて,制御部の電装部品支持部材が制御ケースに装着されたときに,抜防止用突起が抜防止用突起係合穴に係合して当該制御部の落下を防止してなることを特徴とする。
【0023】
【発明の実施の形態】
本発明の実施の形態を図を参照して説明する。図1は本発明にかかる浴室暖房乾燥機の外観斜視図であり,図2はその組立分解斜視図,図3は浴室暖房乾燥機の本体の斜視図,図4は当該浴室暖房乾燥機を浴室及び脱衣室に据付けたときの様子を示す図,図5は浴室天井に据付けられた浴室暖房乾燥機の側面図である。
【0024】
当該浴室暖房乾燥機100は,浴室等の空気を温水と熱交換させて当該浴室等を暖めると共に換気する本体101,該本体101の前面(浴室等の側)に据付られたグリル102,本体101を天井に据付るための据付装置103等を有している。
【0025】
据付装置103は,野縁104等に固定される野縁固定具105,該野縁固定具105に本体101を垂下して,当該本体101を固定する吊下部材106等により構成されている。
【0026】
野縁固定具105は,図6に示すように方形をなすアングルで,各コーナ部には雌ネジ107が固着され,側板108に複数の貫通穴109が設けられて,野縁104にネジ止めする構成となっている。
【0027】
吊下部材106は,図7に示すようにボルト110及びワッシャ111から構成されている。ボルト110は,先端に先端ネジ部112が形成されると共に後端に後端ネジ部113が形成され,かつ,これらの中間領域114の直径は,先端ネジ部112及び後端ネジ部113のネジ谷がなす直径より適宜小さくなっている。
【0028】
一方,ワッシャ111は中央穴115まで切込116が形成されている。この中央穴115の寸法D1は,ボルト110の中間領域114の直径D2より適宜大きく,かつ,ボルト110の頭部がなす直径D3より適宜小さくなっている。
【0029】
グリル102は図8に示すように,4方の周辺部に第1〜第4吹出口240〜243を開閉するように第1〜第4ルーバ244〜247が設けられ,当該第1〜第4ルーバ244〜247により温風の吹出方向を設定するようになっている。
【0030】
一方,吸気パネル117の一端には,頭部が脚部より幅広に形成された概略「T」字状のヒンジ爪120が突設され,対向する端部には開閉ボタン121が設けられている。また,吸気パネル117の裏面(本体101側)の対向する端部には,それぞれ図示しないフィルタ支持爪が設けられてフィルタが脱着可能になっている。
【0031】
図9は本体101の内部構成を示す斜視図で,当該本体101は浴室等の空気を吸気して,これを温風にした後,再度浴室等に送風する加熱部128,該加熱部128からの温風を4つの第1〜第4吹出口240〜243に導く導風部161,浴室等の空気等を換気する換気部130,加熱部128や換気部130を駆動制御する制御部131等を有し,これらが本体ケース132内に収納されている。
【0032】
なお,本体ケース132内は,仕切板133により加熱部128等が収納される加熱室と換気部130や制御部131等が収納される制御室とに区画されて,少なくとも制御室には浴室等の湿度の高い空気が侵入しないようになっている。
【0033】
加熱部128は,図10に示すように,3辺からなる概略「コ」字状に形成されて,浴室等の空気を温水配管137を介して熱源機136から循環してきた温水と熱交換させる熱交換器138,浴室等の空気を吸気して熱交換器138を介して循環させる吐出す循環用送風機139等により構成されている。
【0034】
導風部161は,図11及び図12に示すように,第1〜第3吹出窓162〜164が形成されて加熱室をカバーするように設けられた加熱室カバー126,第4吹出口243と位置が一致するように第4吹出窓165が設けられて制御室をカバーする制御室カバー127,加熱室と制御室とが連通することなく,第4吹出窓165を加熱室に連通させる温風ガイド166等により構成されている。
【0035】
制御室カバー127には,図12に示すように,第4吹出口243と位置が一致するように第4吹出窓165が設けられると共に,後述する換気用送風機173に吸気される空気の換気用空気通路174及び換気吸気口175が形成され,また当該制御室カバー127の裏面には,温風ガイド166が固着されるようになっている。
【0036】
温風ガイド166は,側壁の一つが開口されて温風導入口176をなすと共に上面が開口されてなる箱体で,第4吹出窓165が位置する制御室カバー127の裏面に固着されて,温風導入口176から導入された温風が上面の開口を介して第4吹出口243から吹出されるようになっている。
【0037】
換気部130は,図13〜図17に示すように,制御室カバー127に設けられた換気用空気通路174及び換気吸気口175を介して浴室又は脱衣室の空気を吸気して換気ダクト216に吐出すことにより換気する換気用送風機173,該換気用送風機173から吐出される空気が換気ダクト216に流入するように当該換気用送風機173の吹出流路を規定する換気用送風ガイド180,換気ダクト216が接続されるダクト接続管181,本体ケース132に設けられてダクト接続管181が装着される接続管連結口182,装着されたダクト接続管181が本体ケース132から抜けないようにする爪板183等により構成されている。
【0038】
換気用送風機173は,循環用送風機139と同じ複数のエンペラが周囲に設けられた遠心型ファン184であるため,等方的に空気が吐出されるので,図13及び図14に示す換気用送風ガイド180が設けられて,吐出された空気が換気ダクト216に向うようになっている。なお,当該換気用送風ガイド180は,換気モータ189のカバーも兼ねている。
【0039】
この換気用送風ガイド180は,深皿状に形成された凹部185,該凹部185の中心に形成されてモータ軸が挿通するモータ軸穴186,凹部185の側面が一部開口されてダクト接続管181に連通する換気空気吹出口187,当該換気用送風ガイド180を本体ケース132に固定するための仮止爪188等により構成されて換気モータ189の頭部に配設される。
【0040】
なお,本体ケース132には図15に示すような換気モータ189が収納される換気モータ収納穴190が設けられると共に,当該換気モータ収納穴190の上端周辺部に換気用送風ガイド180に設けられた仮止爪188が係合する係止突起191が設けられている。
【0041】
そして,換気モータ189の頭部と底部とに換気モータ支持部材192を宛い,換気モータ収納穴190に収納して,凹部185の中心に形成されたモータ軸穴186にモータ軸を挿通しながら換気用送風ガイド180を被せ,当該換気用送風ガイド180を回転させることにより仮止爪188と係止突起191とを係合させる。
【0042】
これにより,換気用送風ガイド180は換気モータ189を支持しながら本体ケース132に仮止され,その後ネジにより固定する。
【0043】
このように換気モータ189を支持する換気用送風ガイド180が仮止される構成にすることにより,作業者は両手が使えるようになり,ネジを抑えながらドライバーを使うことが可能になって,作業効率及び安全性が向上する。
【0044】
ダクト接続管181は,図16に示すように,接続された換気ダクト216が容易に抜けないようにする返し構造の突起193が設けられたダクト接続部194,本体ケース132に設けられた接続管連結口182に装着された際に,当該ダクト接続管181の回転位置を位置決めする回転位置規制部179,接続管連結口182に装着された際の挿入位置を規制する挿入位置規制部195,爪板183が挿着される爪板挿着溝196,ダクト接続管181を接続管連結口182に装着する際に把持する取手部197,換気ダクト216内を空気が逆流しないようにする逆止弁198等により構成されている。
【0045】
なお,図16(a)は,ダクト接続管181の側面図,図16(b)はその断面図,図16(c)は正面図である。
【0046】
ダクト接続管181内には,逆止弁198が配設されると共に,当該ダクト接続管181の内壁に逆止弁198が逆方向(本体ケース132側)に傾かないように規制する逆止弁規制突起199が設けられている。
【0047】
そして,逆止弁198は,その重心から所定量ずれた所(図16(c)では上方)で揺動軸200により揺動可能に設けられて,換気を行わない場合には,自重で垂下がることによりダクト接続管181を閉じると共に,ダクト接続管181内を空気が逆流しようとしたときには,逆止弁198が逆止弁規制突起199に当接して当該ダクト接続管181が開かないようになっている。
【0048】
爪板183は,図17に示すように,ダクト接続管181が挿入される挿入口201が形成され,その断面は楔状に形成されて,爪板挿着溝196への挿入を容易にすると共に,挿入完了時には,ダクト接続管181と本体ケース132とが密着してガタツキが生じないようになっている。
【0049】
制御部131は,図18〜図20に示すような金属製等の耐熱部材からなる制御部ケース202,図21及び図22に示すような該制御部ケース202に収納されて循環用送風機139や換気用送風機173に電力を供給して制御する電装部品が据付られた電装部品支持部材203等を有している。
【0050】
図18は制御部ケース202の正面側面図,図19は図18における矢視Fから見たときの側面図,図20は図18における矢視Gから見たときの上面図である。また,図21は電装部品支持部材203の側面図,図22は図21における矢視Jから見たときの側面図である。
【0051】
なお,制御部ケース202には,蓋204が設けられ,当該蓋204は温風ガイド166の底面に固着されている(図12参照)。従って,制御部131の保守等においては,温風ガイド166を取外すだけで制御部131の蓋204を取ることが可能になっている。
【0052】
電装部品支持部材203の側面上端には抜防止用突起205が設けられると共に,正面下端には落下防止用爪206が設けられている。また,制御部ケース202の側面上端には抜防止用突起係合穴207が設けられると共に,正面に落下防止用爪係止208が設けられている。
【0053】
この抜防止用突起205は,電装部品支持部材203の端部に設けられた山状突起で,その頂部が電装部品支持部材203を制御部ケース202に正しく収納した際に,制御部ケース202の抜防止用突起係合穴207に填り込むことにより,電装部品支持部材203が制御部ケース202から抜落ちないようにしている。
【0054】
そして,電装部品支持部材203を制御部ケース202から引抜く時は,抜防止用突起205の開放端209をケース内側に引き,抜防止用突起205と抜防止用突起係合穴207との係合を解除することにより行う。
【0055】
なお,制御部131の保守点検時(浴室暖房乾燥機100は浴室天井に据付られている)は,不用意に抜防止用突起205と抜防止用突起係合穴207との係合を解除すると電装部品支持部材203が落下して,破損してしまうようなことが起り得る。
【0056】
このような事態を防止するために,電装部品支持部材203が所定位置まで抜けたときに落下防止用爪206が落下防止用爪係止208に係合するように設けられている。
【0057】
この落下防止用爪係止208は,図20からもわかるように,制御部ケース202の正面側面の一部をケース外側に向って膨らませて形成された円弧状部210,該円弧状部210の端部を制御部ケース202と切離すことにより形成された円弧状端部211とにより構成されている。
【0058】
従って,電装部品支持部材203が収納されている時は,落下防止用爪206は円弧状部210内に位置して制御部ケース202と接触しないが,落下すると落下防止用爪206が円弧状端部211に填り込んでそれ以上の落下が防止されるようになっている。
【0059】
無論,電装部品の検査や交換等があり得るので,そのときは落下防止用爪206が円弧状端部211に係止される直前まで電装部品支持部材203を抜出し,その後円弧状端部211より下の本体ケース132部分を適宜広げて円弧状端部211に落下防止用爪206が係止されないようにして引出せばよい。
【0060】
次に,上記構成の浴室暖房乾燥機100の据付手順及び保守点検手順を図4に示す浴室と脱衣室とに浴室暖房乾燥機100を据付,熱源機136からの温水は脱衣室の浴室暖房乾燥機100に供給される場合を例に説明する。
【0061】
また,浴室暖房乾燥機100の据付は,既存住宅に据付る場合であって,浴室天井及び脱衣室天井の野縁104の間隔が60cmの場合について説明する。しかし,本発明は,これらに限定されるもので無く,新築住宅に据付けてもよいことは明らかである。
【0062】
なお,野縁104には化粧天井板が固定されて,当該化粧天井板のメジの位置が野縁104の位置となっているものとする。
【0063】
このような前提で据付手順や保守点検手順を説明するが,浴室等及び脱衣室における浴室暖房乾燥機100の共通する据付手順等は,これらの区別を行わないで説明する。
【0064】
先ず,浴室暖房乾燥機100を据付るための据付開口212を浴室天井等に設ける。当該浴室暖房乾燥機100の本体ケース132の寸法は例えば53cmとし,据付開口212は例えば55cmの正方形とする。また,グリル102の寸法は野縁104の間隔より広い寸法で,例えば61cmとする。
【0065】
規格住宅における野縁104間の最小幅が60cmであるので,上記寸法に設定するならば,どのような規格住宅でも据付けることができるようになり,野縁104の間を広げたりする作業及びそれに伴うコスト不要になる。
【0066】
熱源機136からの温水配管137を脱衣室の浴室暖房乾燥機100まで配管する。このとき,温水配管137は後述する理由から適宜長めに配管する。また,換気ダクト216を据付開口212の近傍まで配設しておく。さらに制御線213を配線しておく。
【0067】
次に,野縁104に野縁固定具105を固定する。そして,野縁固定具105の雌ネジ107に,ボルト110の先端ネジ部112を螺合させて,当該ボルト110が据付開口212から吊下がった状態にしておく。
【0068】
このような状態が完了した後,図23に示すように,浴室暖房乾燥機100の本体101を持上げ,当該本体101の周辺4隅に設けられた吊下穴177にボルト110を通す。この吊下穴177はボルト110の頭より適宜大きく,かつ,ワッシャ111より小さく形成されている。
【0069】
そして,ワッシャ111を切込116からボルト110に挿入し,当該ボルト110の頭にワッシャ111を当接させて本体101を下げる。吊下穴177はワッシャ111より小さいので,本体101はワッシャ111に当接して中吊状態となる。図24は,このときの様子を示す断面図である。
【0070】
浴室等及び脱衣室の浴室暖房乾燥機100をこのような中吊状態にした後,温水配管137の接続及び制御線213の接続を行う。
【0071】
温水配管137は,適度にフレキシブルな樹脂管等が用いられ,かつ,長めに配管されているので,当該温水配管137の端部を浴室側等に引出して給排水部230に接続する。
【0072】
これにより温水配管137及び制御線213の接続が完了し,次に本体101を所定位置に固定する。当該本体101の固定は,ボルト110の先端ネジ部112が雌ネジ107を越えるまで回して,雌ネジ107が中間領域114に位置するようにする。そこで,本体101及びボルト110を押上げて,後端ネジ部113と雌ネジ107とを螺合させることにより行う。
【0073】
本体101が所定位置に固定された後,制御室カバー127を取外し(予め取外しておいてもよい),本体ケース132の内側から換気ダクト216を当該本体ケース132に引込むようにして接続する。
【0074】
そして,グリル102を本体101にネジ止めし,4つの第1〜第4ルーバ244〜247の角度を温風が適宜所望の方向に送風されるように調整して浴室暖房乾燥機100の据付作業が完了する。
【0075】
なお,据付装置103の状態,据付開口212の形成状態或は化粧天井板の固定状態等により,本体101が化粧天井板のメジと平行にならない場合がある。このとき,本体ケース132の端部とメジとは近接しているので,多少の非平行状態でも目立ってしまい微調整が必要になる。
【0076】
しかし,本発明にかかるグリル102の寸法は,化粧天井板より大きめに設定されているので,かかる天井化粧板のメジが隠されて多少の非平行状態でも目立なくすることができるようになっている。
【0077】
このようにして据付られた浴室暖房乾燥機100の保守点検を行うときは,上述した据付手順を遡ることにより可能である。
【0078】
【発明の効果】
以上説明したように請求項1にかかる発明によれば,浴室等の空気を吸気して,これを温風にした後,再度浴室等に送風する加熱部,該加熱部からの温風を4つの第1〜第4吹出口に導く導風部,浴室等の空気等を換気する換気部,加熱部や換気部を駆動制御する制御部を収納する底面開口の本体ケースと,該本体ケースの底面開口及び該本体ケースが据付けられる天井の据付開口を着脱可能に覆うグリルとを備え,制御部は,加熱部が収納される加熱室とは仕切板により区画された制御室内にあって,底面開口の制御部ケースに下方に引出し可能に収納して成ると共に,制御部が,制御部ケースから落下するのを防止する落下防止手段を有し,かつ第4吹出口と位置が一致するように第4吹出窓が設けられて制御室をカバーする制御室カバーの裏面に,加熱室と制御室とが連通することなく,第4吹出窓を加熱室に連通させる温風ガイドを固着すると共に,この温風ガイドには制御部ケースの底面開口の蓋が固着されているので,浴室天井のグリルを外して制御室カバーを外すだけで,制御部ケースの蓋も自動的に開いて制御部にアクセス可能になり,制御部自体も制御部ケースごと取り外すことなく制御部ケースから下方に引出すことができるので,制御部のメンテナンスのための作業が非常に簡単になると共に,浴室側等から天井に向って制御部を保守点検する際においても,当該制御部が落下してしまうことが無くなり,作業性及び安全性が向上する。
【0079】
請求項2にかかる発明によれば,落下防止手段を制御ケースに設けられた落下防止用爪係止と,制御部の電装部品支持部材に設けられた落下防止用爪とから構成して,制御部の電装部品支持部材が制御ケースから所定量抜出したときに,落下防止用爪落下防止用爪係止に係合するようにしたので,浴室側等から天井に向って制御部を保守点検する際においても,当該制御部が落下してしまうことが無くなり,作業性及び安全性が向上する。
【0080】
請求項3にかかる発明によれば,落下防止手段が,制御部ケースに設けられた抜防止用突起係合穴と,制御部の電装部品支持部材に設けられた抜防止用突起とから構成されて,,制御部の電装部品支持部材が制御ケースに装着されたときに,抜防止用突起が抜防止用突起係合穴に係合するようにしたので,浴室側等から天井に向って制御部を保守点検する際においても,当該制御部が落下してしまうことが無くなり,作業性及び安全性が向上する。
【図面の簡単な説明】
【図1】本発明の実施の形態の説明に適用される浴室暖房乾燥機の斜視図である。
【図2】浴室暖房乾燥機の分解斜視図である。
【図3】グリルを取除いたときの浴室暖房乾燥機本体の斜視図である。
【図4】浴室及び脱衣室に浴室暖房乾燥機を設けたときの模式図である。
【図5】浴室暖房乾燥機を据付けたときの側面図である。
【図6】野縁固定具の構成図である。
【図7】吊下部材の構成図である。
【図8】グリルの斜視図である。
【図9】浴室暖房乾燥機本体の内部構成を示す斜視図である。
【図10】熱交換器の他の構成図である。
【図11】加熱室カバーの上面図である。
【図12】制御室カバーの斜視図である。
【図13】換気用送風ガイドの上面図である。
【図14】換気用送風ガイドの側面図である。
【図15】換気用送風ガイドが固定される部分を含む本体ケースの断面図である。
【図16】ダクト接続管の構成図である。
【図17】爪板の構成図である。
【図18】制御部ケースの側面図である。
【図19】制御部ケースの側面図である。
【図20】制御部ケースの底面図である。
【図21】電装部品支持部材の側面図である。
【図22】電装部品支持部材の側面図である。
【図23】浴室暖房乾燥機本体の取付状況を示す模式図である。
【図24】浴室暖房乾燥機本体を据付けたときの側面図である。
【図25】従来の技術の説明に適用される浴室暖房乾燥機を浴室に取付けたときの模式図である。
【図26】従来の技術の説明に適用される浴室暖房乾燥機の構成図である。
【図27】従来の技術の説明に適用される一方向吹出の温度分布図である。
【符号の説明】
100 浴室暖房乾燥機
101 本体
102 グリル
103 据付装置
104 野縁
128 加熱部
130 換気部
132 本体ケース
136 熱源機
138 熱交換器
139 循環用送風機
161 導風部
162〜164 第1〜第3吹出窓
166 温風ガイド
202 制御部ケース
203 電装部品支持部材
205 抜防止用突起
206 落下防止用爪
207 抜防止用突起係合穴
208 落下防止用爪係止
210 円弧状部
211 円弧状端部
240〜243 第1〜4吹出口
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a bathroom heater / dryer capable of heating or drying a bathroom or a dressing room (hereinafter referred to as a bathroom) by blowing in four directions.
[0002]
[Prior art]
The temperature of a bathroom in a general house does not change much from the outside air temperature when nobody has bathed yet, so for people with reduced environmental adaptability, such as the elderly, sudden temperature changes in winter May cause a large heat shock, causing sudden blood pressure fluctuations and fatalities.
[0003]
On the other hand, due to changes in housing conditions in recent years, there is a case where ventilation of a bathroom or the like cannot be performed sufficiently, and mold is easily generated on the wall or ceiling of the bathroom, and a means for drying the bathroom is desired.
[0004]
Furthermore, due to changes in housing conditions, it is often difficult to secure a clothes drying place for drying laundry, and it has been proposed to use a bathroom or the like as a clothes drying place.
[0005]
In response to such a demand, for example, a bathroom heating dryer as in JP-A-9-66199 has been proposed.
[0006]
As shown in FIGS. 25 and 26, the bathroom heater / dryer 10 according to the above publication circulates the heat exchanger 12 through which the hot water from the heat source unit 11 circulates and the air in the bathroom through the heat exchanger 12. It has a cross flow fan 13, a ventilation fan 14 for ventilating air in the bathroom, a power supply block 18 for supplying power to the cross flow fan 13 and the ventilation fan 14, and the like.
[0007]
And the said bathroom heating dryer 10 is installed in the opening provided in ceilings, such as a bathroom, and becomes the structure by which the hot water piping 16 and the exhaust duct 15 were connected by the ceiling back.
[0008]
Installation and maintenance of the bathroom heater / dryer 10, hot water piping 16 and exhaust duct 15 and the like are carried out by reaching the back of the ceiling from the inspection port 17 provided adjacent to the opening and sometimes entering the back of the ceiling. To do.
[0009]
In addition, a general room, not limited to a bathroom, has a ceiling formed by a decorative board supported by a field edge, etc., and a ceiling provided by it and supported by neda etc. (for example, a floor on the second floor) The space between them forms the back of the ceiling. Therefore, in this specification, the ceiling affixed with the decorative board is described as a bathroom ceiling, and the ceiling above the ceiling is described as a main ceiling.
[0010]
[Problems to be solved by the invention]
However, the bathroom heater / dryer 10 according to the above configuration has a problem in that since the warm air is blown out by the cross flow fan 13, the blowing direction is one-way blowing and a large temperature distribution is generated in the bathroom or the like.
[0011]
FIG. 27 shows the result of simulating the temperature distribution in the bathroom in the case of such one-way blowing. As can be seen from the figure, if the main space such as a bathroom is set around body temperature (36 degrees), the temperature in the vicinity of the outlet must be 40 degrees or more.
[0012]
This can prevent heat shock due to low bath temperature, but there is a risk of falling and falling due to heat shock due to high temperature.
[0013]
In addition, since the warm air does not hit the wall of the bathroom or the like, there is a problem that the drying efficiency is deteriorated when the bather touches the wall of the bathroom or the like to feel cold or the bathroom is dried.
[0014]
Furthermore, the bathrooms and the like of houses constructed in recent years have many standard dimensions (for example, 1 tsubos type), and the decorative panels used for bathroom ceilings and the like have many standard dimensions. Therefore, there is a problem that it is difficult to provide the bathroom heater / dryer 10 and the inspection port 17 in an optimal place.
[0015]
In other words, bathrooms are equipped with bathtubs, doors, windows, etc., and the temperature distribution depends on them, so when determining the location of the bathroom heating dryer, these positions and It is necessary to provide the optimal position in consideration of the size and the like.
[0016]
Such determination of the optimal position requires construction with the assumption of actual temperature distribution, and therefore, installation and construction work is essential for operators with such knowledge and experience. However, there is a problem that the construction cost becomes high.
[0017]
In addition, even if the optimum position is determined, if the optimum position is a corner of the bathroom ceiling or does not coincide with the position of the joint (medium) of the decorative board, it becomes unnatural (the design becomes worse). There is a problem that you have to choose between taking a picture or taking a form.
[0018]
In maintenance and inspection, for example, when replacing the power supply block 18 or the motor, the engaging portion must be released using a flat-blade screwdriver, which complicates the configuration and makes the workability worse. There is a risk of dropping the block 18 or the motor.
[0019]
Therefore, the present invention enables four-way blowing to efficiently heat and dry a bathroom, etc., and allows easy installation and maintenance without using an inspection port. An object of the present invention is to provide a bathroom heater / dryer in which the removed electrical parts are not dropped.
[0020]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, the invention according to claim 1 is directed to a heating unit that sucks air in a bathroom and the like, then turns it into hot air, and then blows it again into the bathroom. A main body case having a bottom opening that houses a wind guide section that leads to the first to fourth outlets, a ventilation section that ventilates air in the bathroom, etc., a control section that drives and controls the heating section and the ventilation section, A bottom opening and a grill that removably covers a ceiling installation opening on which the main body case is installed, and the control unit is in a control room partitioned by a partition plate from the heating chamber in which the heating unit is accommodated. the opening of the control unit case together formed by drawable housed downward, so that the control unit, to have a fall preventing means for preventing the dropping from the control unit case, and the fourth outlet and a position matching A control room cover provided with a fourth outlet window to cover the control room A hot air guide that allows the fourth blow-out window to communicate with the heating chamber is secured to the back surface of the heating chamber, and the lid of the bottom opening of the control unit case is secured to the warm air guide. It is characterized by being.
[0021]
Such invention in claim 2, fall prevention means consists drop and preventing pawl locking provided in the control unit case, a fall prevention claw provided on electrical component supporting member of the control unit, the control When a predetermined amount of the electrical component support member is pulled out from the control unit case, the fall prevention claw engages with the fall prevention claw lock to prevent the control unit from falling.
[0022]
According to a third aspect of the present invention, the fall prevention means is constituted by a protrusion preventing protrusion engaging hole provided in the control part case and a protrusion preventing protrusion provided in the electrical component support member of the control part . When the electrical component support member of the control unit is mounted on the control unit case, the anti- extraction protrusion engages with the anti-extraction protrusion engaging hole to prevent the control unit from falling. .
[0023]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described with reference to the drawings. FIG. 1 is an external perspective view of a bathroom heater / dryer according to the present invention, FIG. 2 is an exploded perspective view thereof, FIG. 3 is a perspective view of a main body of the bathroom heater / dryer, and FIG. FIG. 5 is a side view of the bathroom heater / dryer installed on the bathroom ceiling.
[0024]
The bathroom heater / dryer 100 includes a main body 101 that heats and ventilates the bathroom and the like by exchanging heat of the air in the bathroom and the like with hot water, a grill 102 that is installed on the front surface (side of the bathroom, etc.) of the main body 101, and the main body 101. Has an installation device 103 and the like.
[0025]
The installation device 103 includes a field edge fixture 105 that is fixed to the field edge 104 and the like, and a suspension member 106 that fixes the body 101 by hanging the body 101 from the field edge fixture 105.
[0026]
As shown in FIG. 6, the field edge fixing tool 105 has a square angle, and a female screw 107 is fixed to each corner portion. A plurality of through holes 109 are provided in the side plate 108, and the field edge 104 is screwed to the field edge 104. It is the composition to do.
[0027]
As shown in FIG. 7, the suspension member 106 includes a bolt 110 and a washer 111. The bolt 110 has a front end threaded portion 112 formed at the front end and a rear end threaded portion 113 formed at the rear end, and the diameter of the intermediate region 114 depends on the screw of the front end threaded portion 112 and the rear end threaded portion 113. It is appropriately smaller than the diameter formed by the valley.
[0028]
On the other hand, the washer 111 has a cut 116 formed up to the central hole 115. The dimension D1 of the central hole 115 is appropriately larger than the diameter D2 of the intermediate region 114 of the bolt 110 and smaller than the diameter D3 formed by the head of the bolt 110.
[0029]
As shown in FIG. 8, the grill 102 is provided with first to fourth louvers 244 to 247 so as to open and close the first to fourth outlets 240 to 243 at four peripheral portions. The louver 244 to 247 sets the blowing direction of the warm air.
[0030]
On the other hand, a generally “T” -shaped hinge claw 120 whose head is formed wider than the leg is protruded from one end of the intake panel 117, and an open / close button 121 is provided at the opposite end. . Further, filter support claws (not shown) are provided at opposite ends of the back surface (the main body 101 side) of the intake panel 117 so that the filter can be attached and detached.
[0031]
FIG. 9 is a perspective view showing an internal configuration of the main body 101. The main body 101 sucks air from a bathroom or the like, turns it into warm air, and then blows the air again into the bathroom or the like. The air guide part 161 for guiding the warm air to the four first to fourth outlets 240 to 243, the ventilation part 130 for ventilating the air etc. in the bathroom, the control part 131 for driving and controlling the heating part 128 and the ventilation part 130, etc. These are housed in the main body case 132.
[0032]
The main body case 132 is partitioned into a heating chamber in which the heating unit 128 and the like are accommodated by a partition plate 133 and a control room in which the ventilation unit 130 and the control unit 131 are accommodated. High humidity air is prevented from entering.
[0033]
As shown in FIG. 10, the heating unit 128 is formed in an approximately “U” shape having three sides, and heat-exchanges the air in the bathroom or the like with the hot water circulated from the heat source unit 136 through the hot water pipe 137. The heat exchanger 138 includes a circulation fan 139 that discharges air from the bathroom and circulates it through the heat exchanger 138.
[0034]
As shown in FIGS. 11 and 12, the air guide portion 161 includes a heating chamber cover 126 and a fourth outlet 243 provided with first to third blowing windows 162 to 164 to cover the heating chamber. The fourth blowout window 165 is provided so as to match the position of the control chamber cover 127 that covers the control chamber, and the heating chamber and the control chamber are not communicated with each other, and the fourth blowout window 165 is communicated with the heating chamber. The wind guide 166 is configured.
[0035]
As shown in FIG. 12, the control room cover 127 is provided with a fourth blowout window 165 so as to coincide with the position of the fourth blowout outlet 243, and for ventilation of air sucked into a ventilation blower 173 described later. An air passage 174 and a ventilation inlet 175 are formed, and a hot air guide 166 is fixed to the back surface of the control chamber cover 127.
[0036]
The hot air guide 166 is a box body in which one of the side walls is opened to form the hot air introduction port 176 and the upper surface is opened, and is fixed to the back surface of the control chamber cover 127 where the fourth blowing window 165 is located, Hot air introduced from the hot air inlet 176 is blown out from the fourth outlet 243 through the opening on the upper surface.
[0037]
As shown in FIGS. 13 to 17, the ventilation unit 130 sucks the air in the bathroom or the dressing room through the ventilation air passage 174 and the ventilation intake port 175 provided in the control room cover 127 and enters the ventilation duct 216. A ventilation fan 173 for ventilating by being discharged, a ventilation fan guide 180 for defining a blow-off flow path of the ventilation fan 173 so that air discharged from the ventilation fan 173 flows into the ventilation duct 216, a ventilation duct 216 is connected to the duct connection pipe 181, the main body case 132 is connected to the connection pipe connection port 182 to which the duct connection pipe 181 is attached, and the attached duct connection pipe 181 is prevented from being removed from the main body case 132. 183 and the like.
[0038]
Since the ventilation fan 173 is a centrifugal fan 184 provided with a plurality of the same impellers as the circulation fan 139, air is discharged isotropically, so the ventilation fan shown in FIGS. 13 and 14 is used. A guide 180 is provided so that the discharged air is directed toward the ventilation duct 216. The ventilation guide 180 also serves as a cover for the ventilation motor 189.
[0039]
This ventilation blower guide 180 has a concave portion 185 formed in a deep dish shape, a motor shaft hole 186 formed in the center of the concave portion 185 and through which a motor shaft is inserted, and a side surface of the concave portion 185 is partially opened to form a duct connecting pipe. A ventilation air outlet 187 communicated with 181 and a temporary pawl 188 for fixing the ventilation air blowing guide 180 to the main body case 132 are disposed on the head of the ventilation motor 189.
[0040]
The main body case 132 is provided with a ventilation motor storage hole 190 for storing the ventilation motor 189 as shown in FIG. 15, and provided in the ventilation blower guide 180 around the upper end of the ventilation motor storage hole 190. A locking projection 191 with which the temporary pawl 188 engages is provided.
[0041]
The ventilation motor support member 192 is directed to the head and bottom of the ventilation motor 189, accommodated in the ventilation motor accommodation hole 190, and the motor shaft is inserted into the motor shaft hole 186 formed at the center of the recess 185. The ventilation blower guide 180 is covered and the ventilation blower guide 180 is rotated to engage the temporary pawl 188 and the locking projection 191.
[0042]
Thus, the ventilation air guide 180 is temporarily fixed to the main body case 132 while supporting the ventilation motor 189, and then fixed by screws.
[0043]
By adopting a configuration in which the ventilation air guide 180 supporting the ventilation motor 189 is temporarily fixed in this way, the operator can use both hands, and can use the screwdriver while holding down the screw. Efficiency and safety are improved.
[0044]
As shown in FIG. 16, the duct connection pipe 181 includes a duct connection portion 194 provided with a projection 193 having a barbed structure that prevents the connected ventilation duct 216 from being easily removed, and a connection pipe provided in the main body case 132. A rotational position restricting portion 179 that positions the rotational position of the duct connecting pipe 181 when attached to the connecting port 182; an insertion position restricting portion 195 that restricts an inserting position when attached to the connecting pipe connecting port 182; Claw plate insertion groove 196 into which the plate 183 is inserted, a handle 197 that is gripped when the duct connection pipe 181 is attached to the connection pipe connection port 182, and a check valve that prevents the air from flowing back through the ventilation duct 216. 198 etc.
[0045]
16A is a side view of the duct connection pipe 181, FIG. 16B is a cross-sectional view thereof, and FIG. 16C is a front view thereof.
[0046]
A check valve 198 is provided in the duct connection pipe 181 and restricts the check valve 198 so as not to incline in the reverse direction (main body case 132 side) on the inner wall of the duct connection pipe 181. A restricting protrusion 199 is provided.
[0047]
The check valve 198 is swingably provided by the swing shaft 200 at a position deviated by a predetermined amount from the center of gravity (upward in FIG. 16 (c)). When the duct connection pipe 181 is closed by being lowered and air is going to flow backward in the duct connection pipe 181, the check valve 198 contacts the check valve restricting projection 199 so that the duct connection pipe 181 does not open. It has become.
[0048]
As shown in FIG. 17, the nail plate 183 is formed with an insertion port 201 into which the duct connecting pipe 181 is inserted, and its cross section is formed in a wedge shape to facilitate insertion into the nail plate insertion groove 196. When the insertion is completed, the duct connection pipe 181 and the main body case 132 are in close contact with each other so that no rattling occurs.
[0049]
The control unit 131 is housed in a control unit case 202 made of a heat-resistant member such as a metal as shown in FIGS. 18 to 20, and in the control unit case 202 as shown in FIGS. An electrical component support member 203 on which electrical components that supply and control power to the ventilation fan 173 are installed.
[0050]
18 is a front side view of the control unit case 202, FIG. 19 is a side view when viewed from the arrow F in FIG. 18, and FIG. 20 is a top view when viewed from the arrow G in FIG. 21 is a side view of the electrical component support member 203, and FIG. 22 is a side view as seen from the direction of arrow J in FIG.
[0051]
The control unit case 202 is provided with a lid 204, and the lid 204 is fixed to the bottom surface of the hot air guide 166 (see FIG. 12). Therefore, when the controller 131 is maintained, the lid 204 of the controller 131 can be removed simply by removing the hot air guide 166.
[0052]
An extraction preventing projection 205 is provided at the upper end of the side surface of the electrical component support member 203, and a drop preventing claw 206 is provided at the lower end of the front surface. Further, a pull-out preventing projection engaging hole 207 is provided at the upper end of the side surface of the control unit case 202, and a drop preventing claw locking 208 is provided at the front.
[0053]
The anti-extraction protrusion 205 is a mountain-shaped protrusion provided at the end of the electrical component support member 203, and the top of the projection 205 is when the electrical component support member 203 is correctly stored in the control unit case 202. The electrical component support member 203 is prevented from falling out of the control unit case 202 by being inserted into the anti-extraction protrusion engaging hole 207.
[0054]
When the electrical component support member 203 is pulled out from the control unit case 202, the open end 209 of the pull-out preventing projection 205 is pulled inward of the case, and the engagement between the pull-out preventing projection 205 and the pull-out preventing projection engaging hole 207 is engaged. This is done by releasing the match.
[0055]
During maintenance inspection of the control unit 131 (the bathroom heater / dryer 100 is installed on the ceiling of the bathroom), if the engagement between the anti-extraction protrusion 205 and the anti-extraction protrusion engagement hole 207 is inadvertently released, The electrical component support member 203 may fall and be damaged.
[0056]
In order to prevent such a situation, the fall prevention claw 206 is provided so as to engage with the fall prevention claw lock 208 when the electrical component support member 203 is pulled out to a predetermined position.
[0057]
As can be seen from FIG. 20, the drop-preventing claw lock 208 includes an arc-shaped portion 210 formed by inflating a part of the front side surface of the control unit case 202 toward the outer side of the case, An arcuate end 211 is formed by separating the end from the control unit case 202.
[0058]
Therefore, when the electrical component support member 203 is housed, the fall prevention claw 206 is positioned in the arcuate portion 210 and does not contact the control unit case 202, but when dropped, the fall prevention claw 206 is moved to the arcuate end. It is inserted into the portion 211 to prevent further dropping.
[0059]
Of course, since there is a possibility of inspection or replacement of electrical components, at that time, the electrical component support member 203 is pulled out until just before the drop prevention claw 206 is locked to the arc-shaped end portion 211, and then from the arc-shaped end portion 211. The lower main body case 132 may be appropriately widened and pulled out so that the fall-preventing claw 206 is not locked to the arcuate end 211.
[0060]
Next, the installation procedure and the maintenance inspection procedure of the bathroom heating dryer 100 having the above-described configuration are installed in the bathroom and the dressing room shown in FIG. 4, and the hot water from the heat source 136 is used for drying the bathroom heating in the dressing room. The case where it is supplied to the machine 100 will be described as an example.
[0061]
Moreover, the installation of the bathroom heater / dryer 100 will be described in the case where it is installed in an existing house, and the distance between the edge 104 of the bathroom ceiling and the dressing room ceiling is 60 cm. However, it is obvious that the present invention is not limited to these and may be installed in a new house.
[0062]
It is assumed that a decorative ceiling board is fixed to the field edge 104, and the position of the edge of the decorative ceiling board is the position of the field edge 104.
[0063]
The installation procedure and the maintenance / inspection procedure will be described based on such premise, but the installation procedure and the like common to the bathroom heating dryer 100 in the bathroom and the dressing room will be described without distinguishing between them.
[0064]
First, the installation opening 212 for installing the bathroom heating dryer 100 is provided in the bathroom ceiling or the like. The size of the main body case 132 of the bathroom heater / dryer 100 is, for example, 53 cm, and the installation opening 212 is, for example, a 55 cm square. The size of the grill 102 is wider than the distance between the field edges 104, for example, 61 cm.
[0065]
Since the minimum width between the field edges 104 in the standard house is 60 cm, any standard house can be installed if the dimensions are set as described above, and the work between the field edges 104 can be expanded. The cost associated with it becomes unnecessary.
[0066]
The hot water pipe 137 from the heat source machine 136 is piped to the bathroom heating dryer 100 in the dressing room. At this time, the hot water pipe 137 is appropriately long for the reason described later. Further, the ventilation duct 216 is disposed up to the vicinity of the installation opening 212. Further, a control line 213 is wired.
[0067]
Next, the field edge fixture 105 is fixed to the field edge 104. Then, the screw thread 112 of the bolt 110 is screwed into the female screw 107 of the field edge fixture 105 so that the bolt 110 is suspended from the installation opening 212.
[0068]
After such a state is completed, as shown in FIG. 23, the main body 101 of the bathroom heating / drying machine 100 is lifted, and the bolts 110 are passed through the suspension holes 177 provided at the four corners around the main body 101. The hanging hole 177 is appropriately larger than the head of the bolt 110 and smaller than the washer 111.
[0069]
Then, the washer 111 is inserted into the bolt 110 through the notch 116, and the main body 101 is lowered by bringing the washer 111 into contact with the head of the bolt 110. Since the suspension hole 177 is smaller than the washer 111, the main body 101 comes into contact with the washer 111 and is in a suspended state. FIG. 24 is a cross-sectional view showing the state at this time.
[0070]
After the bathroom heater / dryer 100 in the bathroom and the dressing room is in such a suspended state, the hot water pipe 137 and the control line 213 are connected.
[0071]
Since the hot water pipe 137 is made of a moderately flexible resin pipe or the like and is long, the end of the hot water pipe 137 is drawn out to the bathroom side and connected to the water supply / drainage section 230.
[0072]
Thereby, the connection of the hot water pipe 137 and the control line 213 is completed, and then the main body 101 is fixed at a predetermined position. The main body 101 is fixed by rotating the front end threaded portion 112 of the bolt 110 until it exceeds the female screw 107 so that the female screw 107 is positioned in the intermediate region 114. Therefore, the main body 101 and the bolt 110 are pushed up, and the rear end screw portion 113 and the female screw 107 are screwed together.
[0073]
After the body 101 is fixed in position, remove the control chamber cover 127 (which may be previously removed), connected from the inside of the body case 132 a ventilation duct 216 so as to pull on the body case 132.
[0074]
Then, the grill 102 is screwed to the main body 101, and the angle of the four first to fourth louvers 244 to 247 is adjusted so that the hot air is blown in a desired direction as appropriate, thereby installing the bathroom heating dryer 100. Is completed.
[0075]
Depending on the state of the installation device 103, the formation state of the installation opening 212, the fixed state of the decorative ceiling panel, etc., the main body 101 may not be parallel to the media of the decorative ceiling panel. At this time, since the end of the main body case 132 and the medium are close to each other, they are conspicuous even in a slightly non-parallel state, and fine adjustment is necessary.
[0076]
However, since the size of the grill 102 according to the present invention is set to be larger than that of the decorative ceiling plate, the medium of the decorative ceiling plate is hidden so that it can be made inconspicuous even in some non-parallel state. ing.
[0077]
When the maintenance check of the bathroom heater / dryer 100 installed in this way is performed, it is possible to go back to the installation procedure described above.
[0078]
【The invention's effect】
As described above, according to the first aspect of the present invention, after the air in the bathroom or the like is sucked into the warm air, the heating section that blows the air again into the bathroom or the like, and the warm air from the heating section is reduced to 4 A main body case having a bottom opening that houses a wind guide section that leads to the first to fourth outlets, a ventilation section that ventilates air in the bathroom, etc., a control section that drives and controls the heating section and the ventilation section, A bottom opening and a grill that removably covers a ceiling installation opening on which the main body case is installed, and the control unit is in a control room partitioned by a partition plate from the heating chamber in which the heating unit is accommodated. It is housed in a control part case of the opening so that it can be pulled out downward, and the control part has a fall prevention means for preventing it from falling out of the control part case, and is aligned with the fourth outlet. A control room cover provided with a fourth outlet window to cover the control room A hot air guide that allows the fourth blow-out window to communicate with the heating chamber is secured to the back surface of the heating chamber, and the lid of the bottom opening of the control unit case is secured to the warm air guide. because it is, simply remove the bathroom ceiling of the grill and remove the control room cover, the cover of the control unit case also allows access to the control unit automatically opens, the control unit itself without removing each control unit case Since it can be pulled out from the control unit case, the maintenance work for the control unit becomes very simple, and when the control unit is inspected from the bathroom side toward the ceiling, the control unit It will not drop and workability and safety will be improved.
[0079]
According to the invention according to claim 2, constituted by the drop preventing pawl locking provided a fall prevention unit to the control unit case, a fall prevention claw provided on electrical component supporting member of the control unit, When the electrical component support member of the control unit is pulled out from the control unit case by a predetermined amount, the fall prevention claw is engaged with the fall prevention claw lock. Even during maintenance and inspection, the control unit will not fall, improving workability and safety.
[0080]
According to the invention of claim 3, the fall prevention means is configured by the anti-extraction protrusion engaging hole provided in the control part case and the anti-extraction protrusion provided in the electrical component support member of the control part. Thus , when the electrical component support member of the control unit is attached to the control unit case, the removal prevention protrusion is engaged with the removal prevention protrusion engagement hole. Even during maintenance and inspection of the control unit, the control unit is not dropped, and workability and safety are improved.
[Brief description of the drawings]
FIG. 1 is a perspective view of a bathroom heating / drying machine applied to the description of an embodiment of the present invention.
FIG. 2 is an exploded perspective view of a bathroom heating dryer.
FIG. 3 is a perspective view of the bathroom heating / drying machine main body when the grill is removed.
FIG. 4 is a schematic view when a bathroom heater / dryer is provided in a bathroom and a dressing room.
FIG. 5 is a side view when the bathroom heating dryer is installed.
FIG. 6 is a configuration diagram of a field edge fixture.
FIG. 7 is a configuration diagram of a suspension member.
FIG. 8 is a perspective view of a grill.
FIG. 9 is a perspective view showing an internal configuration of a bathroom heating / drying machine main body.
FIG. 10 is another configuration diagram of the heat exchanger.
FIG. 11 is a top view of a heating chamber cover.
FIG. 12 is a perspective view of a control chamber cover.
FIG. 13 is a top view of a ventilation fan guide.
FIG. 14 is a side view of a ventilation guide for ventilation.
FIG. 15 is a cross-sectional view of the main body case including a portion to which the ventilation guide for ventilation is fixed.
FIG. 16 is a configuration diagram of a duct connection pipe.
FIG. 17 is a configuration diagram of a nail plate.
FIG. 18 is a side view of a control unit case.
FIG. 19 is a side view of a control unit case.
FIG. 20 is a bottom view of the control unit case.
FIG. 21 is a side view of the electrical component support member.
FIG. 22 is a side view of the electrical component support member.
FIG. 23 is a schematic view showing an installation state of a bathroom heating / drying machine main body.
FIG. 24 is a side view when the bathroom heating / drying machine main body is installed.
FIG. 25 is a schematic view when a bathroom heating / drying machine applied to the description of the prior art is attached to a bathroom.
FIG. 26 is a block diagram of a bathroom heater / dryer applied to the description of the prior art.
FIG. 27 is a temperature distribution diagram of one-way blowing applied to the description of the prior art.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 100 Bathroom heating dryer 101 Main body 102 Grill 103 Installation apparatus 104 Field edge 128 Heating part 130 Ventilation part 132 Main body case 136 Heat source machine 138 Heat exchanger 139 Circulation fan 161 Air guide parts 162-164 First to third outlet windows 166 Hot air guide 202 Control unit case 203 Electrical component support member 205 Anti-extraction protrusion 206 Drop prevention nail 207 Anti-drop protrusion engagement hole 208 Anti-fall nail lock 210 Arc-shaped part 211 Arc-shaped end parts 240 to 243 1-4 outlets

Claims (3)

浴室等の空気を吸気して,これを温風にした後,再度浴室等に送風する加熱部,該加熱部からの温風を4つの第1〜第4吹出口に導く導風部,浴室等の空気等を換気する換気部,前記加熱部や前記換気部を駆動制御する制御部を収納する底面開口の本体ケースと,該本体ケースの底面開口及び該本体ケースが据付けられる天井の据付開口を着脱可能に覆うグリルとを備え,前記制御部は,前記加熱部が収納される加熱室とは仕切板により区画された制御室内にあって,底面開口の制御部ケースに下方に引出し可能に収納して成ると共に,前記制御部が,前記制御部ケースから落下するのを防止する落下防止手段を有し,かつ前記第4吹出口と位置が一致するように第4吹出窓が設けられて前記制御室をカバーする制御室カバーの裏面に,前記加熱室と制御室とが連通することなく,前記第4吹出窓を加熱室に連通させる温風ガイドを固着すると共に,この温風ガイドには前記制御部ケースの底面開口の蓋が固着されていることを特徴とする浴室暖房乾燥機。A heating unit that inhales air from a bathroom, etc., turns it into hot air, and then blows it back into the bathroom, etc., an air guide unit that guides the hot air from the heating unit to the four first to fourth outlets, and the bathroom A main body case with a bottom opening for housing a ventilation section for ventilating air, etc., a heating section and a control section for driving and controlling the ventilation section, and a bottom opening of the main body case and a ceiling installation opening on which the main body case is installed And the control unit is in a control chamber partitioned by a partition plate from the heating chamber in which the heating unit is accommodated, and can be drawn downward to the control unit case of the bottom opening. together comprising housed, the control section, have a fall preventing means for preventing the dropping from the controller case, and a fourth outlet window is provided such that the fourth outlet and position coincides On the back surface of the control room cover that covers the control room, A hot air guide that allows the fourth blowing window to communicate with the heating chamber is fixed without communication between the hot chamber and the control chamber, and a lid on the bottom opening of the control unit case is fixed to the hot air guide. bathroom heating dryer and said that you are. 落下防止手段が,前記制御部ケースに設けられた落下防止用爪係止と,前記制御部の電装部品支持部材に設けられた落下防止用爪とから構成されて,前記制御部の電装部品支持部材が前記制御部ケースから所定量抜出したときに,前記落下防止用爪が前記落下防止用爪係止に係合して当該制御部の落下を防止してなることを特徴とする請求項1記載の浴室暖房乾燥機。  The fall prevention means includes a fall prevention claw lock provided on the control unit case and a fall prevention claw provided on the electrical component support member of the control unit, and the electrical component support of the control unit 2. The drop prevention claw is engaged with the drop prevention claw lock to prevent the control unit from dropping when a member is pulled out of the control unit case by a predetermined amount. The bathroom heating dryer described. 落下防止手段が,前記制御部ケースに設けられた抜防止用突起係合穴と,前記制御部の電装部品支持部材に設けられた抜防止用突起とから構成されて,前記制御部の電装部品支持部材が前記制御部ケースに装着されたときに,前記抜防止用突起が前記抜防止用突起係合穴に係合して当該制御部の落下を防止してなることを特徴とする請求項1記載の浴室暖房乾燥機。  The drop prevention means is constituted by an anti-extraction protrusion engaging hole provided in the control part case and an anti-extraction protrusion provided in the electric part support member of the control part, and the electric part of the control part 2. The pull-out prevention protrusion engages with the pull-out prevention protrusion engagement hole to prevent the control section from falling when a support member is attached to the control part case. The bathroom heating dryer according to 1.
JP22259398A 1998-08-06 1998-08-06 Bathroom heating dryer Expired - Fee Related JP3999883B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22259398A JP3999883B2 (en) 1998-08-06 1998-08-06 Bathroom heating dryer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22259398A JP3999883B2 (en) 1998-08-06 1998-08-06 Bathroom heating dryer

Publications (2)

Publication Number Publication Date
JP2000055394A JP2000055394A (en) 2000-02-22
JP3999883B2 true JP3999883B2 (en) 2007-10-31

Family

ID=16784910

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22259398A Expired - Fee Related JP3999883B2 (en) 1998-08-06 1998-08-06 Bathroom heating dryer

Country Status (1)

Country Link
JP (1) JP3999883B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113154545A (en) * 2021-03-25 2021-07-23 福建克莱默节能科技有限公司 Air temperature adjusting method and system capable of being internally arranged in household air conditioner external unit

Also Published As

Publication number Publication date
JP2000055394A (en) 2000-02-22

Similar Documents

Publication Publication Date Title
JP2001208413A (en) Bathroom heater/dryer
JP3999883B2 (en) Bathroom heating dryer
JP3730415B2 (en) Bathroom heating dryer
JP3942972B2 (en) Bathroom heating dryer
JP3939031B2 (en) Bathroom heating dryer
JP2000055552A (en) Bathroom heater/dryer
JP3913365B2 (en) Bathroom heating dryer
JP3954460B2 (en) Bathroom heating system
JP2000055550A (en) Bathroom heater/dryer
JP3688472B2 (en) Bathroom heating dryer
JP5304367B2 (en) Blower
JP4214095B2 (en) Bathroom heater with mist sauna function
JP3939032B2 (en) Bathroom heating dryer
JP2000055395A (en) Bathroom heater/dryer
JP2000055551A (en) Bathroom heater/dryer
JP2000055549A (en) Bathroom heater/dryer
JP2000055396A (en) Bathroom heater/dryer
JP2005164213A (en) Ceiling suspension type air conditioner
JP3730577B2 (en) Heating system
JP4542219B2 (en) Air conditioner
JP3791081B2 (en) Hot air supply device
JPH1163607A (en) Ventilator
JPH1137491A (en) Bathroom heating and drying device
JP2585209Y2 (en) Bathroom heating dryer
JP4337497B2 (en) Hot air heater and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050107

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060623

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060912

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061110

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070109

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070312

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070424

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070622

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070717

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070810

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100817

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100817

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110817

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees