Nothing Special   »   [go: up one dir, main page]

JP2710740B2 - Front face exploration method - Google Patents

Front face exploration method

Info

Publication number
JP2710740B2
JP2710740B2 JP8556993A JP8556993A JP2710740B2 JP 2710740 B2 JP2710740 B2 JP 2710740B2 JP 8556993 A JP8556993 A JP 8556993A JP 8556993 A JP8556993 A JP 8556993A JP 2710740 B2 JP2710740 B2 JP 2710740B2
Authority
JP
Japan
Prior art keywords
analysis
face
drilling
drill
tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP8556993A
Other languages
Japanese (ja)
Other versions
JPH06273533A (en
Inventor
光政 岡村
誠 請川
隆浩 中村
将史 内藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP8556993A priority Critical patent/JP2710740B2/en
Publication of JPH06273533A publication Critical patent/JPH06273533A/en
Application granted granted Critical
Publication of JP2710740B2 publication Critical patent/JP2710740B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、地下にトンネル等の空
間を造る場合において、掘削面である切羽の前方の地層
を探査する切羽前方探査方式に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a front face exploration method for exploring a stratum in front of a face as an excavation surface when a space such as a tunnel is formed underground.

【0002】[0002]

【従来の技術】トンネルの掘削においては、掘削面であ
る切羽の前方の地質を確実に把握し、その対策を講ずる
ことが安全かつ確実な施工を行う上で必要となる。
2. Description of the Related Art In excavation of a tunnel, it is necessary to surely grasp the geology in front of a face, which is an excavation surface, and to take countermeasures for safe and reliable construction.

【0003】このような切羽の前方を調べる従来の探査
方式としては、トンネル壁面切羽での地質観察結果を基
に予測を行い、必要に応じて先進ボーリングによる調査
を行う方法があった。この先進ボーリングによれば、調
べたい地層のコアを確実に採取できるため切羽前方の地
層を直接目視することができる。
[0003] As a conventional search method for examining the front of such a face, there has been a method of making a prediction based on a result of geological observation at a tunnel wall face, and conducting a survey by advanced boring as necessary. According to this advanced boring, the core of the stratum to be checked can be reliably collected, so that the stratum in front of the face can be directly visually observed.

【0004】また、その他の従来の探査方式としては、
レーリー波探査法が知られている。このレーリー波探査
法は、例えば土木学界第46回年次学術講演会(平成3
年9月)資料の194頁および195頁に開示されてお
り、切羽に起振器と受振器を取付け、レーリー波の周波
数を変化させながら振動させることにより、進路方向の
データを得るものである。切羽前方20m先の断層破砕
体が検出可能とされている。
[0004] Other conventional search methods include:
Rayleigh wave probing is known. The Rayleigh wave exploration method is described in, for example, the 46th Annual Scientific Lecture
(September, 1989) disclosed on pages 194 and 195 of the document, in which a vibrator is attached to a face and vibrated while changing the frequency of the Rayleigh wave to obtain data in the course direction. . It is possible to detect a fault crushed body 20 m ahead of the face.

【0005】[0005]

【発明が解決しようとする課題】ところで、上述した先
進ボーリングを行う従来の探査方式においては、先行ボ
ーリングを行う際に切羽の進行を止めるか、あるいは横
坑を掘削して行う必要があり、工期,工費を圧迫し、工
事進捗に支障をきたすという問題があった。
However, in the conventional exploration system for performing the above-mentioned advanced boring, it is necessary to stop the advancement of the cutting face or to excavate the horizontal shaft when performing the preceding boring. , Which put pressure on construction costs and hindered the progress of construction.

【0006】また、上述したレーリー波探査法において
は、切羽前方の探査距離が数mから20m程度であり探
査距離が短く、しかも切羽に大型の起振器を取り付ける
必要があり、工事の進捗に支障をきたすという問題があ
った。
In the above-mentioned Rayleigh wave exploration method, the exploration distance in front of the face is about several to 20 m, the exploration distance is short, and it is necessary to attach a large exciter to the face. There was a problem that caused trouble.

【0007】そこで、本発明はこのような点に鑑みてな
されたものであり、その目的は探査距離が長く、二次元
あるいは三次元的な探査を容易に行うことができ、しか
も工事の進捗に支障をきたすことがない切羽前方探査方
式を提供することにある。
Therefore, the present invention has been made in view of the above points, and has as its object the purpose of which is to provide a long exploration distance, facilitate two-dimensional or three-dimensional exploration, and improve the progress of construction. An object of the present invention is to provide a front face exploration method that does not cause any trouble.

【0008】[0008]

【課題を解決するための手段】上述した課題を解決する
ために、本発明の切羽前方探査方式は、切羽前方に対し
先端位置を移動させながら削孔を行う削孔ドリルと、
切羽表面に二次元的な広がりをもって配置され、前記削
孔ドリルの先端のビット部によって発生した振動波を検
出する複数の受振器と、前記削孔ドリルの先端位置を切
羽前方に移動させながら、前記複数の受振器によって検
出した前記ビット部と前記切羽表面との間の振動波の解
析を行う解析手段と、前記解析手段による解析結果に基
づいて前記切羽前方の地層の性状あるいは構造を解析す
る地質判別手段と、前記解析手段による解析結果を出力
する出力手段と、を備えることを特徴とする。
In order to solve the above-mentioned problems, a front face exploration system according to the present invention comprises: a drill for drilling while moving a tip position with respect to a front of a face;
A plurality of geophones that are arranged with a two-dimensional spread on the surface of the face and detect a vibration wave generated by a bit portion at the tip of the drill;
Analyzing means for analyzing a vibration wave between the bit portion and the surface of the face detected by the plurality of geophones while moving the blade in front of the blade; and a formation in front of the face based on an analysis result by the analyzing means. And geological discriminating means for analyzing the properties or structure of the object, and output means for outputting an analysis result by the analyzing means.

【0009】[0009]

【作用】本発明の切羽前方探査方式においては、削孔ド
リル先端のビット部によって発生する振動を切羽表面に
二次元的な広がりをもって取り付けられた複数の受振器
で検出する。そして、この検出した振動波を解析手段に
よって解析し、さらに地質判別手段がこの解析結果に基
づいて地層の性状,構造を判別する。
In the front face exploration method of the present invention, the vibration generated by the bit portion at the tip of the drilling hole is detected by a plurality of geophones attached two-dimensionally to the surface of the face. Then, the detected vibration wave is analyzed by the analyzing means, and the geological judging means judges the properties and structure of the stratum based on the analysis result.

【0010】特に、削孔ドリルによって発生する振動と
しては、削孔時に先端のビット部によって岩石等を砕く
際に発生する連続振動波と、削孔を一時停止して先端の
ビット部を孔底に衝打する際に発生するパルス状の振動
波とがあり、このいずれか一方あるいは両方を解析する
ことにより、地山状況・物性値、すなわち地層の性状あ
るいは構造を正確に判別することができる。
[0010] In particular, the vibration generated by the drilling drill includes a continuous vibration wave generated when a rock or the like is crushed by the bit at the tip at the time of drilling, and a bit at the tip at the bottom when the drilling is temporarily stopped. There is a pulse-like vibration wave generated when hitting the ground, and by analyzing one or both of them, the ground condition and physical property values, that is, the properties or structure of the stratum can be accurately determined. .

【0011】本発明にあっては、削孔ドリルを用いて解
析に必要な振動波を発生させており、発破工法等に用い
られる一般の削孔ドリルを振動発生用に兼用することが
でき、特に大型の起振器を切羽に取り付ける必要がな
く、工事の進捗に支障をきたすことがない。
In the present invention, a vibration wave necessary for analysis is generated by using a drill, and a general drill used for a blasting method or the like can also be used for generating vibration. In particular, there is no need to attach a large exciter to the face, and there is no hindrance to the progress of the construction.

【0012】また、一般の削孔ドリルを使用しているた
め、ロッドを継ぎ足していけばその掘削深度を数10m
から数100mとすることも可能であり、探査距離を長
くすることができる。 さらに、削孔ドリルの先端のビ
ット部によって発生した振動波を二次元的な広がりをも
って配置された受振器で検出しているため、容易に三次
元的な探査を行うことができる。
Further, since a general drill is used, if a rod is added, the drilling depth becomes several tens of meters.
To several hundred meters, and the search distance can be lengthened. Furthermore, since the vibration wave generated by the bit portion at the tip of the drilling hole is detected by the geophone arranged with a two-dimensional spread, three-dimensional exploration can be easily performed.

【0013】[0013]

【実施例】以下、図面に基づいて本発明の切羽前方探査
方式を適用した一実施例の探査システムについて詳細に
説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an exploded perspective view of an embodiment of a search system according to the present invention;

【0014】本実施例の探査システムの特徴は、油圧ド
リルによって切羽に削孔を行う際に発生する連続振動波
を切羽に取り付けた受振器によって検出して解析を行う
点にある。また、他の特徴は、この削孔を一時停止し、
油圧ドリルのビット先端によって孔底を衝打するときに
生ずる単発のパルス状の振動波を切羽に取り付けた受振
器で検出して解析を行う点にある。従って、これら2種
類の振動波によって発生した振動波を用いて切羽の前方
探査を行っており、以下に本実施例の探査システムの詳
細について、構成及び動作について場合を分けて説明す
る。
A feature of the exploration system of the present embodiment is that a continuous vibration wave generated when drilling a face with a hydraulic drill is detected by a geophone attached to the face and analyzed. Another feature is that this drilling is paused,
The point is that a single-pulse vibration wave generated when the bottom of the hole is hit by the tip of the bit of the hydraulic drill is detected by a geophone attached to the face and analyzed. Therefore, the frontal exploration of the face is performed using the vibration waves generated by these two types of vibration waves. Hereinafter, the details and configuration and operation of the search system of the present embodiment will be described separately.

【0015】(1)探査システムの構成 図1は、本実施例の探査システムの全体構成を示す図で
ある。
(1) Configuration of the Search System FIG. 1 is a diagram showing the overall configuration of the search system of the present embodiment.

【0016】同図において、複数の受振器10のそれぞ
れは、切羽60の前方の地層内部から切羽表面に伝播さ
れる振動波を検出するものである。例えば、固定磁石の
作る磁場内をバネで吊るされたコイルが相対的に動くこ
とにより生ずる起電力を利用して振動を検出するジオフ
ォントが用いられる。これら複数の受振器10は、その
ほとんどが切羽60の全面に分散して配置されるもので
あるが、その中の1つは油圧ドリル12に取り付けられ
ている。
In FIG. 1, each of a plurality of geophones 10 detects a vibration wave propagated from the inside of the stratum in front of the face 60 to the surface of the face. For example, a geofont that detects vibration by using an electromotive force generated by a relative movement of a coil suspended by a spring in a magnetic field created by a fixed magnet is used. Most of the plurality of geophones 10 are distributed over the entire surface of the face 60, and one of them is attached to the hydraulic drill 12.

【0017】収集データ格納部20は、複数の受振器1
0のそれぞれにおいて受振,検出した振動波を各受振器
10毎に収集,蓄積するものである。収集データ格納部
20に格納するデータはデジタルあるいはアナログのい
ずれであってもよいが、本実施例においてはデジタルデ
ータに変換して格納するものとする。このため、本実施
例の探査システムは、収集データ格納部20の前段にア
ナログ−デジタル(A/D)変換器22を有しており、
このA/D変換器22によって各受振器10の出力(ア
ナログデータ)をデジタルデータに変換し、この変換後
のデジタルデータを収集データ格納部20に格納する。
The collected data storage unit 20 includes a plurality of geophones 1
The vibration waves detected and received in each of the zeros are collected and accumulated for each of the vibration receivers 10. The data stored in the collected data storage unit 20 may be either digital or analog, but in this embodiment, it is assumed that the data is converted into digital data and stored. For this reason, the exploration system of the present embodiment has an analog-digital (A / D) converter 22 at a stage preceding the collected data storage unit 20.
The output (analog data) of each geophone 10 is converted into digital data by the A / D converter 22, and the converted digital data is stored in the collected data storage unit 20.

【0018】なお、各受振器10によって検出した振動
波をアナログの形態で収集(蓄積)する場合には、収集
データ格納部20の後段にA/D変換器22を接続す
る。
When collecting (accumulating) the vibration waves detected by the respective geophones 10 in an analog form, an A / D converter 22 is connected to a stage subsequent to the collected data storage unit 20.

【0019】スペクトル解析部24は、油圧ドリル12
によって削孔を行う際に、そのビット先端14が岩盤を
砕くために発生する連続波(連続削孔波)の解析を行う
ものである。このスペクトル解析を行うことにより、切
羽前方を伝播する連続削孔波の時間遅れおよび減衰量が
周波数成分毎にわかるため、地山状況および物性値の推
定を二次元,三次元的に行うことができる。
The spectrum analysis unit 24 includes the hydraulic drill 12
When drilling is performed, a continuous wave (continuous drilling wave) generated by the bit tip 14 breaking the rock is analyzed. By performing this spectrum analysis, the time delay and attenuation of the continuous drilling wave propagating in front of the face can be determined for each frequency component, and the estimation of the ground condition and physical properties can be performed two-dimensionally and three-dimensionally. it can.

【0020】同様に、ジオトモグラフィー解析部26
は、油圧ドリル12のビット先端14を孔底に衝打させ
たときに発生する弾性波に基づいてジオトモグラフィー
による解析を行うものである。このジオトモグラフィー
解析を行うことにより、切羽前方の二次元,三次元構造
(地質断面構造,物性分布等)を知ることができる。
Similarly, the geotomography analysis unit 26
Is to perform an analysis by geotomography based on an elastic wave generated when the bit tip 14 of the hydraulic drill 12 is hit against the bottom of the hole. By performing this geotomography analysis, the two-dimensional and three-dimensional structures (geological sectional structure, physical property distribution, etc.) in front of the face can be known.

【0021】解析結果格納部28は、スペクトル解析部
24およびジオトモグラフィー解析部26の各解析結果
を一時格納するためのものである。これらの各解析は、
油圧ドリル12のビット先端14の位置が切羽60から
所定の位置に達したときに行うが、これらの各解析を行
うビット先端14の位置は所定間隔(例えば1m間隔)
に設定されている。そして、これら所定間隔のビット先
端位置に対応した各解析結果を解析結果格納部28に格
納する。
The analysis result storage unit 28 is for temporarily storing analysis results of the spectrum analysis unit 24 and the geotomography analysis unit 26. Each of these analyzes
This is performed when the position of the bit tip 14 of the hydraulic drill 12 reaches a predetermined position from the face 60. The position of the bit tip 14 for performing each of these analyzes is at a predetermined interval (for example, 1 m interval).
Is set to Then, the analysis results corresponding to the bit tip positions at these predetermined intervals are stored in the analysis result storage unit 28.

【0022】地質判別部30は、解析結果格納部28に
格納された解析結果に基づいて、地質の性状および構造
を判別する。また、比較データ格納部32は、既知の地
質についてのスペクトル解析結果およびジオトモグラフ
ィー解析結果を予め格納しておくものである。
The geological determination unit 30 determines the nature and structure of the geology based on the analysis result stored in the analysis result storage unit 28. In addition, the comparison data storage unit 32 stores a spectrum analysis result and a geotomography analysis result for a known geology in advance.

【0023】地質判別部30は、この比較データ格納部
32に格納された既知の地層についての解析結果と、解
析結果格納部28に格納されている実際の探査で得られ
た各解析結果とを比較することにより、切羽60の前方
の地質の判別を行っている。
The geological discriminating unit 30 compares the analysis result of the known stratum stored in the comparison data storage unit 32 with each analysis result obtained by actual exploration stored in the analysis result storage unit 28. By comparing, the geology in front of the face 60 is determined.

【0024】表示部34は、地質判別部30による判別
結果を表示するためのものであり、例えばCRT(陰極
線管)とその表示制御部とを含んで構成されている。ま
た、表示部34はスぺクトル解析部24,ジオトモグラ
フィー解析部26の各解析結果についてもリアルタイム
で表示できるようになっている。
The display unit 34 is for displaying the result of the determination by the geological determination unit 30, and includes, for example, a CRT (cathode ray tube) and its display control unit. The display unit 34 can also display the analysis results of the spectrum analysis unit 24 and the geotomography analysis unit 26 in real time.

【0025】プリンタ36は、地質判別部30による判
別結果を記録紙に出力するためのものであるが、表示部
34と同様にスぺクトル解析部24,ジオトモグラフィ
ー解析部26の各解析結果についてもリアルタイムで出
力できるようになっている。
The printer 36 is for outputting the result of the determination by the geological determination unit 30 to a recording sheet. As with the display unit 34, the printer 36 performs the analysis results of the spectrum analysis unit 24 and the geotomography analysis unit 26. Can also be output in real time.

【0026】探査制御部40は、上述した探査システム
の全体動作を制御するものであり、特に収集データ格納
部20,スペクトル解析部24,ジオトモグラフィー解
析部26,解析結果格納部28,地質判別部38の動作
タイミングを制御している。すなわち、収集データ格納
部20から所定の振動波データを読み出したときに、ス
ペクトル解析部24およびジオトモグラフィー解析部2
6による解析を開始し、この解析が終了した時点でこれ
ら各解析結果を解析結果格納部28に格納する。また、
全ての解析が終了した時点で全解析結果を解析結果格納
部28から読み出し、地質判別部30による判別処理を
行うようタイミング制御を行っている。
The search control unit 40 controls the overall operation of the above-described search system. In particular, the collected data storage unit 20, the spectrum analysis unit 24, the geotomography analysis unit 26, the analysis result storage unit 28, the geological determination unit 38 is controlled. That is, when predetermined vibration wave data is read from the collected data storage unit 20, the spectrum analysis unit 24 and the geotomography analysis unit 2
6 and the analysis results are stored in the analysis result storage unit 28 when the analysis is completed. Also,
When all the analyzes are completed, all the analysis results are read from the analysis result storage unit 28, and the timing control is performed so that the geological determination unit 30 performs the determination process.

【0027】また、スペクトル解析部24,ジオトモグ
ラフィー解析部26,地質判別部30による各処理にお
いては、油圧ドリル12のビット先端14の位置データ
を解析あるいは判別のパラメータとして使用する必要が
あるが、この位置データは後述する油圧ドリル駆動制御
部50から探査制御部40に入力され他ビット位置情報
に基づいて、探査制御部36が作成し、スペクトル解析
部24,ジオトモグラフィー解析部26,地質判別部2
8に入力している。
In each processing by the spectrum analysis unit 24, the geotomography analysis unit 26, and the geological determination unit 30, it is necessary to use the position data of the bit tip 14 of the hydraulic drill 12 as a parameter for analysis or determination. The position data is input to the search control unit 40 from the hydraulic drill drive control unit 50 described later and is created by the search control unit 36 based on the other bit position information, and the spectrum analysis unit 24, the geotomography analysis unit 26, the geological determination unit 2
8 has been entered.

【0028】油圧ドリル駆動制御部50は、油圧ドリル
12による削孔動作を制御するものであり、削孔速度や
削孔長を自由に設定することができる。この制御された
削孔長は、ビット位置情報として探査制御部40に入力
される。
The hydraulic drill drive control unit 50 controls the drilling operation by the hydraulic drill 12, and can freely set the drilling speed and drilling length. The controlled drilling length is input to the search control unit 40 as bit position information.

【0029】また、油圧ドリル駆動制御部50は、油圧
ドリル12によって発生する振動波の制御も行ってい
る。すなわち、連続削孔波を発生させる場合には、油圧
ドリル駆動制御部50は、油圧ドリル12を回転,推進
させる制御を行う。一方、パルス状の弾性波を発生させ
るには、油圧ドリル駆動制御部50は、油圧ドリル12
の回転,推進を一時停止し、油圧ドリル12の全体を往
復運動させることにより、そのビット先端14を孔底に
衝打させる制御を行う。
The hydraulic drill drive control unit 50 also controls vibration waves generated by the hydraulic drill 12. That is, when a continuous drilling wave is generated, the hydraulic drill drive control unit 50 performs control to rotate and propel the hydraulic drill 12. On the other hand, in order to generate a pulse-like elastic wave, the hydraulic drill drive control unit 50
By temporarily stopping the rotation and propulsion of the hydraulic drill 12 and reciprocating the entire hydraulic drill 12, control is performed to strike the bit tip 14 against the bottom of the hole.

【0030】図2は、切羽60表面において、複数の受
振器10の設置位置および油圧ドリル12による削孔位
置を示す図である。
FIG. 2 is a diagram showing the installation positions of the plurality of vibration receivers 10 and the drilling positions by the hydraulic drill 12 on the surface of the face 60.

【0031】同図(a)には受振器10をクロスライン
上に設置した例が示されており、水平ライン上に7個の
受振器10が、これと交差する垂直ライン上に3個の受
振器10が配置されている。また、削孔位置は、水平ラ
インの両端および垂直ラインの上端と、両ラインの交差
部分に合計4個配置されており、この削孔位置は以下に
示す同図(b),(c)の場合も同じであるものとす
る。
FIG. 3A shows an example in which the geophones 10 are installed on a cross line. Seven geophones 10 are arranged on a horizontal line, and three geophones are arranged on a vertical line intersecting the geophone. A geophone 10 is arranged. Further, a total of four drilling positions are arranged at both ends of the horizontal line and the upper end of the vertical line, and at the intersection of the two lines, and the drilling positions are shown in FIGS. The same applies to the case.

【0032】また、同図(b)には受振器10を円周上
に設置した例が示されており、円周上に9個の受振器1
0が配置されている。同図(c)では同図(b)に示し
た位置に加え、さらに内側に5個の受振器10が配置さ
れている。
FIG. 2B shows an example in which the geophone 10 is installed on the circumference, and nine geophones 1 are arranged on the circumference.
0 is arranged. In FIG. 6C, in addition to the position shown in FIG. 6B, five geophones 10 are further disposed inside.

【0033】図3は、上述した油圧ドリル12を備えた
削岩機の概略構造を示す図である。この削岩機は、油圧
ドリル12を有する削岩機と移動用車両とが一体化した
構造を有しており、掘削の進行によって切羽60の位置
が前進した場合に、容易に油圧ドリル12の位置を変え
ることができるようになっている。また、油圧ドリル1
2によって切羽60に対して削孔を行うが、その削孔長
については、ロッドを継ぎ足すことにより数10〜数1
00mとすることができる。
FIG. 3 is a view showing a schematic structure of a rock drill having the above-mentioned hydraulic drill 12. As shown in FIG. This rock drill has a structure in which the rock drill having the hydraulic drill 12 and the vehicle for movement are integrated, and when the position of the face 60 advances due to the progress of the drilling, the hydraulic drill 12 can be easily mounted. The position can be changed. Hydraulic drill 1
2, the drilling is performed on the face 60. The drilling length is determined by adding several rods to several
00 m.

【0034】(2)探査システムによる探査動作 次に、本実施例の探査システムを用いて前方探査を行う
場合の動作を説明する。
(2) Searching operation by the search system Next, an operation when a forward search is performed using the search system of this embodiment will be described.

【0035】本実施例の探査システムは、上述したよう
に2種類の振動波を用いて地質及びその構造の判別を行
うものである。図4は、そのうちの連続削孔波を発生さ
せる場合の概略を示す図である。同図に示すように、削
岩機に取り付けられた油圧ドリル12によって削孔を行
うが、この削孔の詳細については一般の発破工法等で行
われる削孔と何ら変わるところがない。従って、油圧ド
リル12は通常のトンネル工事で使用されているものを
そのまま兼用することができる。なお、一般の発破工法
等においては、その削孔距離は数m程度であるため、本
実施例のように数10mから数100mの削孔を行う場
合には、その削孔距離に応じてビットを継ぎ足す必要が
ある。
The exploration system of the present embodiment discriminates geology and its structure using two types of vibration waves as described above. FIG. 4 is a view schematically showing a case where a continuous drilling wave is generated. As shown in the figure, drilling is performed by a hydraulic drill 12 attached to a rock drill, but the details of the drilling are no different from drilling performed by a general blasting method or the like. Therefore, the hydraulic drill 12 used in ordinary tunnel construction can be used as it is. In a general blasting method or the like, the drilling distance is about several meters. Therefore, when drilling from several tens of meters to several hundreds of meters as in this embodiment, the bit length is determined according to the drilling distance. Need to be added.

【0036】また、図5は油圧ドリル12のビット先端
14によって孔底を衝打し、パルス状の弾性波を発生さ
せる場合の概略を示す図である。このような弾性波を発
生させるためには油圧ドリル12による削孔を一時停止
し、回転が止まった油圧ドリル12のビット先端14に
よって、削孔の孔底を打撃する。その後、削孔を再開
し、ビット先端14の位置が所定距離だけ進行した後、
再び削孔を一時中止し、弾性波を発生させる。このよう
に、所定間隔で削孔を停止して孔底を打撃することによ
り、所定間隔でパルス状の弾性波を発生させている。
FIG. 5 is a view schematically showing a case where the bottom of the hole is hit with the bit tip 14 of the hydraulic drill 12 to generate a pulse-like elastic wave. In order to generate such elastic waves, drilling by the hydraulic drill 12 is temporarily stopped, and the bottom of the drilled hole is hit by the bit tip 14 of the hydraulic drill 12 that has stopped rotating. Thereafter, drilling is resumed, and after the position of the bit tip 14 has advanced a predetermined distance,
The drilling is temporarily stopped again to generate an elastic wave. In this way, by stopping drilling at predetermined intervals and hitting the bottom of the hole, pulse-like elastic waves are generated at predetermined intervals.

【0037】次に、本実施例の探査システムによって切
羽60の前方探査を行う場合の詳細な動作を説明する。
図6はその動作手順を示す図であり、以下、図6の各ス
テップ毎に説明を行う。
Next, a detailed operation in the case of performing a forward search of the face 60 by the search system of this embodiment will be described.
FIG. 6 is a diagram showing the operation procedure, and each step in FIG. 6 will be described below.

【0038】ステップ600(削孔):まず、本探査シ
ステムは切羽60の所定位置(例えば図2(a)の中央
近傍の位置)に対して削孔を開始する。具体的には、油
圧ドリル駆動制御部50の制御により油圧ドリル12を
回転させると共に振動,推進させ、そのビット先端14
によって岩盤を削り採ることにより削孔を行う。
Step 600 (Drilling): First, the survey system starts drilling a predetermined position of the face 60 (for example, a position near the center in FIG. 2A). Specifically, the hydraulic drill 12 is rotated, vibrated, and propelled under the control of the hydraulic drill drive control unit 50, and the bit tip 14 is rotated.
Drilling is performed by shaving the rock.

【0039】ステップ601(連続削孔波の受振等):
次に、探査制御部40は、収集データ格納部20に指示
を送って、各受振器10によって検出した振動波のデー
タ蓄積を行う。切羽60の全面に分散配置された受振器
10および油圧ドリル12に取り付けられた受振器10
によって検出された振動波がA/D変換器22を介して
収集データ格納部20に入力されており、収集データ格
納部20は、探査制御部40からの格納指示に基づいて
これら各受振器10からの出力させるデータを格納す
る。
Step 601 (reception of continuous drilling wave, etc.):
Next, the search control unit 40 sends an instruction to the collected data storage unit 20 to accumulate data of the vibration waves detected by the respective geophones 10. The geophones 10 distributed on the entire face of the face 60 and the geophones 10 attached to the hydraulic drill 12
Is output to the collected data storage unit 20 via the A / D converter 22, and the collected data storage unit 20 stores the vibration waves based on the storage instruction from the search control unit 40. Stores data to be output from.

【0040】ステップ602(ビット先端位置の検
出):次に、油圧ドリル12のビット先端14の位置検
出が行われる。この位置検出は油圧ドリル駆動制御部5
0から探査制御部40に送られるビット位置情報に基づ
いて行われる。
Step 602 (detection of bit tip position): Next, the position of the bit tip 14 of the hydraulic drill 12 is detected. This position detection is performed by the hydraulic drill drive control unit 5
This is performed based on the bit position information sent from 0 to the search control unit 40.

【0041】ステップ603(探査位置の判定):次
に、油圧ドリル12のビット先端14が探査位置に達し
たか否かの判定が行われる。この探査位置の判定は、油
圧ドリル駆動制御部50から入力されるビット位置情報
に基づいて探査制御部40が行っており、探査位置に達
していない場合にはステップ600に戻って削孔動作を
継続する。また、ビット先端14の位置が探査位置に達
すると、探査制御部40はこのステップ602における
判定処理において肯定判断を行う。
Step 603 (determination of search position): Next, it is determined whether or not the bit tip 14 of the hydraulic drill 12 has reached the search position. The search position is determined by the search control unit 40 based on the bit position information input from the hydraulic drill drive control unit 50. If the search position has not been reached, the process returns to step 600 to perform the drilling operation. continue. When the position of the bit tip 14 reaches the search position, the search control unit 40 makes an affirmative determination in the determination processing in step 602.

【0042】なお、上述した説明においては、探査制御
部40が油圧ドリル駆動制御部50から入力されるビッ
ト位置情報に基づいてステップ603の判定処理を行
い、自動的に収集データ格納部20に格納指示を送るよ
うにしているが、作業員が油圧ドリル駆動制御部50あ
るいは探査制御部40に接続された表示部(図示せず)
を監視しており、目視によるステップ603の判定を行
ってもよい。この場合は、ビット先端14が所定位置に
達したときに作業者が探査制御部40に対して指示を送
り、探査制御部40はこの指示に応じて収集データ格納
部20に対して格納指示を送ることになる。
In the above description, the search control unit 40 performs the determination processing of step 603 based on the bit position information input from the hydraulic drill drive control unit 50, and automatically stores it in the collected data storage unit 20. Although an instruction is sent, a worker is provided with a display unit (not shown) connected to the hydraulic drill drive control unit 50 or the search control unit 40.
May be monitored, and the determination in Step 603 may be visually performed. In this case, when the bit tip 14 reaches the predetermined position, the operator sends an instruction to the search control unit 40, and the search control unit 40 issues a storage instruction to the collected data storage unit 20 in response to the instruction. Will be sent.

【0043】ステップ604(削孔停止):次に、油圧
ドリル駆動制御部50は、油圧ドリル12の回転,推進
を中断し、削孔動作を停止する。この停止処理は、油圧
ドリル駆動制御部50自身の判断で行ってもよいし、探
査制御部40から油圧ドリル駆動制御部50に対して停
止指示を送るようにしてもよい。また、収集データ格納
部20に対するデータ格納が終了したことを作業員が確
認した後、この作業員が油圧ドリル駆動制御部50を操
作して削孔動作を停止するようにしてもよい。
Step 604 (stop drilling): Next, the hydraulic drill drive control unit 50 suspends rotation and propulsion of the hydraulic drill 12 and stops drilling operation. This stopping process may be performed by the judgment of the hydraulic drill drive control unit 50 itself, or the search control unit 40 may send a stop instruction to the hydraulic drill drive control unit 50. After the operator confirms that the data storage in the collected data storage unit 20 has been completed, the operator may operate the hydraulic drill drive control unit 50 to stop the drilling operation.

【0044】ステップ605(パルス状の弾性波発
生):次に、パルス状の弾性波の発生が行われる。この
弾性波発生は、油圧ドリル駆動制御部50の制御によっ
て油圧ドリル12のビット先端14をステップ600に
おいて削孔した孔底に打ち付けることにより行う。
Step 605 (pulse-like elastic wave generation): Next, a pulse-like elastic wave is generated. The generation of the elastic wave is performed by hitting the bit tip 14 of the hydraulic drill 12 to the hole bottom drilled in step 600 under the control of the hydraulic drill drive control unit 50.

【0045】ステップ606(弾性波の蓄積):次に、
探査制御部40から収集データ格納部20に対して指示
を送り、収集データ格納部20は各受振器10で受振し
たパルス状の弾性波に基づく出力信号を格納する。この
格納処理は、上述したステップ601における処理と実
質的には同じである。
Step 606 (accumulation of elastic waves):
An instruction is sent from the search control unit 40 to the collected data storage unit 20, and the collected data storage unit 20 stores an output signal based on the pulsed elastic wave received by each of the geophones 10. This storage processing is substantially the same as the processing in step 601 described above.

【0046】ステップ607(収集データの読出し):
次に、探査制御部40は、収集データ格納部20に格納
されているデータの読出しを行う。なお、収集データ格
納部20には、上述したステップ601において格納し
た連続削孔波に対する収集データと、ステップ606に
おいて格納したパルス状の弾性波に対応する収集データ
とが格納されているが、連続削孔波に対するデータは収
集データ格納部20から読み出された後、スペクトル解
析部24に入力される。一方、パルス状の弾性波に対応
するデータは収集データ格納部20から読み出された
後、ジオトモグラフィー解析部26に入力される。
Step 607 (reading of collected data):
Next, the search control unit 40 reads the data stored in the collected data storage unit 20. The collected data storage unit 20 stores the collected data for the continuous drilling wave stored in step 601 and the collected data corresponding to the pulsed elastic wave stored in step 606. The data for the drilling wave is read from the collected data storage unit 20 and then input to the spectrum analysis unit 24. On the other hand, data corresponding to the pulsed elastic wave is read from the collected data storage unit 20 and then input to the geotomography analysis unit 26.

【0047】ステップ608(スペクトル,ジオトモグ
ラフィー解析):次に、スペクトル解析部24は、収集
データ格納部20から読出されて入力されたデータに基
づいてスペクトル解析を行う。同様に、ジオトモグラフ
ィー解析部26は、収集データ格納部20から読み出さ
れて入力されたデータに基づいてジオトモグラフィー解
析を行う。
Step 608 (Spectrum, Geotomography Analysis): Next, the spectrum analysis unit 24 performs a spectrum analysis based on the data read from the collected data storage unit 20 and input. Similarly, the geotomography analysis unit 26 performs a geotomography analysis based on the data read and input from the collected data storage unit 20.

【0048】図7は、スペクトル解析の概略を示す説明
図である。同図(a)は、各受振器10によって受信し
た連続削孔波の振動波形を示すものであり、各チャネル
ch.1〜nが受振器10のそれぞれに対応している。
この振動波データは収集データ格納部20から読み出さ
れてスペクトル解析部24に入力されるものである。ビ
ット先端14と各受振器10との距離は受振器毎に異な
っているため、各受振器10で検出した連続削孔波も各
受振器10の位置に応じた時間遅れを有する。また、同
図(b)はスペクトル解析部24によるスペクトル解析
の結果を示すものであり、同図(a)の各チャネル毎の
振動波形に対してスペクトル分析を行ったものである。
FIG. 7 is an explanatory diagram showing an outline of the spectrum analysis. FIG. 3A shows a vibration waveform of a continuous drilling wave received by each of the geophones 10. 1 to n correspond to the respective geophones 10.
The vibration wave data is read from the collected data storage unit 20 and input to the spectrum analysis unit 24. Since the distance between the bit tip 14 and each geophone 10 is different for each geophone, the continuous drilling wave detected by each geophone 10 also has a time delay according to the position of each geophone 10. FIG. 2B shows the result of the spectrum analysis by the spectrum analysis unit 24, in which the spectrum analysis is performed on the vibration waveform of each channel in FIG.

【0049】同様に、図8はジオトモグラフィー解析の
概略を示す説明図である。同図において、0チャネル
(ch.0)の波形データは、油圧ドリル12に取り付
けられた受振器10に対応するものであり、ビット先端
14によるパルス状の弾性波の発生時点を示すものであ
る。また、それ以外のチャネル(ch.1〜n)との波
形は、切羽60に分散配置されたそれ以外の受振器10
に対応するものであり、ビット先端14から各受振器1
0間での距離に応じた時間遅れを生じる。従って、この
各チャネル毎の時間遅れt1,t2,t3……や各波形
の減衰量等に基づいてジオトモグラフィー解析が行われ
る。
Similarly, FIG. 8 is an explanatory diagram showing an outline of the geotomography analysis. In the figure, the waveform data of channel 0 (ch. 0) corresponds to the geophone 10 attached to the hydraulic drill 12 and indicates the point in time when a pulse-like elastic wave is generated by the bit tip 14. . Waveforms of the other channels (ch. 1 to n) are distributed to the other geophones 10 distributed on the face 60.
, And each of the geophones 1
A time delay corresponding to the distance between zeros occurs. Therefore, geotomography analysis is performed based on the time delays t1, t2, t3,... For each channel, the amount of attenuation of each waveform, and the like.

【0050】なお、本実施例においては油圧ドリル12
に取り付けた受振器10によってパルス状の弾性波の発
生の時点を確認しているが、油圧ドリル12に取り付け
た受振器10とビット先端14の位置的ずれにより振動
発生の時間的ずれが生じる場合には、この時間的ずれを
予め計測しておいて、ジオトモグラフィー解析時に補正
を行う必要がある。また、油圧ドリル12に受振器10
を取り付ける方法以外にも、油圧ドリル駆動制御部50
から油圧ドリル12に削孔指示を送ってからビット先端
14によって振動を発生するまでの時間的遅れを予め計
測しておいて、油圧ドリル駆動制御部50から出力され
る削孔指示に基づいてパルス状の弾性波の発生時点を特
定するようにしてもよい。
In this embodiment, the hydraulic drill 12
When the time point of generation of a pulse-like elastic wave is confirmed by the geophone 10 attached to the hydraulic drill 12, the time lag of vibration generation occurs due to the positional deviation between the geophone 10 attached to the hydraulic drill 12 and the bit tip 14 In this case, it is necessary to measure this time lag beforehand and to perform correction at the time of geotomography analysis. In addition, the hydraulic drill 12 has
In addition to the method of attaching the hydraulic drill drive control unit 50
, A time delay from when a drilling instruction is sent to the hydraulic drill 12 to when vibration is generated by the bit tip 14 is measured in advance, and a pulse is generated based on the drilling instruction output from the hydraulic drill drive control unit 50. You may make it specify the generation | occurrence | production point of the shape-like elastic wave.

【0051】ステップ609(解析結果の格納):この
ようにしてスペクトル解析部24およびジオトモグラフ
ィー解析部26による解析が行われると、次に、解析結
果格納部28は、これら各解析結果を格納する。
Step 609 (storage of analysis results): After the analysis is performed by the spectrum analysis unit 24 and the geotomography analysis unit 26 in this manner, the analysis result storage unit 28 stores these analysis results. .

【0052】ステップ610(データ収集・解析終了の
判断):次に、探査制御部40は、各受振器10から収
集データ格納部20に対するデータの収集,格納および
スペクトル解析部24,ジオトモグラフィー解析部26
による各解析が全て終了したか否かを判定する。終了し
ていない場合、すなわちさらに油圧ドリル12による削
孔を継続してデータの種集,解析を行う場合には否定判
断を行い、ステップ600に戻って削孔動作を繰り返
す。例えば、100mの深さの削孔を行い、その間1m
間隔でデータの収集,解析を行う場合には100mの深
さに達するまでこのステップ610において否定判断を
行って削孔動作を継続する。
Step 610 (judgment of completion of data collection / analysis): Next, the search control unit 40 collects and stores data from each of the geophones 10 in the collected data storage unit 20, and the spectrum analysis unit 24, the geotomography analysis unit 26
It is determined whether or not all the analyzes by have been completed. If not completed, that is, if the drilling by the hydraulic drill 12 is to be continued to collect and analyze data, a negative determination is made, and the process returns to step 600 to repeat the drilling operation. For example, a hole with a depth of 100 m is made, and
When collecting and analyzing data at intervals, a negative determination is made in this step 610 until the depth reaches 100 m, and the drilling operation is continued.

【0053】ステップ611(地質判別):全てのデー
タ収集,解析が終了すると、調査制御部40はステップ
610の判定処理において肯定判断を行い、地質判別部
30に対して判別処理の開始を指示する。この指示を受
けて、地質判別30は、既に解析結果格納部28に格納
されている前記解析結果に基づいて切羽60の前方の地
質の判別を行う。この地質判別には、地質を構成する岩
石の種類等を判別する性状判別と地層内の断層等を判別
する構造判別とがある。それぞれの判別は比較データ格
納部32に格納されている既知の地質データと、解析結
果格納部28から読み出す解析結果とを比較することに
より行われる。
Step 611 (Geological discrimination): When all data collection and analysis are completed, the investigation control unit 40 makes an affirmative judgment in the judgment processing of Step 610, and instructs the geological judgment unit 30 to start the judgment processing. . In response to this instruction, the geological determination 30 determines the geology in front of the face 60 based on the analysis result already stored in the analysis result storage unit 28. The geological discrimination includes a property discrimination for discriminating a type of rock constituting the geology and a structure discrimination for discriminating a fault or the like in the stratum. Each determination is made by comparing the known geological data stored in the comparison data storage unit 32 with the analysis result read from the analysis result storage unit 28.

【0054】ステップ612(結果の表示,出力):地
質判別部30による判別処理が終了すると、その判別結
果は、一次元,二次元あるいは三次元の形で表示部34
の表示画面上に表示される。あるいは、必要に応じてプ
リンタ36から出力されるようになっている。
Step 612 (display and output of result): When the discrimination processing by the geological discrimination unit 30 is completed, the discrimination result is displayed in the one-dimensional, two-dimensional or three-dimensional form on the display unit 34.
Is displayed on the display screen. Alternatively, the data is output from the printer 36 as needed.

【0055】なお、表示部34およびプリンタ36は、
地質判別結果の他に地質判別の途中経過およびスペクト
ル解析部24,ジオトモグラフィー解析部26による解
析結果もその都度表示,出力するようになっており、作
業員はこれらの途中経過を参照しながら前方探査を行う
ことができる。
The display unit 34 and the printer 36
In addition to the results of the geological discrimination, the progress of the geological discrimination and the results of the analysis by the spectrum analysis unit 24 and the geotomography analysis unit 26 are displayed and output each time. Exploration can be performed.

【0056】このように、本実施例の切羽前方探査シス
テムによれば、通常の発破工法等で用いられる油圧ドリ
ル12を用いて前方探査に必要な振動波を発生させてお
り、前方探査のみに用いられる起振源を特別に設置する
必要がない。従って、前方探査を行う際に通常の掘削用
の設備一切を切羽面から後退させる必要もなく、トネル
工事の進捗に支障をきたすこともない。
As described above, according to the front face exploration system of the present embodiment, the vibration wave necessary for the front exploration is generated by using the hydraulic drill 12 used in the normal blasting method or the like. There is no need to specially install the vibration source used. Therefore, it is not necessary to retract all of the normal excavation equipment from the face when performing forward exploration, and there is no hindrance to the progress of the tunnel construction.

【0057】また、発破工法等に用いられる一般の油圧
ドリル12は、ロッドを継ぎ足すことによりその削孔深
度を数10mから数100mにのばすことが可能であ
り、この結果本実施例の切羽前法探査システムによる探
査深度も数10mから数100mの間で可能となる。こ
れは、従来のレーリー波による探査深度である20m程
度と比較しても十分な長さである。
Further, a general hydraulic drill 12 used for a blasting method or the like can extend the drilling depth from several tens of meters to several hundreds of meters by adding rods. The exploration depth by the forensic exploration system is also possible between tens of meters and hundreds of meters. This is a sufficient length even when compared to the conventional depth of about 20 m, which is the exploration depth by the Rayleigh wave.

【0058】また、本実施例において振動波検出に用い
られる複数の受振器10は、図2に示すように切羽60
の全面に分散して二次元的に配置されているため、振源
であるビット先端14と各受振器10とが三次元的に結
ばれる。従って、本実施例の探査システムによる探査も
容易に三次元的な探査に拡張することができる。
Further, in the present embodiment, the plurality of vibration receivers 10 used for detecting the vibration wave are provided with a face 60 as shown in FIG.
Are distributed and arranged two-dimensionally on the entire surface, so that the bit tip 14 as a vibration source and each of the geophones 10 are three-dimensionally connected. Therefore, the search by the search system of the present embodiment can be easily extended to a three-dimensional search.

【0059】なお、本発明は上述した実施例に限定され
るものではなく、本発明の要旨の範囲内で種々の変形実
施が可能である。
The present invention is not limited to the above-described embodiment, and various modifications can be made within the scope of the present invention.

【0060】例えば、本実施例では、連続削孔波を用い
てスペクトル解析を行うと共に、パルス状の弾性波を用
いてジオトモグラフィー解析を行う場合を例にとり説明
したが、連続削孔波による解析とパルス状の弾性波よる
解析は必ずしも併用する必要はなく、いずれか1つのみ
を用いるようにしてもよい。また、解析の手法について
も、スペクトル解析およびジオトモグラフィー解析に限
定されるものではなく、地質判別に役立つ解析手法であ
れば他の方法を用いてもよい。他の解析方法としては、
様々な伝搬モードの重畳した連続削孔波から特定のモー
ドのみを抽出して到達時間差を決定するといったクロス
スペクトル法等がある。
For example, in this embodiment, the case where the spectrum analysis is performed using the continuous drilling wave and the geotomography analysis is performed using the pulsed elastic wave has been described as an example. It is not always necessary to use the analysis using the pulsed elastic wave and only one of them may be used. In addition, the analysis method is not limited to the spectrum analysis and the geotomography analysis, and any other analysis method useful for geological discrimination may be used. Other analysis methods include:
There is a cross spectrum method or the like in which only a specific mode is extracted from a continuous drilling wave in which various propagation modes are superimposed to determine a time difference of arrival.

【0061】また、本実施例においては、油圧ドリル1
2によって削孔を行うようにしたが、機械式ドリルによ
って削孔を行うようにしてもよい。
In this embodiment, the hydraulic drill 1
Although the drilling is performed by the method 2, the drilling may be performed by a mechanical drill.

【0062】また、本実施例では、油圧ドリル12で掘
り進んでいったときに、1m間隔でデータの収集,解析
を行い、これらの全ての解析結果に基づいて地質の判別
を行うようにしたが、各掘削深度毎にデータの解析と地
質の判別を行うようにしてもよい。
In this embodiment, when the drilling is performed by the hydraulic drill 12, data is collected and analyzed at intervals of 1 m, and the geology is determined based on all the analysis results. However, data analysis and geological discrimination may be performed for each excavation depth.

【0063】さらに、本実施例では、連続削孔波につい
てのデータを常時収集するとともに、所定間隔でパルス
状の弾性波についてのデータを収集し、その後これらの
収集データを解析するというサイクルを繰り返し、最終
的にこれらの解析結果に基づいて地質判別を行うように
したが、このデータ収集や解析の順序についてはこれに
限られるものではなく、これらの順序を入れ替えたり、
同時に行うようにしてもよい。例えば、図6のステップ
608におけるスペクトル解析及びジオトモグラフィー
解析を全てのデータ収集が終了した後、すなわちステッ
プ610において肯定判断を行った後に行うようにして
もよい。また、ステップ601における連続削孔波デー
タの収集,蓄積と並行してスペクトル解析を行い、削孔
ドリルのビット先端が断層等を通過したときに、並行し
て得られるスペクトル解析結果を参照することによりこ
の断層等をリアルタイムで判別するようにしてもよい。
Further, in this embodiment, a cycle of continuously collecting data on continuous drilling waves, collecting data on pulsed elastic waves at predetermined intervals, and then analyzing the collected data is repeated. In the end, geological discrimination was performed based on the results of these analyses, but the order of data collection and analysis is not limited to this.
You may make it perform simultaneously. For example, the spectrum analysis and the geotomography analysis in step 608 of FIG. 6 may be performed after all data collection is completed, that is, after a positive determination is made in step 610. In addition, the spectrum analysis is performed in parallel with the collection and accumulation of the continuous drilling wave data in step 601, and when the bit tip of the drilling drill passes through a fault or the like, the spectrum analysis result obtained in parallel is referred to. This may be used to determine this tomography or the like in real time.

【0064】[0064]

【発明の効果】上述したように、本発明によれば、削孔
ドリルを用いて解析に必要な振動波を発生させており、
発破工法等に用いられる一般の削孔ドリルを振動発生用
に兼用することができ、特に起振源をボーリング孔内に
取り付ける等の必要がなく、工事の進捗に支障をきたす
ことがない。
As described above, according to the present invention, a vibration wave necessary for analysis is generated using a drill.
A general drill used for the blasting method or the like can also be used for generating vibration, and there is no need to particularly mount a vibration source in a boring hole, which does not hinder the progress of construction.

【0065】また、一般の削孔ドリルを使用しているた
め、ロッドを継ぎ足していけば、その削孔深度を数10
mから数100mとすることも可能であり、探査距離を
長くすることができる。
Further, since a general drill is used, if a rod is added, the drill depth becomes several tens.
m to several hundred meters, and the search distance can be extended.

【0066】さらに、削孔ドリルの先端のビット部によ
って発生した振動波を二次元的な広がりをもって配置さ
れた受振器で検出しているため、容易に三次元的な地質
探査を行うことができる。
Further, since the vibration wave generated by the bit portion at the tip of the drilling hole is detected by the geophone arranged with a two-dimensional spread, three-dimensional geological exploration can be easily performed. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】本実施例の探査システムの全体構成を示す図で
ある。
FIG. 1 is a diagram illustrating an overall configuration of a search system according to an embodiment.

【図2】切羽表面における複数の受振器の設置位置およ
び油圧ドリルの削孔位置を示す図である。
FIG. 2 is a diagram showing the installation positions of a plurality of geophones and the drilling positions of a hydraulic drill on the face of the face.

【図3】油圧ドリルを備えた削岩機の概略構造を示す図
である。
FIG. 3 is a diagram showing a schematic structure of a rock drill having a hydraulic drill.

【図4】連続削孔波を発生させる場合の概略を示す図で
ある。
FIG. 4 is a view schematically showing a case where a continuous drilling wave is generated.

【図5】パルス状の弾性波を発生させる場合の概略を示
す図である。
FIG. 5 is a diagram schematically showing a case where a pulse-like elastic wave is generated.

【図6】本実施例の探査システムの動作手順を示す図で
ある。
FIG. 6 is a diagram illustrating an operation procedure of the search system of the present embodiment.

【図7】スペクトル解析データの概略を示す図である。FIG. 7 is a diagram showing an outline of spectrum analysis data.

【図8】ジオトモグラフィー解析データの概略を示す図
である。
FIG. 8 is a diagram showing an outline of geotomography analysis data.

【符号の説明】[Explanation of symbols]

10 受振器 12 油圧ドリル 14 ビット先端 20 収集データ格納部 24 スペクトル解析部 26 ジオトモグラフィー解析部 28 解析結果格納部 30 地質判別部 32 比較データ格納部 40 探査制御部 50 油圧ドリル駆動制御部 DESCRIPTION OF SYMBOLS 10 Geophone 12 Hydraulic drill 14 Bit tip 20 Collection data storage part 24 Spectrum analysis part 26 Geotomography analysis part 28 Analysis result storage part 30 Geological discrimination part 32 Comparison data storage part 40 Search control part 50 Hydraulic drill drive control part

フロントページの続き (72)発明者 内藤 将史 東京都中央区京橋1丁目7番1号 戸田 建設株式会社内 (56)参考文献 特開 平1−223289(JP,A) 特開 昭63−32085(JP,A) 特開 昭62−101800(JP,A) 特開 平3−28494(JP,A)Continuation of the front page (72) Inventor Masafumi Naito 1-7-1, Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (56) References JP-A 1-223289 (JP, A) JP-A 63-32085 (JP, A) JP-A-62-101800 (JP, A) JP-A-3-28494 (JP, A)

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 切羽前方に対して先端位置を移動させな
がら削孔を行う削孔ドリルと、 切羽表面に二次元的な広がりをもって配置され、前記削
孔ドリルの先端のビット部によって発生した振動波を検
出する複数の受振器と、前記削孔ドリルの先端位置を切羽前方に移動させなが
ら、 前記複数の受振器によって検出した前記ビット部と
前記切羽表面との間の振動波の解析を行う解析手段と、 前記解析手段による解析結果に基づいて前記切羽前方
地層の性状あるいは構造を解析する地質判別手段と、 前記解析手段による解析結果を出力する出力手段と、 を備えることを特徴とする切羽前方探査方式。
1. Do not move the tip position with respect to the front of the face.
And a plurality of geophones that are arranged with a two-dimensional spread on the surface of the face and detect a vibration wave generated by a bit portion at the tip of the drill, While moving the tip position in front of the face
The bit portion detected by the plurality of geophones ;
Analysis means for analyzing the vibration wave between the face and the surface, geological discrimination means for analyzing the properties or structure of the stratum in front of the face based on the analysis results by the analysis means, and analysis results by the analysis means Output means for outputting, and a front face exploration method for a face.
【請求項2】 請求項1において、 前記受振器によって検出する振動波は、削孔時に前記削
孔ドリルの先端のビット部により発生する振動波である
ことを特徴とする切羽前方探査方式。
2. The front face exploration method according to claim 1, wherein the vibration wave detected by the geophone is a vibration wave generated by a bit portion at the tip of the drill during drilling.
【請求項3】 請求項1において、 前記受振器によって検出する振動波は、前記削孔ドリル
による削孔を停止して先端のビット部を衝打させること
により発生する振動波であることを特徴とする切羽前方
探査方式。
3. The vibration wave according to claim 1, wherein the vibration wave detected by the geophone is a vibration wave generated by stopping drilling by the drill and hitting a bit portion at a tip. The front face exploration method.
【請求項4】 請求項1において、 前記地質判別手段は、 前記削孔ドリルの先端位置を所定間隔で変えたときに得
られる前記解析手段による解析結果を順次格納する解析
結果格納部と、 既知の地層に関する解析結果を比較データとして格納す
る比較データ格納部と、 前記解析結果格納部に格納された解析結果が入力され、
前記比較データ格納部に格納されている比較データに基
づいて前記削孔ドリルの先端と切羽間の地層の性状ある
いは構造を解析する判別部と、 を備えることを特徴とする切羽前方探査方式。
4. The analysis result storage unit according to claim 1, wherein the geological determination means sequentially stores analysis results obtained by the analysis means obtained when a tip position of the drilling drill is changed at predetermined intervals. A comparison data storage unit that stores the analysis result of the formation as comparison data, and the analysis result stored in the analysis result storage unit is input,
A discriminator for analyzing the properties or structure of the stratum between the tip of the drill and the cutting face based on the comparison data stored in the comparison data storage section.
JP8556993A 1993-03-19 1993-03-19 Front face exploration method Expired - Fee Related JP2710740B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8556993A JP2710740B2 (en) 1993-03-19 1993-03-19 Front face exploration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8556993A JP2710740B2 (en) 1993-03-19 1993-03-19 Front face exploration method

Publications (2)

Publication Number Publication Date
JPH06273533A JPH06273533A (en) 1994-09-30
JP2710740B2 true JP2710740B2 (en) 1998-02-10

Family

ID=13862447

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8556993A Expired - Fee Related JP2710740B2 (en) 1993-03-19 1993-03-19 Front face exploration method

Country Status (1)

Country Link
JP (1) JP2710740B2 (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3443714B2 (en) * 1995-05-12 2003-09-08 財団法人先端建設技術センター Tunnel front exploration device and exploration method
GB9703529D0 (en) * 1997-02-20 1997-04-09 Geco As A method of processing seismic data signals
JP3629670B2 (en) * 1997-05-29 2005-03-16 清水建設株式会社 Tunneling method
JP2003014863A (en) * 2001-07-03 2003-01-15 Fujita Corp Method for investigating natural ground
JP5249874B2 (en) * 2009-08-07 2013-07-31 大成建設株式会社 Ground evaluation apparatus and ground evaluation method
JP5677820B2 (en) * 2010-11-30 2015-02-25 大成建設株式会社 Ground exploration device and exploration method.
JP6495579B2 (en) * 2014-06-03 2019-04-03 株式会社鴻池組 Bedrock property judgment device
JP6393100B2 (en) * 2014-07-10 2018-09-19 大成建設株式会社 Tunnel face forward exploration method
JP6602675B2 (en) * 2016-01-12 2019-11-06 戸田建設株式会社 Geological exploration method in front of the face
JP6764725B2 (en) * 2016-08-10 2020-10-07 株式会社安藤・間 Tunnel elastic wave exploration method and tunnel elastic wave exploration system used for this
CN106990431B (en) * 2017-05-18 2023-08-15 国家海洋局第一海洋研究所 Offshore bottom hydrate detection system
JP7123316B2 (en) * 2018-04-26 2022-08-23 株式会社東京ソイルリサーチ Underground sound source position measurement method and measurement device
CN113720394B (en) * 2021-09-08 2023-10-31 苏州融萃特种机器人有限公司 Intelligent detection robot and searching method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62101800A (en) * 1985-10-28 1987-05-12 株式会社小松製作所 Detector for facing of shield excavator
JPS6332085A (en) * 1986-07-23 1988-02-10 東北大学長 Pit drilling monitor method
JPH01223289A (en) * 1988-02-29 1989-09-06 Komatsu Ltd Working face front soil detecting device for sealed drilling machine
JP2748151B2 (en) * 1989-06-26 1998-05-06 弘明 新妻 Excavation tip position detection method in underground drilling method

Also Published As

Publication number Publication date
JPH06273533A (en) 1994-09-30

Similar Documents

Publication Publication Date Title
CN108798690B (en) Combined TBM for realizing geological detection and geological detection tunneling method
JP2710740B2 (en) Front face exploration method
KR101547508B1 (en) Apparatus for predicting front geological features and the method thereof
EP0538136B1 (en) Methods and apparatus for simultaneous compressional, shear and stoneley logging
CN1950720B (en) Stratum earthquake surveying method
CN108802193A (en) A kind of detecting devices and detection method of Exploring Loose Rock Country in Tunnels
CN116859487B (en) Advanced detection method for drilling geophysical prospecting integrated detection device of TBM
JP4157635B2 (en) Tunnel face forward exploration method
EP0296987B1 (en) Borehole logging methods for detection and imaging of formation structural features
JP5997521B2 (en) Face investigation method using shield machine
CN208334667U (en) One kind is for soft rock tunnel Preceding geology predictor three-dimensional over long distances
JP4260329B2 (en) Geological exploration method in front of tunnel face
JPH10311880A (en) Working face forward survey system, method thereof, and tunnel excavating method
CN113267806A (en) Multi-wave acquisition system and advanced detection method for TBM cutter head rock breaking noise source
JPH08226975A (en) Method for surveying geology in front of face of tunnel
JP5258734B2 (en) Tunnel front face exploration method and exploration system
JP3856392B2 (en) Evaluation method of natural ground in front of ground excavation part
JPH07259472A (en) Geological survey in tunnel digging
CN116626757A (en) Advanced geological forecasting method for tunnel
CN110850472A (en) Variable offset distance advanced fault detection method based on shock wave excitation seismic source
JP3072621B2 (en) Ground survey method and device using S-wave generator and cone penetration device mounted on ground survey vehicle
JP3308478B2 (en) Exploration method in front of tunnel face
CN109991654A (en) A kind of Gas Outburst driving face gas pocket is with pick forward probe device and detection method
JP3439334B2 (en) Speed logging method
JP2569246B2 (en) Front face exploration method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19970930

LAPS Cancellation because of no payment of annual fees