JP2004076568A - Bag body for civil engineering, method for laying bag body for civil engineering and its structure - Google Patents
Bag body for civil engineering, method for laying bag body for civil engineering and its structure Download PDFInfo
- Publication number
- JP2004076568A JP2004076568A JP2003178452A JP2003178452A JP2004076568A JP 2004076568 A JP2004076568 A JP 2004076568A JP 2003178452 A JP2003178452 A JP 2003178452A JP 2003178452 A JP2003178452 A JP 2003178452A JP 2004076568 A JP2004076568 A JP 2004076568A
- Authority
- JP
- Japan
- Prior art keywords
- civil engineering
- bag
- engineering bag
- outer cylinder
- inner cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
本発明は、特に、トンネルなどの空洞部の掘削面と、該空洞部内に設けられた反力部材と、の間に形成される隙間に配置され、グラウト等を注入し掘削面の沈下抑制を行う土木用袋体及びその土木用袋体敷設方法ならびにその構造体に関する。
【0002】
【従来の技術】
トンネルなどの空洞部を掘削する際は、H型鋼材を円弧状に曲げた支保工を掘削された掘削面に沿って設置し、地山の緩みや掘削面の崩壊を防止している。この支保工と掘削面との間には必ず隙間が生じる。この隙間に袋体を間詰し、袋体内にグラウト等を注入して地山と密着した状態で凝固させる工法がある。このような工法はプレロードシェル工法(例えば、特公平2−5237号公報)と呼ばれ、地山にプレロードをかけ、地山の沈下抑制を行っている。
【0003】
また、めがねトンネルの施工においては、まず左右に隣り合う本坑位置の中間に中央導坑を掘削して形成し、次にめがねトンネルの中心となる中壁コンクリートを作り、その上に本坑の支保工を建て込みながら本坑の掘削を行うという手順で施工が行われる。この支保工を設置するため、中壁コンクリート上面と掘削面との間に、大きな隙間がトンネル長さ方向に沿って必要となる。この大きな隙間に、径が大きい袋体を連続的に並べて間詰を行い、支保工を設置した後に袋体内にグラウト等を注入して地山の沈下抑制を行っている。
【0004】
前述した隙間に間詰される袋体は、端部で縫製、金具のかしめ、鉄板などの板で挟むというような方法で袋体に注入されるグラウト等をシールしている。
【0005】
【発明が解決しようとする課題】
しかしながら、このような方法で袋体の端部をシールすると、袋体は端部まで膨らまないので、袋体端部付近には隙間が残ることになる。特に、袋体端部同士を突き合わせて並べた場合では、突き合わせ部に大きな隙間が残ることになる。また、このような袋体の中心部では、注入されたグラウトの加圧脱水がしにくいため中心部に余剰水が残り、注入停止後に脱水によって収縮するというような問題があった。
【0006】
本発明では、以上のような問題点を考慮して、トンネルなどの空洞部の掘削面と、該空洞部内に設けられた反力部材との間に形成される隙間に、袋体端部まで確実に膨張し、袋体端部同士の突き合わせ部の隙間を極力小さくでき、さらに注入されたグラウトの中心部まで加圧脱水できる土木用袋体及びその土木用袋体敷設方法ならびにその構造体を提供することを目的とする。
【0007】
【課題を解決するための手段】
前記課題を解決するための本発明の請求項1に記載の土木用袋体は、筒状袋体の両端部が閉塞され、内部に膨張可能な空間が形成されている土木用袋体であって、前記両端部を前記筒状袋体内に配置される連結部材で連結し、前記空間の筒長方向の膨張を前記連結部材で規制することを特徴とするものである。
【0008】
このような構成によると、本来の筒状袋体の両端部が、連結部材によって筒長方向の膨張を規制され、筒状袋体の内側に存在する。従って、新しく存在する土木用袋体の両端部は、土木用袋体の径方向に膨張する膨張径と略等しく膨張するため、所定の位置で確実に間詰ができる。また、土木用袋体端部同士を突き合わせて並べて使用する場合では、突き合わせ部の隙間が極力小さくなる。
【0009】
また、本発明の請求項2に記載の土木用袋体は、外筒と、前記外筒内に挿入された内筒とで構成され、前記外筒と前記内筒の両端が連続的になるように連結されており、前記外筒と前記内筒との間に膨張可能な空間が形成されていることを特徴とするものである。
【0010】
このような構成によると、両端部が、土木用袋体の径方向に膨張する膨張径と略等しく膨張するため、所定位置で確実に間詰ができる。また、土木用袋体端部同士を突き合わせて並べて使用する場合では、突き合わせ部の隙間が極力小さくなる。
【0011】
また、本発明の請求項3に記載の土木用袋体は、請求項1において、前記連結部材は、排水性を有することを特徴とする。
【0012】
このような構成によると、土木用袋体にグラウトが注入され加圧されると両端部より連結部材に張力がかかり、排水性を有する連結部材が土木用袋体の中心部で直線状に張られて位置することになる。そして、その連結部材を通って脱水が起こり、土木用袋体中心部まで十分に脱水される。従って、土木用袋体内へのグラウト注入停止後のブリージングが無く、収縮が少なくなる。
【0013】
また、本発明の請求項4に記載の土木用袋体は、請求項2において、前記外筒と前記内筒とが一枚の筒状袋体で形成されてなり、前記筒状袋体の一方の端部が折り返されて他方の端部と連結されてなるものである。
【0014】
このような構成によると、製造方法が簡易となる。しかも、外筒及び内筒の長さの範囲内で反転可能な土木用袋体となる。また、両端部が、土木用袋体の径方向に膨張する膨張径と略等しく膨張するため、所定位置に確実に間詰ができる。また、土木用袋体端部同士を突き合わせて並べて使用する場合では、突き合わせ部の隙間が極力小さくなる。
【0015】
また、本発明の請求項5に記載の土木用袋体は、請求項4において、前記筒状袋体が、異径筒状織物でなることを特徴とするものである。
【0016】
このような構成によると、異径筒状織物を使用することによって、グラウトが注入され加圧されても、織物のたて糸及びよこ糸に均等に力が作用し、大きな圧力にも耐えることができる。土木用袋体の中心位置に内筒が形成されグラウトの脱水が向上する。
【0017】
また、本発明の請求項6に記載の土木用袋体は、請求項2乃至5のいずれかにおいて、前記内筒の内側に閉塞防止部材が挿入されたことを特徴とするものである。
【0018】
このような構成によると、土木用袋体の中心部からの排水効率が向上する。従って、中心部までの脱水がより確実となって、グラウトの凝固時間が短くなり、施工時間が短縮される。特に、異径筒状織物からなる土木用袋体を使用する場合には、排水材の位置が中心部となるので、より排水効率が高くなる。
【0019】
また、本発明の請求項7に記載の土木用袋体敷設方法は、掘削によって形成された空洞部の掘削面と前記空洞部内に設けられた反力部材との間に形成される隙間に、外筒と、前記外筒内に挿入された内筒とで構成され、前記外筒と前記内筒の両端が連続的になるように連結されてなる土木用袋体を配置し、前記外筒と前記内筒との間の膨張可能な空間内に自硬性流体を加圧充填した後、硬化させて前記隙間を埋めるものである。
【0020】
このような方法によると、土木用袋体内に自硬性流体を注入した際、土木用袋体の両端部が、土木用袋体の径方向に膨張する膨張径と略等しく膨張するため、所定位置に確実に間詰ができ、さらに掘削面に対してプレロードをかけ、地山を抑制することができる。また、土木用袋体端部同士を突き合わせて並べて使用する場合では、突き合わせ部の隙間が極力小さくなる。
【0021】
また、本発明の請求項8に記載の構造体は、掘削によって形成された空洞部の掘削面と前記空洞部内に設けられた反力部材との間に形成される隙間に、外筒と、前記外筒内に挿入された内筒とで構成され、前記外筒と前記内筒の両端が連続的になるように連結されてなる土木用袋体を配置し、前記外筒と前記内筒との間の膨張可能な空間内に自硬性流体を加圧充填した後、硬化させて前記隙間を埋めるものである。
【0022】
このような構造体によると、土木用袋体内への自硬性流体の注入停止後、土木用袋体の中心部より脱水され、ブリージングが無く、収縮の少ないものができる。また、中心部からの脱水で自硬性流体の凝固時間が短くなることによって、施工時間を短縮することができる。
【0023】
【発明の実施の形態】
本発明の実施の形態例を図1乃至図10に基づいて以下に説明する。
【0024】
図1(a)は本実施の形態例での土木用袋体の斜視図を示し、図1(b)は土木用袋体の軸方向の断面図を示す。土木用袋体1は、外側に面する外筒2と、内側に折り込まれた内筒3と、外筒2と内筒3との間に膨張可能な空間6が形成されており、その空間6と連通した外筒2の穴から突出する逆止弁付ノズル4と、逆止弁付ノズル4に接続されたホース5とで構成される。なお、内筒3に、外筒2と内筒3の端部同士を連続して縫製した縫製部10がある。
【0025】
外筒2と内筒3とは、同一の直径を有するものであって、その素材も同一のものである。また、外筒2と内筒3とは、その両端で連続的に連結されており、全体にエンドレス構造となっている。この外筒2及び内筒3は、ポリエステル製の筒状織物などで排水性を有する筒状袋体より形成されている。この筒状袋体の素材は、排水性を有するものであればポリエステル等何れであっても適用され、特に限定するものではない。土木用袋体1が織物で形成されることによって、外筒2と内筒3との間に形成された空間6にグラウト等の自硬性流体が注入され加圧されても、織物のたて糸及びよこ糸に均等に力が作用し、大きな圧力にも耐えることができる。
【0026】
また、この筒状袋体は、異径のものも好適に使用することができる。異径筒状織物を使用した場合では、後述するように土木用袋体の中心位置に内筒が形成されているので、外筒と内筒との間に形成された空間にグラウト等の自硬性流体が注入され加圧されても、土木用袋体の中心部から脱水することができる。
【0027】
外筒2及び内筒3は、それぞれ固定的なものではなく、相互に入れ換わり得るものである。この土木用袋体1は、外筒2と内筒3とは素材も直径も同一であり、全体に亘って均一な状態にある。そのため、土木用袋体1の長さの半分が外筒2を構成し、残りの半分が内筒3を構成している。従って、この土木用袋体1に外力を加えれば、外筒2が内筒3へ、内筒3が外筒2へと反転して入れ換わることが可能である。
【0028】
図1(b)に示す縫製部10は、外筒2と内筒3の端部を連続して縫製されたものである。この縫製部10を図1(b)に示すように土木用袋体1の内側に存在させることによって、新たな土木用袋体1の両端部7が形成されることになる。
【0029】
この両端部7は、土木用袋体1の径方向に膨張する膨張径と略等しく膨張することができる。従って、後述するような掘削面と中壁コンクリートとの隙間に確実に間詰ができ、さらに土木用袋体1の端部7同士を突き合わせて並べて使用する場合では、突き合わせ部の隙間が極力小さくなる。
【0030】
逆止弁付ノズル4は、公知の構造のものを用いることができる。逆止弁付ノズル4から、外筒2と内筒3との間に形成された空間6内に、グラウト等の自硬性流体を供給することができる。また、逆止弁付ノズル4を使用することによって、グラウト等の自硬性流体の逆流を防ぐことができ、空間6内に留まらせることができる。
【0031】
ホース5は、逆止弁付ノズル4に連結されており、ホース5から逆止弁4を介して外筒2と内筒3との間に形成された空間6内にグラウト等の自硬性流体を供給することができる。
【0032】
なお、逆止弁付ノズル4及びホース5は、固定手段としても機能する。図1(b)で、逆止弁付ノズル4及びホース5が、土木用袋体1の右端にくる状態から、左端にくる状態までの範囲で、土木用袋体1は軸方向に反転可能である。
【0033】
図1(c)は他の実施の形態例での土木用袋体の軸方向の断面図を示す。土木用袋体1cは、外側に面する外筒2cと、両端部3cを土木用袋体1cの内側で連結している連結部材8cと、外筒2cと連結部材8cとの間に膨張可能な空間6cが形成されており、その空間6cと連通した外筒2cの穴から突出する逆止弁付ノズル4cと、逆止弁付ノズル4cに接続されたホース5cとで構成される。なお、外筒2c、逆止弁付ノズル4c、ホース5c等は、前述したものと同様のものを使用することができる。
【0034】
外筒2cの両端部3cが、土木用袋体1cの内側の連結部材8cで連結されることによって、筒長方向の空間6cの膨張が規制され、両端部3cが土木用袋体1cの内側に存在する。従って、外筒2cと連結部材8cとの間の空間6cにグラウト等の自硬性流体が逆止弁付ノズル4c、ホース5cを介して供給されると、外筒2cと連結部材8cとの間の空間6cが膨張し、新たな土木用袋体1cの両端部7cが形成されることになる。
【0035】
図1(c)に示すこの新たな両端部7cは、土木用袋体1cの径方向に膨張する膨張径と略等しく膨張することができる。従って、後述するような掘削面と中壁コンクリートとの隙間に確実に間詰ができ、さらに土木用袋体端部同士を突き合わせて並べて使用する場合では、突き合わせ部の隙間が極力小さくなる。
【0036】
また、連結部材8cは、織物等の排水性を有するベルト状物、ロープ状物等が好適に使用できる。このような連結部材をもちいた土木用袋体にグラウト等の自硬性流体を空間に注入し、加圧すると空間が膨張し両端部3cより連結部材に張力がかかり、連結部材が土木用袋体の中心部で直線状に張られて位置することになる。そして、その連結部材を通ってグラウト等の自硬性流体の脱水が起こり、土木用袋体中心部まで十分に脱水されることになる。従って、土木用袋体内へのグラウト注入停止後のブリージングが無く、収縮を少なくすることができる。
【0037】
次に、図2(a)〜(f)に、土木用袋体1の製造工程を示す。
【0038】
図2(a)に示す筒状織物1aが、図2(b)に示すように扁平に畳まれる。筒状織物1aの一端を裏返して、図2(c)に示すように端部を揃える。これにより、一端が連続的に連結された外筒2と内筒3とが形成される。
【0039】
そして、図2(d)に示すように、外筒2と内筒3の開放側を一体的に縫製し、縫製部10とする。この時、外筒2と内筒3との間の空間6と連通する逆止弁付ノズル4を取り付けておく。
【0040】
次に、図2(e)に示すように、逆止弁付ノズル4を取り付けた後、図2(f)に示すように、縫製部10を内筒3の奥に押し込む。これにより、土木用袋体1が形成される。この土木用袋体1は、図2(f)において、縫製部10が土木用袋体1の右端にくる位置から左端にくる位置までの範囲で、反転可能である。
【0041】
また、土木用袋体の他の実施の形態例として、図3(a)〜(f)に、外筒と内筒の両端が連続的に連結されている土木用袋体11の製造工程の断面図を示す。
【0042】
図3(a)の筒状織物11aが、図3(b)に示すように扁平に畳まれる。筒状織物11aの一端を裏返して、図3(c)に示すように端部を揃える。これにより、一端が連続的に連結された外筒12と内筒13とが形成される。
【0043】
そして、図3(d)に示すように、外筒12と内筒13の開放側を袖状に縫製し、縫製部20とする。この時、外筒12と内筒13との間の空間16と連通する逆止弁付ノズル14を取り付けておく。
【0044】
次に、図3(e)に示すように、逆止弁付ノズル14を取り付けた後、図3(f)に示すように、縫製部20を内筒13の奥に押し込む。これにより、土木用袋体11が形成される。この土木用袋体11は、逆止弁付ノズル14に固定手段を設けなければ、エンドレスに反転可能である
【0045】
土木用袋体1は、外筒2と内筒3の開放側を一体的に縫製するため、縫製の工程が簡易である。反転する範囲が限られてしまうが、用途によっては十分目的を果たす反転の範囲が得られる。逆止弁付ノズル4が設けられることにより限定される軸方向に移動可能な範囲と、縫製部10により限定される軸方向に移動可能な範囲は一致するため、逆止弁付ノズルを設ける場合は、簡易な方法で製造できる土木用袋体1とすればよい。また、土木用袋体11は、外筒12と内筒13とを袖状に縫製するため、エンドレスに反転可能である。
【0046】
次に、めがねトンネルの施工時における土木用袋体を用いた構造体についての一実施の形態例を説明するものであり、特に限定するものではない。
【0047】
図4は、めがねトンネルの施工時におけるトンネル断面を示すものである。図4に示す左右に隣り合う2つ本坑21、22は、掘削等によって形成される。これらの本坑21、22は、同時に掘削して形成するのではなく、はじめに2つの本坑21、22の中間位置を掘削して空洞部23(一般的には、中央導坑と呼ばれる)を形成し、その空洞部23に中壁コンクリート24をトンネル長さ方向に形成する。後に、この中壁コンクリート24は2つの本坑21、22の共通した側壁となる。また、中壁コンクリート24上面に後述する土木用袋体30を乗せ、土木用袋体30内にグラウトを注入加圧し、掘削面に対してプレロードをかけ、地山の沈下抑制を行うことができる。従って、中壁コンクリート24は、反力部材としても成り立ち、利用することができる。
【0048】
また、図4のようなトンネル断面の場合では、先行して小さい断面を有する本坑21を掘削し、支保工を建て込みながら形成する。そして、少し遅れて大きな断面を有する本坑22も同じようにして形成する。これらの本坑21、22を形成する際に、地山の緩みや掘削面の崩壊を防ぐための支保工を本坑21、22の長さ方向に所定の間隔で、中壁コンクリート24の上面25にのせるようにして掘削面26に沿って設置する。なお、中壁コンクリート24と空洞部23上部の掘削面26との間には、支保工を設置するための大きな隙間27が空洞部23の長さ方向に沿って必要となる。
【0049】
このようなめがねトンネルの施工時において、空洞部23に形成される中壁コンクリート24の上面25と掘削面26との間の隙間27に土木用袋体30を図5に示すように端部を突き合わせるように並べて設置し、土木用袋体30内の空間にグラウト等の自硬性流体を加圧充填した後、硬化させて隙間27を埋め、構造体とした。なお、以下に示す自硬性流体にグラウトを用いた例を示すが特に限定するものではない。
【0050】
また、土木用袋体30には、前述したように端部が径方向に膨張する膨張径と略等しく膨張し、端部同士を突き合わせて並べて使用する場合に突き合わせ部の隙間が極力小さくなり、且つ土木用袋体の内側より脱水することができるものであれば良い。例えば、図6に示すような小径部31φ400mm×2000mm(テーパ部含む)、大径部32φ1000×2000mmの全長6000mmのポリエステル製異径筒状織物を用いることができる。この小径部31から大径部32までは、滑らかなテーパ形状を有しており、大径部32外面の略中心には、グラウト等の自硬性流体を注入するための逆止弁ノズル33を設けている。
【0051】
この土木用袋体30は、図7に示すように異径筒状織物の小径部31の両端部を異径筒状袋体内に向かって折り返して端部同士を縫製して接続し、異径筒状袋体内側の略中心部に位置するようにして得たものである。このようにして、図7に示すような外筒34と、内筒35が形成される。
【0052】
また、土木用袋体30の内筒35に閉塞防止材36を挿入している。この閉塞防止材36としては、プラッスチック製のネット状のもの(以下、メッシュともいう)を用いた。メッシュの厚みは、約3mmで目の大きさが6mmのものを、幅400mm、長さ2000mmにカットして使用した。この閉塞防止材36は、土木用袋体30の空間37にグラウトを加圧注入した時に圧力によって、内筒35が閉塞されることを防ぎ、グラウト注入停止後、土木用袋体30の中心部の脱水を確実にすることができ、排水効率が向上する。従って、グラウトの凝固時間が短くなり、施工時間が短縮される。また、異径筒状織物からなる土木用袋体30では、内筒35が中心位置に形成されるので閉塞防止材36が中心部に配置され、より排水効率が高くなる。
【0053】
また、閉塞防止材36は、内筒35が閉塞することを防ぎ、グラウトが脱水できれば特に限定されるものではない。つまり、パイプに穴を明けたもの、コイル状物、砂などを透水性布で包み込んだドレーン材など種々のものを適用することができる。
【0054】
また、図8(a)に土木用袋体端部同士を突き合わせて設置した状況説明図を示す。図8(b)には、従来の袋体端部同士を突き合わせて設置した状況説明図を示す。図8(a)(b)に示す土木用袋体30と袋体40は、前述した隙間27に突き合わせて並べた状況を示している。図8(a)に示すように土木用袋体30の端部は、図8(b)に示す袋体端部を金具でかしめたものと比較して突き合わせ部に生じる隙間27が極力小さくなることが良く理解できる。このように土木用袋体30の端部は、土木用袋体30の径方向に膨張する膨張径と略等しく膨張し、確実に隙間を小さくして埋めることができる。
【0055】
以上のようにして、土木用袋体30の空間37にグラウトを注入して硬化させて、空洞部23に形成される中壁コンクリート24の上面25と掘削面26との隙間27を埋め、構造体とするものである。
【0056】
以下に、めがねトンネルの施工時において土木用袋体30の敷設方法について説明するが一実施の形態例を説明するものであり、特に限定するものではない。
【0057】
図4に示す土木用袋体30は、ポリエステル製の織物なので折り畳まれて施工現場に搬入される。そして、折り畳まれた土木用袋体30を長さ方向に広げ、作業者によって、掘削面26と中壁コンクリート24の間の隙間27に土木用袋体30の端部が突き合わせるように並べて設置される。
【0058】
次に、土木用袋体30の逆止弁付ノズル33にホースを接続する。このホースの他端には、グラウトを吐出するグラウトポンプが接続されている。このグラウトポンプは、一般的に使用されているものを適用することができる。グラウトポンプからホース、逆止弁付ノズル33を介して、土木用袋体30内の空間37にグラウトが注入される。この注入方法としては、一度に多量のグラウトを注入するのではなく、繰り返し注入を行う。
【0059】
このようにグラウトを注入することによって、グラウト注入中に土木用袋体30の外筒34表面から余剰水が滲み出し、さらに内筒35からも挿入されていた閉塞防止材36をつたって余剰水が出てき、土木用袋体30に加圧されていた圧力が減少する。そして、さらに注入加圧を行う。この作業を繰り返し行った後、注入を停止する。このように注入を繰り返し行うことによって、地山の掘削面26に対して、中壁コンクリート(反力部材)24を反力にして、プレロードをかけて地山を抑制することができる。
【0060】
このようにしてグラウトの注入停止後、グラウトが硬化し、隙間27を埋め、地山にプレロードをかけることが可能な土木用袋体30を敷設することができる。
【0061】
また、本発明に係る土木用袋体は、前述の実施の形態例に限定されるものでなく、以下に示すような地盤改良用としても使用することができる。
【0062】
例えば、図9に示すように地盤40に掘削して形成された孔41内に土木用袋体45と、土木用袋体45に取り付けられた逆止弁付ノズルと接続できる注入管42とを、土木用袋体45の端部48が孔41の底面43に接する位置まで挿入する。
【0063】
次に、土木用袋体45内に、注入管42と逆止弁付ノズルを介してグラウトを繰り返し加圧注入し、図10のように孔41の両側壁44間の幅以上に、土木用袋体45を膨張させ、地盤40を圧縮し、グラウトを硬化させる。この後、注入管は撤去しても良いし、そのまま埋め殺しにしても良い。
【0064】
このようにして地盤40に対して孔41内から圧縮することができ、且つグラウトを硬化させた土木用袋体45を改良体として地盤40に存在させることにより、地盤40が圧縮された状態を保つことができる。
【0065】
また、土木用袋体45は、前述した土木用袋体の長さや径が異なるだけで、素材や形状は同様のものを用いることができ、特に限定されるものではない。従って、土木用袋体45内へのグラウト注入停止後は、外筒46と内筒47から脱水され、グラウトの硬化の際にブリージングが無く、収縮が少なくなる。また、図10に示すように土木用袋体45は、端部48が土木用袋体45の径方向に膨張する膨張径と略等しく膨張するため、孔41の底面43に対して接する端部48の接触面積が大きくなり、より大きな上載荷重に対して支持力を有することができる。
【0066】
以上のようにして、土木用袋体45を地盤中に改良体として存在させ、上載荷重に対して高い支持力が得られる地盤改良をすることができる。
【0067】
また、本発明に係る土木用袋体50は、図11に示すような地盤シール用としても使用することができる。
この土木用袋体50は、外筒と、外筒内に挿入された内筒とで構成され、前記外筒と前記内筒の両端が連続的になるように連結されており、前記外筒と前記内筒との間に膨張可能な空間が形成されている。例えば、前記外筒と前記内筒とが一枚の筒状袋体で形成されてなり、前記筒状袋体の一方の端部が折り返されて他方の端部と連結されてなり、さらに前記筒状袋体が、異径筒状織物でなるものが好適に用いられる。
【0068】
図11(a)において、土木用袋体50は、先行地山改良および先受け工法での坑内切羽において、フォアパイル51と掘削切羽52に設けられた掘削孔53とのシールに使用される。ドリルジャンボ54により、掘削切羽52に掘削孔53を開設し、この掘削孔53内にフォアパイル51を挿入する。
このフォアパイル51の基端(掘削孔53の入口付近)に、土木用袋体50が被せられている(図11(b)参照)。また、フォアパイル51には注入用の適宜の孔51aが設けられている。ポンプ55による加圧注入により、土木用袋体50内にモルタル等の自硬性流体を注入する。
自硬性流体の圧力により土木用袋体50内の余分な水分が排出され、袋体50内部はフォアパイル51をしっかり把持しながら膨らんでいく。袋体50の外周は掘削孔53に食い込んだ状態となり、フォアパイル51と掘削孔53との間をシールする(図11(c)参照)。
その後、ポンプ55をフォアパイル51に接続し、フォアパイル51の孔51aから掘削孔53内に薬液を加圧注入する。膨張状態の袋体50により薬液の漏れが防止される。
【0069】
この工法では、フォアパイル51に対する袋体50の取り付けは、袋体50の中心孔にフォアパイル51を通すだけであるため、簡単にできる。取り付けのための、特別の治具は必要ない。また、袋体50の取り付け位置は、袋体50をフォアパイル51に沿って移動させるだけで簡単に調整できる。
【0070】
また、本発明に係る土木用袋体60は、図12に示すような地盤への柱体敷設用としても使用することができる。
この土木用袋体60は、図11の袋体50と同じものが好適に用いられる。
標識や支柱等の柱体61の地盤側先端に袋体60を被せる。なお、この袋体60の長さは、後述する掘削孔63の深さにほぼ等しいかやや短いものが好適に用いられる。
【0071】
図12(a)において、地盤62に掘削孔63を成形した後、袋体60が被せられた柱体61の先端を掘削孔63の底に設置する。その後、袋体60の注入孔60aを経由して自硬性流体を打設する。
図12(b)のように、打設した自硬性流体は袋体60の外部に余分な水分を排出し、袋体60の内部は柱体61をしっかり把持し、袋体60の外周は掘削孔63に密着する。そして、袋体60内に強固な固形層が形成され、標識や支柱等の柱体61は、地盤62に強固に設置される。
【0072】
以上のように、この工法では、袋体60を用いて柱体61を簡単且つ確実に地盤に敷設することができる。
【0073】
【発明の効果】
請求項1によると、本来の筒状袋体の両端部が、連結部材によって筒長方向の膨張を規制され、筒状袋体の内側に存在する。従って、新しく存在する土木用袋体の両端部は、土木用袋体の径方向に膨張する膨張径と略等しく膨張するため、所定の位置で確実に間詰ができる。また、土木用袋体端部同士を突き合わせて並べて使用する場合では、突き合わせ部の隙間が極力小さくなる。
【0074】
請求項2によると、両端部が、土木用袋体の径方向に膨張する膨張径と略等しく膨張するため、所定位置で確実に間詰ができる。また、土木用袋体端部同士を突き合わせて並べて使用する場合では、突き合わせ部の隙間が極力小さくなる。
【0075】
請求項3によると、土木用袋体にグラウトが注入され加圧されると両端部より連結部材に張力がかかり、排水性を有する連結部材が土木用袋体の中心部で直線状に張られて位置することになる。そして、その連結部材を通って脱水が起こり、土木用袋体中心部まで十分に脱水される。従って、土木用袋体内へのグラウト注入停止後のブリージングが無く、収縮が少なくなる。
【0076】
請求項4によると、製造方法が簡易となる。しかも、外筒及び内筒の長さの範囲内で反転可能な土木用袋体となる。また、両端部が、土木用袋体の径方向に膨張する膨張径と略等しく膨張するため、所定位置に確実に間詰ができる。また、土木用袋体端部同士を突き合わせて並べて使用する場合では、突き合わせ部の隙間が極力小さくなる。
【0077】
請求項5によると、異径筒状織物を使用することによって、グラウトが注入され加圧されても、織物のたて糸及びよこ糸に均等に力が作用し、大きな圧力にも耐えることができる。土木用袋体の中心位置に内筒が形成されグラウトの脱水が向上する。
【0078】
請求項6によると、土木用袋体の中心部からの排水効率が向上する。従って、中心部までの脱水がより確実となって、グラウトの凝固時間が短くなり、施工時間が短縮される。特に、異径筒状織物からなる土木用袋体を使用する場合には、排水材の位置が中心部となるので、より排水効率が高くなる。
【0079】
請求項7によると、土木用袋体内に自硬性流体を注入した際、土木用袋体の両端部が、土木用袋体の径方向に膨張する膨張径と略等しく膨張するため、所定位置に確実に間詰ができ、さらに掘削面に対してプレロードをかけ、地山を抑制することができる。また、土木用袋体端部同士を突き合わせて並べて使用する場合では、突き合わせ部の隙間が極力小さくなる。
【0080】
請求項8によると、土木用袋体内への自硬性流体の注入停止後、土木用袋体の中心部より脱水され、ブリージングが無く、収縮の少ないものができる。また、中心部からの脱水で自硬性流体の凝固時間が短くなることによって、施工時間を短縮することができる。
【図面の簡単な説明】
【図1】本発明の実施の形態例に用いた土木用袋体の、(a)は斜視図で、(b)は軸方向の断面図であり、(c)は他の実施の形態例に用いた土木用袋体の軸方向の断面図である。
【図2】本発明の実施の形態例に用いた土木用袋体の製造工程の断面図である。
【図3】本発明の他の実施の形態例の土木用袋体の製造工程の断面図である。
【図4】本発明の他の実施の形態例を用いためがねトンネル施工時におけるトンネル断面図である。
【図5】図4におけるA−A´断面図である。
【図6】本発明の他の実施の形態例に用いた土木用袋体の異径筒状織物の概略側面図である。
【図7】本発明の他の実施の形態例に用いた土木用袋体の概略側面図である。
【図8】本発明の他の実施の形態例に用いた土木用袋体の、(a)は端部同士を突き合わせて設置した状況説明図であり、(b)は、従来の袋体の端部同士を突き合わせて設置した状況説明図である。
【図9】本発明に係る土木用袋体を用いた地盤改良の施工時における一実施の形態例の説明図である。
【図10】本発明に係る土木用袋体を用いた地盤改良の施工時における一実施の形態例の説明図である。
【図11】本発明に係る土木用袋体を用いた地盤シール工法における一実施の形態例の説明図である。
【図12】本発明に係る土木用袋体を用いた柱体敷設工法における一実施の形態例の説明図である。
【符号の説明】
1、1c 土木用袋体
2、2c 外筒
3 内筒
3c 端部
6、6c 空間
7、7c 端部
8c 連結部材
10 縫製部
21、22 本坑
23 空洞部(中央導坑)
24 中壁コンクリート(反力部材)
25 上面
26 掘削面
27 隙間
30 土木用袋体
34 外筒
35 内筒
36 閉塞防止材
37 空間[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention is particularly arranged in a gap formed between a digging surface of a hollow portion such as a tunnel and a reaction force member provided in the hollow portion, and injects grout or the like to suppress settlement of the digging surface. The present invention relates to a civil engineering bag, a method of laying the civil engineering bag, and a structure thereof.
[0002]
[Prior art]
When excavating a hollow part such as a tunnel, a support constructed by bending an H-shaped steel material into an arc shape is installed along the excavated surface to prevent loosening of the ground and collapse of the excavated surface. There is always a gap between this support and the excavation surface. There is a method in which a bag is filled in the gap, grout or the like is injected into the bag, and the bag is solidified in close contact with the ground. Such a construction method is referred to as a preload shell construction method (for example, Japanese Patent Publication No. 2-5237), in which preload is applied to the ground to suppress settlement of the ground.
[0003]
In addition, in the construction of the eyeglass tunnel, first, a central shaft is excavated and formed in the middle of the main shaft position adjacent to the left and right, then the middle wall concrete that becomes the center of the eyeglass tunnel is made, and Construction is performed by the procedure of excavating the main pit while building a shoring. In order to install this shoring, a large gap is required between the upper surface of the middle concrete wall and the excavated surface along the tunnel length direction. A bag with a large diameter is continuously arranged in the large gap to fill the space, grout or the like is injected into the bag after the support is installed, and the settlement of the ground is suppressed.
[0004]
The bag filled in the above-mentioned gap seals grout or the like injected into the bag by a method such as sewing at an end portion, caulking a metal fitting, and sandwiching between metal plates or the like.
[0005]
[Problems to be solved by the invention]
However, if the end of the bag is sealed in such a manner, the bag does not expand to the end, so that a gap remains near the end of the bag. In particular, in the case where the ends of the bag body are aligned with each other, a large gap remains at the butted portion. In addition, in the central portion of such a bag, there is a problem that since the injected grout is hardly dehydrated under pressure, excess water remains in the central portion and shrinks due to dehydration after stopping the injection.
[0006]
In the present invention, in consideration of the above problems, the gap formed between the excavated surface of a cavity such as a tunnel and a reaction force member provided in the cavity, the end of the bag body A civil engineering bag capable of reliably inflating, minimizing a gap between butted portions of bag ends, and capable of dehydrating under pressure up to the center of the injected grout, a method of laying the civil engineering bag, and a structure thereof. The purpose is to provide.
[0007]
[Means for Solving the Problems]
The civil engineering bag according to
[0008]
According to such a configuration, both ends of the original tubular bag body are restricted from expanding in the tube length direction by the connecting member, and are present inside the tubular bag body. Therefore, since the both ends of the newly existing civil engineering bag expand substantially equal to the expansion diameter of the civil engineering bag which expands in the radial direction, the space can be reliably filled at a predetermined position. In addition, when the ends of the civil engineering bag are used side by side, the gap between the butted portions is as small as possible.
[0009]
Further, the civil engineering bag according to
[0010]
According to such a configuration, since both ends inflate substantially the same as the inflated diameter that expands in the radial direction of the civil engineering bag, clogging can be reliably performed at a predetermined position. In addition, when the ends of the civil engineering bag are used side by side, the gap between the butted portions is as small as possible.
[0011]
The civil engineering bag according to a third aspect of the present invention is characterized in that, in the first aspect, the connecting member has a drainage property.
[0012]
According to such a configuration, when grout is injected into the civil engineering bag and pressurized, tension is applied to the connecting member from both ends, and the draining coupling member is stretched linearly at the center of the civil engineering bag. Will be located. Then, dehydration occurs through the connecting member, and is sufficiently dehydrated up to the center of the civil engineering bag. Therefore, there is no breathing after the grout injection into the civil engineering bag is stopped, and the shrinkage is reduced.
[0013]
Further, the civil engineering bag according to
[0014]
According to such a configuration, the manufacturing method is simplified. In addition, the civil engineering bag can be inverted within the range of the length of the outer cylinder and the inner cylinder. In addition, since both ends inflate substantially equal to the inflation diameter that expands in the radial direction of the civil engineering bag, the predetermined position can be reliably filled. In addition, when the ends of the civil engineering bag are used side by side, the gap between the butted portions is as small as possible.
[0015]
A civil engineering bag according to a fifth aspect of the present invention is the civil engineering bag according to the fourth aspect, wherein the cylindrical bag is made of a different-diameter cylindrical fabric.
[0016]
According to such a configuration, even when grout is injected and pressurized, a force acts evenly on the warp and weft yarns of the woven fabric and can withstand a large pressure by using the cylindrical woven fabric having a different diameter. An inner cylinder is formed at the center position of the civil engineering bag, and the dewatering of the grout is improved.
[0017]
Further, the civil engineering bag according to
[0018]
According to such a configuration, drainage efficiency from the center of the civil engineering bag is improved. Therefore, dehydration to the center is more reliable, the solidification time of the grout is shortened, and the construction time is shortened. In particular, when a civil engineering bag made of a cylindrical fabric having a different diameter is used, the position of the drainage material is located at the center, so that the drainage efficiency is further improved.
[0019]
In the method for laying a civil engineering bag according to
[0020]
According to such a method, when the self-hardening fluid is injected into the civil engineering bag body, both ends of the civil engineering bag body are inflated substantially equal to the inflated diameter that expands in the radial direction of the civil engineering bag body. In addition, the clogging can be surely performed, and the excavated surface can be preloaded to suppress the ground. In addition, when the ends of the civil engineering bag are used side by side, the gap between the butted portions is as small as possible.
[0021]
Further, the structure according to claim 8 of the present invention includes an outer cylinder in a gap formed between an excavation surface of a cavity formed by excavation and a reaction member provided in the cavity. A civil engineering bag, comprising: an inner cylinder inserted into the outer cylinder, wherein both ends of the outer cylinder and the inner cylinder are connected so as to be continuous, and the outer cylinder and the inner cylinder are arranged. Is filled with a self-hardening fluid under pressure and then cured to fill the gap.
[0022]
According to such a structure, after the injection of the self-hardening fluid into the civil engineering bag is stopped, the central portion of the civil engineering bag is dehydrated, and there is no breathing and little shrinkage. In addition, since the solidification time of the self-hardening fluid is shortened by dehydration from the center, the construction time can be shortened.
[0023]
BEST MODE FOR CARRYING OUT THE INVENTION
An embodiment of the present invention will be described below with reference to FIGS.
[0024]
FIG. 1A is a perspective view of a civil engineering bag according to the present embodiment, and FIG. 1B is an axial sectional view of the civil engineering bag. The
[0025]
The
[0026]
Further, as this cylindrical bag, one having a different diameter can be suitably used. In the case of using a cylindrical fabric having a different diameter, the inner cylinder is formed at the center position of the civil engineering bag body as described later, so that a space such as grout is formed in a space formed between the outer cylinder and the inner cylinder. Even if a hard fluid is injected and pressurized, it can be dewatered from the center of the civil engineering bag.
[0027]
The
[0028]
The
[0029]
Both ends 7 can be inflated substantially equal to the inflated diameter of the
[0030]
As the
[0031]
The
[0032]
In addition, the
[0033]
FIG. 1C shows an axial sectional view of a civil engineering bag according to another embodiment. The
[0034]
By connecting both ends 3c of the
[0035]
The new ends 7c shown in FIG. 1 (c) can inflate substantially the same as the expansion diameter of the
[0036]
Further, as the connecting
[0037]
Next, FIGS. 2A to 2F show a manufacturing process of the
[0038]
The
[0039]
Then, as shown in FIG. 2D, the open sides of the
[0040]
Next, as shown in FIG. 2 (e), after attaching the
[0041]
Further, as another embodiment of the civil engineering bag, FIGS. 3A to 3F show a process of manufacturing the
[0042]
The
[0043]
Then, as shown in FIG. 3D, the open sides of the
[0044]
Next, as shown in FIG. 3 (e), after attaching the
[0045]
Since the open side of the
[0046]
Next, an embodiment of the structure using the civil engineering bag at the time of constructing the glasses tunnel will be described, and there is no particular limitation.
[0047]
FIG. 4 shows a cross section of the tunnel when constructing the glasses tunnel. The two
[0048]
In the case of a tunnel cross section as shown in FIG. 4, the
[0049]
At the time of constructing such a glasses tunnel, an end of the
[0050]
In addition, the
[0051]
As shown in FIG. 7, the
[0052]
Further, a
[0053]
In addition, the
[0054]
FIG. 8 (a) is a diagram illustrating a situation in which the ends of the civil engineering bag are placed in contact with each other. FIG. 8 (b) shows a situation explanatory view in which the conventional bag body is installed with the ends thereof abutting each other. 8A and 8B show a state in which the
[0055]
As described above, grout is injected into the
[0056]
In the following, a method of laying the
[0057]
The
[0058]
Next, a hose is connected to the
[0059]
By injecting the grout in this manner, during the grout injection, excess water seeps out of the surface of the
[0060]
In this way, after the grout injection is stopped, the grout hardens, the
[0061]
Further, the civil engineering bag according to the present invention is not limited to the above-described embodiment, and can be used for ground improvement as described below.
[0062]
For example, as shown in FIG. 9, a
[0063]
Next, grout is repeatedly pressurized and injected into the
[0064]
In this way, the
[0065]
The material and shape of the
[0066]
As described above, the civil
[0067]
Further, the
The civil
[0068]
In FIG. 11A, the civil
A
Excess water in the
Thereafter, the
[0069]
According to this method, the
[0070]
The civil
As the
The
[0071]
In FIG. 12A, after forming an
As shown in FIG. 12 (b), the poured self-hardening fluid discharges excess moisture to the outside of the
[0072]
As described above, according to this construction method, the
[0073]
【The invention's effect】
According to the first aspect, both ends of the original tubular bag are restricted from expanding in the tubular length direction by the connecting member, and are present inside the tubular bag. Therefore, since the both ends of the newly existing civil engineering bag expand substantially equal to the expansion diameter of the civil engineering bag which expands in the radial direction, the space can be reliably filled at a predetermined position. In addition, when the ends of the civil engineering bag are used side by side, the gap between the butted portions is as small as possible.
[0074]
According to the second aspect, the both ends inflate substantially the same as the inflated diameter in the radial direction of the civil engineering bag, so that clogging can be reliably performed at a predetermined position. In addition, when the ends of the civil engineering bag are used side by side, the gap between the butted portions is as small as possible.
[0075]
According to the third aspect, when grout is injected into the civil engineering bag and pressurized, tension is applied to the connecting member from both ends, and the draining coupling member is stretched linearly at the center of the civil engineering bag. Position. Then, dehydration occurs through the connecting member, and is sufficiently dehydrated up to the center of the civil engineering bag. Therefore, there is no breathing after the grout injection into the civil engineering bag is stopped, and the shrinkage is reduced.
[0076]
According to
[0077]
According to the fifth aspect, even when grout is injected and pressurized, the warp yarn and the weft yarn of the woven fabric are evenly acted on by using the different-diameter tubular woven fabric, so that it can withstand a large pressure. An inner cylinder is formed at the center position of the civil engineering bag, and the dewatering of the grout is improved.
[0078]
According to
[0079]
According to
[0080]
According to the eighth aspect, after the injection of the self-hardening fluid into the civil engineering bag body is stopped, the central part of the civil engineering bag body is dehydrated, there is no breathing, and there is little shrinkage. In addition, since the solidification time of the self-hardening fluid is shortened by dehydration from the center, the construction time can be shortened.
[Brief description of the drawings]
1A is a perspective view, FIG. 1B is an axial cross-sectional view, and FIG. 1C is another embodiment of the civil engineering bag used in the embodiment of the present invention. FIG. 3 is an axial cross-sectional view of the civil engineering bag used in FIG.
FIG. 2 is a cross-sectional view of a manufacturing process of the civil engineering bag used in the embodiment of the present invention.
FIG. 3 is a cross-sectional view of a manufacturing process of a civil engineering bag according to another embodiment of the present invention.
FIG. 4 is a cross-sectional view of a tunnel during construction of an eyeglass tunnel using another embodiment of the present invention.
FIG. 5 is a sectional view taken along line AA ′ in FIG. 4;
FIG. 6 is a schematic side view of a cylindrical woven fabric having a different diameter of a civil engineering bag used in another embodiment of the present invention.
FIG. 7 is a schematic side view of a civil engineering bag used in another embodiment of the present invention.
8 (a) is an explanatory view showing a situation in which the ends of the civil engineering bag used in another embodiment of the present invention are installed in a state where the ends thereof are abutted with each other, and FIG. It is explanatory drawing of the situation which installed the end part butted.
FIG. 9 is an explanatory view of one embodiment at the time of soil improvement using the civil engineering bag according to the present invention.
FIG. 10 is an explanatory diagram of one embodiment at the time of soil improvement using the civil engineering bag according to the present invention.
FIG. 11 is an explanatory diagram of one embodiment of a ground sealing method using a civil engineering bag according to the present invention.
FIG. 12 is an explanatory diagram of one embodiment of a pillar laying method using a civil engineering bag according to the present invention.
[Explanation of symbols]
1,1c Civil engineering bag
2, 2c outer cylinder
3 inner cylinder
3c end
6, 6c space
7, 7c end
8c connecting member
10 Sewing part
21, 22 main shaft
23 hollow part (central shaft)
24 Middle wall concrete (reaction member)
25 Top
26 Drilling surface
27 gap
30 Civil engineering bags
34 outer cylinder
35 inner cylinder
36 Blockage prevention material
37 Space
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003178452A JP4219747B2 (en) | 2002-06-21 | 2003-06-23 | Civil engineering bag |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002181242 | 2002-06-21 | ||
JP2003178452A JP4219747B2 (en) | 2002-06-21 | 2003-06-23 | Civil engineering bag |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004076568A true JP2004076568A (en) | 2004-03-11 |
JP4219747B2 JP4219747B2 (en) | 2009-02-04 |
Family
ID=32032598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003178452A Expired - Fee Related JP4219747B2 (en) | 2002-06-21 | 2003-06-23 | Civil engineering bag |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4219747B2 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006104691A (en) * | 2004-10-01 | 2006-04-20 | Ashimori Ind Co Ltd | Bag for civil engineering |
JP2006104751A (en) * | 2004-10-05 | 2006-04-20 | Ashimori Ind Co Ltd | Bag for civil engineering |
JP2006183703A (en) * | 2004-12-27 | 2006-07-13 | Ashimori Ind Co Ltd | Check valve for filling fluid material |
JP2006283281A (en) * | 2005-03-31 | 2006-10-19 | Ashimori Ind Co Ltd | Bag body for civil engineering work |
JP2007203231A (en) * | 2006-02-03 | 2007-08-16 | Ps Mitsubishi Construction Co Ltd | Bagging and dewatering method and its equipment |
JP2008291574A (en) * | 2007-05-28 | 2008-12-04 | Asahi Kasei Construction Materials Co Ltd | Bag body for pile body, pile with bag body, and pile body installation method |
WO2009053797A2 (en) * | 2007-10-24 | 2009-04-30 | Skarboevig Nils Mittet | Mine support grout bags and grout packs |
JP2010159623A (en) * | 2009-12-11 | 2010-07-22 | Ashimori Ind Co Ltd | Bag body for civil engineering |
-
2003
- 2003-06-23 JP JP2003178452A patent/JP4219747B2/en not_active Expired - Fee Related
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4481130B2 (en) * | 2004-10-01 | 2010-06-16 | 芦森工業株式会社 | Civil engineering bag |
JP2006104691A (en) * | 2004-10-01 | 2006-04-20 | Ashimori Ind Co Ltd | Bag for civil engineering |
JP2006104751A (en) * | 2004-10-05 | 2006-04-20 | Ashimori Ind Co Ltd | Bag for civil engineering |
JP4481134B2 (en) * | 2004-10-05 | 2010-06-16 | 芦森工業株式会社 | Civil engineering bag |
JP2006183703A (en) * | 2004-12-27 | 2006-07-13 | Ashimori Ind Co Ltd | Check valve for filling fluid material |
JP4533128B2 (en) * | 2004-12-27 | 2010-09-01 | 芦森工業株式会社 | Check valve for filling fluid material |
JP2006283281A (en) * | 2005-03-31 | 2006-10-19 | Ashimori Ind Co Ltd | Bag body for civil engineering work |
JP4490859B2 (en) * | 2005-03-31 | 2010-06-30 | 芦森工業株式会社 | Civil engineering bag |
JP2007203231A (en) * | 2006-02-03 | 2007-08-16 | Ps Mitsubishi Construction Co Ltd | Bagging and dewatering method and its equipment |
JP2008291574A (en) * | 2007-05-28 | 2008-12-04 | Asahi Kasei Construction Materials Co Ltd | Bag body for pile body, pile with bag body, and pile body installation method |
WO2009053797A3 (en) * | 2007-10-24 | 2009-10-15 | Skarboevig Nils Mittet | Mine support grout bags and grout packs |
WO2009053797A2 (en) * | 2007-10-24 | 2009-04-30 | Skarboevig Nils Mittet | Mine support grout bags and grout packs |
US8414226B2 (en) | 2007-10-24 | 2013-04-09 | Nils Mittet Skarbövig | Mine support grout bags and grout packs |
JP2010159623A (en) * | 2009-12-11 | 2010-07-22 | Ashimori Ind Co Ltd | Bag body for civil engineering |
Also Published As
Publication number | Publication date |
---|---|
JP4219747B2 (en) | 2009-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1375754B1 (en) | A packing apparatus and method for soil nailing | |
JP6252842B2 (en) | Construction method of outer shield tunnel | |
KR101657058B1 (en) | Double inflatable grouting equipment and the grouting method using the same | |
JP2004027813A5 (en) | ||
KR100331969B1 (en) | An apparatus and method for multi-step grouting using FRP tube | |
KR101541718B1 (en) | The grouting method using the double paker type grouting equipment | |
KR101457309B1 (en) | Mortar grouting apparatus with tension bag and grouting construction method using the same | |
KR100760293B1 (en) | Tunnel construction method for shallow overburden tunnel | |
JP4859064B2 (en) | Sealing method for civil engineering work | |
KR100795202B1 (en) | Pressurized grouting packer with waterproof function | |
JP4451553B2 (en) | Buoyancy prevention structure and construction method thereof | |
KR100437910B1 (en) | grouting apparatus for earth anchor using compound packer and earth anchor construction method using the same | |
JP4219747B2 (en) | Civil engineering bag | |
KR20090024434A (en) | Limit expansion packer, anchoring method using pressing and reaming & water stopping anchoring method using pressing | |
JP2008248524A (en) | Method of placing steel pipe pile | |
KR100958053B1 (en) | Water stopping anchoring method using pressing | |
KR20200048265A (en) | Steel pipe multi-stage grouting device | |
KR101874464B1 (en) | Bottom-up ground reinforcement anchor with Front drain pipe | |
JP2533853B2 (en) | Pile construction method | |
KR20200099358A (en) | Method of grouting with steel pipe for reinforcemnet of tunnel section and structure by the same in constructing tunnel | |
JP2000045260A (en) | Aseismatic natural ground reinforcing earth engineering method | |
JP2018131754A (en) | Drainage pipe, ground reinforcing structure and ground reinforcing method | |
KR101158416B1 (en) | Punching inlet hole sealing apparatus in an anchoring working | |
JP2005120576A (en) | Tunnel cut-off structure and its construction method | |
JP3355282B2 (en) | Construction method of perforated sheet pile and continuous underground wall having permeation section using this sheet pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060614 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080125 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080205 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080325 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20080701 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080822 |
|
A911 | Transfer of reconsideration by examiner before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20080905 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20081111 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20081112 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111121 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111121 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121121 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131121 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |