EP0497861B1 - Hanging scaffold - Google Patents
Hanging scaffold Download PDFInfo
- Publication number
- EP0497861B1 EP0497861B1 EP90916394A EP90916394A EP0497861B1 EP 0497861 B1 EP0497861 B1 EP 0497861B1 EP 90916394 A EP90916394 A EP 90916394A EP 90916394 A EP90916394 A EP 90916394A EP 0497861 B1 EP0497861 B1 EP 0497861B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- rod
- scaffold
- scaffold according
- framework
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/22—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
- E04G3/26—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons specially adapted for working on roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/041—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffolds on roof frameworks or on roofs
Definitions
- the present invention relates to a hanging scaffold for use in an eave region or a facade region of a building which has roof construction parts projecting from the body of the building and which scaffold includes at least two frameworks each of which can be hung from a respective outwardly projecting roof construction part and the function of which is to carry a scaffold balustrade, wherein each of the frameworks includes a bottom beam, one end of which supports a balustrade post and the other end of which is connected to a scaffold stanchion which includes a first rod; which is connectable to an attachment device on the roof projection part so as to hang from said attachment device.
- a scaffold constructed in the manner indicated above is known from DE-A1-334 1031, for instance.
- This known scaffold includes a stanchion which is suspended at its upper end by a bolt which passes through a roof truss rafter and the bottom end of which supports against the facade of the building, and in which a framework structure intended to carry a guard rail, or balustrade, and a floor is displaceable along the stanchion.
- One object of the invention is to provide a hanging scaffold with which at least one of the aforesaid drawbacks is avoided, either totally or partially.
- each attachment device has the form of a substantially U-shaped bracket which is intended to straddle a rafter or ceiling joist forming part of a roof truss in the building roof structure, and a bolt which passes horizontally through the roof truss part and also through the bracket legs located on respective opposite sides thereof and from which the upper end of the first rod included in a framework structure can be hung.
- the remaining part of the framework structure can be guided for movement along the first rod and capable of being locked in different positions thereon.
- the attachment devices are ideally carried directly by the load-carrying roof-truss parts and are located completely beneath the roofing of the building.
- the hanging scaffold can, of course, be used immediately the roof truss is in position and can therewith also be used in work carried out on the building subsequent to fitting the roof truss in position.
- the substantially U-shaped bracket in separate parts, i.e. in the form of two generally L-shaped members which together define the bracket, the members can be fitted by hammering the bracket legs, which rest against the upper side of the roof truss part, in between the upper side of the rafter and a roof covering mounted on top of the rafter.
- the arrangement, according to Claim 4, provides favourable distribution in the roof truss part of the load applied via the attachment device.
- the arrangement according to Claim 5 affords the advantage that the connecting pieces can be left to form a permanent part of the roof projection, which is particularly advantageous in the case of roof projections whose undersurfaces are faced with board.
- the attachment is unaccessible behind the facing board, whereas the connecting pieces are accessible, wherein the slots enable the connecting pieces to be moved to locations in which they are hidden from view, when the remainder of the scaffold is dismantled.
- Claims 6-8 define advantageous arrangements which enable the hanging scaffold to be adapted favourably to different buildings and to different kinds of work carried out thereon while using permanently mounted attachment devices and optionally permanent connecting pieces on these buildings.
- the object of the invention is also to provide a hanging scaffold which does not require any form of support against the facade of the building, but which is solely mounted on the roof projection parts, while still enabling the scaffold to be adapted readily to roof projections of mutually different configurations and to roofs of different pitche angles.
- a scaffold finds particular use as an eaves guard or a scaffold for working in the region of the eaves.
- the inventive hanging scaffold is characterized in that the hanging stanchion, in addition to said first rod, also includes a second rod which supports against the roof projection (for instance, the rafter of a roof truss) from beneath and at a point which is located between the suspension point of the first rod on said attachment device and the body of the building.
- a second rod which supports against the roof projection (for instance, the rafter of a roof truss) from beneath and at a point which is located between the suspension point of the first rod on said attachment device and the body of the building.
- the second rod has a pivot joint at one end and one of the two rods has an adjustable length so that the position of the framework structure relative to the roof projection part can be adjusted and therewith adjust the framework structure and the scaffold to the desired position in relation to the building, irrespective of the pitch of the roof or the configuration of the part of the roof projection concerned.
- the second rod preferably extends substantially perpendicular to the bottom beam and the balustrade post is substantially parallel to the second rod.
- the means for attaching the second rod preferably has the form of a U-shaped bracket which straddles the roof projection part from beneath and is locked against sliding along said part, said roof projection part normally comprising at least one wooden beam of rectangular cross-section.
- the second rod of the framework structure may be telescopic and includes a sleeve which is fixed to the bottom beam/floor beam, and a bar which is displaceable vertically through the sleeve and which can be locked in selected positions relative thereto and the upper end of which supports against the roof projection part.
- the balustrade post may be vertically adjustable relative to the bottom beam and the bottom beam may have an adjustable length at right angles to the facade, so as to enable the balustrade to be positioned immediately above and adjacent the bottom edge of the roof and function as a barrier against snow, ice and debris slipping from the roof.
- Figure 1 illustrates schematically part of a building structure, which includes a roof truss comprising a rafter 10, upper and lower stories 11 and 12, flooring 13 separating the stories, and a facade 14.
- the building further comprises an outwardly projecting roof construction part or roof projection which extends from the actual body of the building, beyond the facade 14.
- a hanging scaffold Suspended from the roof projection is a hanging scaffold, which includes planks 15 which form a floor and a back support and which are supported by and extend between two or more frameworks disposed along the facade 14, each of said frameworks being detachably hung from a respective rafter 10 in the region of the roof projection. Only one rafter with a framework suspended therefrom is shown in Figure 1.
- the framework illustrated in Figure 1 includes a first post which comprises a number of elongated profiled members 16 which are arranged in line with one another and of which the upper end of the upper profile members 16 is detachably suspended from an attachment device carried by the rafter 10, through the intermediary of connecting pieces 17.
- the attachment device has the form of a substantially U-shaped bracket which straddles the rafter 10, so that each leg of the bracket 18 is located on a respective side of the rafter 10.
- the legs 18 and the web 19 of the U-shaped bracket are straight and flat, wherewith the legs 18 extend substantially at right angles to the web 19 and the web and the legs abut flatly with the upper surface of the rafter 10 and respective vertical side surfaces thereof.
- Extending horizontally through a transverse hole in the legs 18 and the rafter 10 is a screw-threaded bolt 20 having a head 21 and coacting with a nut 22, this bolt forming part of the attachment device.
- the profiled members 16 are suspended from the bolt through the intermediary of the connecting pieces 17.
- the bottom ends of the connecting pieces 17 are rigidly connected to the profiled members by means of bolts 23 which pass through said connecting pieces and the upper profiled member 16, said profiled member being detachably suspended from the bolt 20 on a respective side of the rafter 10. More specifically, the connecting pieces 17 are located between the outer surface of an associated leg and the bolt head 21 and the nut 22 respectively.
- the bolt 20 passes through an opening or a vertical slot 24 in each of the connecting pieces 17, which may be mounted for pivotal movement around the horizontal bolt axle. Shims or the like 25 may be used to compensate for any dissimilarities in the distance between the outer surfaces of the legs 18 and in the distance between those sides of the profiled member 16 which face towards the connecting pieces 17.
- the framework includes one or more parts which can be moved guidingly along the profiled members and locked in different positions thereon.
- Each of these parts includes a sleeve 26 which can be moved along the profiled members and locked in different positions thereon and which, in turn, carries an arm 27, which in the illustrated embodiment has a lattice configuration.
- This arm 27 forms a support for the planks 15 which form the scaffold floor, and also carries a post 28 which, in turn, carries the planks or boards 15 forming the ballustade.
- FIG. 3 is a cross-sectional view of a profiled member 16 and a sleeve 26, from which it will be seen that the profiled member and the sleeve have an elongated rectangular cross-section and that the cross-section of the sleeve conforms with the cross-section of the profiled member and is guided by and movable along said member.
- Each profiled member 16 has formed along its length a row of mutually spaced holes 29 and each sleeve 26 is provided with an opening 30 that can be positioned in register with any one of the holes 29.
- the profiled member 16 and the sleeve 26 can be mutually locked together in any desired position, with the aid of a locking element 31 which passes through the opening 30 and a selected hole 29.
- this locking element 31 is a threaded bolt which meshes with a nut 32 welded to the outer surface of the sleeve around the opening 30, the outer end of the bolt 31 being provided with a handle 33 which enables the sleeve 26 to be fixated relative to the profiled member 16 without needing the use of a tool herefor.
- the bolt 31 passes freely through the holes 29 and the opening 30, and when the bolt 31 in Figure 3 is tightened, the profile member 16 will be urged against the side of the sleeve distal from the nut 32.
- Figure 1 shows two mutually similar profiled members 16 joined together at 34.
- the manner in which this join is accomplished is shown in more detail in Figure 4, according to which end plates 35 are welded at the mutually adjacent ends of the profiled members.
- Each plate has a hole provided therein and a bolt 36 which is welded to the top plate extends out through the hole in the top plate 35 and freely through the hole in the bottom plate 35 and meshes with a nut 37 welded to the bottom plate.
- the profiled member 16 can thus be connected to one another and detached from one another, by turning the members relative to one another in one or the other direction.
- the scaffold will have a tendency to swing clockwise around the bolt 20, as seen in Figure 1. Accordingly, in order to avoid contact between the facade 14 and the scaffold, the scaffold is provided at 38 with an adjustable support, in a known manner, therewith enabling the profiled member 16 to be maintained in a substantially vertical position.
- the bolt 20 When dismantling the scaffold illustrated in Figures 1-4, the bolt 20 is unscrewed and the connecting pieces 17 released from the bracket 18, 19.
- the bracket 18, 19 is left on the rafter 10, with the bolt 20 optionally replaced, where the bracket is located well protected beneath the roof in readiness for use in future repair work on the building.
- Figure 5 illustrates the attachment device, or bracket, of which only one leg 18 is shown, attached to the ceiling joist of a truss part 10' forming a lattice-type roof truss, the undersurface of the roof projection being clad with boards 39.
- the bolt 20 is difficult to reach once the boards 39 have been placed in position. Consequently, when dismantling the scaffold, which is only partially shown in Figure 5, the bolts 23 are unscrewed and the upper profiled member 16 is released from the connecting pieces 17.
- the connecting pieces can be displaced transversely to the axis of the bolt 20 and then pushed from the downwardly extending position shown in full lines to the upwardly displaced position shown in broken lines, wherein the bottom ends of the connecting pieces are located approximately level with the undersurface of the ceiling joist 10'. In this position, the bracket and the connecting pieces 17 are left well protected beneath the roof in preparation for use in future repairs to the building.
- the first post includes two parallel profiles 106 which are attached to opposite sides of the bottom beam or the arm 27, and a second post 101 which is secured to the beam 27.
- a U-shaped bracket 107 is fitted onto the upper side of the rafter, so that the web 19 and the legs 18 of the bracket are contiguous with corresponding surfaces of the rafter 10.
- the profiles 106 are pivotally connected to the bracket 107, by means of through-passing headed bolts 20, which extend through bores in the legs 18 of the bracket and through the rafter 10 and also through the profiles 106.
- a nut 22 is fitted onto the free end of the bolt 21.
- the bracket 107 takes-up the tensile load acting through the profiles 106 and substantially against the upper surface of the rafter 10, and the bolt 21 forms primarily a pivot for the profiles 106 and a means of anchoring the profiles 106 to the bracket 107.
- the second post of the scaffold stanchion is telescopic and includes a sleeve 101, which is attached to the bottom beam 27, and a profiled member 102, which can be moved axially through the sleeve 101 and can be locked thereto in selected positions for adjustment of the second post to a desired effective length above the bottom beam 27.
- the profiled member 102 carries at its upper end a bracket 103 which is pivotally connected to a tongue 104 on an attachment 105 for the second rod.
- the attachment bracket 105 includes a web which lies against the undersurface of the rafter 10, and two legs which lie against the side surfaces of said rafter, said legs being provided with holes which enable the bracket 105 to be secured to the rafter 10 with the aid of screws or the like.
- the bottom arm 27 may include a load-supporting profile 110, which may optionally be reinforced with a bottom rod 111 and lattice reinforcements 112, particularly when the bottom beam 27 is intended to support planks 15 or the like for a truss scaffold.
- the scaffold post 28 may include a member 120, such as a tubular section, which is attached to the bottom arm 27 and which fixedly receives a post 121 which displaceably carries a tubular section 122 corresponding to the tubular section 120.
- the tubular section 122 carries profiled members 15 which bridge two frameworks in a manner to form a ballustade.
- the tubular section 122 can be locked to the post 121 in selected positions thereon, by means of a locking device which corresponds to the locking device 70 illustrated in Figure 8 and relates to the second post 101, 102.
- the bolt 31 engages a nut 32 attached to the sleeve 101, and extends through a corresponding opening in the sleeve 101 and through an opening in the tubular section 102 in register with said sleeve opening.
- the front end of the bolt 31 presses against the inner surface of the profiled section 102 and clamps said section into frictional engagement with an adjacent inner-wall part of the sleeve 101.
- the profile 102 may be provided with a series of mutually spaced openings for accommodating the bolt 31, thereby to ensure that the locking device is effective even should the clamping action afforded by the free end of the bolt be lost.
- the whole of the framework can be swung to a desired position in relation to the rafter 10, irrespective of its slope, by extending or shortening the length of the post 101, 102 between the beam 27 and its attachment 105. It is essential that the point at which the second post 101, 102 engages the rafter 10 lies between the point at which the first post engages said rafter and the facade, so that the bending moment exerted on the framework by the load can be taken up by the supportive engagement of the second post 101, 102 with the undersurface of the rafter 10.
- the suspension stanchion and the bottom beam 27 are dimensioned so that the ballustrade 15 can be located in the immediate vicinity of the bottom edge 123 of the roof and extend upwardly therefrom, to form a shield against debris and persons sliding from the roof.
- the bottom beam 27 shall be given a length such as to enable an appropriately wide support to be formed for floor planks 15 or the like, and the vertical extension of the stanchion shall be such as to enable floor planks to be positioned at appropriate heights in relation to the truss region.
- the bracket 107 can be fitted to the rafter 10, prior to laying the roof thereon. For instance, the bracket or fitting 107 can be fitted onto the rafter 10 in the factory where the trusses are produced, said bracket 107 and its bolt 20 being fitted to the rafter during said manufacture.
- the attachment device 105 may form part of the framework structure of the hanging scaffold.
- the attachment device 105 is prevented from sliding along the undersurface of the rafter 10 when the posts 106 and 102 are mutually attached in a manner to be flexurally rigid.
- a hole or bore may be provided in each of the legs of the U-shaped attachment device 105 and, if desired, subsequent to hanging the scaffold framework, a hole can be drilled into or through the rafter 10, via the holes in the legs of said attachment device, and a bolt or a locking pin then inserted into the hole.
- the bolt or the locking pin may be connected to the attachment device 105 by a piece of wire or the like.
- Figure 9 illustrates an alternative embodiment of the attachment device, which straddles the roof projection part from above.
- the U-shaped attachment bracket is in two parts and has the form of two, substantially identical L-shaped members, each of which includes a first leg 18 having a hole provided therein and intended to lie against a corresponding side surface of the roof projection part, for instance the rafter 10, and also a second leg 19' which extends essentially perpendicular to the first leg 18 and which rests on top of the roof projection part.
- attachment can be established by hooking the legs 19' of the L-shaped bracket members onto the rafter 10, or by driving said legs in between said rafter and a roof construction mounted thereon.
- the bracket attachment illustrated in Figure 9 can therefore be readily dismantled from the rafter 10, even subsequent to covering the rafter with a roof construction.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
- Bridges Or Land Bridges (AREA)
- Transition And Organic Metals Composition Catalysts For Addition Polymerization (AREA)
- Absorbent Articles And Supports Therefor (AREA)
- Paper (AREA)
- Glass Compositions (AREA)
- Load-Engaging Elements For Cranes (AREA)
- Supports For Pipes And Cables (AREA)
- Defrosting Systems (AREA)
Abstract
Description
- The present invention relates to a hanging scaffold for use in an eave region or a facade region of a building which has roof construction parts projecting from the body of the building and which scaffold includes at least two frameworks each of which can be hung from a respective outwardly projecting roof construction part and the function of which is to carry a scaffold balustrade, wherein each of the frameworks includes a bottom beam, one end of which supports a balustrade post and the other end of which is connected to a scaffold stanchion which includes a first rod; which is connectable to an attachment device on the roof projection part so as to hang from said attachment device.
- A scaffold constructed in the manner indicated above is known from DE-A1-334 1031, for instance.
- This known scaffold includes a stanchion which is suspended at its upper end by a bolt which passes through a roof truss rafter and the bottom end of which supports against the facade of the building, and in which a framework structure intended to carry a guard rail, or balustrade, and a floor is displaceable along the stanchion.
- This method of hanging the scaffold is unsatisfactory with respect to load safety.
- Furthermore, it is unsatisfactory to stabilize the framework structure, by supportive abutment of the bottom end part of the stanchion with the facade of the building, because the facade can be readily damaged as a result of its contact with the facade support of the stanchion. The facade is also liable to be damaged when an anchoring device is fitted in order to prevent the bottom part of the stanchion from swinging away from the facade.
- One object of the invention is to provide a hanging scaffold with which at least one of the aforesaid drawbacks is avoided, either totally or partially.
- This object is achieved with a hanging scaffold defined in the following Claim 1. Thus, according to the invention, in the case of a hanging scaffold of the type described in the introduction, each attachment device has the form of a substantially U-shaped bracket which is intended to straddle a rafter or ceiling joist forming part of a roof truss in the building roof structure, and a bolt which passes horizontally through the roof truss part and also through the bracket legs located on respective opposite sides thereof and from which the upper end of the first rod included in a framework structure can be hung. The remaining part of the framework structure can be guided for movement along the first rod and capable of being locked in different positions thereon. As a result of this arrangement, the attachment devices are ideally carried directly by the load-carrying roof-truss parts and are located completely beneath the roofing of the building. The hanging scaffold can, of course, be used immediately the roof truss is in position and can therewith also be used in work carried out on the building subsequent to fitting the roof truss in position. By constructing the substantially U-shaped bracket in separate parts, i.e. in the form of two generally L-shaped members which together define the bracket, the members can be fitted by hammering the bracket legs, which rest against the upper side of the roof truss part, in between the upper side of the rafter and a roof covering mounted on top of the rafter.
- The arrangement described in Claims 2 and 3 provides optimum support for the attachment device against the roof truss part, while the arrangement according to Figure 3 affords favourable absorption of the load to which the roof truss part is subjected through the attachment device.
- The arrangement, according to
Claim 4, provides favourable distribution in the roof truss part of the load applied via the attachment device. - The arrangement according to Claim 5 affords the advantage that the connecting pieces can be left to form a permanent part of the roof projection, which is particularly advantageous in the case of roof projections whose undersurfaces are faced with board. In this case, the attachment is unaccessible behind the facing board, whereas the connecting pieces are accessible, wherein the slots enable the connecting pieces to be moved to locations in which they are hidden from view, when the remainder of the scaffold is dismantled.
- Claims 6-8 define advantageous arrangements which enable the hanging scaffold to be adapted favourably to different buildings and to different kinds of work carried out thereon while using permanently mounted attachment devices and optionally permanent connecting pieces on these buildings.
- The object of the invention is also to provide a hanging scaffold which does not require any form of support against the facade of the building, but which is solely mounted on the roof projection parts, while still enabling the scaffold to be adapted readily to roof projections of mutually different configurations and to roofs of different pitche angles. Such a scaffold finds particular use as an eaves guard or a scaffold for working in the region of the eaves.
- To this end, the inventive hanging scaffold is characterized in that the hanging stanchion, in addition to said first rod, also includes a second rod which supports against the roof projection (for instance, the rafter of a roof truss) from beneath and at a point which is located between the suspension point of the first rod on said attachment device and the body of the building. This enables the second rod to be anchored to the roof projection part through the intermediary of an attachment device fitted on said part, so as to stabilize the framework structure against swinging in a direction perpendicular to the facade.
- Preferably, the second rod has a pivot joint at one end and one of the two rods has an adjustable length so that the position of the framework structure relative to the roof projection part can be adjusted and therewith adjust the framework structure and the scaffold to the desired position in relation to the building, irrespective of the pitch of the roof or the configuration of the part of the roof projection concerned.
- The second rod preferably extends substantially perpendicular to the bottom beam and the balustrade post is substantially parallel to the second rod.
- The means for attaching the second rod preferably has the form of a U-shaped bracket which straddles the roof projection part from beneath and is locked against sliding along said part, said roof projection part normally comprising at least one wooden beam of rectangular cross-section.
- The second rod of the framework structure may be telescopic and includes a sleeve which is fixed to the bottom beam/floor beam, and a bar which is displaceable vertically through the sleeve and which can be locked in selected positions relative thereto and the upper end of which supports against the roof projection part.
- The balustrade post may be vertically adjustable relative to the bottom beam and the bottom beam may have an adjustable length at right angles to the facade, so as to enable the balustrade to be positioned immediately above and adjacent the bottom edge of the roof and function as a barrier against snow, ice and debris slipping from the roof.
- The invention and further developments thereof are characterized by the features set forth in the following Claims.
- The invention will now be described in more detail with reference to a number of exemplifying embodiments thereof illustrated in the accompanying drawings.
- Figure 1 is a schematic view in vertical section of part of a building on which an inventive scaffold is hung;
- Figure 2 is a longitudinal sectional view of the upper part of the scaffold;
- Figure 3 is a cross-sectional view which illustrates the mutual connection of profiled members, which form part of the inventive scaffold shown in Figure 1, with a remaining framework structural part;
- Figure 4 is a longitudinal sectional view through adjacent ends of two mutually connected profiled members;
- Figure 5 is a schematic vertical-section view of an upper part of a building having a roof projection which is covered with board on the undersurface thereof, and also shows the inventive scaffold attached to the building;
- Figure 6 is a schematic side view of a framework structure which forms part of a second embodiment of the inventive scaffold;
- Figure 7 is a partially sectioned view taken on the line VII-VII in Figure 6;
- Figure 8 is a partially sectioned view taken on the line VIII-VIII in Figure 6; and
- Figure 9 illustrates an alternative attachment device.
- Mutually coinciding or essentially coinciding members illustrated in the various Figures of the drawings have been identified with the same reference signs.
- Figure 1 illustrates schematically part of a building structure, which includes a roof truss comprising a
rafter 10, upper andlower stories flooring 13 separating the stories, and afacade 14. The building further comprises an outwardly projecting roof construction part or roof projection which extends from the actual body of the building, beyond thefacade 14. Suspended from the roof projection is a hanging scaffold, which includesplanks 15 which form a floor and a back support and which are supported by and extend between two or more frameworks disposed along thefacade 14, each of said frameworks being detachably hung from arespective rafter 10 in the region of the roof projection. Only one rafter with a framework suspended therefrom is shown in Figure 1. It is assumed, however, thatadditional rafters 10 are located along thefacade 14 and that a framework or frameworks is/or are hung from one or more of these rafters, in complete agreement with the rafter and framework illustrated in Figure 1. These further rafters and frameworks are consequently not shown in Figure 1. - The framework illustrated in Figure 1 includes a first post which comprises a number of elongated profiled
members 16 which are arranged in line with one another and of which the upper end of theupper profile members 16 is detachably suspended from an attachment device carried by therafter 10, through the intermediary of connectingpieces 17. This can be seen more clearly from Figure 2, from which it will also be seen that the attachment device has the form of a substantially U-shaped bracket which straddles therafter 10, so that each leg of thebracket 18 is located on a respective side of therafter 10. More specifically, thelegs 18 and theweb 19 of the U-shaped bracket are straight and flat, wherewith thelegs 18 extend substantially at right angles to theweb 19 and the web and the legs abut flatly with the upper surface of therafter 10 and respective vertical side surfaces thereof. Extending horizontally through a transverse hole in thelegs 18 and therafter 10 is a screw-threadedbolt 20 having ahead 21 and coacting with anut 22, this bolt forming part of the attachment device. The profiledmembers 16 are suspended from the bolt through the intermediary of the connectingpieces 17. The bottom ends of the connectingpieces 17 are rigidly connected to the profiled members by means ofbolts 23 which pass through said connecting pieces and the upper profiledmember 16, said profiled member being detachably suspended from thebolt 20 on a respective side of therafter 10. More specifically, the connectingpieces 17 are located between the outer surface of an associated leg and thebolt head 21 and thenut 22 respectively. Thebolt 20 passes through an opening or avertical slot 24 in each of the connectingpieces 17, which may be mounted for pivotal movement around the horizontal bolt axle. Shims or the like 25 may be used to compensate for any dissimilarities in the distance between the outer surfaces of thelegs 18 and in the distance between those sides of the profiledmember 16 which face towards the connectingpieces 17. - In addition to the profiled
member 16, the framework includes one or more parts which can be moved guidingly along the profiled members and locked in different positions thereon. Each of these parts includes asleeve 26 which can be moved along the profiled members and locked in different positions thereon and which, in turn, carries anarm 27, which in the illustrated embodiment has a lattice configuration. Thisarm 27 forms a support for theplanks 15 which form the scaffold floor, and also carries apost 28 which, in turn, carries the planks orboards 15 forming the ballustade. Figure 3 is a cross-sectional view of a profiledmember 16 and asleeve 26, from which it will be seen that the profiled member and the sleeve have an elongated rectangular cross-section and that the cross-section of the sleeve conforms with the cross-section of the profiled member and is guided by and movable along said member. Each profiledmember 16 has formed along its length a row of mutually spacedholes 29 and eachsleeve 26 is provided with an opening 30 that can be positioned in register with any one of theholes 29. The profiledmember 16 and thesleeve 26 can be mutually locked together in any desired position, with the aid of alocking element 31 which passes through theopening 30 and a selectedhole 29. In the Figure 3 embodiment, thislocking element 31 is a threaded bolt which meshes with anut 32 welded to the outer surface of the sleeve around theopening 30, the outer end of thebolt 31 being provided with ahandle 33 which enables thesleeve 26 to be fixated relative to the profiledmember 16 without needing the use of a tool herefor. Thebolt 31 passes freely through theholes 29 and the opening 30, and when thebolt 31 in Figure 3 is tightened, theprofile member 16 will be urged against the side of the sleeve distal from thenut 32. - Figure 1 shows two mutually similar profiled
members 16 joined together at 34. The manner in which this join is accomplished is shown in more detail in Figure 4, according to whichend plates 35 are welded at the mutually adjacent ends of the profiled members. Each plate has a hole provided therein and abolt 36 which is welded to the top plate extends out through the hole in thetop plate 35 and freely through the hole in thebottom plate 35 and meshes with anut 37 welded to the bottom plate. The profiledmember 16 can thus be connected to one another and detached from one another, by turning the members relative to one another in one or the other direction. - It is realized that the scaffold will have a tendency to swing clockwise around the
bolt 20, as seen in Figure 1. Accordingly, in order to avoid contact between thefacade 14 and the scaffold, the scaffold is provided at 38 with an adjustable support, in a known manner, therewith enabling the profiledmember 16 to be maintained in a substantially vertical position. - When dismantling the scaffold illustrated in Figures 1-4, the
bolt 20 is unscrewed and the connectingpieces 17 released from thebracket bracket rafter 10, with thebolt 20 optionally replaced, where the bracket is located well protected beneath the roof in readiness for use in future repair work on the building. - Figure 5 illustrates the attachment device, or bracket, of which only one
leg 18 is shown, attached to the ceiling joist of a truss part 10' forming a lattice-type roof truss, the undersurface of the roof projection being clad withboards 39. In this case, thebolt 20 is difficult to reach once theboards 39 have been placed in position. Consequently, when dismantling the scaffold, which is only partially shown in Figure 5, thebolts 23 are unscrewed and the upper profiledmember 16 is released from the connectingpieces 17. Because of the provision of theslots 24, the connecting pieces can be displaced transversely to the axis of thebolt 20 and then pushed from the downwardly extending position shown in full lines to the upwardly displaced position shown in broken lines, wherein the bottom ends of the connecting pieces are located approximately level with the undersurface of the ceiling joist 10'. In this position, the bracket and the connectingpieces 17 are left well protected beneath the roof in preparation for use in future repairs to the building. - In the case of the embodiment illustrated in Figure 6, the first post includes two
parallel profiles 106 which are attached to opposite sides of the bottom beam or thearm 27, and asecond post 101 which is secured to thebeam 27. - A
U-shaped bracket 107 is fitted onto the upper side of the rafter, so that theweb 19 and thelegs 18 of the bracket are contiguous with corresponding surfaces of therafter 10. Theprofiles 106 are pivotally connected to thebracket 107, by means of through-passing headedbolts 20, which extend through bores in thelegs 18 of the bracket and through therafter 10 and also through theprofiles 106. Anut 22 is fitted onto the free end of thebolt 21. Thebracket 107 takes-up the tensile load acting through theprofiles 106 and substantially against the upper surface of therafter 10, and thebolt 21 forms primarily a pivot for theprofiles 106 and a means of anchoring theprofiles 106 to thebracket 107. In addition, thebolt 21 functions to prevent thebracket 107 from sliding along the rafter. The second post of the scaffold stanchion is telescopic and includes asleeve 101, which is attached to thebottom beam 27, and a profiledmember 102, which can be moved axially through thesleeve 101 and can be locked thereto in selected positions for adjustment of the second post to a desired effective length above thebottom beam 27. The profiledmember 102 carries at its upper end abracket 103 which is pivotally connected to atongue 104 on anattachment 105 for the second rod. Theattachment bracket 105 includes a web which lies against the undersurface of therafter 10, and two legs which lie against the side surfaces of said rafter, said legs being provided with holes which enable thebracket 105 to be secured to therafter 10 with the aid of screws or the like. - The
bottom arm 27 may include a load-supportingprofile 110, which may optionally be reinforced with abottom rod 111 andlattice reinforcements 112, particularly when thebottom beam 27 is intended to supportplanks 15 or the like for a truss scaffold. - The
scaffold post 28 may include amember 120, such as a tubular section, which is attached to thebottom arm 27 and which fixedly receives apost 121 which displaceably carries atubular section 122 corresponding to thetubular section 120. Thetubular section 122 carries profiledmembers 15 which bridge two frameworks in a manner to form a ballustade. Thetubular section 122 can be locked to thepost 121 in selected positions thereon, by means of a locking device which corresponds to thelocking device 70 illustrated in Figure 8 and relates to thesecond post - It will be seen from Figure 8 that the
bolt 31 engages anut 32 attached to thesleeve 101, and extends through a corresponding opening in thesleeve 101 and through an opening in thetubular section 102 in register with said sleeve opening. The front end of thebolt 31 presses against the inner surface of the profiledsection 102 and clamps said section into frictional engagement with an adjacent inner-wall part of thesleeve 101. - The
profile 102 may be provided with a series of mutually spaced openings for accommodating thebolt 31, thereby to ensure that the locking device is effective even should the clamping action afforded by the free end of the bolt be lost. - It will be seen that the whole of the framework can be swung to a desired position in relation to the
rafter 10, irrespective of its slope, by extending or shortening the length of thepost beam 27 and itsattachment 105. It is essential that the point at which thesecond post rafter 10 lies between the point at which the first post engages said rafter and the facade, so that the bending moment exerted on the framework by the load can be taken up by the supportive engagement of thesecond post rafter 10. - When the framework is to be used as an eave guard rail the suspension stanchion and the
bottom beam 27 are dimensioned so that theballustrade 15 can be located in the immediate vicinity of the bottom edge 123 of the roof and extend upwardly therefrom, to form a shield against debris and persons sliding from the roof. - When the framework is to be used as an eave scaffold, the
bottom beam 27 shall be given a length such as to enable an appropriately wide support to be formed forfloor planks 15 or the like, and the vertical extension of the stanchion shall be such as to enable floor planks to be positioned at appropriate heights in relation to the truss region. Thebracket 107 can be fitted to therafter 10, prior to laying the roof thereon. For instance, the bracket or fitting 107 can be fitted onto therafter 10 in the factory where the trusses are produced, saidbracket 107 and itsbolt 20 being fitted to the rafter during said manufacture. - The
attachment device 105 may form part of the framework structure of the hanging scaffold. Theattachment device 105 is prevented from sliding along the undersurface of therafter 10 when theposts U-shaped attachment device 105 and, if desired, subsequent to hanging the scaffold framework, a hole can be drilled into or through therafter 10, via the holes in the legs of said attachment device, and a bolt or a locking pin then inserted into the hole. The bolt or the locking pin may be connected to theattachment device 105 by a piece of wire or the like.
Figure 9 illustrates an alternative embodiment of the attachment device, which straddles the roof projection part from above. In the case of the Figure 9 embodiment, the U-shaped attachment bracket is in two parts and has the form of two, substantially identical L-shaped members, each of which includes afirst leg 18 having a hole provided therein and intended to lie against a corresponding side surface of the roof projection part, for instance therafter 10, and also a second leg 19' which extends essentially perpendicular to thefirst leg 18 and which rests on top of the roof projection part. In the case of the Figure 9 embodiment, attachment can be established by hooking the legs 19' of the L-shaped bracket members onto therafter 10, or by driving said legs in between said rafter and a roof construction mounted thereon. The bracket attachment illustrated in Figure 9 can therefore be readily dismantled from therafter 10, even subsequent to covering the rafter with a roof construction.
Claims (16)
- A hanging scaffold for use in an eave region or a facade region of a building which has roof construction parts (10) projecting from the body of the building and which scaffold includes at least two frameworks (16, 27, 28; 106, 27, 28) each of which can be hung from a respective outwardly projecting roof construction part (10) and the function of which is to carry a scaffold balustrade (15), wherein each of the frameworks (16, 27, 28; 106, 27, 28) includes a bottom beam (27), one end of which supports a balustrade post (28) and the other end of which is connected to a scaffold stanchion which includes a first rod (16; 106); which is connectable to an attachment device (107, 20; 18-20) on the roof projection part (10) so as to hang from said attachment device, characterized in that each attachment device (107, 20; 18-20) has the form of a substantially U-shaped bracket (107; 18, 19) which is intended to straddle a rafter or ceiling joist forming a truss part (10) of the building, and a bolt (20) which passes horizontally through said truss part (10) and also through the bracket legs (18) located on respective opposite sides of said truss part, and in that the upper end of the first rod (16) forming part of framework can be hung from said bolt.
- A scaffold according to Claim 1, characterized in that the legs (18) of the U-shaped bracket are straight and extend substantially perpendicular to the straight web (19) of the bracket; and in that the distance between the legs (18) corresponds to the distance between the mutually opposite vertical sides of the truss part (10).
- A scaffold according to Claim 2, characterized in that the legs (18) and the web (19) of the U-shaped bracket are flat and abut said vertical side surfaces and the upper surface of the truss part (10) respectively.
- A scaffold according to any one of Claims 1-3, characterized in that the first rod (16) can be connected to the U-shaped bracket (18, 19) through the medium of a pair of connecting pieces (17) which can be connected rigidly to the upper end of the first rod (16) and which are intended to be placed adjacent a respective vertical side of the truss part (10) and which are provided with openings (24) for receiving the bolt (20) which passes through the truss part (10) and the bracket legs (18).
- A scaffold according to Claim 4, characterized in that said openings (24) have the form of slots whose lengths are sufficient to permit the connecting pieces (17) to be displaced on respective bolt ends between a lower position, in which the bottom ends of the connecting pieces are located at some distance beneath the underside of the truss part (10'), and an upper position in which said ends are located above the underside of the truss part (10).
- A scaffold according to any one of Claims 1-5, characterized in that the remaining parts (26, 27) of the framework is movably displaceable and can be locked in different positions on the first rod (16), said first rod having the form of a profiled section.
- A scaffold according to any one of Claims 1-6, characterized in that the remaining part of the framework (26, 27) includes sleeves (26) which can be moved along the profiled section (16) and locked in different positions thereon; and in that said sleeve (26) carries an outwardly projecting arm (27) which is intended to form a foundation for floor elements (15), such as planks.
- A scaffold according to Claim 6, characterized in that the profiled section (16) has the form of a hollow profile, preferably a hollow rectangular profile, provided along its profiled length with a row of mutually spaced holes (29), in that the sleeve (26) preferably has a rectangular cross-section corresponding to the hollow profile and is provided with an opening (30) which can be brought into register with any of the holes provided in the profiled section; and in that the profiled section and the sleeve can be locked together with the aid of a locking device which passes through a sleeve opening (30) and one of the holes (29) in the profiled section.
- A scaffold according to Claim 1, characterized in that the scaffold stanchion also includes a second rod (101, 102) which is intended to support against the roof projection part (10) at a point between the first rod attachment device (107) and the body of the building, so as to brace the framework and prevent said framework from swinging in towards the building (1) under the influence of vertical loads.
- A scaffold according to Claim 9, characterized in that the second rod (101, 102) has an adjustable length so that the framework can be positioned as desired, substantially independent of the configuration and the pitch angle of the outwardly projecting roof part.
- A scaffold according to Claim 9 or 10, characterized in that the bottom ends of the first rod (106) and the second rod (101, 102) are fixedly connected to the bottom beam (27) of the framework.
- A scaffold according to any one of Claims 9-11, characterized in that the second rod (101, 102) extends substantially perpendicular to the bottom beam (27) of the framework.
- A scaffold according to any one of Claims 9-12, characterized in that the second rod (101, 102) is pivotally connected (103, 104) to an associated attachment device (105) which is connected to the roof projection part (10).
- A scaffold according to any one of Claims 9-13, characterized in that the second rod connects with an roof projection part (10) through the intermediary of an attachment device in the form of a U-shaped bracket which straddles the roof projection part from beneath and is anchored against sliding along the undersurface of said part.
- A scaffold according to any one of Claims 10-14, characterized in that the second rod (101, 102) is telescopic and can be locked in selected lengths.
- A scaffold according to any one of Claims 1-15, characterized in that the first rod attachment device (107; 18-20) is in two parts and includes two mutually facing L-shaped elements, one leg (19') of each of which rests on the upper surface of the truss part (10).
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE8903607A SE464479B (en) | 1989-10-27 | 1989-10-27 | Hanging scaffold |
SE8903607 | 1989-10-27 | ||
SE9002890 | 1990-09-11 | ||
SE9002890A SE464767B (en) | 1990-09-11 | 1990-09-11 | Hanging scaffold |
PCT/SE1990/000693 WO1991006729A1 (en) | 1989-10-27 | 1990-10-26 | Hanging scaffold |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0497861A1 EP0497861A1 (en) | 1992-08-12 |
EP0497861B1 true EP0497861B1 (en) | 1995-01-11 |
Family
ID=26660621
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP90916394A Expired - Lifetime EP0497861B1 (en) | 1989-10-27 | 1990-10-26 | Hanging scaffold |
Country Status (8)
Country | Link |
---|---|
EP (1) | EP0497861B1 (en) |
AT (1) | ATE117039T1 (en) |
AU (1) | AU7040391A (en) |
DE (1) | DE69016041T2 (en) |
DK (1) | DK0497861T3 (en) |
FI (1) | FI921883A (en) |
NO (1) | NO177112C (en) |
WO (1) | WO1991006729A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3957807A1 (en) * | 2020-08-18 | 2022-02-23 | Verstassepät Oy | A scaffolding support structure and a method for assembling scaffolding |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU721858B2 (en) * | 1996-11-06 | 2000-07-13 | de Malmanche, Caroline | Safety rail system |
AU779204B2 (en) * | 2000-05-25 | 2005-01-13 | Eric J. Batty | Hangform scaffold |
ITUD20020004A1 (en) * | 2002-01-15 | 2003-07-15 | Francesco Savio | MODULE FOR RIBBON SCAFFOLDING |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE661100C (en) * | 1938-06-10 | Erich Stark | Bracket, especially for hanging roof stirrups | |
CH395503A (en) * | 1962-08-15 | 1965-07-15 | Brenner Adolf | Work scaffolding to be supported on a building, especially for plumbing work |
FR2299476A2 (en) * | 1975-01-30 | 1976-08-27 | Goubaud Michel | Scaffolding for roof construction or repair - has ladder hook on heel of anchor with flat base for attachment to rafter |
SE404711B (en) * | 1977-04-01 | 1978-10-23 | Sundstrom Nils Sune | POSITION |
DE3341031A1 (en) * | 1983-11-12 | 1984-06-14 | Anton 7971 Aitrach Schad | Framework bracket for producing a bracket framework which can be adjusted in height and width and is fastened onto the rafters, purlins, cross members etc. forming part of a roof construction |
-
1990
- 1990-10-26 DE DE69016041T patent/DE69016041T2/en not_active Expired - Fee Related
- 1990-10-26 DK DK90916394.1T patent/DK0497861T3/en active
- 1990-10-26 WO PCT/SE1990/000693 patent/WO1991006729A1/en active IP Right Grant
- 1990-10-26 EP EP90916394A patent/EP0497861B1/en not_active Expired - Lifetime
- 1990-10-26 AT AT90916394T patent/ATE117039T1/en not_active IP Right Cessation
- 1990-10-26 AU AU70403/91A patent/AU7040391A/en not_active Abandoned
-
1992
- 1992-04-24 NO NO921599A patent/NO177112C/en unknown
- 1992-04-27 FI FI921883A patent/FI921883A/en not_active Application Discontinuation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3957807A1 (en) * | 2020-08-18 | 2022-02-23 | Verstassepät Oy | A scaffolding support structure and a method for assembling scaffolding |
EP4293175A3 (en) * | 2020-08-18 | 2024-02-28 | Pica teline Oy | A scaffolding support structure and a method for assembling scaffolding |
Also Published As
Publication number | Publication date |
---|---|
EP0497861A1 (en) | 1992-08-12 |
NO921599L (en) | 1992-04-24 |
FI921883A0 (en) | 1992-04-27 |
NO177112C (en) | 1995-07-19 |
DE69016041D1 (en) | 1995-02-23 |
NO921599D0 (en) | 1992-04-24 |
NO177112B (en) | 1995-04-10 |
FI921883A (en) | 1992-04-27 |
DK0497861T3 (en) | 1995-03-20 |
AU7040391A (en) | 1991-05-31 |
DE69016041T2 (en) | 1995-05-24 |
ATE117039T1 (en) | 1995-01-15 |
WO1991006729A1 (en) | 1991-05-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4979725A (en) | Roof safety barrier supporting frame | |
US6003630A (en) | Unilateral scaffold system | |
US20060175130A1 (en) | Hanging scaffold support bracket | |
US6840350B2 (en) | Adjustable scaffold and walkboard ladder holder | |
US8186479B2 (en) | Roof scaffolding system | |
US20080105489A1 (en) | Roofmates gablemaster ladder support | |
US20040041141A1 (en) | Temporary safety guard rail system | |
US5664391A (en) | Roof anchor and hanging scaffold system | |
US20060243523A1 (en) | Scaffolding brackets | |
US8245816B2 (en) | Integral safety system which can be used for construction | |
EP0408645A4 (en) | Clamp for building structures | |
EP0497861B1 (en) | Hanging scaffold | |
AU675213B2 (en) | Stanchions for steel framed buildings | |
US20020166722A1 (en) | Mobile outrigger scaffolding system | |
WO1998020215A1 (en) | Safety rail system | |
WO1999019582A1 (en) | Barriers and barrier systems and components for barrier systems | |
EP1327733A2 (en) | Module for cantilevered scaffolding | |
GB1568355A (en) | Building platform structures | |
WO1999040274A1 (en) | Suspended scaffolding | |
AU744957B2 (en) | Barriers and barrier systems and components for barrier systems | |
CN214615558U (en) | Quick-mounting limb guardrail | |
JPH0425877Y2 (en) | ||
AU761207B2 (en) | Suspended scaffolding | |
EP1876315A1 (en) | Integral safety system which can be used for construction | |
AU2002301442B2 (en) | Scaffolding System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19920513 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE DK ES FR GB IT LI NL SE |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: AB PA-SO PRODUKTER |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: BJOERK, SOEREN GUNNAR Owner name: SOEDERGREN, SVEN REINE |
|
17Q | First examination report despatched |
Effective date: 19930712 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE DK ES FR GB IT LI NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT Effective date: 19950111 Ref country code: ES Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY Effective date: 19950111 |
|
REF | Corresponds to: |
Ref document number: 117039 Country of ref document: AT Date of ref document: 19950115 Kind code of ref document: T |
|
EAL | Se: european patent in force in sweden |
Ref document number: 90916394.1 |
|
REF | Corresponds to: |
Ref document number: 69016041 Country of ref document: DE Date of ref document: 19950223 |
|
ET | Fr: translation filed | ||
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 19951025 Year of fee payment: 6 Ref country code: DK Payment date: 19951025 Year of fee payment: 6 Ref country code: GB Payment date: 19951025 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 19951031 Year of fee payment: 6 Ref country code: FR Payment date: 19951031 Year of fee payment: 6 Ref country code: NL Payment date: 19951031 Year of fee payment: 6 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 19951120 Year of fee payment: 6 |
|
26N | No opposition filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19961026 Ref country code: DK Effective date: 19961026 Ref country code: AT Effective date: 19961026 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Effective date: 19961031 Ref country code: CH Effective date: 19961031 Ref country code: LI Effective date: 19961031 |
|
BERE | Be: lapsed |
Owner name: SODERGREN SVEN REINE Effective date: 19961031 Owner name: BJORK SOREN GUNNAR Effective date: 19961031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Effective date: 19970501 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 19961026 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Effective date: 19970630 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee |
Effective date: 19970501 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19971015 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 19971027 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19981027 |
|
EUG | Se: european patent has lapsed |
Ref document number: 90916394.1 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990803 |