Nothing Special   »   [go: up one dir, main page]

EP0258705A2 - Device for handling and setting drill pipes in a derrick - Google Patents

Device for handling and setting drill pipes in a derrick Download PDF

Info

Publication number
EP0258705A2
EP0258705A2 EP87111744A EP87111744A EP0258705A2 EP 0258705 A2 EP0258705 A2 EP 0258705A2 EP 87111744 A EP87111744 A EP 87111744A EP 87111744 A EP87111744 A EP 87111744A EP 0258705 A2 EP0258705 A2 EP 0258705A2
Authority
EP
European Patent Office
Prior art keywords
finger
drill string
drilling rig
storage
finger platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP87111744A
Other languages
German (de)
French (fr)
Other versions
EP0258705A3 (en
EP0258705B1 (en
Inventor
Eckhard Dipl.-Ing. Voigts
Hans Herbert Dipl.-Ing. Achilles
Adolf Dipl.-Ing. Häussler
Eberhard Dr.-Ing. Peschel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Wintershall AG
Preussag AG Erdol und Erdgas
KCA Deutag Tiefbohr GmbH
Original Assignee
Siemens AG
Wintershall AG
Deutag Deutsche Tiefbohr AG
Preussag AG Erdol und Erdgas
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG, Wintershall AG, Deutag Deutsche Tiefbohr AG, Preussag AG Erdol und Erdgas filed Critical Siemens AG
Publication of EP0258705A2 publication Critical patent/EP0258705A2/en
Publication of EP0258705A3 publication Critical patent/EP0258705A3/en
Application granted granted Critical
Publication of EP0258705B1 publication Critical patent/EP0258705B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole

Definitions

  • the invention relates to a drilling rig device training according to the preamble of claim 1.
  • the drill string and drilling tool (drill bit and catch tool, milling head, etc.), but also drill rods or so-called heavy weights - if available in individual cases - can be installed or removed much faster than in known facilities.
  • a check and replacement of a drilling tool can thus be carried out in a relatively short time, so that the drilling rig is ready for use again after a short time interval for the drilling work to be carried out.
  • the costly downtimes of the drilling rig can thus be reduced by a substantial amount.
  • the finger platform and storage trolley When transporting the drill string trains, the finger platform and storage trolley are brought into the respective loading or unloading position, in which the boom robot continuously rotates the by means of a pivoting movement and extension of the gripper arms. Place drill string cables in the rows of fingers on the finger platform or in the corresponding areas of the storage trolley or out of them can see. Time-consuming transport routes from the borehole to the side end areas of the work deck are completely eliminated with the derrick. After filling or emptying a row of fingers in the course of the transport movement of the linkage robot or its gripping arms, the finger platform and the storage trolley can be moved into the next pick-up or removal position in a structurally and control-technically simple manner. The travel path to be covered is limited to the dimension corresponding to the finger division of the finger platform.
  • the step-by-step positioning of the finger platform and storage trolley can be carried out using conventional drive and control elements.
  • the storage trolley and finger stage preferably have an electric motor drive with a control system which, after manual activation of a trigger, for example, automatically controls the corresponding next position.
  • the drive for positioning the finger platform and storage trolley can interact with stops or the like.
  • the finger platform and storage trolley are expediently guided in a structurally simple manner in running tracks fixed on the work deck or on the drilling rig supports. By eliminating the movement of the boom robot, the boom trains are transported free of vibrations and thus without impairing the rig stability.
  • the derrick generally designated 1 in the drawing with derrick supports 2 and a work deck 3, on which, as shown in FIG. 2, a lifting mechanism 4 and a crane operator control station 5 are mounted, is provided with a pulley 7, which is vertically movably guided on rails 6, with a pull hook . 8 and an elevator 9 provided.
  • the elevator 9 engages around the upper end connection 13 of a drill string pull 11, so that the drill string 10 is pulled out by the corresponding upward stroke movement of the block and tackle 9 so that the lower end connection 13 of the drill string pull 11 to be turned off located above the work deck 3.
  • two storage trolleys 15, each movable in the direction of the arrows 14 shown in FIG. 1, are supported in opposite tower side areas.
  • rails 16 are fastened to the drilling rig supports 2 at a distance corresponding approximately to the length of the drill pipe trains 11 to be switched off, on which two finger platforms 17 arranged one behind the other are likewise guided in the direction of the arrows 18 (FIG. 1).
  • a storage trolley 15 is assigned to the finger platforms 17.
  • the respective finger platforms 17 are to be moved synchronously with their assigned storage trolleys relative to the linkage robot (pipehandler) 19 fixedly mounted on the work deck 3.
  • the pipehandler 19 has a tower structure 21 which can be pivoted about a vertical axis 20 (FIG. 2) and comprises extendable and retractable gripping arms 22 for gripping the setbacks to be transported or placed on the set-up surface (setbacks) 15 and into the rows 23 of fingers with the fingers 24 provided finger train 17 to be inserted rod trains 11.
  • the drill string 10 is pulled out of the borehole so far that the lower end connection 13 of the rod train to be turned off is above the work deck 3 and the upper end connection 13 of the rod train 11 is above the finger platform 17, the drill string 10 is first intercepted by wedges.
  • the unscrewed rod train is held by the pipehandler 19, which lifts it off the drill string 10 and pivots it by 90 ° about its pivot axis 20 (arrows 26 and 27 in FIG.
  • the respective finger platform 17 and the associated storage trolley 15 are moved by one of the finger pitches of the finger platform 17 corresponding degree synchronous (F ig. 2) in the direction of the mounted on the working deck 3 working structures 4 and 5, and moved in the opposite direction.
  • the electromotive drives 29 and 43 of storage trolley 15 and finger platform 17 have control elements (not shown in more detail) which, after actuation of a clock trigger, automatically bring the finger platform 17 and storage trolley 15 into the next pick-up position corresponding to the finger division.
  • the storage trolley 15 is expediently to be moved in its upright out-of-service position, so that after being transferred to its upright out-of-service position it is to be brought into a work deck area in which it does not have free access to the drill chute 34 disabled (reference numeral 35 in Fig. 2).
  • To move the upright storage trolley 15 3 rails or other suitable transport guide body are embedded in the work deck. Removing the storage trolley 15 is also by means of roller pallets or with Possible with the help of a crane.
  • the work deck superstructures 4 and 5 can also be fixed on the work deck 3 to form a receiving space (not shown) for one or more storage trolleys, so that a storage trolley 5 after unloading the drill string cables 11 drawer-like under the elevator 4 or the crane operator control station 5 is to be pushed.
  • the drilling rig device according to the invention also creates the possibility of leaving empty storage trolleys which are not required, thereby enlarging the working area, in their inoperative position.
  • a section of the work deck 3 is shown in cross-section with storage trolleys 15 movably guided thereon, the illustration of the linkage robot 19 being omitted for the sake of clarity.
  • the vertical pivot axis 20 of the drill robot 19 is shown, which is positioned directly adjacent to the borehole 12 or the turntable 25.
  • the substructure supports 35 of the work deck 3 are correspondingly strongly dimensioned in the storage area of the rod trains 11 or the setback packages facing away from the work deck superstructures 4 and 5.
  • the substructure 35 and the turntable 25 are supported on double-T supports 36.
  • the Abstellwagen 15 are provided on their top with rod holders 45 and on its underside with conventional roller packages 37 g deckausEnglishun in working en 38 arranged rails are performed 39 (Fig. 4).
  • racks 40 are provided on the top of both running rails, which work together to drive the parking trolleys 15 with drive pinions 42 driven by an electric drive 29 via a gear 41.
  • racks 40 are provided on the top of both running rails, which work together to drive the parking trolleys 15 with drive pinions 42 driven by an electric drive 29 via a gear 41.
  • By the respective sides of a an.beiden bstell- A carriage 15 provided for the drive pinion 42 is a tilting of the carriage 15
  • the electric motor 29 and the gear 41 are provided in the illustrated exemplary embodiment below the storage surface: of the storage trolley 15.
  • the drives can also be provided on the work deck and the toothed racks 40 are located beneath the storage surfaces of the storage trolleys 15 and are protected against contamination.
  • the electric motor drives 29 each have a power supply line with detachable plugs which are withdrawn to remove unloaded storage trolleys 15.
  • FIG. 7 shows the finger platforms 17 provided on opposite side regions of the drilling tower 1.
  • the two finger platforms 17 on the left in the drawing are shown in a working position in which the last row of fingers 23 is loaded with drill string trains 11 when the drill string 10 is dismantled.
  • the two finger platforms 17 and storage trolley 15 have already moved into their rear end position in the reinforced working deck area.
  • the finger platforms 17 shown on the right in FIG. 7 are shown in a working position in which the last drill string trains 11 of the row of fingers 23 are removed when a drill string 10 is installed and the finger platforms 17 are thus unloaded.
  • Each F ingerbühne 17 is equipped with a drive 43 and a gear 44 and driven in a manner analogous to the storage car 15 via drive pinions and racks, not shown.
  • the drives 43 and 29 are coupled in terms of control technology.
  • the finger platforms are of rectangular design and are guided on straight running rails 16. If necessary or advantageous, the finger platforms 17 can also be on a. concentric circular path to Bohr longitudinal axis 28 movably guided and designed, for example, as a finger stage rotating carousel.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

Die Erfindung bezieht sich auf eine Bohrturmeinrichtung mit zumindest einer oberhalb des Arbeitsdecks 3 abstützbaren Fingerbühne 17 oder dgl. nebeneinander angeordnete Aufnahmeräume 23 zur Bevorratung von Bohrgesta"ngezügen 11 eines Bohrstranges 10 aufweisenden Gestängehaltern, zumindest einer der Fingerbühne 17 zugeordneten Bohrgestängeabstellfläche und einem schwenkbeweglichen, Greifarme 22 umfassenden Gestängeroboter 19 zur Beschickung der Fingerbühne 17 mit vom Bohrstrang 10 gelösten Bohrgestängezügen 11 bzw. zur Überführung der Bohrgestängezüge 11 von der Fingerbühne 17 an den Bohrstrang. Um die Demontage- und Montagezeiten des Bohrstranges 10 zu verkürzen, sind die Fingerbühne 17 und ein die Bohrgestängeabstellfläche bildender, auf dem Arbeitsdeck 3 abstützbarer Abstellwagen 15 beweglich ausgebildet und syhnchron relativ zu dem ortsfest auf dem Arbeitsdeck 3 festlegbaren Gestängeroboter 19 verfahrbar.The invention relates to a drilling rig device with at least one finger platform 17 that can be supported above the work deck 3 or the like. Receiving spaces 23 arranged next to one another for stocking drill pipe trains 11 of a drill string comprising drill string 10, at least one drill rod parking area assigned to the finger platform 17 and a pivotable, gripping arms 22 comprehensive rod robot 19 for loading the finger platform 17 with drill string cables 11 detached from the drill string 10 or for transferring the drill string cables 11 from the finger platform 17 to the drill string Forming, on the work deck 3 supportable trolley 15 movable and synchronously movable relative to the stationary on the work deck 3 linkage robot 19.

Description

Die Erfindung bezieht sich auf eine Bohrturm einrichtung Ausbildung nach dem Oberbegriff des Anspruchs 1.The invention relates to a drilling rig device training according to the preamble of claim 1.

einrichtungen zur Aufnahme von Bohrgestängezügen Bohrturm herkömmlicher Bauart sind mit zwei an gegenüberliegenden Bohrturmseiteneckbereichen mit Turmträgern fest verbundenen Fingerbühnen und diesen zugeordneten, im Arbeitsdeck integrierten Abstellflächen (Setbacks) versehen. Die jeweiligen Bohrgestängezüge des Bohrstranges werden in der Regel noch von der Arbeitsmannschaft des Bohrturms mittels Flaschenzug und Lastenkran in die entsprechenden Fingerreihen der Fingerbühne in mühevoller und zeitraubender Arbeit mit nichtunerheblichem Unfallrisiko eingebracht. Inzwischen werden Bohrtürme vereinzelt auch schon mit einem zwischen den Fingerbühmen bzw. den Setbacks verfahrbaren Gestängeroboter (Pipehandler) ausgerüstet, der z.B. zur Auswechslung des Bohrwerkzeuges jeweils einen gelösten Bohrgestängezug an die jeweilige aufnahmebereite Fingerreihe transportiert und mittels seiner Greifarme den Bohrgestängezug einführt und abstellt, um danach zum Transport eines nachfolgenden Bohrgestängezuges in seine Ausgangsstellung zurückzukehren. Aufgrund der für die Demontages bzw. Montage insbesondere bei größeren Bohrteufen.vom Gestängeroboter zu durchfahrenden langen Transportwegeentlang der Fingerbühnen von bei modernen Bohrtürmen durchaus bis zu fünf Metern gestaltet sich jedoch auch hier der Montage- bzw. Demontagevorgang des Bohrstrangs außerordentlich zeitaufwendig und dadurch bedingt auch kostenintensiv. Durch die Verfahrbewegung des Gestängeroboters unter der Last der Bohrgestängezüge kann es darüber hinaus zu die Turmstabilität beeinträchtigenden Schwingungen kommen.conventional facilities for receiving Bohrgestängezügen derrick type are provided with two on opposite Bohrturmseiteneckbereichen with Turmträ ren g integral finger platforms and associated therewith, is integrated in the working deck shelves (setbacks) provided. The respective drill string trains of the drill string are usually still brought into the corresponding finger rows of the finger platform by the working team of the drilling tower using pulley blocks and load cranes in laborious and time-consuming work with a non-negligible risk of accidents. Meanwhile derricks are separated even with a traveling between the Fingerbühmen or the setbacks linkage robot (pipe handler) equipped, the example for replacement of the drilling tool transported in each case a dissolved Bohr g estän g ezug to the respective receptive row of fingers and inserts the Bohrgestängezug by means of its gripping arms, and stops to then return to its original position for transporting a subsequent drill string train. Due to the long transport routes along the finger platforms, which are necessary for disassembly or assembly, especially for larger drilling depths of modern drilling towers up to five meters, however, the assembly or disassembly process of the drill string is also extremely time-consuming and therefore also cost-intensive. The movement of the drill robot under the load of the drill string trains can also result in vibrations that impair tower stability.

Es ist Aufgabe der vorliegenden Erfindung, auf baulich einfache Weiseeine Bohrturmeinrichtunc der eingangs genannten Art zu schaffen, bei dem der Bohrstrang wesentlich schneller zu montieren und demontieren ist. Zur Lösung dieser Aufgabe zeichnet sich die Bohrturmeinrichtung nach der Erfindung durch die im kennzeichnenden Teil des Anspruchs 1 angegebenen Merkmale aus. Hinsichtlich weiterer vorteilhafter Ausgestaltungen der Erfindung wird auf die Ansprüche 2 bis 12 verwiesen.It is an object of the present invention to provide a drilling rig device of the type mentioned at the outset in a structurally simple manner, in which the drill string can be assembled and disassembled considerably more quickly. To achieve this object, the derrick according to the invention is characterized by the features specified in the characterizing part of claim 1. With regard to further advantageous embodiments of the invention, reference is made to claims 2 to 12.

Durch die synchrone Verfahrbarkeit von Fingerbühne und Abstellwagen relativ zu dem ortsfest angeordneten Gestängerorobter lassen sich Bohrstrang und Bohrwerkzeug (Bohrkrone und Fangwerkzeug, Fräskopf u.dgl.) aber auch Schwerstangen oder sog. Heavy Weights - soweit im Einzelfall vorhanden - wesentlich schneller einbauen bzw. ausbauen als bei bekannten Einrichtungen. Eine Überprüfung und Auswechslung eines Bohrwerkzeuges ist damit in relativ kurzer Zeit zu vollziehen, so daß der Bohrturm schon nach kurzen Zeitabständen für die durchzuführenden Bohrarbeiten wieder einsatzbereit ist. Die kostenintensiven Stillstandzeiten des Bohrturms sind damit um ein wesentliches Maß zu reduzieren. Fingerbühne und Abstellwagen werden bei der Beförderung der Bohrgestängezüge in die jeweilige Beladungs- bzw. Entladungsstellung gebracht, in der der Gestängeroboter mittels einer Schwenkbewegung und Ausfahren der Greifarme kontinuierlich die. Bohrgestängezüge in den Fingerreihen der Fingerbühne bzw. an den entsprechenden Bereichen des Abstellwagens plazieren bzw. aus diesen entnehmen kann. Zeitraubende Transportwege vom Bohrloch bis hin zu Seitenendbereichen des Arbeitsdecks entfallen bei dem Bohrturm gänzlich. Die Fingerbühne und der Abstellwagen sind in baulich und steuerungstechnisch einfacher Weise nach Befüllen bzw. Entleeren einer Fingerreihe im Verlaufe der Transportbewegung des Gestängeroboters bzw. seiner Greifarme in die jeweils nächste Aufnahme- bzw. Entnahmestellung zu bewegen. Der durchzulaufende Verfahrweg beschränkt sich dabei auf das der Fingerteilung der Fingerbühne entsprechende Maß. Die taktweise Weiterpositionierung von Fingerbühne und Abstellwagen ist mit konventionellen Antriebs- und Steuerungselementen zu vollziehen. Bevorzugt haben Abstellwagen und Fingerbühne einen eletromotorischen Antrieb mit einer Steuerung, die nach beispielsweise manueller Betätigung eines Auslösers die entsprechend nächste Position automatisch ansteuert. Alternativ kann der Antrieb zum Positionieren von Fingerbühne und Abstellwagen an der jeweils erforderlichen Abstellstelle mit Anschlägen oder dgl. Indexierungen zusammenwirken. Fingerbühne und Abstellwagen sind in baulich einfacher Weise zweckmäßigerweise in am Arbeitsdeck bzw. an den Bohrturmträgern festgelegten Laufschienen geführt. Durch den Entfall von Verfahrtransportbewegungen des Gestängeroboters erfolgt der Transport der Gestängezüge frei von Schwingungen und damit ohne Beeinträchtigung der Bohrturmstabilität.Due to the synchronous movability of the finger platform and storage trolley relative to the stationary rod lifter, the drill string and drilling tool (drill bit and catch tool, milling head, etc.), but also drill rods or so-called heavy weights - if available in individual cases - can be installed or removed much faster than in known facilities. A check and replacement of a drilling tool can thus be carried out in a relatively short time, so that the drilling rig is ready for use again after a short time interval for the drilling work to be carried out. The costly downtimes of the drilling rig can thus be reduced by a substantial amount. When transporting the drill string trains, the finger platform and storage trolley are brought into the respective loading or unloading position, in which the boom robot continuously rotates the by means of a pivoting movement and extension of the gripper arms. Place drill string cables in the rows of fingers on the finger platform or in the corresponding areas of the storage trolley or out of them can see. Time-consuming transport routes from the borehole to the side end areas of the work deck are completely eliminated with the derrick. After filling or emptying a row of fingers in the course of the transport movement of the linkage robot or its gripping arms, the finger platform and the storage trolley can be moved into the next pick-up or removal position in a structurally and control-technically simple manner. The travel path to be covered is limited to the dimension corresponding to the finger division of the finger platform. The step-by-step positioning of the finger platform and storage trolley can be carried out using conventional drive and control elements. The storage trolley and finger stage preferably have an electric motor drive with a control system which, after manual activation of a trigger, for example, automatically controls the corresponding next position. Alternatively, the drive for positioning the finger platform and storage trolley can interact with stops or the like. The finger platform and storage trolley are expediently guided in a structurally simple manner in running tracks fixed on the work deck or on the drilling rig supports. By eliminating the movement of the boom robot, the boom trains are transported free of vibrations and thus without impairing the rig stability.

Als Bohrgestängehalter sind bevorzugt an gegenüberliegenden Seitenbereichen zwei oder drei, insgesamt also vier oder sechs, Fingerbühnen mit jeweils zugeordneten Abstellwagen vorgesehen. Die mit dem Bohrgestängezügen beladenen Abstellwagen werden zweckmäßigerweise in dem den Arbeitsdeckaufbauten abgewandten und hier entsprechend verstärkt ausgebildeten Arbeitsdeckbereich plaziert, so daß Fingerbühne und Abstellwagen bei einem Entladevorgang in Richtung der Arbeitsdeckaufbauten bewegt werden. Nach Entladen der der Abstellwagen können diese auf einfache Weise vom Arbeitsbereich des Arbeitsdecks weggeschafft werden, indem sie beispielsweise klappbar am Arbeitsdeck festzulegen sind und in eine im wesentlichen aufrechte Außerbetriebstellung geklappt werden, um auch Verfahrraum für einen nachfolgenden Abstellwagen zu schaffen. Der Bohrturm nach der Erfindung bietet darüber hinaus die Möglichkeit, jeweils nur Abstellwagen in entsprechender Anzahl und Größe einzusetzen, die je nach Länge des zu montierenden bzw. demontierenden Bohrstrangs benötigt werden. Das Arbeitsdeck kann somit bei kürzeren Bohrsträngen von einer nicht benötigten Bohrgestängeabstellfläche freigehalten werden. Weitere vorteilhafte Ausgestaltungen der Erfindung ergeben sich aus der nachfolgenden Beschreibung und der Zeichnung, in der ein Ausführungsbeispiel eine Bohrturmeinrichtung nach der Erfindung dargestellt ist. Es zeigen:

  • Fig. 1 in schematischer perspektivischer Darstellung eine Bohrturmeinrichtung nach der Erfindung,
  • Fig. 2 eine Draufsicht auf das Arbeitsdeck des Bohrturms mit darauf montierten Arbeitsaufbauten,
  • Fig. 3 ausschnittsweise eine Querschnittsdarstellung des Arbeitsdecks und der Abstellwagen ohne Darstellung des Gestängeroboters,
  • Fig. 4 Querschnittsdarstellung eines Abstellwagens entsprechend der Schnittlinie IV-IV in Fig. 2, der klappbar am Arbeitsdeck festgelegt ist,
  • Fig. 5 Draufsicht auf einen Abstellwagen mit Gelenkanschlußflanschen,
  • Fig. 6 Draufsicht auf einen Abstellwagen, auf dem die Abstellpositicnender Gestängezüge veranschaulicht sind und
  • Fig. 7 in schematischer Draufsicht die an Bohrturmträgern verfahrbar festgelegten Fingerbühnen der Bohrturmeinrichtung nach der Erfindung.
As drill pipe holders, two or three, in total four or six, finger platforms, each with associated storage trolleys, are preferably provided on opposite side areas. The loaded with the Bohrgestängezügen Abstellwagen are advantageously in the end opposite the working deck structures and corresponding here reinforced construction A rbeitsdeckbereich placed so that fingers stage and Abstellwagen be moved in a discharging direction of the work in the superstructure. After unloading the the storage trolleys can be easily removed from the work area of the work deck, for example by attaching them to the work deck in a foldable manner and folding them into an essentially upright out-of-service position, in order to also create travel space for a subsequent storage trolley. The drilling rig according to the invention also offers the possibility of using only storage trolleys of the appropriate number and size, which are required depending on the length of the drill string to be assembled or disassembled. The work deck can thus be kept free of a drill pipe storage surface that is not required for shorter drill strings. Further advantageous embodiments of the invention result from the following description and the drawing, in which an exemplary embodiment of a drilling rig device according to the invention is shown. Show it:
  • 1 is a schematic perspective view of a derrick according to the invention,
  • 2 is a plan view of the working deck of the derrick with work structures mounted thereon,
  • 3 shows a section of a cross-sectional view of the work deck and the storage trolleys without showing the boom robot,
  • 4 cross-sectional view of a storage trolley according to the section line IV-IV in Fig. 2, which is hinged to the work deck,
  • 5 top view of a storage trolley with articulated connection flanges,
  • Fig. 6 top view of a storage trolley, on which the Abstellpositicnender rod trains are illustrated and
  • Fig. 7 is a schematic plan view of the finger platforms of the drilling rig device according to the invention which are movably attached to the rig carriers.

Der in der Zeichnung allgemein mit 1 gekennzeichnete Bohrturm mit Bohrturmträgern 2 sowie einem Arbeitsdeck 3, auf dem entsprechend der Darstellung nach Fig. 2 ein Hebewerk 4 sowie ein Kranführerleitstand 5 montiert sind, ist mit einem an Schienen 6 vertikal beweglich geführten Flaschenzug 7 mit einem Zughaken. 8 sowie einem Elevator 9 versehen. Zum Herausbefördern des allgemein mit 10 bezifferten Bohrstranges aus dem Bohrloch 12 umgreift der Elevator 9 die obere Endverbindung 13 eines Bohrgestängezuges 11, so daß der Bohrstrang 10 durch die entsprechende Aufwärtshubbewegung des Flaschenzuges 9 soweit herausgezogen wird, daß sich die untere Endverbindung 13 des abzustellenden Gestängezuges 11 oberhalb des Arbeitsdecks 3 befindet.The derrick generally designated 1 in the drawing with derrick supports 2 and a work deck 3, on which, as shown in FIG. 2, a lifting mechanism 4 and a crane operator control station 5 are mounted, is provided with a pulley 7, which is vertically movably guided on rails 6, with a pull hook . 8 and an elevator 9 provided. In order to convey the drill string, generally numbered 10, out of the borehole 12, the elevator 9 engages around the upper end connection 13 of a drill string pull 11, so that the drill string 10 is pulled out by the corresponding upward stroke movement of the block and tackle 9 so that the lower end connection 13 of the drill string pull 11 to be turned off located above the work deck 3.

Auf dem Arbeitsdeck 3 sind in gegenüberliegenden Turmseitenbereichen jeweils zwei in Richtung der in Fig. 1 dargestellten Pfeile 14 verfahrbare Abstellwagen 15 abgestützt. Oberhalb des Arbeitsdecks sind in einem etwa der Länge der abzustellenden Bohrgestängezüge 11 entsprechenden Abstand Laufschienen 16 an den Bohrturmträgern 2 befestigt, an denen ebenfalls jeweils zwei hintereinander angeordnete Fingerbühnen 17 in Richtung der Pfeile 18 (Fig. 1) verfahrbar geführt sind. Den Fingerbühnen 17 ist jeweils ein Abstellwagen 15 zugeordnet. Die jeweiligen Fingerbühnen 17 sind mit ihren zugeordneten Abstellwagen synchron relativ zu dem ortsfest auf dem Arbeitsdeck 3 montierten Gestängeroboter (Pipehandler) 19 zu verfahren. Der Pipehandler 19 hat einen um eine Vertikalachse 20 (Fig. 2) schwenkbaren Turmaufbau 21 und umfaßt aus-und einfahrbare Greifarme 22 zum Greifen der zu transportierenden bzw. auf der Abstellfläche (Setbacks) eines Abstellwagnes 15 abzustellenden und in die Fingerreihen 23 der mit Fingern 24 versehenen Fingerbühne 17 einzuführendenGestängezüge 11.On the working deck 3, two storage trolleys 15, each movable in the direction of the arrows 14 shown in FIG. 1, are supported in opposite tower side areas. Above the working deck, rails 16 are fastened to the drilling rig supports 2 at a distance corresponding approximately to the length of the drill pipe trains 11 to be switched off, on which two finger platforms 17 arranged one behind the other are likewise guided in the direction of the arrows 18 (FIG. 1). A storage trolley 15 is assigned to the finger platforms 17. The respective finger platforms 17 are to be moved synchronously with their assigned storage trolleys relative to the linkage robot (pipehandler) 19 fixedly mounted on the work deck 3. The pipehandler 19 has a tower structure 21 which can be pivoted about a vertical axis 20 (FIG. 2) and comprises extendable and retractable gripping arms 22 for gripping the setbacks to be transported or placed on the set-up surface (setbacks) 15 and into the rows 23 of fingers with the fingers 24 provided finger train 17 to be inserted rod trains 11.

Ist der Bohrstrang 10 soweit aus dem Bohrloch herausgezogen, daß sich die untere Endverbindung 13 des abzustellenden Gestängezuges oberhalb des Arbeitsdecks 3 und die obere Endverbindung 13 des Gestängezuges 11 oberhalb der Fingerbühne 17 befinden, wird der Bohrstrang 10 zunächst durch Keile abgefangen. Der Pipehandler 19, dessen Schwenkachse 20 unmittelbar an das Bohrloch 12 bzw. den Drehkranz: 25 (Fig:. 3) des Bohrturms 1 angrenzt, greift mit seinen Greifarmen 22 den abzustellenden Bohrgestängezug 11 und entschraubt ihn von dem noch im Bohrloch befindlichen Bohrstrang 10. Nach öffnen des Elevators 9 wird der entschraubte Gestängezug vom Pipehandler 19 gehalten, der ihn vom Bohrstrang 10 abhebt und um 90° um seine Schwenkachse 20 (Pfeile 26 bzw. 27 in Fig. 2) verschwenkt. Nach dieser Schwenkbewegung befindet sich ein abzustellender Gestängezug 11 unmittelbar vor der Fingerreihe 23 der Fingerbühne 17, in der der Gestängezug nach Ausfahren der Greifarme 22 zu plazieren ist. Danach schwenkt der Turmaufbau 21 des Pipehandlers 19 um 90° zurück, um in gleicher Arbeitsfolge den nächsten Gestängezug zu transportieren. Die Abstände der Endflächen der Fingerbühne 17 sowie der Abstellwagen 15 und Bohrlochlängsachse 28 haben in etwa einen gleichen Abstand zur Schwenkachse 20 des Gestängeroboters 19, so daß mit der beschriebenen 90°-Schwenkbewegung des Turmaufbaus 21 der Bohrgestängezug 11 vom Bohrstrang 10 ohne sonstige Verfahrwege des Roboters 19 direkt vor,.der jeweiligen den Gestängezug aufnehmenden Fingerreihe zu plazieren ist. Nach Auffüllung einer Fingerreihe können die abgestellten Gestängezüge mittels einer nicht näher gezeigten.Verriegelungsvorrichtung festgelegt werden.If the drill string 10 is pulled out of the borehole so far that the lower end connection 13 of the rod train to be turned off is above the work deck 3 and the upper end connection 13 of the rod train 11 is above the finger platform 17, the drill string 10 is first intercepted by wedges. The pipehandler 19, the pivot axis 20 of which directly adjoins the borehole 12 or the slewing ring: 25 (FIG. 3) of the drilling tower 1, grips the drill rod train 11 to be stopped with its gripper arms 22 and unscrews it from the drill string 10 still located in the borehole. After opening the elevator 9, the unscrewed rod train is held by the pipehandler 19, which lifts it off the drill string 10 and pivots it by 90 ° about its pivot axis 20 (arrows 26 and 27 in FIG. 2). After this swiveling movement there is a rod train 11 to be switched off immediately in front of the finger row 23 of the finger platform 17, in which the rod train is to be placed after the gripping arms 22 have been extended. Then the tower structure 21 of the pipehandler 19 swings back by 90 ° in order to transport the next rod train in the same work sequence. The distances between the end faces of the finger stage 17 and the storage trolley 15 and the longitudinal axis 28 of the borehole are approximately the same distance from the pivot axis 20 of the drill robot 19, so that with the described 90 ° pivoting movement of the tower structure 21, the drill string train 11 from the drill string 10 without any other travel paths of the robot 19 directly in front of the respective row of fingers receiving the rod train. After filling up a row of fingers, the parked rods can be locked using a locking device, not shown.

Sobald eine Fingerreihe 23 mit Bohrgestängezügen 11 beladen bzw. bei Montage eines Bohrstranges 10 entladen ist, werden die jeweilige Fingerbühne 17 und der zugeordnete Abstellwagen 15 um ein der Fingerteilung der Fingerbühne 17 entsprechendes Maß synchron in Richtung der auf dem Arbeitsdeck 3 montierten Arbeitsaufbauten 4 und 5 (Fig. 2) bzw. in die entgegengesetzte Richtung verfahren. Dazu weisen die elektromotorischen Antriebe 29 und 43 von Abstellwagen 15 und Fingerbühne 17 im einzelnen nicht näher dargestellte Steuerungselemente auf, die nach Betätigung eines Taktauslösers automatisch Fingerbühne 17 und Abstellwagen 15 in die der Fingerteilung entsprechende: nächste Aufnahmestellung bringen. Diese Verfahrbewegung erfolgt unmittelbar nach Beladen bzw. Entladen einer Fingerreihe 23, so daß der Pipehandler 19 ohne Unterbrechung seines Arbeitsbetriebes schon den nächsten Gestängezug 11 in der benachbarten Fingerreihe 23 plazieren kann. Ist ein Abstellwagen 15 vollständig entladen (Fig. 6), wird der Abstellwagen 15 aus dem Arbeitsbereich des Arbeitsdecks 3 gebracht. Dazu sind auf dem Arbeitsdeck 3 des gezeigten Ausführungsbeispiels Scharnierteile 30 mit Gelenklaschen 31 befestigt, an denen mittels eines einfachen Steckbolzens an den Abstellwagen 15 ausgebildete Anschlußflansche 32 festzulegen sind, so daß ein entladener Abstellwagen in die in Fig. 2 gezeigte, aufrechte Außerbetriebstellung (Bezugsziffer 33) zu schwenken ist. In den dadurch frei gewordenen Raum auf dem Arbeitsdeck 3 kann nun ein nachfolgender Abstellwagen 5 verfahren werden.As soon as a row of fingers 23 is loaded with drill string trains 11 or is unloaded when assembling a drill string 10, the respective finger platform 17 and the associated storage trolley 15 are moved by one of the finger pitches of the finger platform 17 corresponding degree synchronous (F ig. 2) in the direction of the mounted on the working deck 3 working structures 4 and 5, and moved in the opposite direction. For this purpose, the electromotive drives 29 and 43 of storage trolley 15 and finger platform 17 have control elements (not shown in more detail) which, after actuation of a clock trigger, automatically bring the finger platform 17 and storage trolley 15 into the next pick-up position corresponding to the finger division. This traversing movement takes place immediately after loading or unloading of a row of fingers 23, so that the pipe handler 19 can already place the next rod train 11 in the adjacent row of fingers 23 without interrupting its working operation. If a storage trolley 15 is completely unloaded (FIG. 6), the storage trolley 15 is brought out of the working area of the work deck 3. For this purpose, hinge parts 30 are fastened on the working deck 3 of the exemplary embodiment shown, with articulated brackets 31, on which connecting flanges 32 formed on the storage trolley 15 are to be fixed by means of a simple plug-in bolt, so that an unloaded storage trolley is moved into the upright inoperative position shown in FIG. 2 (reference number 33 ) is to be pivoted. A subsequent storage trolley 5 can now be moved into the space thus freed up on the work deck 3.

Ist beispielsweise an einem Seitenrandbereich des Arbeitsdecks eine Gestängerutsche 34 vorgesehen, ist der Abstellwagen 15 in seiner aufrechten Außerbetriebstellung zweckmäßigerweise zu verschieben, so daß er nach Überführung in seine aufrechte Außerbetriebstellung in einen Arbeitsdeckbereich zu bringen ist, in dem er den freien Zugang zur Gestängerutsche 34 nicht behindert (Bezugsziffer 35 in Fig. 2). Zum Verschieben des aufrechten Abstellwagens 15 sind in das Arbeitsdeck 3 Schienen oder sonstige geeignete Transportführungskörper eingelassen. Ein Wegschaffen des Abstellwagens 15 ist auch mittels Rollpaletten oder mit Hilfe eines Krans möglich. Anstelle der am Arbeitsdeck 3 befestigten Scharnierteile 30 können beispielsweise auch die Arbeitsdeckaufbauten 4 und 5 unter Ausbildung eines nicht gezeigten Aufnahmeraums für einen oder mehrere Abstellwagen auf dem Arbeitsdeck 3 festgelegt sein, so daß ein Abstellwagen 5 nach Entladen der Bohrgestängezüge 11 schubladenartig unter das Hebewerk 4 bzw. den Kranführerleitstand 5 zu schieben ist. Je nach Länge des zu montierenden bzw. zu demontierenden Bohrstranges 10 ist bei der Bohrturmeinrichtung nach der Erfindung dadurch auch die Möglichkeit geschaffen, nicht benötigte leere Abstellwagen unter Vergrößerung des Arbeitsbereichs in ihrer Außerbetriebstellung zu belassen.If, for example, a rod chute 34 is provided on a side edge area of the work deck, the storage trolley 15 is expediently to be moved in its upright out-of-service position, so that after being transferred to its upright out-of-service position it is to be brought into a work deck area in which it does not have free access to the drill chute 34 disabled (reference numeral 35 in Fig. 2). To move the upright storage trolley 15 3 rails or other suitable transport guide body are embedded in the work deck. Removing the storage trolley 15 is also by means of roller pallets or with Possible with the help of a crane. Instead of the hinge parts 30 fastened to the work deck 3, for example the work deck superstructures 4 and 5 can also be fixed on the work deck 3 to form a receiving space (not shown) for one or more storage trolleys, so that a storage trolley 5 after unloading the drill string cables 11 drawer-like under the elevator 4 or the crane operator control station 5 is to be pushed. Depending on the length of the drill string 10 to be assembled or disassembled, the drilling rig device according to the invention also creates the possibility of leaving empty storage trolleys which are not required, thereby enlarging the working area, in their inoperative position.

In Fig. 3 ist ausschnittsweise das Arbeitsdeck 3 mit darauf beweglich geführten Abstellwagen 15 im Querschnitt veranschaulicht, wobei der besseren Übersichtlichkeit wegen auf die Darstellung des Gestängeroboters 19 verzichtet wurde. Gezeigt ist jedoch die vertikale Schwenkachse 20 des Gestängeroboters 19, die unmittelbar an das Bohrloch 12 bzw. den Drehtisch 25 angrenzend positioniert ist. Die Unterbauträger 35 des Arbeitsdecks 3 sind in dem den Arbeitsdeckaufbauten 4 und 5 abgewandten Abstellbereich der Gestängezüge 11 bzw. der Setbackpakete entsprechend stark dimensioniert. Die Unterbauträger 35 und der Drehtisch 25 stützen sich auf Doppel-T-Trägern 36 ab. Die Abstellwagen 15 sind an ihrer Oberseite mit Gestängehaltern 45 und an ihrer Unterseite mit konventionellen Rollenpaketen 37 versehen, die auf in Arbeits- deckausnehmungen 38 angeordneten Laufschienen 39 geführt sind (Fig. 4). Oberseitig sind an beiden Laufschienen 39 Zahnstangen 40 vorgesehen, die zum Verfahren der Abstellwagen 15 mit von einem Elektroantrieb 29 über ein Getriebe 41 angetriebenen Antriebsritzeln 42 zusammenwirken. Durch die jeweils an.beiden Seiten eines Abstell- wagens 15 vorgesehenen Antriebsritzel 42 ist ein Verkanten der Wagen 15In Fig. 3, a section of the work deck 3 is shown in cross-section with storage trolleys 15 movably guided thereon, the illustration of the linkage robot 19 being omitted for the sake of clarity. However, the vertical pivot axis 20 of the drill robot 19 is shown, which is positioned directly adjacent to the borehole 12 or the turntable 25. The substructure supports 35 of the work deck 3 are correspondingly strongly dimensioned in the storage area of the rod trains 11 or the setback packages facing away from the work deck superstructures 4 and 5. The substructure 35 and the turntable 25 are supported on double-T supports 36. The Abstellwagen 15 are provided on their top with rod holders 45 and on its underside with conventional roller packages 37 g deckausnehmun in working en 38 arranged rails are performed 39 (Fig. 4). 39 racks 40 are provided on the top of both running rails, which work together to drive the parking trolleys 15 with drive pinions 42 driven by an electric drive 29 via a gear 41. By the respective sides of a an.beiden bstell- A carriage 15 provided for the drive pinion 42 is a tilting of the carriage 15

während der Verfahrbewegung unter Last verhindert. Der Elektromotor 29 und d.as Getriebe 41 sind in dem veranschaulichten Ausführungsbeispiel unterhalb der Abstellfläche: des Abstellwagens15 vorgesehen. Daneben können die Antriebe aber auch am Arbeitsdeck vorgesehen sein und sich die Zahnstangen 40 vor Verschmutzungen geschützt unterhalb der Abstellflächen der Abstellwagen 15 befinden. Nicht näher dargestellt. haben die elektromotorischen Antriebe 29 jeweils eine Stromzuleitung mit lösbaren Steckem, die zum Wegschaffen entladener Abstellwagen 15 abgezogen werden.prevented during travel under load. The electric motor 29 and the gear 41 are provided in the illustrated exemplary embodiment below the storage surface: of the storage trolley 15. In addition, the drives can also be provided on the work deck and the toothed racks 40 are located beneath the storage surfaces of the storage trolleys 15 and are protected against contamination. Not shown in detail. the electric motor drives 29 each have a power supply line with detachable plugs which are withdrawn to remove unloaded storage trolleys 15.

In Fig. 7 sind die an gegenüberliegenden Seitenbereichen des Bohrturms 1 vorgesehenen Fingerbühnen 17 näher veranschaulicht. Die beiden in der Zeichnung linken Fingerbühnen 17 sind in einer Arbeitsstellung gezeigt, in der bei Demontage des Bohrstranges 10 die letzte Fingerreihe 23 mit Bohrgestängezügen 11 beladen wird. Die beiden Fingerbühnen 17 und Abstellwagen 15 sind bereits in ihre.hintere Endstellung im verstärkt ausgebildeten Arbeitsdeckbereich verfahren. Die in Fig. 7 rechts dargestellten Fingerbühnen 17 sind in einer Arbeitsstellung gezeigt, in der bei Montage eines Bohrstranges 10 und somit Entladen der Fingerbühnen 17 die letzten Bohrgestängezüge 11 der Fingerreihe 23 entnommen werden. Jede Fingerbühne 17 ist mit einem Antrieb 43 sowie einem Getriebe 44 ausgerüstet und in analoger Weise wie die Abstellwagen 15 über nicht näher dargestellte Antriebsritzel und Zahnstangen angetrieben. Zur Synchronbewegung der jeweiligen Fingerbühnen 17 und der zugeordneten Abstellwagen 1.5 sind die Antriebe 43 und 29 steuerungstechnisch gekoppelt. In dem dargestellten Ausführungsbeispiel sind die Fingerbühnen rechteckförmig gestaltet und an geradlinigen Laufschienen 16 geführt. Soweit erforderlich oder vorteilhaft können die Fingerbühnen 17 auch auf einer. konzentrischen Kreisbahn zur Bohrlochlängsachse 28 beweglich geführt und z.B. als Fingerbühnendrehkarussell ausgebildet sein.7 shows the finger platforms 17 provided on opposite side regions of the drilling tower 1. The two finger platforms 17 on the left in the drawing are shown in a working position in which the last row of fingers 23 is loaded with drill string trains 11 when the drill string 10 is dismantled. The two finger platforms 17 and storage trolley 15 have already moved into their rear end position in the reinforced working deck area. The finger platforms 17 shown on the right in FIG. 7 are shown in a working position in which the last drill string trains 11 of the row of fingers 23 are removed when a drill string 10 is installed and the finger platforms 17 are thus unloaded. Each F ingerbühne 17 is equipped with a drive 43 and a gear 44 and driven in a manner analogous to the storage car 15 via drive pinions and racks, not shown. For synchronous movement of the respective finger platforms 17 and the associated storage trolleys 1.5, the drives 43 and 29 are coupled in terms of control technology. In the exemplary embodiment shown, the finger platforms are of rectangular design and are guided on straight running rails 16. If necessary or advantageous, the finger platforms 17 can also be on a. concentric circular path to Bohr longitudinal axis 28 movably guided and designed, for example, as a finger stage rotating carousel.

Claims (12)

1. Bohrturmeinrichtung mit zumindest einer oberhalb eines Arbeitsdecks (3) abstützbaren Fingerbühne (17) oder dgl. nebeneinander angeordnete Aufnahmeräume (23) zur Bevorratung von Bohrgestängezügen (11) eines Bohrstrangs (10) aufweisenden Gestängehaltern, zumindest einer der Fingerbühne (17) zugeordneten Bohrgestängeabstellfläche und einem schwenkbeweglichen, Greifarme (22) umfassenden Gestängeroboter (19) zur Beschickung der Fingerbühne (17) und der zugeordneten Bohrgestänceabstellfläche mit vom Bohrstrang (10) gelösten Bohrgestängezügen (11) bzw. zur Überführung der Bohrgestängezüge (11) von der Fingerbühne (17) an den Bohrstrang (10), dadurch gekennzeichnet, daß die Fingerbühne (17) und ein die Bohrgestängeabstellfläche bildender, auf dem Arbeitsdeck (3) abstützbarer Abstellwagen (15) beweglich ausgebildet und synchron relativ zu dem ortsfest auf dem Arbeitsdeck (3) festlegbaren Gestängeroboter (19) verfahrbar sind. 1st Drilling rig device with at least one finger platform (17) which can be supported above a work deck (3) or the like.Reservation rooms (23) arranged next to one another for storing drill string trains (11) of a drill string (10) having drill string (10), at least one drill rod storage area assigned to the finger platform (17) and one pivotable, gripping arms (22) comprising rod robot (19) for loading the finger platform (17) and the associated drill rod storage area with drill rod cables (11) detached from the drill string (10) or for transferring the drill rod cables (11) from the finger platform (17) to the Drill string (10), characterized in that the finger platform (17) and a storage trolley (15), which forms the drill pipe storage surface and can be supported on the work deck (3), are designed to be movable and synchronous relative to the rod robot (19) which can be fixed in place on the work deck (3). are movable. 2. Bohrturmeinrichtungnach Anspruch 1, dadurch gekennzeichnet, daß die Fingerbühne (17) und der zugeordnete Abstellwagen (15) mittels eines eine Steuerung aufweisenden Antriebs (29,43) nach Entleeren und Befüllen jeweils einer Fingerreihe (23) um ein der Fingerteilung entsprechendes Maß relativ zum Gestängeroboter (19) verfahrbar sind. 2nd Drilling rig device according to claim 1, characterized in that the finger platform (17) and the associated storage trolley (15) by means of a drive (29, 43) having a control after emptying and filling each of a row of fingers (23) by an amount corresponding to the finger pitch are movable relative to the linkage robot (19). 3. Bohrturmeinrichtung nach Anspruch 1 oder 2 mit auf dem Arbeitsdeck (3) befestigten Arbeitsaufbauten, beispielsweise einem Hebewerk (4) oder einem Kranführerleitstand (5), dadurch gekennzeichnet, daß die Fingerbühne (17) und der zugeordnete Abstellwagen (15) mit Entladen der Fingerreihen (23) mittels ihres Antriebs (29,43) in Richtung der Arbeitsaufbauten (4,5) verfahrbar sind. 3rd A derrick according to claim 1 or 2 having mounted on the working deck (3) working assemblies, for instance a lift (4) or a crane driver control console (5), characterized in that the finger platform (17) and the associated Abstellwa g s (15), with unloading of the Rows of fingers (23) can be moved in the direction of the work superstructures (4,5) by means of their drive (29, 43). 4. Bohrturmeinrichtung, nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß der Abstellwagen (15) klappbar an dem Arbeitsdeck (3) festlegbar und in eine im wesentlichen aufrechte Außerbetriebsstellung überführbar ist. 4. drilling rig device, according to one of claims 1 to 3, characterized in that the storage trolley (15) foldable on the work deck (3) can be fixed and can be transferred into a substantially upright out-of-service position. 5. Bohrturmsinrichtung nach Anspruch 4, dadurch gekennzeichnet, daß der Abstellwagen (15) in seiner aufrechten Außerbetriebstellung verschieblich am Arbeitsdeck (3) geführt ist.5. drilling rig device according to claim 4, characterized in that the storage trolley (15) in its upright position out of operation is slidably guided on the work deck (3). 6. Bohrturmeinrichtung nach Anspruch 3, dadurch gekennzeichnet, daß zwischen dem Arbeitsdeck (3) und den darauf befestigten Arbeitsaufbauten (4,5) ein Aufnahmeraum für den Abstellwagen (15) in seiner Außerbetriebsstellung ausgebildet ist.6. drilling rig device according to claim 3, characterized in that a receiving space for the storage trolley (15) is formed in its inoperative position between the work deck (3) and the work structures (4,5) fastened thereon. 7. Bohrturmeinrichtung nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, daß an gegenüberliegenden Bchrturmbereichen jeweils zumindest zwei aneinandergereihte Fingerbühnen (17) mit zugeordneten Abstellwagen (15) vorgesehen sind.7. drilling rig device according to one of claims 1 to 6, characterized in that at least two lined-up finger platforms (17) with associated storage trolleys (15) are provided on opposite burr tower areas. 8. Bohrturmeinrichtung nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß die dem Bohrturminnenbereich zugewandten Stirnflächen der Fingerbühne (17) sowie des Abstellwagens (15) und die Bohrlochlängsachse (28) in etwa gleichen Abstand zur Schwenkachse (20) des Gestängeroboters (19) haben.8. drilling rig device according to one of claims 1 to 7, characterized in that the end faces of the drilling tower inner region of the finger platform (17) and the Abstellwagens (15) and the borehole longitudinal axis (28) at approximately the same distance from the pivot axis (20) of the rod robot (19). 9. Bohrturmeinrichtung nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß an Bohrturmträgern sowie am Arbeitsdeck (3) Laufschienen (16,39) zur beweglichen Abstützung der Fingerbühne (17) bzw. des Abstellwagens (15) festgelegt sind.9. drilling rig device according to one of claims 1 to 8, characterized in that on drilling rig supports and on the work deck (3) rails (16,39) for movable support of the finger platform (17) or the storage trolley (15) are fixed. 10 Bohrturmeinrichtung nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, daß der Abstellwagen (15) und die Fingerbühne (17) auf einer zurSchwenkachse (20) des Gestängeroboters (19) konzentrischen Kreisbahn angeordnet sind.10 drilling rig device according to one of claims 1 to 9, characterized in that the storage trolley (15) and the finger platform (17) are arranged on a circular path concentric to the pivot axis (20) of the linkage robot (19). 11 . Bohrturmeinrichtung nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, daß der einen Elektromotor (29) mit einer lösbare Stecker aufweisenden Stromzuleitung sowie Antriebsritzel (42) umfassende Abstellwagenantrieb unterhalb der Abstellfläche des Abstellwagens (15) geschützt vorgesehen-ist.11. Is provided protected derrick arrangement according to one of claims 1 to 10, characterized in that an electric motor (29) bstellwagenantrieb with a releasable connector having electrical supply and drive pinion (42) comprising A below the support surface of the Abstellwagens (15). 12. Bohrturineinrichtung nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, daß der einen Elektromotor (29) sowie Antriebsritzel (42) umfassende Abstellwagenantrieb in einen im Arbeitsdeck (3) ausgebildeten Antriebsraum geschützt angeordnet ist.12. drilling turbine device according to one of claims 1 to 10, characterized in that the one electric motor (29) and drive pinion (42) comprehensive storage trolley drive is arranged in a protected manner in the working deck (3) drive space.
EP87111744A 1986-09-03 1987-08-13 Device for handling and setting drill pipes in a derrick Expired - Lifetime EP0258705B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19863629946 DE3629946A1 (en) 1986-09-03 1986-09-03 DERRICK
DE3629946 1986-09-03

Publications (3)

Publication Number Publication Date
EP0258705A2 true EP0258705A2 (en) 1988-03-09
EP0258705A3 EP0258705A3 (en) 1989-03-01
EP0258705B1 EP0258705B1 (en) 1992-04-22

Family

ID=6308808

Family Applications (1)

Application Number Title Priority Date Filing Date
EP87111744A Expired - Lifetime EP0258705B1 (en) 1986-09-03 1987-08-13 Device for handling and setting drill pipes in a derrick

Country Status (7)

Country Link
US (1) US4862973A (en)
EP (1) EP0258705B1 (en)
JP (1) JPS63134783A (en)
KR (1) KR880004196A (en)
CA (1) CA1285930C (en)
DE (2) DE3629946A1 (en)
NO (1) NO873673L (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008012580A1 (en) * 2006-07-25 2008-01-31 Ohs Group Limited Racking module
US7802636B2 (en) 2007-02-23 2010-09-28 Atwood Oceanics, Inc. Simultaneous tubular handling system and method
US8215888B2 (en) 2009-10-16 2012-07-10 Friede Goldman United, Ltd. Cartridge tubular handling system
WO2015043740A1 (en) * 2013-09-24 2015-04-02 Herrenknecht Vertical Gmbh Handling device for drill pipes of a deep hole drilling device

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2771572B2 (en) * 1989-02-03 1998-07-02 三菱瓦斯化学株式会社 Coating composition
US5503234A (en) * 1994-09-30 1996-04-02 Clanton; Duane 2×4 drilling and hoisting system
US6085852A (en) 1995-02-22 2000-07-11 The Charles Machine Works, Inc. Pipe handling device
US6085851A (en) * 1996-05-03 2000-07-11 Transocean Offshore Inc. Multi-activity offshore exploration and/or development drill method and apparatus
IT1292791B1 (en) * 1997-06-20 1999-02-11 Soilmec Spa MANEUVERING EQUIPMENT FOR AUCTIONS USED IN DRILLING SYSTEMS
AU2007254646B2 (en) * 2001-01-16 2009-12-03 Given Imaging Ltd System And Method For Wide Field Imaging Of Body Lumens
US20060016621A1 (en) * 2004-06-09 2006-01-26 Placer Dome Technical Services Limited Method and system for deep sea drilling
CA2888584C (en) * 2006-06-14 2017-05-16 Motion Metrics International Corp. Systems and methods for autonomous tripping of oil well pipes
US7510028B2 (en) * 2006-08-24 2009-03-31 Walter Thomas Welsh Drill pipe racking apparatus
US20100150661A1 (en) * 2008-12-12 2010-06-17 Woolslayer Companies, Inc. Open face derrick
US8317448B2 (en) * 2009-06-01 2012-11-27 National Oilwell Varco, L.P. Pipe stand transfer systems and methods
US8961093B2 (en) 2010-07-23 2015-02-24 National Oilwell Varco, L.P. Drilling rig pipe transfer systems and methods
NL2005912C2 (en) * 2010-12-23 2012-06-27 Itrec Bv Drilling installation and offshore drilling vessel with drilling installation.

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1483865B1 (en) * 1966-08-10 1970-01-22 Salzgitter Maschinen Ag DEVICE FOR INSERTING AND REMOVING BORING BARS OF A DRILLING MACHINE IN OR. FROM A MAGAZINE FIXED ON THE LATTER
EP0093067A2 (en) * 1982-04-23 1983-11-02 Hughes Tool Company Beam type racking system
US4445579A (en) * 1981-08-10 1984-05-01 Paul Bello Pipe carousel for well-drilling rig
GB2160564A (en) * 1984-06-18 1985-12-24 Kjell Haughom Drill pipe handling equipment

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2628725A (en) * 1951-11-03 1953-02-17 Standard Oil Dev Co Apparatus for racking pipe in derricks
US2773605A (en) * 1953-11-12 1956-12-11 Paul A Medearis Pipe racking apparatus
DE968463C (en) * 1954-06-13 1958-02-20 Deilmann Bergbau G M B H C System for drilling freeze holes
US3061011A (en) * 1955-05-05 1962-10-30 Joy Mfg Co Transfer mechanism for the drill pipe of an oil field drill rig
US3701435A (en) * 1970-10-26 1972-10-31 Moore Corp Lee C Horizontally moving pipe rack
US3840128A (en) * 1973-07-09 1974-10-08 N Swoboda Racking arm for pipe sections, drill collars, riser pipe, and the like used in well drilling operations
US4274778A (en) * 1979-06-05 1981-06-23 Putnam Paul S Mechanized stand handling apparatus for drilling rigs
SU901462A1 (en) * 1980-04-29 1982-01-30 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт Нефтяного Машиностроения "Вниинефтемаш" Mechanized rack for horizontally placing casings
GB2083106B (en) * 1981-08-28 1984-09-12 Boland Thomas Apparatus for storing and transferring drill stems to a drilling head
EP0121545A1 (en) * 1982-10-13 1984-10-17 Moss Rosenberg Verft A/S Assembly for handling and racking drill pipe in a derrick
NO156700C (en) * 1985-05-28 1987-11-04 Kjell Haughom DEVICE FOR A RUDGER MANAGER.

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1483865B1 (en) * 1966-08-10 1970-01-22 Salzgitter Maschinen Ag DEVICE FOR INSERTING AND REMOVING BORING BARS OF A DRILLING MACHINE IN OR. FROM A MAGAZINE FIXED ON THE LATTER
US4445579A (en) * 1981-08-10 1984-05-01 Paul Bello Pipe carousel for well-drilling rig
EP0093067A2 (en) * 1982-04-23 1983-11-02 Hughes Tool Company Beam type racking system
GB2160564A (en) * 1984-06-18 1985-12-24 Kjell Haughom Drill pipe handling equipment

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008012580A1 (en) * 2006-07-25 2008-01-31 Ohs Group Limited Racking module
US7802636B2 (en) 2007-02-23 2010-09-28 Atwood Oceanics, Inc. Simultaneous tubular handling system and method
US8186455B2 (en) 2007-02-23 2012-05-29 Atwood Oceanics, Inc. Simultaneous tubular handling system and method
US8584773B2 (en) 2007-02-23 2013-11-19 Atwood Oceanics, Inc. Simultaneous tubular handling system and method
US9410385B2 (en) 2007-02-23 2016-08-09 Friede Goldman United, Ltd. Simultaneous tubular handling system
US8215888B2 (en) 2009-10-16 2012-07-10 Friede Goldman United, Ltd. Cartridge tubular handling system
US8696289B2 (en) 2009-10-16 2014-04-15 Friede Goldman United, Ltd. Cartridge tubular handling system
US9476265B2 (en) 2009-10-16 2016-10-25 Friede Goldman United, Ltd. Trolley apparatus
WO2015043740A1 (en) * 2013-09-24 2015-04-02 Herrenknecht Vertical Gmbh Handling device for drill pipes of a deep hole drilling device

Also Published As

Publication number Publication date
EP0258705A3 (en) 1989-03-01
CA1285930C (en) 1991-07-09
NO873673L (en) 1988-03-04
NO873673D0 (en) 1987-09-01
US4862973A (en) 1989-09-05
JPS63134783A (en) 1988-06-07
DE3778456D1 (en) 1992-05-27
DE3629946A1 (en) 1988-03-10
KR880004196A (en) 1988-06-02
DE3629946C2 (en) 1988-07-28
JPH0581715B2 (en) 1993-11-15
EP0258705B1 (en) 1992-04-22

Similar Documents

Publication Publication Date Title
EP0258705B1 (en) Device for handling and setting drill pipes in a derrick
DE69229748T2 (en) System for storing and handling drill pipes for drilling rigs
DE2124784B2 (en) DEVICE FOR THE HORIZONTAL DEPOSITION OF PIPES
DE2714088A1 (en) DEVICE FOR HANDLING AND STORING RISING PIPES AND DRILL PIPES
DE10313769B4 (en) More Katz container crane
EP0276646B1 (en) Installation for taking-up or laying as well as transporting lengths of assembled track
DE2119164C2 (en) Mobile machine for laying and / or picking up cross sleepers of a track
EP0155375B1 (en) Monitoring manipulator for pressure vessels to be opened at the top
DE19958501A1 (en) Lifting device to increase the performance of a handling device for ISO containers
DE2741647A1 (en) PALLET EXCHANGE PENDULUM DEVICE
DE4414186C2 (en) Elevator for parking platforms of motor vehicle parking systems
DE2823048A1 (en) Freight container handling mechanism - has cantilever travel beams adjustable for height in portal crane
DE3108053C2 (en) Device for magazine-like storage and handling of rods and pipes for drilling equipment
DE2817635C2 (en)
DE1919037B2 (en) Guide device for hatch covers or lighter on board a lighter transport ship with a gantry crane
DE2623502C3 (en) System for handling and providing clamping plates and / or casting molds
DE3419240A1 (en) Track-construction machine for laying and dismantling mounted track sections or track connections
EP1277916A1 (en) Apparatus and method for constructing a reinforced concrete shuttering in a tunnel
DE3419205A1 (en) Track construction machine for laying and dismantling mounted track sections or track connections
AT389337B (en) Track-travelling system and method for picking up, transporting and putting down or exchanging goods, in particular sleepers
DE3733622A1 (en) Restacking and conveying device for workpiece pallets
DE1764803A1 (en) Device for inserting and removing replacement elements in a nuclear power plant
DE1756918A1 (en) On-board crane system for container ships
DE3419237A1 (en) Track-construction machine for laying and dismantling mounted track sections or track connections
DE1508161C (en) Blowing lance device for metallurgical vessels

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): DE FR GB NL

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): DE FR GB NL

RAP3 Party data changed (applicant data changed or rights of an application transferred)

Owner name: WINTERSHALL AKTIENGESELLSCHAFT

Owner name: SIEMENS AKTIENGESELLSCHAFT

Owner name: PREUSSAG AG ERDOEL UND ERDGAS

Owner name: DEUTAG DEUTSCHE TIEFBOHR-AG

17P Request for examination filed

Effective date: 19890313

17Q First examination report despatched

Effective date: 19910611

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR GB NL

REF Corresponds to:

Ref document number: 3778456

Country of ref document: DE

Date of ref document: 19920527

ET Fr: translation filed
GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19920831

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19920915

Year of fee payment: 6

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19930729

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19930803

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19940301

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19940503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19940813

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19940813

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19950428

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST